|
|
|
SB1909 Enrolled |
|
LRB094 09267 RSP 39503 b |
|
|
1 |
| AN ACT concerning safety.
|
2 |
| Be it enacted by the People of the State of Illinois,
|
3 |
| represented in the General Assembly:
|
4 |
| Section 5. The Environmental Protection Act is amended by |
5 |
| changing Sections 3.135 and 39 and by adding Section 9.14 as |
6 |
| follows:
|
7 |
| (415 ILCS 5/3.135) (was 415 ILCS 5/3.94)
|
8 |
| Sec. 3.135. Coal combustion by-product; CCB.
|
9 |
| (a) "Coal combustion
by-product" (CCB) means coal |
10 |
| combustion waste when used beneficially in
for any of
the |
11 |
| following ways
purposes : |
12 |
| (1) The extraction or recovery of material compounds |
13 |
| contained within CCB.
|
14 |
| (2) The use of CCB as a raw ingredient or mineral |
15 |
| filler in the
manufacture of the following commercial |
16 |
| products: cement; concrete and concrete mortars; |
17 |
| cementious
concrete products
including block, pipe and |
18 |
| precast/prestressed components; asphalt or cementious
|
19 |
| cement
based roofing products
shingles ; plastic products |
20 |
| including pipes and fittings; paints
and metal alloys ; kiln |
21 |
| fired products including bricks, blocks, and tiles; |
22 |
| abrasive media; gypsum wallboard; asphaltic concrete, or |
23 |
| asphalt based paving material . |
24 |
| (3) CCB used (A) in accordance
conformance with the |
25 |
| Illinois Department of Transportation ("IDOT") standard
|
26 |
| specifications and subsection (a-5) of this Section or (B)
|
27 |
| and
under the
approval of the Department of Transportation |
28 |
| for IDOT projects .
|
29 |
| (4) Bottom ash used as antiskid material, athletic |
30 |
| tracks, or foot paths.
|
31 |
| (5) Use as a substitute for lime (CaO and MgO) in the |
32 |
| lime
stabilization or modification of
soils providing the |
|
|
|
SB1909 Enrolled |
- 2 - |
LRB094 09267 RSP 39503 b |
|
|
1 |
| CCB meets the IDOT
Illinois Department of Transportation
|
2 |
| ("IDOT")
specifications for soil modifiers
byproduct |
3 |
| limes .
|
4 |
| (6) CCB used as a functionally equivalent substitute |
5 |
| for agricultural lime
as a soil conditioner.
|
6 |
| (7) Bottom ash used in non-IDOT pavement sub-base or
|
7 |
| base, pipe bedding, or foundation
backfill.
|
8 |
| (8) Structural fill, when used in an engineered |
9 |
| application or combined
with cement, sand, or water to |
10 |
| produce a controlled strength fill material
and covered |
11 |
| with 12 inches of soil unless infiltration is prevented by |
12 |
| the
material itself or other cover material.
|
13 |
| (9) Mine subsidence, mine fire control, mine sealing, |
14 |
| and mine reclamation. |
15 |
| (a-5)
(10) Except to the extent that the uses are otherwise |
16 |
| authorized by law
without such restrictions, the uses specified |
17 |
| in items (a)(3)(A) and (a) (7) through (9) shall be subject to |
18 |
| the
following conditions:
|
19 |
| (A) CCB shall not have been mixed with hazardous waste |
20 |
| prior to use .
;
|
21 |
| (B) CCB shall not exceed Class I Groundwater Standards |
22 |
| for
metals when
tested utilizing test method ASTM D3987-85 . |
23 |
| The sample or samples tested shall be representative of the |
24 |
| CCB being considered for use. ;
|
25 |
| (C) Unless otherwise exempted, users of CCB for the |
26 |
| purposes described in items (a)(3)(A) and (a)(7) through |
27 |
| (9) of this Section shall provide notification
to the |
28 |
| Agency for each project utilizing CCB documenting the |
29 |
| quantity of CCB
utilized and certification of compliance |
30 |
| with conditions (A) and (B) of this subsection .
|
31 |
| Notification shall not be required for users of CCB for |
32 |
| purposes described in items (a)(1), (a)(2), (a)(3)(B), |
33 |
| (a)(4), (a)(5) and (a)(6) of this Section, or as required |
34 |
| specifically under a beneficial use determination as |
35 |
| provided under this Section, or pavement base, parking lot |
36 |
| base, or
building base projects utilizing less than 10,000 |
|
|
|
SB1909 Enrolled |
- 3 - |
LRB094 09267 RSP 39503 b |
|
|
1 |
| tons, flowable fill/grout
projects utilizing less than |
2 |
| 1,000 cubic yards or other applications utilizing
less than |
3 |
| 100 tons .
;
|
4 |
| (D) Fly ash shall be managed
applied in a manner that |
5 |
| minimizes the generation
of airborne particles and dust |
6 |
| using techniques such as moisture conditioning,
|
7 |
| granulating, inground application, or other demonstrated |
8 |
| method .
;
and
|
9 |
| (E) CCB is not to be accumulated speculatively. CCB is |
10 |
| not accumulated
speculatively if during the calendar year, |
11 |
| the CCB used is equal to 75% of the
CCB by weight or volume |
12 |
| accumulated at the beginning of the period.
|
13 |
| (F) CCB shall include any prescribed mixture of fly |
14 |
| ash, bottom ash, boiler slag, flue gas desulfurization |
15 |
| scrubber sludge, fluidized bed combustion ash, and stoker |
16 |
| boiler ash and shall be tested as intended for use.
|
17 |
| (b) To encourage and promote the utilization of CCB in |
18 |
| productive and beneficial
applications, upon request by the |
19 |
| applicant, the Agency shall
may make a written beneficial use |
20 |
| determination
determination that coal-combustion
waste is CCB |
21 |
| when used in a manner other than those uses specified in |
22 |
| subsection (a) of
that specified in this Section if the |
23 |
| applicant demonstrates that use of the coal-combustion waste |
24 |
| satisfies all of the following criteria: the use will not |
25 |
| cause, threaten, or allow the discharge of any contaminant into |
26 |
| the environment; the use will otherwise protect human health |
27 |
| and safety and the environment; and the use constitutes a |
28 |
| legitimate use of the coal-combustion waste as an ingredient or |
29 |
| raw material that is an effective substitute for an analogous |
30 |
| ingredient or raw material
if
the use has been shown to have no |
31 |
| adverse environmental impact greater than the
beneficial uses |
32 |
| specified, in consultation with the Department of Mines and
|
33 |
| Minerals, the Illinois Clean Coal Institute, the Department of |
34 |
| Transportation,
and such other agencies as may be appropriate .
|
35 |
| The Agency's beneficial use determinations may allow the |
36 |
| uses set forth in items (a)(3)(A) and (a)(7) through (9) of |
|
|
|
SB1909 Enrolled |
- 4 - |
LRB094 09267 RSP 39503 b |
|
|
1 |
| this Section without the CCB being subject to the restrictions |
2 |
| set forth in subdivisions (a-5)(B) and (a-5)(E) of this |
3 |
| Section.
|
4 |
| Within 90 days after the receipt of an application for a |
5 |
| beneficial use determination under this subsection (b), the |
6 |
| Agency shall, in writing, approve, disapprove, or approve with |
7 |
| conditions the beneficial use. Any disapproval or approval with |
8 |
| conditions shall include the Agency's reasons for the |
9 |
| disapproval or conditions. Failure of the Agency to issue a |
10 |
| decision within 90 days shall constitute disapproval of the |
11 |
| beneficial use request. These beneficial use determinations |
12 |
| are subject to review under Section 40 of this Act.
|
13 |
| Any approval of a beneficial use under this subsection (b) |
14 |
| shall become effective upon the date of the Agency's written |
15 |
| decision and remain in effect for a period of 5 years. If an |
16 |
| applicant desires to continue a beneficial use after the |
17 |
| expiration of the 5-year period, the applicant must submit an |
18 |
| application for renewal no later than 90 days prior to the |
19 |
| expiration. The beneficial use approval shall be automatically |
20 |
| extended unless denied by the Agency in writing with the |
21 |
| Agency's reasons for disapproval, or unless the Agency has |
22 |
| requested an extension for review, in which case the use will |
23 |
| continue to be allowed until an Agency determination is made. |
24 |
| Coal-combustion waste for which a beneficial use is |
25 |
| approved pursuant to this subsection (b) shall be considered |
26 |
| CCB during the effective period of the approval, as long as it |
27 |
| is used in accordance with the approval and any conditions. |
28 |
| Notwithstanding the other provisions of this subsection |
29 |
| (b), written beneficial use determination applications for the |
30 |
| use of CCB at sites governed by the federal Surface Mining |
31 |
| Control and Reclamation Act of 1977 (P.L. 95-87) or the rules |
32 |
| and regulations thereunder, or by any law or rule or regulation |
33 |
| adopted by the State of Illinois pursuant thereto, shall be |
34 |
| reviewed and approved by the Office of Mines and Minerals |
35 |
| within the Department of Natural Resources pursuant to 62 Ill. |
36 |
| Adm. Code §§ 1700-1850. Further, appeals of those |
|
|
|
SB1909 Enrolled |
- 5 - |
LRB094 09267 RSP 39503 b |
|
|
1 |
| determinations shall be made pursuant to the Illinois |
2 |
| Administrative Review Law.
|
3 |
| The Board shall adopt rules establishing standards and |
4 |
| procedures for the Agency's issuance of beneficial use |
5 |
| determinations under this subsection (b). The Board rules may |
6 |
| also, but are not required to, include standards and procedures |
7 |
| for the revocation of the beneficial use determinations. Prior |
8 |
| to the effective date of Board rules adopted under this |
9 |
| subsection (b), the Agency is authorized to make beneficial use |
10 |
| determinations in accordance with this subsection (b). |
11 |
| The Agency is authorized to prepare and distribute guidance |
12 |
| documents relating to its administration of this Section. |
13 |
| Guidance documents prepared under this subsection are not rules |
14 |
| for the purposes of the Illinois Administrative Procedure Act.
|
15 |
| (Source: P.A. 92-574, eff. 6-26-02.)
|