Rep. Gary Hannig
Filed: 10/20/2005
|
|
09400SB1843ham001 |
|
LRB094 11455 RSP 49842 a |
|
|
1 |
| AMENDMENT TO SENATE BILL 1843
|
2 |
| AMENDMENT NO. ______. Amend Senate Bill 1843 by replacing |
3 |
| everything after the enacting clause with the following:
|
4 |
| "Section 5. The Illinois Procurement Code is amended by |
5 |
| changing Section 30-30 as follows:
|
6 |
| (30 ILCS 500/30-30)
|
7 |
| Sec. 30-30. Contracts in excess of $250,000. For
building |
8 |
| construction contracts in excess of
$250,000, separate |
9 |
| specifications shall be prepared for all
equipment, labor, and |
10 |
| materials in
connection with the following 5 subdivisions of |
11 |
| the work to be
performed:
|
12 |
| (1) plumbing;
|
13 |
| (2) heating, piping, refrigeration, and automatic
|
14 |
| temperature control systems,
including the testing and |
15 |
| balancing of those systems;
|
16 |
| (3) ventilating and distribution systems for
|
17 |
| conditioned air, including the testing
and balancing of |
18 |
| those systems;
|
19 |
| (4) electric wiring; and
|
20 |
| (5) general contract work.
|
21 |
| The specifications must be so drawn as to permit separate |
22 |
| and
independent bidding upon
each of the 5 subdivisions of |
23 |
| work. All contracts awarded
for any part thereof shall
award |
24 |
| the 5 subdivisions of work separately to responsible and
|
|
|
|
09400SB1843ham001 |
- 2 - |
LRB094 11455 RSP 49842 a |
|
|
1 |
| reliable persons, firms, or
corporations engaged in these |
2 |
| classes of work. The contracts, at
the discretion of the
|
3 |
| construction agency, may be assigned to the successful bidder |
4 |
| on
the general contract work or
to the successful bidder on the |
5 |
| subdivision of work designated by
the construction agency |
6 |
| before
the bidding as the prime subdivision of work, provided |
7 |
| that all
payments will be made directly
to the contractors for |
8 |
| the 5 subdivisions of work upon compliance
with the conditions |
9 |
| of the
contract. A contract may be let for one or more |
10 |
| buildings in any
project to the same contractor.
The |
11 |
| specifications shall require, however, that unless the
|
12 |
| buildings are identical, a separate price
shall be submitted |
13 |
| for each building. The contract may be awarded
to the lowest |
14 |
| responsible
bidder for each or all of the buildings included in |
15 |
| the
specifications.
|
16 |
| Until a date 2 years after the effective date of this |
17 |
| amendatory Act of the 93rd General Assembly, the requirements |
18 |
| of this Section do not apply to the construction of an |
19 |
| Emergency Operations Center for the Illinois Emergency |
20 |
| Management Agency if (i) the majority of the funding for the |
21 |
| project is from federal funds, (ii) the bid of the successful |
22 |
| bidder identifies the name of the subcontractor, if any, and |
23 |
| the bid proposal costs for each of the 5 subdivisions of work |
24 |
| set forth in this Section, and (iii) the contract entered into |
25 |
| with the successful bidder provides that no identified |
26 |
| subcontractor may be terminated without the written consent of |
27 |
| the Capital Development Board.
|
28 |
| Until a date 5 years after the effective date of this |
29 |
| amendatory Act of the 94th General Assembly, the requirements |
30 |
| of this Section do not apply to the Capitol Building HVAC |
31 |
| upgrade project if (i) the bid of the successful bidder |
32 |
| identifies the name of the subcontractor, if any, and the bid |
33 |
| proposal costs for each of the 5 subdivisions of work set forth |
34 |
| in this Section, and (ii) the contract entered into with the |