| "Section 5. The Public Utilities Act is amended by changing |
5 |
| Section 16-125 as follows:
|
6 |
| (220 ILCS 5/16-125)
|
7 |
| Sec. 16-125. Transmission and
and distribution reliability
|
8 |
| requirements. |
9 |
| (a) To assure the reliable delivery of electricity to all
|
10 |
| customers in this State and the effective implementation of
the |
11 |
| provisions of this Article, the Commission shall, within
180 |
12 |
| days of the effective date of this Article, adopt rules
and |
13 |
| regulations for assessing and assuring the reliability of
the |
14 |
| transmission and distribution systems and facilities that
are |
15 |
| under the Commission's jurisdiction.
|
16 |
| (b) These rules and regulations shall require each electric |
17 |
| utility or
alternative retail electric supplier owning, |
18 |
| controlling, or operating
transmission and distribution |
19 |
| facilities and equipment subject to the
Commission's |
20 |
| jurisdiction, referred to in this Section as "jurisdictional
|
21 |
| entities", to adopt and implement procedures for restoring |
22 |
| transmission and
distribution services to customers after |
23 |
| transmission or distribution outages
on a nondiscriminatory |
24 |
| basis without regard to whether a customer has chosen
the |
|
|
|
09400SB1998sam001 |
- 2 - |
LRB094 11736 MKM 43712 a |
|
|
1 |
| electric utility, an affiliate of the electric utility, or |
2 |
| another entity
as its provider of electric power and energy. |
3 |
| These rules and regulations
shall also, at a minimum, |
4 |
| specifically require each jurisdictional entity to
submit |
5 |
| annually to the Commission.
|
6 |
| (1) the number and duration of planned and
unplanned |
7 |
| outages during the prior year and their impacts
on |
8 |
| customers;
|
9 |
| (2) outages that were controllable and outages that
|
10 |
| were exacerbated in scope or duration by the condition of
|
11 |
| facilities, equipment or premises or by the actions or
|
12 |
| inactions of operating personnel or agents;
|
13 |
| (3) customer service interruptions that were due
|
14 |
| solely to the actions or inactions of an alternative
retail |
15 |
| electric supplier or a public utility in supplying
power or |
16 |
| energy;
|
17 |
| (4) a detailed report of the age, current
condition, |
18 |
| reliability and performance of the
jurisdictional entity's |
19 |
| existing transmission and
distribution facilities, which |
20 |
| shall include, without
limitation, the following data:
|
21 |
| (i) a summary of the jurisdictional entity's
|
22 |
| outages and voltage variances reportable under the
|
23 |
| Commission's rules;
|
24 |
| (ii) the jurisdictional entity's expenditures
for |
25 |
| transmission construction and maintenance, the
ratio |
26 |
| of those expenditures to the jurisdictional
entity's |
27 |
| transmission investment, and the average
remaining |
28 |
| depreciation lives of the entity's
transmission |
29 |
| facilities, expressed as a percentage
of total |
30 |
| depreciation lives;
|
31 |
| (iii) the jurisdictional entity's expenditures
for |
32 |
| distribution construction and maintenance, the
ratio |
33 |
| of those expenditures to the jurisdictional
entity's |
34 |
| distribution investment, and the average
remaining |
|
|
|
09400SB1998sam001 |
- 3 - |
LRB094 11736 MKM 43712 a |
|
|
1 |
| depreciation lives of the entity's
distribution |
2 |
| facilities, expressed as a percentage
of total |
3 |
| depreciation lives;
|
4 |
| (iv) a customer satisfaction survey covering,
|
5 |
| among other areas identified in Commission rules,
|
6 |
| reliability, customer service, and understandability
|
7 |
| of the jurisdictional entity's services and prices;
|
8 |
| and
|
9 |
| (v) the corresponding information, in the same
|
10 |
| format, for the previous 3 years, if available;
|
11 |
| (5) a plan for future investment and reliability
|
12 |
| improvements for the jurisdictional entity's transmission
|
13 |
| and distribution facilities that will ensure continued
|
14 |
| reliable delivery of energy to customers and provide the
|
15 |
| delivery reliability needed for fair and open competition; |
16 |
| and
|
17 |
| (6) a report of the jurisdictional entity's
|
18 |
| implementation of its plan filed pursuant to subparagraph |
19 |
| (5)
for the previous reporting period.
|
20 |
| (c) The Commission rules shall set forth the criteria
that |
21 |
| will be used to assess each jurisdictional entity's annual |
22 |
| report and
evaluate its reliability performance. Such criteria
|
23 |
| must take into account, at a minimum: the items required to be
|
24 |
| reported in subsection (b); the relevant characteristics of
the |
25 |
| area served; the age and condition of the system's
equipment |
26 |
| and facilities; good engineering practices; the
costs of |
27 |
| potential actions; and the benefits of avoiding the
risks of |
28 |
| service disruption.
|
29 |
| (d) At least every 3 years, beginning in the year
the |
30 |
| Commission issues the rules required by subsection
(a) or the |
31 |
| following year if the rules are issued after June
1, the |
32 |
| Commission shall assess the annual report of each
|
33 |
| jurisdictional entity and evaluate its reliability |
34 |
| performance. The
Commission's evaluation shall
include |
|
|
|
09400SB1998sam001 |
- 4 - |
LRB094 11736 MKM 43712 a |
|
|
1 |
| specific identification of, and recommendations
concerning, |
2 |
| any potential reliability problems that it has
identified as a |
3 |
| result of its evaluation.
|
4 |
| (e) In the event that more than 30,000 customers of an |
5 |
| electric
utility are subjected to a continuous power |
6 |
| interruption of
4 hours or more that results in the |
7 |
| transmission of power
at less than 50% of the standard voltage, |
8 |
| or that results in
the total loss of power transmission, the |
9 |
| utility shall be
responsible for compensating customers |
10 |
| affected by that interruption for 4
hours or more for all
|
11 |
| actual damages, which shall not include consequential
damages, |
12 |
| suffered as a result of the power interruption.
The utility |
13 |
| shall also reimburse the affected municipality,
county, or |
14 |
| other unit of local government in which the power
interruption |
15 |
| has taken place for all
emergency and contingency expenses |
16 |
| incurred by the unit of
local government as a result of the |
17 |
| interruption. A waiver
of the requirements of this subsection |
18 |
| may be granted by the
Commission in instances in which the |
19 |
| utility can show that
the power interruption was a result of |
20 |
| any
one or more of the following causes:
|
21 |
| (1) Unpreventable damage due to weather events or
|
22 |
| conditions.
|
23 |
| (2) Customer tampering.
|
24 |
| (3) Unpreventable damage due to civil or
international |
25 |
| unrest or animals.
|
26 |
| (4) Damage to utility equipment or other actions by a |
27 |
| party other
than the utility, its employees, agents, or
|
28 |
| contractors.
|
29 |
| Loss of revenue and expenses incurred in complying with this
|
30 |
| subsection may not be recovered from ratepayers.
|
31 |
| (f) In the event of a power surge or other fluctuation
that |
32 |
| causes damage and affects more than 30,000 customers, the |
33 |
| electric utility
shall pay to
affected customers the |
34 |
| replacement value of all goods
damaged as a result of the power |
|
|
|
09400SB1998sam001 |
- 5 - |
LRB094 11736 MKM 43712 a |
|
|
1 |
| surge or other fluctuation
unless the utility can show that the |
2 |
| power surge or other
fluctuation was due to one or more of the |
3 |
| following causes:
|
4 |
| (1) Unpreventable damage due to weather events or
|
5 |
| conditions.
|
6 |
| (2) Customer tampering.
|
7 |
| (3) Unpreventable damage due to civil or
international |
8 |
| unrest or animals.
|
9 |
| (4) Damage to utility equipment or other actions by a |
10 |
| party other
than the utility, its employees, agents, or
|
11 |
| contractors.
|
12 |
| Loss of revenue and expenses incurred in complying with this
|
13 |
| subsection may not be recovered from ratepayers. Customers with |
14 |
| respect to
whom a waiver has been granted by the Commission |
15 |
| pursuant to subparagraphs
(1)-(4) of subsections (e) and (f) |
16 |
| shall not count toward the 30,000 customers
required therein.
|
17 |
| (g) Whenever an electric utility must perform
planned or |
18 |
| routine maintenance or repairs on its equipment
that will |
19 |
| result in transmission of power at less than 50%
of the |
20 |
| standard voltage, loss of power, or power fluctuation
(as |
21 |
| defined in subsection (f)), the utility shall make
reasonable |
22 |
| efforts to notify potentially affected customers
no less than |
23 |
| 24 hours in advance of performance of the
repairs or |
24 |
| maintenance.
|
25 |
| (h) Remedies provided for under this Section may be
sought |
26 |
| exclusively through the Illinois Commerce Commission
as |
27 |
| provided under Section 10-109 of this Act. Damages
awarded |
28 |
| under this Section for a power interruption shall be
limited to |
29 |
| actual damages, which shall not include
consequential damages, |
30 |
| and litigation costs. Damage awards
may not be paid out of |
31 |
| utility rate funds.
|
32 |
| (i) The provisions of this Section shall not in any way
|
33 |
| diminish or replace other civil or administrative remedies
|
34 |
| available to a customer or a class of customers.
|
|
|
|
09400SB1998sam001 |
- 6 - |
LRB094 11736 MKM 43712 a |
|
|
1 |
| (j) The Commission shall by rule require an electric
|
2 |
| utility to maintain service records detailing
information on |
3 |
| each instance of transmission of power at
less than 50% of the |
4 |
| standard voltage, loss of power, or
power fluctuation (as |
5 |
| defined in subsection (f)), that
affects 10 or more customers. |
6 |
| Occurrences that are
momentary shall not be required to be |
7 |
| recorded or reported.
The service record shall include, for |
8 |
| each occurrence, the
following information:
|
9 |
| (1) The date.
|
10 |
| (2) The time of occurrence.
|
11 |
| (3) The duration of the incident.
|
12 |
| (4) The number of customers affected.
|
13 |
| (5) A description of the cause.
|
14 |
| (6) The geographic area affected.
|
15 |
| (7) The specific equipment involved in the
fluctuation |
16 |
| or interruption.
|
17 |
| (8) A description of measures taken to restore
service.
|
18 |
| (9) A description of measures taken to remedy the
cause |
19 |
| of the power interruption or fluctuation.
|
20 |
| (10) A description of measures taken to prevent
future |
21 |
| occurrence.
|
22 |
| (11) The amount of remuneration, if any, paid to
|
23 |
| affected customers.
|
24 |
| (12) A statement of whether the fixed charge was
waived |
25 |
| for affected customers.
|
26 |
| Copies of the records containing this information shall
be |
27 |
| available for public inspection at the utility's offices,
and |
28 |
| copies thereof may be obtained upon payment of a fee not
|
29 |
| exceeding the reasonable cost of reproduction. A copy of
each |
30 |
| record shall be filed with the Commission and shall be
|
31 |
| available for public inspection. Copies of the records may
be |
32 |
| obtained upon payment of a fee not exceeding the
reasonable |
33 |
| cost of reproduction.
|
34 |
| (k) The requirements of subsections (e) through (j) of
this |