94TH GENERAL ASSEMBLY
State of Illinois
2005 and 2006
SB1365
Introduced 2/18/2005, by Sen. Donne E. Trotter
SYNOPSIS AS INTRODUCED:
Makes appropriations for capital expenditures for the following agencies: Department of Agriculture, Department of Commerce and Economic Opportunity, Department of Natural Resources, Department of Military Affairs, Department of State Police, Department of Transportation, Capital Development Board, Illinois Commerce Commission, Environmental Protection Agency, Historic Preservation Agency, Illinois Finance Authority, Medical District Commission, Illinois Emergency Management Agency, Eastern Illinois University, Northeastern Illinois University, Northern Illinois University, Southern Illinois University, University of Illinois, Illinois Community College Board, State Board of Education, and State Board of Elections.
OMB094 00005 SAT 30005 b
|
|
|
AN ACT making appropriations.
Be it enacted by the People of the State of Illinois, represented in the General Assembly:
ARTICLE 1
DEPARTMENT OF AGRICULTURE
Section 5. The following named amounts, or so much thereof as may be necessary are appropriated to the Department of Agriculture for repairs, maintenance, and capital improvements including construction, reconstruction, improvement, repair and installation of capital facilities, cost of planning, supplies, materials, equipment, services and all other expenses required to complete the work:
Payable from Agricultural Premium Fund:
For various projects at the State
Fairgrounds................................... $600,000
For various projects at the DuQuoin State
Fairgrounds.................................... 225,000
Total $825,000
Section 10. The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Agriculture for deposit into the Conservation 2000 Projects Fund.
Section 15. The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Conservation 2000 Projects Fund to the Department of Agriculture for the following project at the approximate cost set forth below:
Conservation Practices Cost-Share Program..... $2,612,500
Total, Article 1 $6,050,000
ARTICLE 2
DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY
Section 5. The sum of $4,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Illinois Institute of Technology for the Biomedical Research Center.
Section 10. The sum of $1,500,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.
Section 15. The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Rare Isotope Accelerator Science Center.
Section 20. The sum of $6,700,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Ricketts Regional Biocontainment Laboratory.
Section 25. The sum of $1,600,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the Applied Manufacturing Research and Technology Center in Rockford.
Section 45. The sum of $4,000,000, or so much thereof as may be necessary, is appropriated from the Port Development Revolving Loan Fund to the Department of Commerce and Economic Opportunity for grants and loans associated with the Port Development Revolving Loan Program pursuant to 30 ILCS 750-9-11.
Section 50. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Northwestern University for the Nanoscale Science and Engineering Center.
Section 55. The sum of $4,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for redevelopment of a corporate biotechnology park in Skokie.
Section 60. The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Board of Trustees of the University of Illinois to plan and construct an electrical and computer engineering facility at the Urbana-Champaign campus and related utilities systems, including planning, land acquisition, demolition, construction, remodeling, landscaping, site improvements, equipment, extension or modification of campus utility systems, and such expenses as may be necessary to complete this facility.
Section 65. The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the City of Marion for design and construction of a multi-use regional recreational facility.
Section 70. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Chicago Academy for conversion of a former community college facility into a magnet high school.
Section 75. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the City of Rockford for development of the Center of Excellence.
Section 80. The sum of $120,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Parkview Foundation for a window renovation project.
Section 85. The sum of $25,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant, but not limited to Article 8, Article 9, and Article 10 of the Build Illinois Act.
Section 90. The sum of $15,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants to companies to expand or construct ethanol plants in Illinois.
Section 95. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Illinois Capital Revolving Loan Fund to the Department of Commerce and Economic Opportunity for the Manufacturing Modernization Program.
Total, Article 2 $89,920,000
ARTICLE 3
DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY
Section 5. The amount of $8,940,147, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 5 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to the DuPage Airport Authority for planning, design, construction and access infrastructure related to the hi-tech business campus.
Section 10. The amount of $6,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 10 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant for planning, design, construction, and all other costs associated with a new Ford Technical Training Center.
Section 15. The sum of $500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 15 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the "TRUE GRID I WIRE" Program.
Section 20. The amounts of $22,000,000 and $551,947, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 91, Section 20 of Public Act 93-0842, are reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the purpose of providing partial funds for planning, design, engineering and testing, and construction of a low emissions boiler system for Illinois high-sulfur coals.
No contract shall be entered into or obligation incurred for any expenditure made in this Section of this Article until after the purpose and amounts have been approved in writing by the Governor.
Section 25. The sum of $6,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 25 of Public Act 93-0842, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the Coal Demonstration Program.
Section 30. The sum of $6,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 30 of Public Act 93-0842, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for Coal Development Programs.
Section 35. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 35 of Public Act 93-0842, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for grants pursuant to 20 ILCS 605/605-332 – Coal Revival Program.
Section 40. The amount of $1,039,300, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 40 of Public Act 93-0842, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the development of other forms of energy.
No contract shall be entered into or obligation incurred for any expenditure made in this Section of this Article until after the purpose and amounts have been approved in writing by the Governor.
Section 45. The sum of $13,815,797, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 45 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 50. The sum of $5,420,856, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 91, Section 50 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8 or Article 10 of the Build Illinois Act.
Section 55. The sum of $4,778,039, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 55 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 60. The sum of $15,533,803, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 60 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 65. The sum of $11,025,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 65 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.
Section 70. The sum of $10,480,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 70 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants to companies to expand or construct ethanol plants in Illinois.
Section 75. The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 75 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Argonne National Laboratory for the Rare Isotope Accelerator for bondable infrastructure improvements. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 80. The sum of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 80 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Nanotechnology Institute for bondable infrastructure improvements. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 85. The sum of $6,403,051, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 91, Section 85 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Nanotechnology.
Total, Article 3 $198,487,940
ARTICLE 4
DEPARTMENT OF NATURAL RESOURCES
GRANTS AND REIMBURSEMENTS - GENERAL OFFICE
Section 10. The sum of $725,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 15. The sum of $120,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 20. To the extent federal funds including reimbursements are available for such purposes, the sum of $75,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 25. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from State Boating Act Fund:
For multiple use facilities and
programs for boating purposes
provided by the Department of Natural
Resources, including construction
and development, all costs for supplies,
materials, labor, land acquisition,
services, studies and all other
expenses required to comply with the
intent of this appropriation.................. 1,200,000
Payable from State Parks Fund:
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 150,000
Section 30. The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for acquisition and development, including grants, for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl for the Mississippi Flyway.
Section 35. To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 40. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal funds provided for such purposes.
Section 45. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Forest Reserve Fund:
For U.S. Forest Service Program.................. 500,000
Section 50. The sum of $110,000, or so much thereof as may be necessary, is appropriated from the Plugging and Restoration Fund to the Department of Natural Resources, Office of Mines and Minerals for the Landowner Grant Program authorized under the Oil and Gas Act, as amended by Public Act 90-0260.
Section 55. The sum of $1,500,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Set Aside Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines and any other expenses necessary for emergency response.
Section 60. The sum of $110,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 65. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from Natural Areas Acquisition Fund:
For the acquisition, preservation and
stewardship of natural areas, including habitats
for endangered and threatened species, high
quality natural communities, wetlands
and other areas with unique or unusual
natural heritage qualities.................... 6,000,000
Section 70. The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".
Section 75. The sum of $550,000, or so much thereof as may be necessary, is appropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
FOR ILLINOIS HABITAT FUND PROGRAM
Section 80. The sum of $1,150,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 85. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 90. The sum of $600,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources for expenditure by the Office of Water Resources from the Flood Control Land Lease Fund for disbursement of monies received pursuant to Act of Congress dated September 3, 1954 (68 Statutes 1266, same as appears in Section 701c-3, Title 33, United States Code Annotated), provided such disbursement shall be in compliance with 15 ILCS 515/1 Illinois Compiled Statutes.
Section 95. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
For Outdoor Recreation Programs................ 6,200,000
Section 100. The sum of $600,000, or so much thereof as may be necessary, is appropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 105. The sum of $4,500,000 or so much thereof as may be necessary, is appropriated from the Conservation 2000 Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term Easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 110. The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire
Protection Assistance Fund:
For Rural Community Fire Protection
Programs........................................ 325,000
Section 115. The sum of $80,000, or so much thereof as may be necessary, is appropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 120. The sum of $625,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 125. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $300,000, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 130. The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl to the Mississippi Flyway as provided in the "Wildlife Code", as amended.
Section 135. The sum of $160,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the development of waterfowl propagation areas within the Dominion of Canada or the United States which specifically provide waterfowl for the Mississippi Flyway as provided in the "Wildlife Code", as amended.
Section 140. The sum of $500,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
Section 145. The sum of $2,500,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 150. The sum of $500,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 155. The sum of $1,500,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.
Section 160. The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:
Payable from the Illinois Beach Marina Fund:
For rehabilitation, reconstruction, repair,
replacing, fixed assets, and improvement
of facilities at North Point Marina at
Winthrop Harbor................................. 375,000
Section 165. The sum of $6,000,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 170. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the State Parks Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction expenses required to comply with this appropriation. Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.
Section 175. No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in Section 170 until after the purpose and amount of such expenditure has been approved in writing by the Governor.
Section 185. The sum of $150,000, new appropriation, is appropriated from the State Boating Act Fund to the Department of Natural Resources for a grant to the Chain O’Lakes – Fox River Waterway Management Agency for the Agency’s operational expenses.
Section 195. The sum of $10,000,000 is appropriated from
the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinos and the United States Department of Agriculture.
Section 200. The sum of $3,000,000 is appropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 205. The sum of $12,000,000, or so much thereof may be necessary is appropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:
Des Plaines River I&M Canal Draines –
Will County - for land rights and
construction of replacing drainage,
flood control, and related
improvements in the Lower Des
Plaines River and south edge
of the I&M Canal................................ $500,000
Fox Chain of Lakes - Lake and
McHenry Counties - For the
State cost share in the
implementation of the
comprehensive Dredging and
Disposal Plan, including beneficial
use of dredge material and
island creation, for the Fox
River and Chain of Lakes...................... $1,000,000
Fox River Dams - Kane County –
for rehabilitation, modification,
and reconstruction of Batavia and
Yorkville dams................................ $1,100,000
Hickory/Spring Creek - Will County –
For implementation of
State IIIb of channel construction
of Hickory/Spring Creeks
flood control project in cooperation
with the City of Joliet....................... $3,000,000
Prairie/Farmers Creeks - Cook County –
For costs associated with the
implementation of flood damage
reduction measures along Prairie/
Farmers Creeks and the Des Plaines
River, including partial payment
of the non-federal cost requirements
of the U.S. Army Corps of Engineers'
Upper Des Plaines River Flood
Control Project............................... $6,300,000
Small Drainage and Flood
Control Projects - For implementation
of small drainage and flood
control improvements in accordance
with plans developed in cooperation
with local governments and school
districts not to exceed $100,000
at any single locality.......................... $100,000
Total $12,000,000
Section 210. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.
Section 215. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for natural resource conservation and public recreation including, but not limited to, acquisition, protection and preservation of lands.
Section 230. The sum of $6,700,000 or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the office of Water Resources to pay for a portion of the non-federal cost requirements associated with the Corps of Engineers' project for the repair of Lake Michigan shoreline in Chicago in cooperation with the City of Chicago and the Chicago Park District.
Section 235. The sum of $325,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital expenses related to the Sahara Woods.
Section 240. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections:
95,
105,
145, 150, 155,
170,
190-235
until after the purpose and amount of such expenditure has been approved in writing by the Governor.
Total, Article 4 $111,740,000
ARTICLE 5
DEPARTMENT OF NATURAL RESOURCES
Section 5. The sum of $725,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 5, page 573, line 25 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 7. The sum of $725,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 10, page 565, line 2 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 10. The sum of $1,542,612, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 10, page 574, line 6 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.
Section 15. The sum of $100,863, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 15, page 574, line 15 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 20. The sum of $160,603, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 20, page 574, line 26 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 22. The sum of $120,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 15, page 565, line 8 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.
Section 30. To the extent federal funds including reimbursements are available for such purposes, the sum of $1,554,184, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 30 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 32. To the extent federal funds including reimbursements are available for such purposes, the sum of $1,075,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 20 of Public Act 93-0842, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.
Section 35. The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Boating Act Fund:
(From Article 93, Section 35, on
page 575, lines 27-32 and on page 576,
lines 1-2, of Public Act 93-0842,
as amended)
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies and all
other expenses required to comply with
the intent of this appropriation.............. 1,351,400
Section 37. The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Boating Act Fund:
(From Article 92, Section 25, on
page 565, lines 25-30 and on page 566,
lines 1-8, of Public Act 93-0842,
as amended)
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies and all
other expenses required to comply with
the intent of this appropriation.............. 1,200,000
Section 40. The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Boating Act Fund:
(From Article 93, Section 40 on page 576,
lines 14-21 of Public Act 93-0842,
as amended)
For multiple use facilities and programs
for boating purposes provided by the
Department of Natural Resources including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies and all
other expenses required to comply with
the intent of this appropriation.............. 1,200,000
Section 45. The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the State Parks Fund:
(From Article 93, Section 45
on page 576, line 32 and on page
577, lines 1-7 of Public
Act 93-0842, as amended)
For multiple use facilities and programs
for park and trail purposes provided
by the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation............... 150,000
Payable from the State Parks Fund:
(From Article 93, Section 45 on
page 577, lines 12-19, of Public
Act 93-0842, as amended)
For multiple use facilities and programs
for park and trail purposes provided
by the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 477,920
Section 47. The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from State Parks Fund:
(From Article 92, Section 25 on
page 566, lines 9-13, of Public
Act 93-0842, as amended)
For multiple use facilities and programs
for park and trail purposes provided by
the Department of Natural Resources, including
construction and development, all costs
for supplies, materials, labor, land
acquisition, services, studies, and
all other expenses required to comply with
the intent of this appropriation................ 150,000
Section 48. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 170 of Public Act 93-0842, as amended, is reappropriated from the State Park Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction expenses required to comply with this appropriation. Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.
Section 50. The sum of $1,619,622 or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 50, page 577, line 20 of Public Act 93-0842, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal funds provided for such purposes.
Section 52. The sum of $2,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 40, page 567, line 1 of Public Act 93-0842, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal funds provided for such purposes.
Section 55. The sum of $2,923,780, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 55, page 577, line 28 of Public Act 93-0842, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal funds provided for such purposes.
Section 60. To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 60, page 578, line 6 of Public Act 93-0842, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 62. To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 35, page 566, line 27 of Public Act 93-0842, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 65. To the extent federal funds including reimbursements are available for such purposes, the sum of $205,997, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 65, page 578, line 17 of Public Act 93-0842, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.
Section 70. The sum of $1,433,426, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 70, page 578, line 26 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 75. The sum of $3,237,550, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 75, page 579, line 4 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.
Section 80. The sum of $27,931,232, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 80, page 579, line 13 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.
Section 85. The sum of $3,940,311, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 85, page 579, line 21 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United State Department of Agriculture.
Section 90. The sum of $871,846, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 90, page 580, line 6 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United State Department of Agriculture.
Section 95. The sum of $1,631,310, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 95 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the acquisition of lands, buildings, and structures, including easements and other property interests, located in the 100-year floodplain in counties or portions of counties authorized to prepare stormwater management plans and for removing such buildings and structures and preparing the site for open space use.
Section 100. The sum of $11,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 100 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:
Union - McHenry County - for flood control
and drainage improvement of unnamed
Kishwaukee River tributary........................ 200,000
Wood River - Madison County - for partial
payment of the non-federal cost requirements
to construct Grassy Lake Pump Station Project
in cooperation with the Wood River Drainage
and Levee District................................ 200,000
Flood Hazard Mitigation - For implementation
of flood hazard mitigation plans, and
acquisition of wetland and tree mitigation
sites for state and local joint
flood control projects in
cooperation with federal agencies, state
agencies, and units of local government,
in various counties............................. 3,300,000
Fox Chain of Lakes - Lake and McHenry
Counties - For the state cost share in
implementation of the comprehensive
Dredging and Disposal Plan, including
beneficial use of dredge material and
island creation, for the Fox River and
Chain of Lakes.................................. 2,000,000
Fox River Dams - Kane County - For
rehabilitation, modification, and
reconstruction of Batavia
and Yorkville Dams.............................. 2,600,000
Field Service Facility - Sangamon County -
For site development and construction
of a field survey service building
and storage facility.............................. 200,000
East St. Louis & Vicinity Flood Control -
Madison and St. Clair Counties - For
partial payment of the non-federal cost
requirement of an interior flood protection
project and ecosystem restoration at East
St. Louis and Vicinity area..................... 1,800,000
Prairie/Farmers Creeks - Cook County -
For costs associated with the implementation
of flood damage reduction measures along
Prairie/Farmers Creeks and the Des Plaines
River, including for partial payment of the
non-federal cost requirements of the U.S.
Army Corps of Engineers' Upper Des Plaines
River Flood Control Project....................... 600,000
Small Drainage and Flood Control Projects -
For implementation of
small drainage and flood control
improvements in accordance with plans
developed in cooperation with local
governments and school districts, not
to exceed $100,000 at any single
locality.......................................... 100,000
Total $11,000,000
FOR WATERWAY IMPROVEMENTS
Section 105. The sum of $28,497,163, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 93, Section 105 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the following projects at the approximate costs set forth below:
Addison Creek Watershed - Cook
and DuPage Counties............................... 214,935
Chandlerville/Panther Creek -
Cass County........................................ 24,294
Chicago Harbor Leakage Control -
Cook County - For implementation
of a project to identify, measure,
control, and eliminate leakage
flows through controlling structures at
the mouth of the Chicago River in
cooperation with federal agencies and
units of local government......................... 990,416
Crisenberry Dam - Jackson County:
For complete rehabilitation of the
dam and spillway, including the
required geotechnical investigation,
the preparation of plans and
specifications, and the construction
of the proposed rehabilitation.................... 522,964
Crystal Creek - Cook County...................... 2,866,704
East Chicago (Ford Heights) - Cook
County - For partial payment of the
non-federal cost requirements of the
Deer Creek federal flood control and
ecosystem restoration project in
cooperation with the Village of East
Chicago........................................... 925,600
East Peoria - Tazewell County.................... 1,878,499
East St. Louis and Vicinity Flood Control -
Madison and St. Clair Counties - For
partial payment of the non-federal cost
requirements of an interior flood protection
project and ecosystem restoration at
East St. Louis and Vicinity area.................. 500,000
Floor Service Facility – Sangamon County........... 200,000
Flood Mitigation - Disaster
Declaration Areas............................... 2,678,372
Fox Chain O'Lakes - Lake and McHenry
Counties ...................................... 1,599,312
Fox River Dams - Kane, Kendall
and McHenry Counties............................ 5,481,776
Granite City - Area Groundwater-
Madison County.................................... 300,000
Havana Facilities - Mason County................... 293,344
Hickory Hills - Cook County........................ 158,410
Hickory/Spring Creeks Watershed -
Cook and Will Counties.......................... 2,595,779
Illinois River Mitigation - Calhoun,
Jersey, Peoria and Woodford
Counties........................................... 80,908
Indian Creek - Kane County.......................... 87,025
Kaskaskia River System - Randolph,
Monroe and St. Clair Counties...................... 33,916
Kyte River - Rochelle, Ogle County............... 1,450,863
Lake Michigan Artificial Reef -
Cook County........................................ 28,040
Little Calumet Watershed -
Cook County........................................ 14,154
Loves Park - Winnebago County...................... 489,745
Lower Des Plaines River Watershed -
Cook and Lake Counties............................ 975,000
Metro-East Sanitary District -
Madison and St. Clair Counties..................... 60,578
North Branch Chicago River Watershed -
Cook and Lake Counties............................. 25,690
Prairie du Rocher - Randolph County:
For partial payment to implement the
federal flood protection project for
the Village of Prairie du Rocher in
cooperation with local units of
government........................................ 10,000
Prairie/Farmers Creek - Cook County.............. 2,756,259
Asian Carp Barrier - Cook County.................... 10,000
Rock River Dams - Rock Island and
Whiteside Counties................................ 151,081
Small Drainage and Flood Control
Projects - Statewide (not to exceed
$100,000 at any locality)......................... 413,499
Union - McHenry County.............................. 30,000
Village of Justice - Cook County................... 100,000
W. B. Stratton (McHenry) Lock
and Dam - McHenry County.......................... 750,000
Total $28,497,163
Section 110. The sum of $213,812, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 110 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources in cooperation with federal agencies, state agencies and units of local government in the implementation of flood hazard mitigation plans in counties that received a Presidential Disaster Declaration as a result of flooding in calendar years 1993 and thereafter, in accordance with reports filed under Section 5 of the "Flood Control Act of 1945".
Section 115. The sum of $5,000,000, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 93, Section 115, page 586, line 3 of Public Act 93-0842, and Article , Section of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.
Section 120. The sum of $10,023,728, less $300,000 to be lapsed from the unexpended appropriation, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 93, Section 120, page 586, line 11 of Public Act 93-0842, and Article , Section of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.
Section 125. The amount of $30,115, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 125 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.
Section 130. The amount of $4,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 130 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.
Section 135. The sum of $61,418, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 135, page 587, line 3 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 137. The sum of $104,200, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 60, page 567, line 29 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 140. The sum of $81,394, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 140, page 587, line 12 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.
Section 145. The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from Natural Areas Acquisition Fund:
(From Article 93, Section
145 on page 587, line 31, and page
588, lines 1-6, of Public
Act 93-0842, as amended)
For the acquisition, preservation and
stewardship of natural areas,
including habitats for endangered and
threatened species, high quality natural
communities, wetlands and other areas
with unique or unusual natural
heritage qualities............................ 3,193,368
Payable from Natural Areas Acquisition Fund:
(From Article 93, Section 145 on
page 588, lines 11-17, of Public
Act 93-0842, as amended)
For the acquisition, preservation and
stewardship of natural areas,
including habitats for endangered and
threatened species, high quality natural
communities, wetlands and other areas
with unique or unusual natural
heritage qualities............................ 2,412,844
Section 147. The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from Natural Areas Acquisition Fund:
(From Article 92, Section 65 on
page 568, lines 16, of Public
Act 93-0842, as amended)
For the acquisition, preservation and
stewardship of natural areas,
including habitats for endangered and
threatened species, high quality natural
communities, wetlands and other areas
with unique or unusual natural
heritage qualities............................ 4,499,200
Section 150. The sum of $18,138,458, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 150, page 588, line 18 of Public Act 93-0842, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".
Section 155. The sum of $27,303,854, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 155, page 588, line 27 of Public Act 93-0842, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".
Section 157. The sum of $20,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 70, page 568, line 17 of Public Act 93-0842, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".
FOR STATE PHEASANT PROGRAM
Section 160. The sum of $305,546, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 160, page 589, line 5 of Public Act 93-0842, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
Section 165. The sum of $179,377, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 165, page 589, line 14 of Public Act 93-0842, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
Section 167. The sum of $550,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 75, page 568, line 23 of Public Act 93-0842, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.
Section 170. The sum of $644,654, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 170, page 589, line 23 of Public Act 93-0842, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 175. The sum of $163,308, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 175, page 590, line 1 of Public Act 93-0842, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 177. The sum of $1,150,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 80, page 569, line 1 of Public Act 93-0842, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.
Section 180. The sum of $142,533, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 180, page 590, line 10 of Public Act 93-0842, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 185. The sum of $1,623, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 185, page 590, line 20 of Public Act 93-0842, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 187. The sum of $250,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 85, page 569, line 7 of Public Act 93-0842, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.
Section 190. The following named sums, or so much thereof as may be necessary and as remain unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 93, Section 190 of Public Act 93-0842, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
(From Article 93, Section
190, page 591, line 15 of Public
Act 93-0842, as amended)
For Outdoor Recreation Programs................ 6,200,000
Payable from Land and Water Recreation Fund:
(From Article 93, Section 190
on page 591, line 20, of Public
Act 93-0842, as amended)
For Outdoor Recreation Programs................ 7,800,777
Section 192. The following named sums, or so much thereof as may be necessary and as remain unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 95 of Public Act 93-0842, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Land and Water Recreation Fund:
(From Article 92, Section 95
on page 570, line 1, of Public
Act 93-0842, as amended)
For Outdoor Recreation Programs................ 6,200,000
Section 195. The sum of $597,437, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 195, page 591, line 21 of Public Act 93-0842, as amended, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 197. The sum of $600,000 or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 100, page 570, line 2 of Public Act 93-0842, as amended, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 200. The sum of $910,741, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 93, Section 200, page 592, line 1 of Public Act 93-0842, as amended, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.
Section 205. The sum of $2,652,734, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes in Article 93, Section 205 of Public Act 93-0842, as amended, is reappropriated from the Conservation 2000 Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 210. The sum of $7,194,314, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes in Article 93, Section 210 of Public Act 93-0842, as amended, is reappropriated from the Conservation 2000 Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.
Section 215. The following named sums, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 93, Sections 215 and of Public Act 93-0842, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire Protection Assistance Fund:
(From Article 93, Section 215
on page 593, lines 17-18 of Public
Act 93-0842, as amended)
For Rural Community Fire
Protection Program............................... 194,419
Section 217. The following named sums, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 110 of Public Act 93-0842, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are reappropriated to the Department of Natural Resources for refunds and the purposes stated:
Payable from Federal Title IV Fire Protection Assistance Fund:
(From Article 92, Section 110
on page 570, lines 21-22 of Public
Act 93-0842, as amended)
For Rural Community Fire
Protection Program............................... 307,532
(From Article 93, Section 220 on
page 593, lines 24-25, of Public
Act 93-0842, as amended)
For Rural Community Fire
Protection Program................................. 21,252
Section 225. The sum of $46,515, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 225, page 593, line 26 of Public Act 93-0842, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 227. The sum of $80,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 115, page 570, line 23 of Public Act 93-0842, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 230. The sum of $48,683, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 93, Section 230, page 594, line 5 of Public Act 93-0842, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.
Section 235. The sum of $605,658, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 235, page 594, line 15 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 237. The sum of $625,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 120, page 570, line 30 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 240. The sum of $15,911, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 240, page 594, line 25 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.
Section 245. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $113,880, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 245, page 595, line 6 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 247. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $208,942, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 125, page 571, line 9 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 250. To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $15,520, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 250, page 595, line 15 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.
Section 255. To the extent federal funds including reimbursements are made available for such purposes, the sum of $206, or so much thereof as may be necessary and as remains unexpended, at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 255 of Public Act 93-0842, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Urban Forestry programs, including technical assistance, education and grants.
Section 260. The sum of $428,359, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 260, page 596, line 1 of Public Act 93-0842, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
Section 262. The sum of $500,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section140, page 571, line 28 of Public Act 93-0842, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
Section 265. The sum of $1,629,108, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 265, page 596, line 9 of Public Act 93-0842, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.
FOR BIKEWAYS PROGRAMS
Section 270. The following named sums, or so much thereof as may be necessary, and is available for expenditure as provided herein, are appropriated from the Park and Conservation Fund to the Department of Natural Resources for the following purposes:
Section 275. The sum of $10,886 or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 275, on page 597, lines 1-6 of Public Act 93-0842, as amended, is reappropriated for land acquisition, development and grants, for the following bike paths at the approximate costs set forth below:
Great River Road/Vadalabene Bikeway
through Grafton................................... 5,300
Super Trail between the Quad Cities
and Savannah.......................................... 0
Illinois Prairie Path in
Cook County....................................... 5,600
Section 280. The sum of $2,328,876, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 280, on page 597, line 7 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 282. The sum of $2,500,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 145, on page 572, line 3 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 285. The sum of $9,866,987, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 285, on page 597, lines 15-22 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.
Section 290. The sum of $56,700, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 290, on page 597, lines 23-31 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development, grants and all other related expenses connected with the acquisition and development of bike paths.
No funds in this Section may be expended in excess of the revenues deposited in the Park and Conservation Fund as provided for in Section 2-119 of the Illinois Vehicle Code.
Section 300. The sum of $843,389, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 300 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.
Section 305. The sum of $500,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 305, page 598, line 18 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 307. The sum of $500,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 150, page 572, line 8 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 310. The sum of $1,792,880, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 310 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the Park and Conservation Fund for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.
Section 315. The sum of $3,788,194, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 315 on page 599, line 10 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.
Section 320. The sum of $1,474,400, less $500,000 to be lapsed from the unexpended appropriation, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 320, page 599, line 19 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.
Section 322. The sum of $1,500,000, less $500,000 to be lapsed from the unexpended appropriation, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 155, page 572, line 14 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.
Section 325. The sum of $4,311,328, less $460,000 to be lapsed from the unexpended appropriation, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 325, page 599, line 30 of Public Act 93-0842, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.
Section 330. The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 330 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects. The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 335. The sum of $12,882,638, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 335 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants to museums for permanent improvements.
Section 340. The sum of $7,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 340 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the Division of Water Resources for costs associated with the repair of the Lake Michigan shoreline in Chicago. The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 345. The sum of $110,969, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 345 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects. The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 350. The sum of $583,423, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 350 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects. The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 360. The sum of $76,789, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 360 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the Division of Water Resources for costs associated with the repair of the Lake Michigan shoreline in Chicago. The appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 375. The amount of $189,520, or so much thereof as may be necessary and remains unexpended on June 30, 2005, from appropriations heretofore made for such purposes in Article 93, Section 375 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the completion of the following projects at the approximate costs set forth below:
Lower Des Plaines River at Tributaries Watershed -
Cook and DuPage Counties - for
construction of drainage, flood control,
recreation and related improvements and
facilities in the Lower Des Plaines
Watershed; and for necessary land
acquisition, relocation, and related
expenses, all in general conformance with
the Lower Des Plaines River and Tributaries
Watershed Work plan in cooperation with the
U.S. Soil Conservation Service and local
governments sponsoring this Federal
Flood Control project........................... 189,520
Section 380. The amount of $32,507, or so much thereof as may be necessary and remains unexpended on June 30, 2005, from appropriations heretofore made for such purposes in Article 93, Section 380 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for the following projects at the approximate costs set forth below:
Indian Creek - Kane County - For implementation
of the Indian Creek flood control project
in Kane County in cooperation with the City
of Aurora ....................................... 18,656
Midlothian Creek - Cook County - Improvement of
Midlothian Creek channel to provide flood
damage reduction for Fernway Subdivision in
cooperation with the Villages of Orland
Park and Tinley Park........................... 13,851
Total $32,507
Section 385. The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the Illinois Beach Marina Fund:
(From Article 93, Section 385 on
page 604, lines 21-25, of Public Act
93-0842, as amended)
For rehabilitation, reconstruction,
repair, replacing, fixed assets,
and improvement of facilities at
North Point Marina at Winthrop
Harbor........................................... 37,500
Section 390. The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the Illinois Beach Marina Fund:
(From Article 93, Section 390
on page 605, lines 4-8 of Public Act
93-0842, as amended)
For rehabilitation, reconstruction,
repair, replacing, fixed assets,
and improvement of facilities at
North Point Marina at Winthrop
Harbor.......................................... 177,895
Section 392. The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:
Payable from the Illinois Beach Marina Fund:
(From Article 92, Section 165
on page 572, line 30 of Public Act
93-0842, as amended)
For rehabilitation, reconstruction,
repair, replacing, fixed assets,
and improvement of facilities at
North Point Marina at Winthrop
Harbor.......................................... 375,000
Section 395. The sum of $4,052,450, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 395, page 605, line 9 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 397. The sum of $6,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 92, Section 165, page 573, line 1 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 400. The sum of $7,128,842, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 93, Section 400, page 605, line 19 of Public Act 93-0842, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.
Section 405. The sum of $4,535,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 93, Section 405, page 605, line 29 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.
Section 410. The sum of $9,966, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 93, Section 410 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Natural Resources for grants and contracts for well plugging and restoration projects.
Section 420. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections:
70 through 130,
190, 192,
205, 210
270 through 380, and
405, 410
until after the purpose and amount of such expenditure has been approved in writing by the Governor.
Total, Article 5 $311,709,063
ARTICLE 6
DEPARTMENT OF MILITARY AFFAIRS
Section 5. The sum of $243,700, or so much thereof as may be necessary, is appropriated from the Illinois National Guard Armory Construction Fund to the Department of Military Affairs for land acquisition and construction of parking facilities at armories.
Total, Article 6 $243,700
ARTICLE 7
DEPARTMENT OF STATE POLICE
Section 10. The sum of $23,666,518, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made for such purposes in Article 96, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of State Police for the cost associated with a statewide voice communication system.
Total, Article 7 $23,666,518
ARTICLE 8
DEPARTMENT OF TRANSPORTATION
Section 5. The sum of $9,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
Section 10. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For costs associated with the
identification and disposal of hazardous
materials at storage facilities............... 1,158,600
For Maintenance, Traffic and Physical
Research Purposes (A)........................ 26,129,100
For repair of damages by motorists
to highway guardrails, fencing,
lighting units, bridges, underpasses,
signs, traffic signals, crash
attenuators, landscaping, roadside
shelters, rest areas, fringe parking
facilities, sanitary facilities,
maintenance facilities including salt
storage buildings, vehicle weight
enforcement facilities including scale
houses, and other highway appurtenances,
provided such amount shall not exceed
funds to be made available from collections
from claims filed by the Department
to recover the costs of such
damages....................................... 5,500,000
For Maintenance, Traffic and Physical
Research Purposes (B)........................ 12,207,100
Total $44,994,800
Section 15. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For apportionment to counties for
construction of township bridges 20
feet or more in length as provided
in Section 6-901 through 6-906 of the
"Illinois Highway Code"...................... 15,000,000
For apportionment to needy Townships and
Road Districts, as determined by the
Department in consultation with the County
Superintendents of Highways, Township
Highway Commissioners, or Road District
Highway Commissioners........................ 10,014,300
For apportionment to high-growth cities over
5,000 in population, as determined by the
Department in consultation with the Illinois
Municipal League.............................. 4,000,000
For apportionment to counties
under 1,000,000 in population,
$8,000,000 of the total apportioned
in equal amounts to each eligible
county, and $13,800,000 apportioned
to each eligible county in proportion
to the amount of motor vehicle license
fees received from the residents of
eligible counties............................ 21,800,000
Total $50,814,300
Section 20. The following sums, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the "Illinois Highway Code"; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg.................................. 0
District 2, Dixon....................................... 0
District 3, Ottawa...................................... 0
District 4, Peoria...................................... 0
District 5, Paris....................................... 0
District 6, Springfield................................. 0
District 7, Effingham................................... 0
District 8, Collinsville................................ 0
District 9, Carbondale.................................. 0
Statewide..................................... 909,185,700
Engineering..................................... 0
Total $909,185,700
Section 25. The sum of $26,250,000, or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.
Section 30. The sum of $152,000,000 or so much thereof as may be necessary, is appropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
Section 35. The sum of $3,325,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.
Section 40. The sum of $5,000,000, or so much thereof as may be necessary, is appropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.
Section 45. The sum of $16,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
Section 50. The following sums, or so much thereof as may be necessary, are appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the "Illinois Highway Code"; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg.................................. 0
District 2, Dixon....................................... 0
District 3, Ottawa...................................... 0
District 4, Peoria...................................... 0
District 5, Paris....................................... 0
District 6, Springfield................................. 0
District 7, Effingham................................... 0
District 8, Collinsville................................ 0
District 9, Carbondale.................................. 0
Statewide..................................... 765,000,000
Engineering...................................... 0
Total $765,000,000
Section 55. The sum of $350,000,000, or so much thereof as may be necessary, for statewide use pursuant to Section 4(a)(1) of the General Obligation Bond Act, is appropriated from the Transportation Bond Series A Fund to the Department of Transportation for land acquisition, engineering (including environmental studies and archaeological activities and other studies and activities necessary or appropriate to secure federal participation in the project), and construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, structures separating highways and railroads and bridges and for purposes allowed or required by Title 23 of the U.S. Code as provided by law in order to implement a portion of the road improvements program.
Section 60. The sum of $1,045,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.
Section 65. No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in
Section 5 Permanent Improvements
Section 35 State Rail Freight Loan Repayment
Section 40 Fed High Speed Rail Trust
Section 60 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
Total, Article 8 $2,300,985,700
ARTICLE 9
DEPARTMENT OF TRANSPORTATION
PERMANENT IMPROVEMENTS
Section 5. The sum of $11,334,116, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning Permanent Improvements heretofore made in Article 98, Section 5 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 10. The sum of $5,854,610, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning Permanent Improvements heretofore made in Article 98, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 15. The sum of $9,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation concerning Permanent Improvements heretofore made in Article 97, Section 5 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
CENTRAL OFFICE, DIVISION OF HIGHWAYS
AWARDS AND GRANTS
Section 20. The sum of $5,386,658, or so much thereof as may be necessary and remains unexpended, less $5,224,479 to be lapsed from the unexpended balance at the close of business on June 30, 2005, from the reappropriation concerning railroad relocation demonstration projects heretofore made in Article 98, Section 15 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes, provided such amount does not exceed funds to be made available from the federal government.
Section 25. The sum of $155,595, or so much thereof as may be necessary and remains unexpended, less $151,229 to be lapsed from the unexpended balance at the close of business on June 30, 2005, from the reappropriation concerning the State share of railroad relocation demonstration projects heretofore made in Article 98, Section 20 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
CONSTRUCTION
Section 30. The sum of $5,143,981, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made for “Engineering and Consultant Contracts” in Article 98, Section 40 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 35. The sum of $10,128,508, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 25 of Public Act 93-0842, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 40. The sum of $22,565,305, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 30 of Public Act 93-0842, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 45. The sum of $49,434,130, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 35 of Public Act 93-0842, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 55. The sum of $4,623,569, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning hazardous materials made in Article 98, Section 50 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 60. The sum of $1,014,499, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning hazardous materials made in Article 98, Section 55 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 65. The sum of $1,158,600, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation concerning hazardous materials made in Article 97, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 70. The sum of $1,617,976, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 98, Section 60 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 75. The sum of $2,709,789, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 98, Section 65 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 80. The sum of $20,669,517, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 97, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 85. The sum of $1,944,287, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning Highway Damage Claims heretofore made in Article 98, Section 70 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 90. The sum of $1,012,991, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning Highway Damage Claims heretofore made in Article 98, Section 75 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 95. The sum of $4,999,781, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation concerning Highway Damage Claims heretofore made in Article 97, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 100. The sum of $115,562,606, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 275 of Public Act 93-0842, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Fund to the Department of Transportation for the same purposes.
Section 105. The sum of $106,636,304, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 97, Section 50 of Public Act 93-0842, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Fund to the Department of Transportation for the same purposes.
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
AWARDS AND GRANTS
Section 110. The sum of $1,787,247, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made for township bridges in Article 98, Section 80 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 115. The sum of $4,682,350, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made for township bridges in Article 98, Section 85 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 120. The sum of $11,838,754, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made for township bridges in Article 97, Section 15 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
CONSTRUCTION
Section 125. The sum of $84,344,126, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 105 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 130. The sum of $15,327,842, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 110 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 135. The sum of $37,190,337, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 90 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 140. The sum of $105,652,814, or so much
thereof as may be necessary, and remains unexpended at the close of business on
June 30, 2005, from the reappropriation heretofore made in Article 98, Section
95 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to
the Department of Transportation for the same purposes.
Section 145. The sum of $84,121,379, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 100 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 150. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 115 of Public Act 93-0842, as amended, are reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code, for bikeways as provided by Public Act 78-850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program; such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg .................... $200,932,200
District 2, Dixon............................ $1,957,521
District 3, Ottawa........................... $4,792,101
District 4, Peoria........................... $2,609,730
District 5, Paris............................ $3,037,678
District 6, Springfield...................... $4,533,803
District 7, Effingham....................... $19,032,878
District 8, Collinsville.................... $24,009,551
District 9, Carbondale....................... $1,197,513
Statewide ................................ $24,771,241
Total $286,874,216
Section 155. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 120 of Public Act 93-0842, as amended, are reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code, for bikeways as provided by Public Act 78-850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program; such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg..................... $189,992,755
District 2, Dixon............................ $9,428,867
District 3, Ottawa .......................... $4,236,876
District 4, Peoria........................... $2,249,157
District 5, Paris............................ $2,881,965
District 6, Springfield...................... $8,922,091
District 7, Effingham........................ $2,624,939
District 8, Collinsville..................... $5,094,159
District 9, Carbondale....................... $7,153,837
Statewide ................................ $15,545,452
Total $248,130,098
Section 160. The sum of $307,718,845, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 97, Section 20 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code, for bikeways as provided by Public Act 78-850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program; such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.
Section 165. The sum of $963,018, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 125 of Public Act 93-0842, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.
Section 170. The sum of $82,888,328, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 98, Section 195 of Public Act 93-0842, as amended, is reappropriated from the Road Fund to the Department of Transportation for highway construction expenditures on projects consistent with the purposes of the Road Fund.
Section 175. The sum of $155,802, or so much thereof as may be necessary, and remains unexpended, less $91,777 to be lapsed from the unexpended balance at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 150 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Transportation for use as matching funds for the Illinois Transportation Enhancement program for the Historic Preservation Agency.
Section 180. The sum of $27,151, or so much thereof as may be necessary, and remains unexpended, less $14,783 to be lapsed from the unexpended balance at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 155 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Department of Transportation for use as matching funds for the Illinois Transportation Enhancement program for the Department of Natural Resources.
Section 185. The sum of $10,426,906, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 300 of Public Act 93-0842, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.
Section 190. The sum of $1,720,966, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 305 of Public Act 93-0842, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.
Section 195. The sum of $4,053,691, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 280 of Public Act 93-0842, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.
Section 200. The sum of $20,264,570, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 285 of Public Act 93-0842, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.
Section 205. The sum of $26,521,044, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 290 of Public Act 93-0842, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for the same purposes.
Section 210. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 295 of Public Act 93-0842, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg...................... $14,599,303
District 2, Dixon............................ $1,055,807
District 3, Ottawa............................. $562,607
District 4, Peoria........................... $2,083,744
District 5, Paris.............................. $345,534
District 6, Springfield........................ $147,944
District 7, Effingham........................ $1,651,750
District 8, Collinsville..................... $3,149,376
District 9, Carbondale......................... $298,425
Statewide................................... $12,721,660
Total $36,616,150
Section 215. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 310 of Public Act 93-0842, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg ..................... $21,017,113
District 2, Dixon........................... $22,191,602
District 3, Ottawa........................... $8,273,466
District 4, Peoria........................... $4,491,447
District 5, Paris............................ $7,276,480
District 6, Springfield..................... $15,160,109
District 7, Effingham....................... $11,368,442
District 8, Collinsville.................... $24,972,306
District 9, Carbondale...................... $15,341,046
Statewide................................... $45,912,173
Total $176,004,184
Section 220. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriations heretofore made in Article 97, Section 50 of Public Act 93-0842, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; and for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations as follows:
District 1, Schaumburg..................... $412,790,159
District 2, Dixon........................... $59,036,358
District 3, Ottawa.......................... $34,943,254
District 4, Peoria......................... $165,675,709
District 5, Paris........................... $41,651,464
District 6, Springfield..................... $45,771,863
District 7, Effingham....................... $26,603,879
District 8, Collinsville.................... $83,920,745
District 9, Carbondale...................... $28,378,481
Statewide................................... $60,527,613
Total $959,299,525
Section 225. The sum of $12,575,772, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 98, Section 200 of Public Act 93-0842, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for highway construction expenditures on projects consistent with the purposes of the State Construction Account Fund.
BOND FUND CONSTRUCTION
CONSTRUCTION
Section 230. The sum of $5,117,609, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 180 of Public Act 93-0842, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.
Section 235. The sum of $20,621,985, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 185 of Public Act 93-0842, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.
Section 240. The sum of $59,360,449, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 190 of Public Act 93-0842, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.
Section 245. The sum of $273,438,795, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 205 of Public Act 93-0842, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.
Section 250. The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 210 of Public Act 93-0842, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.
GRADE CROSSING PROTECTION
CONSTRUCTION
Section 255. The sum of $31,150,068, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made for grade crossing protection or grade separation in Article 98, Section 130 of Public Act 93-0842, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.
Section 260. The sum of $21,897,668, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made for grade crossing protection or grade separation in Article 98, Section 135 of Public Act 93-0842, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.
Section 265. The sum of $26,250,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made for grade crossing protection or grade separation in Article 97, Section 25 of Public Act 93-0842, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.
DIVISION OF AERONAUTICS
AWARDS AND GRANTS
Section 270. The sum of $71,483,115, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 140 of Public Act 93-0842, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
Section 275. The sum of $55,703,205, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 145 of Public Act 93-0842, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
Section 280. The sum of $204,042,900, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 97, Section 30 of Public Act 93-0842, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
Section 285. The sum of $25,845,235, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning airport improvements heretofore made in Article 98, Section 215 of Public Act 93-0842, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
Section 290. The sum of $13,740,100, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning airport improvements heretofore made in Article 98, Section 220 of Public Act 93-0842, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
CONSTRUCTION
Section 295. The sum of $25,610,250, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 225 of Public Act 93-0842, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
Section 300. The sum of $5,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 230 of Public Act 93-0842, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION
AWARDS AND GRANTS
Section 310. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 250 of Public Act 93-0842, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:
Pursuant to Section 4(b)(1) of the General
Obligation Bond Act, as amended,
less $2,736,726 to be lapsed
from the unexpended balance................. $2,987,085
For the counties of Cook, DuPage,
Kane, Lake, McHenry and Will,
pursuant to Section 4(b)(2) of
the General Obligation Bond Act,
as amended, less $1,899,084
to be lapsed from the unexpended balance.... $3,027,296
For the counties of the State
outside the counties of Cook,
DuPage, Kane, Lake, McHenry and
Will, pursuant to Section
4(b)(3) of the General Obligation
Bond Act, as amended, less $843,745
to be lapsed from the unexpended balance...... $871,759
Total $1,406,585
Section 315. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 235 of Public Act 93-0842, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:
Pursuant to Section 4(b)(1) of
the General Obligation Bond Act,
as amended, less $12,665,654
to be lapsed from the unexpended balance.. $143,002,139
For the counties of the State
outside the counties of Cook,
DuPage, Kane, McHenry, and Will,
pursuant to Section 4(b)(1)
of the General Obligation Bond
Act, as amended, less $8,762,953
to be lapsed from the unexpended balance... $15,275,028
For the Department of Transportation's
Greenlight Program pursuant to
Section 4(b)(1) of the General
Obligation Bond Act, as amended,
less $4,757,461 to be lapsed from
the unexpended balance ........................ $46,602,722
To extend the metrolink rail line
to Mid-America Airport........................ $5,000,002
Total $183,693,823
Section 320. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriations heretofore made in Article 98, Section 240 of Public Act 93-0842, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:
Pursuant to Section 4(b)(1) of
the General Obligation Bond Act,
as amended, less $43,703,400
to be lapsed from the unexpended balance... $75,977,478
For the counties of the State
outside the counties of Cook,
DuPage, Kane, McHenry, and Will,
pursuant to Section 4(b)(1)
of the General Obligation Bond
Act, as amended.................................... $0
For the Department of Transportation's
Greenlight Program pursuant to
Section 4(b)(1) of the General
Obligation Bond Act, as amended................ 0
Total $75,977,478
Section 325. The sum of $33,742,989, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 265 of Public Act 93-0842, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
Section 330. The sum of $15,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 270 of Public Act 93-0842, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
Section 335. The sum of $15,039,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 97, Section 45 of Public Act 93-0842, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
RAIL PASSENGER AND RAIL FREIGHT
AWARDS AND GRANTS
Section 340. The sum of $9,603,756, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 160 of Public Act 93-0842, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 345. The sum of $2,575,333, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 165 of Public Act 93-0842, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 350. The sum of $3,500,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 97, Section 35 of Public Act 93-0842, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 355. The sum of $7,840,403, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 170 of Public Act 93-0842, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.
Section 360. The sum of $2,713,714, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 175 of Public Act 93-0842, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.
Section 365. The sum of $5,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation heretofore made in Article 97, Section 40 of Public Act 93-0842, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.
Section 370. The sum of $20,889,926, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 255 of Public Act 93-0842, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
Section 375. The sum of $20,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation heretofore made in Article 98, Section 260 of Public Act 93-0842, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.
Section 380. The sum of $2,609,597, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 98, Section 315 of Public Act 93-0842, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 385. The sum of $1,100,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 98, Section 320 of Public Act 93-0842, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 390. The sum of $1,100,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from the appropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 97, Section 55 of Public Act 93-0842, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.
Section 395. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:
Section 5 Permanent Improvements
Section 10 Permanent Improvements
Section 15 Permanent Improvements
Section 20 Rail Relocation – Federal
Section 25 Rail Relocation - State
Section 175 CDB – Enhancement
Section 180 CDB - Enhancement
Section 230 Series A - (Road Program)
Section 235 Series A - (Road Program)
Section 240 Series A - (Road Program)
Section 245 Series A - (Road Program)
Section 250 Series A - (Road Program)
Section 285 Series B - (Aeronautics)
Section 290 Series B - (Aeronautics)
Section 295 Series B - (Land Acquisition 3rd Airport)
Section 300 Series B - (Land Acquisition 3rd Airport)
Section 310 Series B - (Transit)
Section 315 Series B - (Transit)
Section 320 Series B - (Transit)
Section 340 State Rail Freight Loan Repayment
Section 345 State Rail Freight Loan Repayment
Section 350 State Rail Freight Loan Repayment
Section 355 FHSRTF High Speed Rail-Federal
Section 360 FHSRTF High Speed Rail-Federal
Section 365 FHSRTF High Speed Rail-Federal
Section 370 Series B - (Rail)
Section 375 Series B - (Rail)
Section 380 Federal Rail Freight Loan Repayment
Section 385 Federal Rail Freight Loan Repayment
Section 390 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
Total, Article 9 $4,192,006,252
ARTICLE 10
CAPITAL DEVELOPMENT BOARD
Section 5. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
STATEWIDE
For surveys and modifications to buildings
to meet requirements of the federal Americans
with Disabilities Act (ADA)................... 4,000,000
For surveys and abating hazardous materials........ 250,000
For repairing minor problems and emergencies..... 2,000,000
Total $6,250,000
Section 10. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:
ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
For replacing fire suppression systems in
various buildings............................. 1,107,000
For replacing roofing systems...................... 375,000
Total $1,482,000
Section 15. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:
CAVE-IN-ROCK STATE PARK – HARDIN COUNTY
For replacing the site residence roof............... 22,200
GIANT CITY STATE PARK – JACKSON COUNTY
For replacing roofing systems...................... 102,000
HORSESHOE LAKE CONSERVATION AREA – ALEXANDER COUNTY
For replacing roofing systems...................... 105,000
I & M CANAL – CHANNAHON STATE PARK – WILL COUNTY
For improving DuPage River Spillway, in addition
to funds previously appropriated................ 475,000
JUBILEE COLLEGE STATE PARK – PEORIA COUNTY
For replacing the dump station sewage system....... 409,000
PERE MARQUETTE STATE PARK – JERSEY COUNTY
For repairing sewage and water plant............... 621,000
SNAKEDEN HOLLOW FISH & WILDLIFE AREA – KNOX COUNTY
For rehabilitating the Spillway, in addition
to funds previously appropriated.............. 1,215,000
Total $2,949,200
Section 20. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans’ Affairs for the projects hereinafter enumerated:
LASALLE VETERANS’ HOME
For constructing an 80-bed expansion, in addition
to funds previously appropriated............. 11,600,000
MANTENO VETERANS’ HOME – KANKAKEE COUNTY
For installing nurse call stations................. 454,000
For replacing water mains........................ 1,040,000
For installing humidifiers and
dehumidifers, in addition to
funds previously appropriated................... 855,000
QUINCY VETERANS’ HOME – ADAMS COUNTY
For replacing the fire alarm system................ 373,000
STATEWIDE
For planning and beginning a 200-bed facility.... 2,000,000
... Total...................................... $16,322,000
Section 25. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:
ILLINOIS MEDICAL DISTRICT COMMISSION – CHICAGO
For repairing structural deficiencies.............. 300,000
For redeveloping site and code compliance........ 1,000,000
Total $1,300,000
Section 30. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
DIXON CORRECTIONAL CENTER – LEE COUNTY
For planning and beginning the upgrade of the
fire alarm system............................... 300,000
HARDIN COUNTY WORK CAMP
For upgrading the sewage treatment plant........... 350,000
ILLINOIS YOUTH CENTER – PERE MARQUETTE
For replacing roofing systems....................... 96,000
For replacing boilers in two buildings.............. 91,000
JACKSONVILLE CORRECTIONAL CENTER – MORGAN COUNTY
For upgrading underground utilities................ 189,000
MENARD CORRECTIONAL CENTER – RANDOLPH COUNTY
For rehabilitating the north cellhouse........... 4,769,000
ROBINSON CORRECTIONAL CENTER – CRAWFORD COUNTY
For expanding the warehouse freezer................ 728,000
SHAWNEE CORRECTIONAL CENTER – JOHNSON COUNTY
For replacing windows in housing units in addition
to funds previously appropriated.............. 4,000,000
SHERIDAN CORRECTIONAL CENTER – LASALLE COUNTY
For replacing the door and lock control system..... 400,000
For moveable equipment for the 200-bed
housing unit.................................... 300,000
Total $11,223,000
Section 35. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:
DISTRICT 12 - EFFINGHAM
For upgrading the firing range................... 1,995,000
METRO-EAST
For the acquisition of land, planning
and beginning of a new forensic lab........... 2,500,000
Total $4,495,000
Section 40. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
APPELLATE COURT BUILDING AT MT. VERNON – JEFFERSON COUNTY
For replacing roofing systems....................... 59,000
SUPREME COURT BUILDING AT SPRINGFIELD – SANGAMON COUNTY
For replacing roofing systems...................... 293,000
For renovating former 4th district
appellate court space......................... 1,820,000
Total $2,172,000
Section 45. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
BLACKHAWK HISTORICAL AREA – ROCK ISLAND
For renovating retaining walls and shelters........ 528,000
CAHOKIA MOUNDS HISTORIC SITE – ST. CLAIR COUNTY
For replacing entry doors.......................... 588,000
LINCOLN’S TOMB HISTORIC SITE – SANGAMON COUNTY
For rehabilitating Lincoln’s Tomb.................. 426,000
Total $1,542,000
Section 50. The sum of $150,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for planning and beginning renovation of the Crenshaw House.
Section 55. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:
ILLINOIS CENTER FOR REHABILITATION AND EDUCATION –
ROOSEVELT – CHICAGO
For upgrading the fire alarm system................ 135,000
KENNETH HALL REGIONAL OFFICE BUILDING – EAST ST. LOUIS
For replacing roofing systems...................... 221,000
For upgrading the HVAC system.................... 1,145,000
MARION REGIONAL OFFICE BUILDING – WILLIAMSON COUNTY
For replacing roofing systems...................... 615,000
MEDICAL CENTER ( EDWARDS CENTER) – CHICAGO
For renovating for office space.................. 3,149,000
SINGER MENTAL HEALTH CENTER – ROCKFORD
For renovating for office space.................. 3,500,000
SUBURBAN NORTH REGIONAL OFFICE FACILITY – DES PLAINES
For renovating for office space.................. 1,601,000
... Total...................................... $10,366,000
Section 60. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER – ANNA
For installing an emergency generator.............. 547,000
ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE
For replacing water valves throughout the campus... 403,000
JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN COUNTY
For upgrading coal conveying equipment............. 530,000
KILEY DEVELOPMENTAL CENTER – WAUKEGAN
For repairing/replacing roofing systems.......... 1,481,000
MADDEN MENTAL HEALTH CENTER – HINES
For upgrading pavilions for safety and security.... 525,000
SHAPIRO DEVELOPMENTAL CENTER – WAUKEGAN
For planning and beginning
replacement of the HVAC system................. 1,500,000
SINGER MENTAL HEALTH AND DEVELOPMENTAL CENTER – ROCKFORD
For upgrading the fire alarm system, in addition
to funds previously appropriated................ 300,000
Total $5,286,000
Section 65. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL COMPLEX
For upgrading emergency egress systems........... 1,128,000
HERNDON BUILDING – SPRINGFIELD
For correcting the water infiltration problems..... 897,000
SPRINGFIELD
For upgrading the high voltage system
at the capitol complexand the Dirksen
Parkway motor vehicle services facility......... 535,000
Total $2,560,000
Section 70. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
GALESBURG ARMORY
For the construction of a new armory............. 1,800,000
AURORA ARMORY
For planning and beginning construction
of an Army aviation support facility............ 250,000
Total 2,050,000
Section 75. The following named amounts, or so much thereof as may be necessary, are appropriated from the School Construction Fund to the Capital Development Board for the School Construction Program for the projects hereinafter enumerated:
STATEWIDE
Grants for facility construction............... 500,000,000
Section 80. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:
ATTORNEY GENERAL – SPRINGFIELD
For upgrading the snow melt system................. 134,000
For replacing the roof and stone joints............ 121,000
Total $255,000
Section 85. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board/Illinois Board of Higher Education for the projects hereinafter enumerated:
STATEWIDE
For miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various universities and community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.................................. 30,000,000
Chicago State University............... 483,100
Eastern Illinois University............ 773,300
Governors State University............. 284,600
Illinois State University............ 1,532,000
Northeastern Illinois University....... 575,500
Northern Illinois University......... 1,738,500
Western Illinois University.......... 1,188,300
Southern Illinois University-
Carbondale......................... 2,437,500
Southern Illinois University-
Edwardsville....................... 1,144,600
University of Illinois-Chicago....... 4,165,900
University of Illinois-Springfield..... 343,700
University of Illinois-Urbana-
Champaign.......................... 6,225,400
Illinois Community College Board..... 9,107,600
Section 90. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Board of Trustees of the University of Illinois for the projects hereinafter enumerated:
UNIVERSITY OF ILLINOIS-URBANA-CHAMPAIGN
For the planning, analysis and design
of Lincoln Hall. Design cannot
proceed beyond program analysis/
preliminary design unless
approved in writing by the Governor........... 3,000,000
For planning and beginning construction
of the Integrated-Post-Harvest
Processing Center............................. 2,990,000
Total $5,990,000
Section 95. The following named amount, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Board of Trustees of Western Illinois University for the project hereinafter enumerated:
WESTERN ILLINOIS UNIVERSITY
For planning and beginning the Phase
One construction of the riverfront
campus development............................ 2,399,000
Section 100. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Board of Trustees of Southern Illinois University for the projects hereinafter enumerated:
SOUTHERN ILLINOIS UNIVERSITY – CARBONDALE
For planning and beginning the construction
of a Transportation Education Center.......... 3,902,900
SOUTHERN ILLINOIS UNIVERSITY – EDWARDSVILLE
For planning and beginning the renovation
and expansion of the Science
Laboratory Building........................... 2,906,400
Total $6,809,300
Section 105. The following named amount, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Math and Science Academy for the project hereinafter enumerated:
ILLINOIS MATH AND SCIENCE ACADEMY - AURORA
For replacing the fire alarm system............... $200,000
Section 110. The amount of $377,533, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated for land, planning, remodeling, construction and all costs necessary to construct a facility at the University Center of Lake County, in addition to funds previously appropriated.
Section 115. The amount of $1,887,550, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education to plan and begin construction of a space for the delivery of a teacher training and development and student enrichment program at the Illinois Math and Science Academy, in addition to funds previously appropriated.
Section 120. The sum of $50,000,000, or so much there of as may be necessary, is appropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Total, Article 10 $666,065,583
ARTICLE 11
CAPITAL DEVELOPMENT BOARD
Section 5. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 5 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:
ILLINOIS STATE FAIRGROUNDS - DUQUOIN
(From Article 99, Section 5 of Public Act 93-0842)
For completing the upgrade of the
electrical distribution system, in
addition to funds previously
appropriated................................... 1,510,411
For upgrading the telecommunications
system........................................... 400,000
For upgrading the HVAC system...................... 180,208
For constructing a multi-purpose
building......................................... 297,084
ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
For renovating comfort stations, in addition
to funds previously appropriated................. 982,190
For renovating the grandstand area.................. 92,189
For renovating the Emmerson Building................ 93,813
For renovating or replacing #26 Barn............... 133,169
For renovating the Junior Home Economics
Building.......................................... 61,424
For installing HVAC system and
restrooms in the Orr Building.................... 228,211
Total $3,978,699
Section 15. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 15 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Agriculture for the project hereinafter enumerated:
ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
(From Article 99, Section 15 of Public Act 93-0842)
For replacing and upgrading roofs, in addition
to funds previously appropriated................. 106,968
Section 20. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 20 of Public Act 93-0842, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
MT. VERNON APPELLATE COURT BUILDING
(From Article 99, Section 20 of Public Act 93-0842)
For expanding the courthouse, in
addition to funds previously
appropriated...................................... 33,519
SPRINGFIELD - SUPREME COURT BUILDING
For replacing the roofing system, in addition
to funds previously appropriated.................. 16,570
For replacing the roof.............................. 23,575
For renovating the HVAC system on
the 3rd Floor.................................... 140,000
For installing humidifier and water
filtration systems............................. 1,527,950
APPELLATE COURT SECOND DISTRICT - ELGIN
For miscellaneous improvements...................... 61,779
Total $1,803,393
Section 30. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 30 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:
SUPREME COURT BUILDING - SPRINGFIELD
(From Article 99, Section 30 of Public Act 93-0842)
For renovating the Library and
completing HVAC, in addition to funds
previously appropriated.......................... 235,000
Section 35. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 35 of Public Act 93-0842, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect of the Capitol for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
(From Article 99, Section 35 of Public Act 93-0842)
For equipment, remodeling and all other
costs related to the maintenance, renovation
or restoration of areas located in the
Capitol Building............................... 2,500,000
For all costs related to asbestos and
environmental abatement in the
Capitol Building............................... 7,500,000
Total $10,000,000
Section 40. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 40, of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL BUILDING - SPRINGFIELD
(From Article 99, Section 40 of Public Act 93-0842)
For planning and design, providing a study,
historical analysis, asbestos abatement
and all other costs associated with the
upgrade of the HVAC system in the Capitol
building....................................... 2,650,000
For all costs related to the planning
and design of life safety and fire
protection system improvements, hazardous
material abatement, historical restoration
and construction in the Capitol Building....... 1,000,000
For upgrading the HVAC systems, in
addition to funds previously
appropriated................................... 2,329,972
CAPITOL COMPLEX - SPRINGFIELD
For completing the stone restoration, in
addition to funds previously appropriated...... 1,393,643
For demolition of 222 S. College,
and landscaping of Capitol Complex
in addition to funds previously
appropriated................................... 1,200,000
For demolition of 222 South College
Building and landscaping of
Capitol Complex................................ 2,387,894
DRIVER'S FACILITY WEST - CHICAGO
For renovating the building........................ 832,578
MOTOR VEHICLE SERVICES FACILITY - SPRINGFIELD
For upgrading the fire alarm and
security systems................................. 420,640
STATE POWER PLANT - SPRINGFIELD
For installing new water service and
repairing power plant systems..................... 72,377
WILLIAM G. STRATTON BUILDING - SPRINGFIELD
For the planning, design, reconstruction,
and construction to renovate or replace
the Stratton Office Building, in addition
to funds previously appropriated.............. 11,582,631
Total $23,869,735
Section 45. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 45 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:
CAPITOL COMPLEX – SPRINGFIELD
(From Article 99, Section 45 of Public Act 93-0842)
For upgrading fire alarm systems in
two buildings................................... 150,642
For expanding the shipping and
receiving dock................................... 161,389
Total $312,031
Section 50. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 50 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:
STATEWIDE
(From Article 99, Section 50 of Public Act 93-0842)
For upgrading the building security
system at the James R. Thompson Center
and the State of Illinois building
in addition to funds previously
appropriated..................................... 655,000
OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
For planning and beginning the renovation
of the facility................................ 1,608,958
DIXON STATE GARAGE - LEE COUNTY
For upgrading the lighting and
replacing the roof............................... 240,981
JAMES R. THOMPSON CENTER - CHICAGO
For installing an emergency generator............ 3,545,000
For rehabilitating exterior columns, in
addition to funds previously appropriated...... 1,000,000
For upgrading mechanical systems, in
addition to funds previously appropriated........ 813,472
MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO
For replacing roof and upgrading
mechanical and electrical systems................ 325,656
ROCKFORD REGIONAL OFFICE BUILDING
For replacing Halon and upgrading
the air conditioning............................. 424,590
ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
ROOSEVELT ROAD - CHICAGO
For upgrading electrical systems................... 436,295
For upgrading the HVAC system....................... 45,237
ILLINOIS CENTER FOR REHABILITATION AND
EDUCATION (WOOD) - CHICAGO
For upgrading fire and safety systems.............. 118,253
SPRINGFIELD - RESEARCH AND COLLECTION CENTER
For expanding surplus warehouse.................... 594,445
SPRINGFIELD STATE GARAGE
For renovating the interior of the
central garage................................... 120,033
SPRINGFIELD - COMPUTER FACILITY
For upgrading the computer room and the
electrical system................................ 594,241
For installing a cooling tower and fire alarm
system and various other improvements............ 162,911
STATE OF ILLINOIS BUILDING - CHICAGO
For restoring exterior and rebuilding
foundation....................................... 611,248
Total $11,296,320
Section 60. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 60, of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:
STATEWIDE
(From Article 99, Section 60 of Public Act 93-0842)
Telecommunications Building - Springfield
Roof Replacement.................................. 91,229
ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
(ROOSEVELT) – CHICAGO
For replacing the roofing system................... 91,567
For upgrading the kitchen and plumbing............. 219,513
JAMES R. THOMPSON CENTER - CHICAGO
For rehabilitating exterior columns, in
addition to funds previously appropriated........ 48,157
Total $450,466
Section 65. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 65 and Article 28, Section 95 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:
ARGYLE LAKE STATE PARK - MCDONOUGH COUNTY
(From Article 99, Section 65 of Public Act 93-0842)
For upgrading the sewage treatment system.......... 259,700
BABE WOODYARD STATE NATURAL AREA -
VERMILION COUNTY
For developing the site and associated
land acquisition............................... 2,610,485
BEAVER DAM STATE PARK - MACOUPIN COUNTY
For replacing the sewage system..................... 61,779
CARLYLE LAKE STATE PARKS
For road and site improvements at
Carlyle Lake................................... 1,477,424
For infrastructure and site
improvements at Carlyle Lake..................... 821,110
EAGLE CREEK STATE PARK - SHELBY COUNTY
For constructing lake access boat
docks at resort.................................. 326,934
FERNE CLYFFE STATE PARK - JOHNSON COUNTY
For replacing the campground
sewage treatment system.......................... 391,843
FOX RIDGE STATE PARK - COLES COUNTY
For replacing spillway............................. 127,161
GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
For replacing floating boardwalk.................... 40,980
HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
For rehabilitating/repairing railroad
bridges, in addition to funds
previously appropriated.......................... 859,185
For rehabilitating aqueducts
#3, #4 and #8.................................... 104,452
HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
For dam rehabilitation and the State's share
to implement the ecological restoration
plan in cooperation with the U.S.
Army Corps of Engineers, and
land acquisition................................. 842,605
I & M Canal - CHANNAHON STATE PARK - WILL COUNTY
For improving DuPage River Spillway................ 101,600
ILLINOIS BEACH STATE PARK - LAKE COUNTY
For replacing sanitary sewer line................... 79,748
For replacing sanitary sewer lines................. 362,372
KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
For constructing sanitary sewer system, in
addition to funds previously appropriated...... 5,000,000
KICKAPOO STATE PARK - VERMILION COUNTY
For replacing stairway to Long Pond................. 39,018
For rehabilitating the water
system and day-use areas......................... 108,424
MASON STATE FOREST TREE NURSERY
For expanding the cold storage facility............. 33,004
For expanding the seed cleaning facility........... 210,659
MORAINE HILLS STATE PARK - MCHENRY COUNTY
For replacement of restrooms and upgrading
the water system.................................. 82,922
MORAINE VIEW STATE PARK - MCLEAN COUNTY
For upgrading the water plant....................... 30,008
RED HILLS STATE PARK - LAWRENCE COUNTY
For miscellaneous improvements...................... 44,740
RESEARCH & COLLECTIONS CENTER - SPRINGFIELD
For renovating the interior........................ 113,771
ROCK CUT STATE PARK - WINNEBAGO COUNTY
For upgrading the sewage system.................. 1,936,593
NEW OFFICE BUILDING - SPRINGFIELD
For completing construction of an
office building, in addition to funds
previously appropriated........................... 21,411
SAM PARR STATE PARK - JASPER COUNTY
For renovating recreational facilities............. 819,757
SILOAM SPRINGS STATE PARK - ADAMS COUNTY
For rehabilitating office/service
area........................................... 1,142,972
SNAKEDEN HOLLOW FISH AND WILDLIFE AREA - KNOX COUNTY
For rehabilitating the Spillway, in
addition to funds previously
appropriated...................................... 47,504
WORLD SHOOTING COMPLEX – SPARTA
(From Article 28, Section 95 of Public Act 93-0842)
For construction of the World Shooting
Complex in Sparta............................. 27,956,233
SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
(From Article 99, Section 65 of Public Act 93-0842)
For planning and beginning renovation
of hatchery...................................... 144,480
SPRINGFIELD
For constructing an office building and
interpretive center.............................. 234,875
SPRING LAKE CONSERVATION AREA - TAZEWELL COUNTY
For stabilizing levee and
shoreline........................................ 400,256
STARVED ROCK STATE PARK AND LODGE - LASALLE COUNTY
For upgrading water and sewer systems.............. 119,645
WASTE MANAGEMENT & RESEARCH CENTER
For constructing a garage and
storage area..................................... 368,009
WELDON SPRINGS STATE PARK - DE WITT COUNTY
For upgrading residence utilities................... 40,000
WHITE PINES FOREST STATE PARK - OGLE COUNTY
For completing the replacement of the
sewer system, in addition to funds
previously appropriated........................... 34,506
For planning and beginning sewer system
replacement....................................... 57,278
For planning and beginning lodge and cabin
restoration........................................ 8,512
WILDLIFE PRAIRIE PARK
For rehabilitating the sewage
treatment plant.................................. 768,125
For planning and beginning the upgrade
of the park...................................... 131,648
WILLIAM W. POWERS FISH AND WILDLIFE AREA – COOK COUNTY
For replacing sanitary sewer lines and
lift station..................................... 466,816
TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
For constructing a visitor center and
purchasing land.................................. 329,689
STATE MUSEUM - SPRINGFIELD
Plan, begin construction of Illinois
State Museum................................... 3,573,090
For renovating or replacing exhibits, in
addition to funds previously appropriated......... 48,357
STATEWIDE
For replacing/repairing the roofing systems
at the following locations at the approximate
cost set forth below............................ 245,000
Clinton Lake Recreational
Area - DeWitt County................. 65,000
Ferne Clyffe State Park-
Johnson County....................... 20,000
Hennepin Canal Parkway
State Park........................... 26,000
Lake Le-Aqua-Na State Park-
Stephenson County.................... 39,000
Mermet Lake Conservation Area-
Massac County........................ 95,000
For replacing/repairing the roofing systems
at the following locations at the approximate
costs set forth below........................... 183,179
Starved Rock State Park &
Lodge-LaSalle County................. 60,000
Kaskaskia River Fish & Wildlife
Area-Randolph County................. 25,000
Pyramid State Park-
Perry County.......................... 4,109
Region V Office (Benton)
Franklin County...................... 94,070
For rehabilitating dams and bridges................ 767,542
For constructing, replacing and
renovating lodges and concession
buildings...................................... 3,616,471
For replacing roofs at the following locations,
at the approximate cost set forth below.......... 167,660
Shabbona Lake State
Park................................. 40,850
Hennepin Canal Parkway
State Park........................... 15,750
Randolph Fish &
Wildlife Area........................ 65,000
Dixon Springs State
Park................................. 46,060
For replacing and constructing vault
toilets at the following locations,
at the approximate cost set forth
below............................................ 629,937
Wayne Fitzgerrell State Park........ 106,348
Hennepin Canal Parkway
State Trail......................... 294,567
Kaskaskia River Fish &
Wildlife Area....................... 229,022
For rehabilitating dams at the
following locations, at the
approximate cost set forth below................. 662,604
Rock Cut State Park................. 450,000
Snakeden Hollow State Park.......... 212,604
For replacing roofs at the following
locations, at the approximate
cost set forth below............................. 206,926
Southern IL Arts &
Crafts Center.......................... 412
Frank Holten State Park................. 412
DNR Geological Survey-
Champaign.............................. 413
Sangchris Lake State
Park................................. 5,291
Illini State Park..................... 1,692
Shelbyville Fish &
Wildlife Area....................... 79,480
Trail of Tears State
Forest............................... 3,685
Sanganois Conservation Area............. 413
Rice Lake State Park................. 28,090
Hidden Spring State Park............. 53,740
Siloam Springs State Park............. 2,417
Mississippi Palisades
State Park.......................... 30,880
For replacing roofing systems at the
following locations, at the approximate
cost set forth below............................. 325,528
Beall Woods Conservation Area -
Wabash County....................... 2,500
Eldon Hazlet State Park -
Clinton County...................... 2,475
Fox Ridge State Park -
Coles County....................... 21,532
Giant City State Park -
Jackson/Union Counties.................. 1
Goose Lake Prairie State Park -
Grundy County....................... 9,450
Hennepin Canal Parkway State Trail . 41,303
Illinois Beach State Park -
Lake County....................... 146,682
Illinois Caverns Natural Area -
Monroe County...................... 21,000
Kankakee River State Park -
Kankakee/Will Counties............. 38,647
Moraine Hills State Park -
McHenry County..................... 23,387
Moraine View State Park -
McLean County....................... 3,601
Ramsey Lake State Park -
Fayette County...................... 1,000
Randolph County Conservation Area...... 160
Stephen A. Forbes State Park -
Marion County....................... 6,857
Ten Mile Creek State Fish &
Wildlife Area - Jefferson/
Hamilton Counties...................... 63
Union County Conservation Area.......... 23
Washington County Conservation Area . 3,453
William W. Powers Conservation Area -
Cook County......................... 2,394
Wolf Creek State Park -
Shelby County....................... 1,000
For replacing vault toilets at the following
locations, at the approximate cost set forth
below............................................ 333,369
Anderson Lake Conservation Area -
Fulton/Schuyler Counties........... 86,928
Giant City State Park -
Jackson/Union Counties............ 179,162
Randolph County Conservation Area... 38,158
Silver Springs State Park -
Kendall County.................... 29,121
For constructing hazardous material storage
buildings......................................... 11,535
For constructing vault toilets at the
following locations at the approximate
cost set forth below:............................ 137,897
Apple River Canyon State Park........ 19,699
Des Plaines Conservation Area........ 19,700
Kankakee River State Park............ 19,700
Lake Le-Aqua-Na State Park........... 19,699
Marshall County Conservation Area.... 19,700
Morrison-Rockwood State Park......... 19,699
Rice Lake Conservation Area.......... 19,700
For land acquisition............................... 274,539
For planning, construction, reconstruction,
land acquisition and related costs,
utilities, site improvements, and all other
expenses necessary for various capital
improvements at parks, conservation areas,
and other facilities under the jurisdiction
of the Department of Natural Resources......... 1,307,244
Total $61,816,770
Section 70. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 70 of Public Act 93-0842, are reappropriated from the Tobacco Settlement Recovery Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:
STATEWIDE PROGRAM
(From Article 99, Section 70 of Public Act 93-0842)
For maintaining lodge and concession
facilities........................................ 13,722
For maintaining lodge
and concession facilities......................... 20,018
For rehabilitating or
replacing playground equipment.................... 74,649
ILLINOIS BEACH STATE PARK - LAKE COUNTY
For stabilizing the shoreline...................... 390,055
Total $498,444
Section 75. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 75 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Natural Resources for the project hereinafter enumerated:
GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY
(From Article 99, Section 75 of Public Act 93-0842)
For rehabilitating visitor's center
exterior.......................................... 26,605
STATEWIDE PROGRAM
For replacing roofs at the following
locations, at the approximate costs set
forth below....................................... 63,077
Castle Rock State Park................ 29,414
Morrison-Rockwood State Park.......... 33,663
WELDON SPRINGS STATE PARK - DEWITT COUNTY
For improving the campgrounds....................... 47,232
Total $136,914
Section 80. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 80, of Public Act 93-0842, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
CENTRALIA CORRECTIONAL CENTER
(From Article 99, Section 80 of Public Act 93-0842)
For replacing the cooling tower.................... 624,276
For upgrading the electrical system, in
addition to funds previously appropriated........ 718,989
For upgrading building automation system........... 114,452
DANVILLE CORRECTIONAL CENTER
For upgrading the power plant, in
addition to funds previously appropriated...... 1,045,888
DECATUR CORRECTIONAL CENTER
For upgrading smoke and fire doors................. 140,000
DIXON CORRECTIONAL CENTER
For planning the upgrade and expansion
of the medical care facility..................... 190,913
For constructing a gun range and
classroom building................................ 21,350
DWIGHT CORRECTIONAL CENTER
For renovating Housing Unit C8, in
addition to funds previously
appropriated..................................... 270,000
For renovating buildings, in addition
to funds previously appropriated................. 274,847
For renovation of buildings......................... 30,261
EAST MOLINE CORRECTIONAL CENTER
For completing replacement of the
absorption chiller, in addition to
funds previously appropriated.................... 400,000
For upgrading the roofing system................... 687,807
For replacing windows, in addition to
funds previously appropriated.................. 1,604,422
For replacing the chiller/absorber................. 354,410
For upgrading the electrical
system........................................... 664,359
GRAHAM CORRECTIONAL CENTER
For upgrading the cooling tower.................... 269,881
For upgrading the mechanical system................ 385,955
For upgrading the building automation
system, in addition to funds previously
appropriated..................................... 900,000
For planning upgrade of building automation
system and fire alarm system..................... 128,020
For upgrading electrical system.................... 425,628
HOPKINS PARK
For infrastructure improvements
in connection with the Hopkins Park
Correctional Center............................ 6,398,238
ILLINOIS YOUTH CENTER - HARRISBURG
For utility upgrade, including gas
and sewer...................................... 5,475,300
For constructing a multi-purpose medical,
vocational and confinement building............ 9,757,548
ILLINOIS YOUTH CENTER - RUSHVILLE
For planning, design, construction, equipment
and all other necessary costs to add
a cellhouse.................................... 4,674,988
ILLINOIS YOUTH CENTER - ST. CHARLES
For constructing an R & C building
and other improvements........................ 27,191,194
For rehabilitation of the administration
building......................................... 200,668
JOLIET CORRECTIONAL CENTER
For replacing the transfer switch and
emergency generator.............................. 948,968
KANKAKEE MSU - KANKAKEE COUNTY
For fencing improvements............................ 34,878
LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
For constructing two cellhouses, in
addition to funds previously appropriated........ 158,637
LINCOLN CORRECTIONAL CENTER
For replacing doors and locks...................... 899,618
For upgrading the dietary freezers............... 1,812,420
LOGAN CORRECTIONAL CENTER
For planning and beginning the upgrade
of the power plant............................... 620,609
For renovating the electrical
distribution system............................ 1,653,627
For constructing a medical building
and dietary building........................... 2,405,027
MENARD CORRECTIONAL CENTER - CHESTER
For replacing the administration building,
in addition to funds previously
appropriated.................................. 12,300,000
For replacing the Administration
Building....................................... 1,000,000
For correcting slope failure & MSU
improvements...................................... 45,526
For improving ventilation and dehumidification
systems in the kitchen and dining rooms........... 75,183
For completing upgrade of North Cellhouse
plumbing system, in addition to funds
previously appropriated........................... 35,051
For replacing toilets and waste lines
at E/W Cellhouse and upgrade
North Cellhouse plumbing......................... 374,675
For renovation or replacement of the
Old Hospital Building, in addition to
funds previously appropriated.................... 153,586
For planning and construction of the
Administration Building.......................... 890,215
PONTIAC CORRECTIONAL CENTER
For replacing doors and frames................... 1,620,000
For replacing the roof on the Training
Center and Industry.............................. 368,939
SHAWNEE CORRECTIONAL CENTER
For replacing the emergency generator............ 1,018,257
STATEVILLE CORRECTIONAL CENTER - JOLIET
For replacing doors and locks...................... 580,000
For planning and beginning renovation of
H & I houses..................................... 390,775
For replacing the water line....................... 215,294
For constructing a housing unit, cellhouse,
vehicle maintenance building and
warehouse for the reception and
classification center, in addition to
funds previously appropriated.................... 121,050
For replacing windows in B House................... 126,480
For replacing power plant and
utility distribution system.................... 1,508,463
For planning, design, construction,
equipment and all other necessary costs
for an Adult Reception and Classification
Center......................................... 1,406,145
For upgrading electrical system and elevator
and installing HVAC system..................... 1,156,777
TAMMS CORRECTIONAL CENTER
Construct bar screen............................... 150,905
VANDALIA CORRECTIONAL CENTER
For constructing a multi-purpose program
building.......................................... 90,656
For converting Administration Building and
planning construction of an Administration/
Health Care Unit................................. 308,406
For planning and beginning construction
for a slaughter house and meat plant............. 127,978
VIENNA CORRECTIONAL CENTER
For replacing the cooler and freezer............. 2,170,087
For upgrading the power plant.................... 4,670,000
For upgrading the HVAC system and replacing
water lines in six housing units................. 555,999
STATEWIDE
For upgrading roofing systems at the
following locations at the approximate
costs set forth below............................. 220,833
Hardin County Work
Camp................................. 8,808
Illinois Youth Center
Joliet.............................. 44,151
Pontiac Correctional
Center............................. 167,874
For replacing windows at the following
locations at the approximate costs
set forth below, in addition to funds
previously appropriated......................... 1,008,110
Dixon Correctional Center.......... 1,008,110
For replacing doors and locks
at the following locations at the
approximate costs set forth below.............. 1,758,247
Dixon Correctional Center......... 1,224,587
Hill Correctional Center............ 472,616
Vienna Correctional Center........... 61,044
For replacing roofing systems at
the following locations at the
approximate cost set forth below................. 236,373
Illinois Youth Center -
St. Charles......................... 87,434
Illinois Youth Center -
Warrenville......................... 117,522
Logan Correctional Center............ 31,417
For upgrading showers at the following
locations at the approximate
cost set forth below............................. 545,110
Hill Correctional
Center............................. 545,110
For upgrading water distribution systems at
the following locations at the approximate
cost set forth below............................. 336,500
Dixon Correctional Center............ 30,806
Joliet Correctional
Center............................. 305,694
For upgrading water towers at the following
locations at the approximate
cost set forth below........................... 1,729,245
Dixon Correctional
Center............................. 490,862
Illinois Youth Center -
St. Charles...................... 1,228,853
Illinois Youth Center -
Valley View.......................... 9,530
For planning, design, construction, equipment
and all other necessary costs for a
maximum security facility..................... 95,869,558
For planning a medium security facility
and land acquisition........................... 2,629,428
For replacing locks and control panels
at the following locations at the
approximate costs set forth below................ 849,512
Illinois River
Correctional Center................ 283,171
Western Illinois
Correctional Center................ 283,171
Danville Correctional
Center............................. 283,170
For replacing roofing systems at
the following locations at the
approximate cost set forth below................. 155,768
Menard Correctional Center............ 7,353
Vienna Correctional Center........... 81,100
Illinois Youth Center -
Harrisburg........................... 4,138
Pontiac Correctional Center.............. 10
Illinois Youth Center - Joliet....... 63,167
For replacing or upgrading security and
monitoring systems at the following
locations at the approximate cost set
forth below...................................... 373,156
Vienna Correctional
Center............................. 250,000
Pontiac Correctional
Center.............................. 94,450
Joliet Correctional
Center.............................. 28,706
For planning and replacing windows at the
following locations at the approximate cost
set forth below................................ 2,246,305
Vienna Correctional
Center........................... 1,780,000
Sheridan Correctional
Center............................. 314,454
Illinois Youth Center -
Valley View.......................... 8,310
Illinois Youth Center -
Joliet.............................. 74,875
Dixon Correctional
Center.............................. 65,436
Shawnee Correctional
Center............................... 3,230
For upgrading and renovating showers at
the following locations at the approximate
cost set forth below.............................. 32,189
Shawnee Correctional
Center.............................. 21,345
Danville Correctional
Center............................... 1,017
Graham Correctional
Center............................... 9,827
For replacing security fencing at the
following locations at the approximate
cost set forth below............................. 358,250
Hill Correctional
Center............................... 3,547
Western IL Correctional
Center.............................. 31,427
Joliet Correctional
Center.............................. 49,119
Logan Correctional
Center............................. 200,000
Dixon Correctional
Center............................... 8,752
Shawnee Correctional
Center............................... 5,269
Graham Correctional
Center.............................. 24,369
Danville Correctional
Center.............................. 35,767
For planning, design, construction, equipment
and all other necessary costs for a
female multi-security level
correctional center........................... 61,781,817
For replacing roofing systems at the
following locations at the approximate
cost set forth below............................. 189,284
Vienna Correctional Center......... 150,261
Sheridan Correctional Center........ 17,785
Western Illinois Correctional
Center - Mt. Sterling.............. 21,238
For upgrading security control systems and
panels in housing units at the following
locations at the approximate cost set
forth below....................................... 26,463
Danville Correctional Center......... 5,292
Hill Correctional Center -
Galesburg........................... 5,293
Western Illinois Correctional
Center - Mt. Sterling............... 5,292
Illinois River Correctional
Center - Canton..................... 5,293
Shawnee Correctional Center -
Vienna.............................. 5,293
For planning, design, construction,
equipment and all other necessary costs
for a juvenile facility........................ 1,260,525
For replacing roofing systems at the following
locations at the approximate cost set forth
below............................................. 53,645
Dixon Correctional Center,
four buildings...................... 3,762
IYC - St. Charles, two buildings.... 27,316
Joliet Correctional Center,
six buildings...................... 11,441
Logan Correctional Center - Lincoln
three buildings..................... 5,584
Pontiac Correctional Center,
one building........................ 5,542
For inspecting and upgrading water towers
at the following locations at the approximate
costs set forth below............................ 230,266
Dixon Correctional Center,
Upgrade Water Tower................ 24,238
Graham Correctional Center - Hillsboro
Upgrade Water Tower .............. 30,990
Joliet Correctional Center,
Upgrade Water Tower................ 17,044
Logan Correctional Center - Lincoln
Complete Water Tower Upgrade ..... 13,111
Menard Correctional Center - Chester
Upgrade Water Tower .............. 22,443
Stateville Correctional Center - Joliet
Upgrade Water Tower .............. 36,112
Statewide, Inspect and Upgrade
Water Towers....................... 86,328
For upgrading fire and safety systems at
the following locations at the approximate
costs set forth below, in addition to
funds previously appropriated.................. 2,037,256
Menard Correctional Center -
Chester......................... 1,854,559
Sheridan Correctional Center....... 110,620
Vienna Correctional Center.......... 72,077
For upgrading fire safety systems at the
following locations at the approximate
costs set forth below, in addition to
funds previously appropriated:................... 917,626
Menard Correctional Center............ 1,370
Pontiac Correctional Center......... 696,383
Stateville Correctional Center...... 219,873
For upgrading water and wastewater
systems at the following locations
at the approximate costs set forth below:........ 437,821
Big Muddy Correctional Center
for installing mechanical
bar screen........................... 7,348
Centralia Correctional Center
for upgrading water
treatment plant........................ 946
Ed Jenison Work Camp (Paris)
for installing mechanical
bar screen........................... 2,530
IYC - Harrisburg for upgrading
water distribution system........... 59,198
Kankakee MSU for constructing
well #2............................ 288,550
IYC - St. Charles for upgrading
sewage/storm system................. 67,475
IYC - Valley View for installing
mechanical bar screen............... 11,774
For planning, design, construction,
equipment and other necessary costs
for a Medium Security Correctional
Facility.......................................... 83,625
Total $278,310,537
Section 85. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purpose in Article 99, Section 85, of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:
BIG MUDDY CORRECTIONAL FACILITY
(From Article 99, Section 85 of Public Act 93-0842)
For replacing door locking controls
and intercom systems........................... 2,701,892
STATEVILLE CORRECTIONAL CENTER
For installing fire alarm systems................ 1,600,000
STATEWIDE
For upgrading the water towers at the
following locations at the approximate
costs set forth below............................ 362,058
Joliet Correctional Center........... 334,902
Vienna Correctional Center............ 27,156
HILL CORRECTIONAL CENTER - GALESBURG
For upgrading building automation................... 66,433
VANDALIA CORRECTIONAL CENTER
For upgrading the water distribution system
and replacing the water tower, in addition
to funds previously appropriated................. 103,914
Total $4,834,297
Section 90. The sum of $3,108,095, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 90 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Emergency Management Agency for costs associated with a new State Emergency Operations Center.
Section 95. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 95 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
BISHOP HILL HISTORIC SITE - HENRY COUNTY
(From Article 99, Section 95 of Public Act 93-0842)
For restoring interior and exterior................. 72,197
For rehabilitating Bjorkland Hotel................. 584,757
BRYANT COTTAGE STATE MEMORIAL - BEMENT
For rehabilitating interior and exterior............ 42,862
CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
For providing structural stabilization............. 269,978
For renovation of the Cahokia Courthouse
and the Jarrot House.............................. 31,183
CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
For replacement of Monk's Mounds stairs............ 339,695
For restoration of Monk's Mound.................. 1,009,932
For purchasing private land within historic
site boundary.................................... 189,979
DAVID DAVIS HOME
To acquire a residence to be
converted to a Visitors Center................... 249,400
JARROT MANSION STATE HISTORICAL SITE
For restoring the mansion, site improvements
and land acquisition, in addition
to funds previously appropriated............... 1,528,993
LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
For rehabilitating site and providing
irrigation system................................ 201,760
LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
For rehabilitating interior and exterior............ 16,205
LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY
For providing electrical at
campgrounds...................................... 115,376
LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
For constructing library and museum complex, in
addition to funds previously appropriated..... 17,099,331
For constructing a Lincoln Presidential
Library.......................................... 642,127
OLD STATE CAPITOL - SPRINGFIELD
For repairing elevators............................ 387,464
SHAWNEETOWN BANK HISTORIC SITE - GALLATIN COUNTY
For rehabilitating exterior........................ 202,511
UNION STATION - SPRINGFIELD
For purchasing and rehabilitating................ 2,354,453
STATEWIDE
For statewide ISTEA 21 Match....................... 637,000
For replacing roofing systems at the
following locations at the approximate
costs set forth below:........................... 115,622
Washburne House, Galena............... 5,378
David Davis Mansion, Bloomington..... 22,051
Bishop Hill House, Henry County...... 88,193
For matching ISTEA federal grant funds............. 143,310
Total $26,234,135
Section 105. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 105, of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:
MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY
(From Article 99, Section 105 of Public Act 93-0842)
For rehabilitating interior & exterior............. 206,768
BISHOP HILL HISTORIC SITE – HENRY COUNTY
For restoring interior and exterior................ 100,000
PULLMAN HISTORIC SITE
For all costs associated with the
stabilization and restoration of the
Pullman Historic Site.......................... 4,480,736
Total $4,787,504
Section 110. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 110 of Public Act 93-0842, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
ALTON MENTAL HEALTH CENTER - MADISON COUNTY
(From Article 99, Section 110 of Public Act 93-0842)
For renovating the Forensic Complex and
constructing two building additions, in
addition to funds previously appropriated...... 3,900,000
For renovating the central dietary,
Phase II, in addition to funds previously
appropriated................................... 1,060,593
For constructing two building additions
at the Forensic Complex........................ 7,180,592
For rehabilitation of the central dietary.......... 226,935
CHESTER MENTAL HEALTH CENTER
For completing the replacement of
smoke and heat detectors, in addition
to funds previously appropriated................. 440,000
For upgrading HVAC systems......................... 590,176
For renovating support and residential areas,
in addition to funds previously
appropriated..................................... 119,777
For replacing smoke/heat detectors................. 177,589
For replacing sewer lines.......................... 189,335
For renovating support and residential
area.............................................. 78,150
CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO
For rehabbing absorbers, controls
and valves....................................... 398,432
For renovating residential units, in
addition to funds previously
appropriated..................................... 236,520
For renovation of the West Campus shower
and toilet rooms................................. 134,469
CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
For renovating Sycamore Hall..................... 2,652,585
ELGIN MENTAL HEALTH CENTER - KANE COUNTY
For replacing power plant and engineering
building....................................... 7,942,071
For renovating the central dietary
and kitchen.................................... 3,716,955
For construction of roads, parking lots
and street lights.............................. 1,107,902
FOX DEVELOPMENTAL CENTER - DWIGHT
For upgrading fire alarm systems................... 950,000
For replacing and repairing interior doors,
flooring and walls, in addition to funds
previously appropriated........................ 1,105,000
For planning and beginning replacement
of interior doors and flooring
and repairing walls in the Main and
Administration Buildings......................... 869,443
HOWE DEVELOPMENTAL CENTER - TINLEY PARK
For completing replacement of HVAC
systems, in addition to funds
previously appropriated........................ 1,400,000
For upgrading plumbing in kitchen.................. 735,000
For planning the replacement of
absorption-type A/C.............................. 450,000
For replacing HVAC and duct work.................... 39,704
For completing upgrade of tunnels,
Phase II, in addition to funds previously
appropriated..................................... 366,920
For renovating residences, in addition to
funds previously appropriated.................. 1,156,927
For renovation of residential buildings............. 76,450
ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
For renovating the High School Building
Phase II....................................... 1,580,000
For renovating the health center................... 213,013
For replacing roof and upgrading the
mechanical system at Burns Gym................. 1,968,986
For replacing the visual alert system.............. 466,084
For renovating High School Building.............. 1,050,120
For replacing HVAC, upgrading electrical
and replacing doors, in addition to
funds previously appropriated.................... 455,337
ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
For renovating auditorium, classroom
and administration buildings................... 2,360,924
For renovating classrooms in Building 17......... 1,281,525
For renovating the Girls' Dormitory, in
addition to funds previously appropriated........ 210,537
For renovations to the powerhouse,
boilers and associated coal and ash
equipment For installation of individual
package boilers, in addition
to funds previously appropriated................. 400,000
JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
For planning and beginning the renovation
of the power house............................... 698,226
KILEY DEVELOPMENTAL CENTER - WAUKEGAN
For converting the facility to natural
gas, in addition to funds previously
appropriated..................................... 495,240
For renovating homes, Phase II, in
addition to funds previously
appropriated..................................... 105,008
LINCOLN DEVELOPMENTAL CENTER - LOGAN
For various capital improvements,
including planning and construction
of four ten-bed transitional or
residential homes.............................. 7,000,000
LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
For upgrading the electrical panel............... 1,202,840
For repairing and replacing furnaces and
duct work, in addition to funds previously
appropriated..................................... 500,000
For renovating residential and neighborhood
homes, in addition to funds previously
appropriated................................... 1,195,960
For replacing plumbing, HVAC and
boiler systems................................... 742,685
For renovation of residential buildings,
in addition to funds previously
appropriated..................................... 648,823
For renovation of residences........................ 35,293
MABLEY DEVELOPMENTAL CENTER - DIXON
For replacing mechanicals and upgrading
the fire alarm systems........................... 371,005
For planning and beginning renovation
of residential buildings....................... 1,453,648
MADDEN MENTAL HEALTH CENTER - HINES
For planning and beginning facility
improvements to provide for
patient safety and suicide
prevention........................................ 80,075
For renovating pavilions and
administration building for safety/
security, in addition to
funds previously appropriated.................. 1,200,000
For renovating dietary............................. 858,550
For renovation of pavilions, in addition
to funds previously appropriated................. 350,503
MURRAY DEVELOPMENTAL CENTER - CENTRALIA
For completing the renovation of
the boiler house, in addition to
funds previously appropriated.................. 3,400,000
For renovating the boiler house,
in addition to funds previously
appropriated..................................... 591,566
For replacing the emergency
management system, in
addition to funds previously
appropriated..................................... 585,000
For planning and beginning boiler house
renovation........................................ 38,060
For replacing energy management system.............. 43,151
SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
For replacing the sewer system in
south campus................................... 2,112,880
For planning and beginning renovation
of dietary....................................... 384,925
For work necessary to remedy fire
damper deficiencies............................ 1,027,616
For replacing water mains and valves,
in addition to funds previously
appropriated..................................... 765,085
For replacing steam & condensate
lines, in addition to funds previously
appropriated..................................... 146,278
For upgrading HVAC systems in four
residential buildings............................ 151,801
For planning and beginning the upgrade
of steam and condensate lines..................... 98,347
SINGER MENTAL HEALTH CENTER - ROCKFORD
For upgrading fire alarm systems................... 648,684
For renovating dietary and stores.................. 833,103
For renovating patient units, Phase II,
in addition to funds previously
appropriated ................................. 3,100,000
For renovating mechanicals and
residential areas................................ 731,508
TINLEY PARK MENTAL HEALTH CENTER – COOK COUNTY
For completing the upgrade of fire
and life/safety issues in Oak Hall,
in addition to funds previously
appropriated..................................... 600,000
TINLEY PARK MENTAL HEALTH CENTER/HOWE DEVELOPMENTAL CENTER
For renovation for accessibility in four
buildings......................................... 74,856
TREATMENT AND DETENTION FACILITY - JOLIET
For improving the administration
building for life safety......................... 160,000
STATEWIDE
For planning and beginning life
safety/security systems........................ 1,500,000
For replacing roofing systems at
the following locations, at the
approximate costs set forth below.............. 2,526,737
Chicago-Read Mental
Health Center - Cook
County........................... 2,026,737
Fox Developmental
Center - Dwight.................... 200,000
Kiley Developmental Center -
Waukegan........................... 300,000
For replacing and repairing roofing systems
at the following locations, at the
approximate cost set forth below................ 2,014,437
Alton Mental Health Center -
Madison............................... 89,139
Shapiro Developmental Center -
Kankakee............................. 115,000
Ludeman Developmental Center -
Park Forest........................... 14,087
Madden Mental Health Center -
Hines................................ 815,326
Murray Developmental Center -
Centralia............................ 708,650
Kiley Developmental Center -
Waukegan............................. 272,235
For replacing and repairing roofing
systems at the following locations, at
the approximate cost set forth below............. 934,403
Chicago-Read Mental Health
Center............................. 421,632
Howe Developmental Center -
Tinley Park........................ 283,758
Shapiro Developmental Center -
Kankakee............................ 42,393
Illinois School for the
Deaf - Jacksonville................. 69,661
Kiley Developmental
Center - Waukegan.................. 116,959
For repairing or replacing roofs
at the following locations, at
the approximate cost set forth below........... 1,440,761
Illinois School for the
Visually Impaired -
Jacksonville........................ 38,369
Jacksonville Developmental
Center - Morgan County.............. 60,000
Lincoln Developmental Center -
Logan County......................... 7,001
Murray Developmental Center -
Centralia........................... 79,136
Shapiro Developmental Center -
Kankakee......................... 1,256,255
For planning and beginning construction
of a facility for sexually violent
persons.......................................... 250,381
For replacing and repairing roofing systems
at the following locations at the approximate
cost set forth below............................. 270,007
Choate Developmental Center -
Anna................................ 7,628
Chicago-Read Mental Health Center.... 5,475
Tinley Park Mental Health Center.... 12,974
Illinois School for the Visually
Impaired - Jacksonville............ 19,414
Shapiro Developmental Center -
Kankakee........................... 25,955
Kiley Developmental Center -
Waukegan........................... 19,284
Ludeman Developmental Center -
Park Forest....................... 179,277
For replacement of roofing systems at the
following locations at the approximate costs
set forth below:................................. 150,811
Lincoln Development Center.......... 37,702
Murray Developmental Center......... 37,703
Elgin Developmental Center.......... 37,703
Shapiro Developmental Center........ 37,703
Total $88,806,304
Section 115. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 115 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
(From Article 99, Section 115 of Public Act 93-0842)
For renovations to the powerhouse,
boilers and associated coal and ash
equipment For installation of individual
package boilers.................................. 224,019
Total $224,019
Section 120. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 120 of Public Act 93-0842, are reappropriated from the Tobacco Settlement Recovery Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:
STATEWIDE PROGRAM
(From Article 99, Section 120 of Public Act 93-0842)
For tuckpointing at the following locations
at the approximate cost set forth below........... 171,772
Howe Developmental Center -
Tinley Park......................... 115,000
Madden Mental Health
Center - Hines....................... 43,661
Tinley Park Mental
Health Center........................ 13,111
For tuckpointing exterior and repairing
masonry at various facilities.................... 394,844
Total $566,616
Section 125. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 125 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Human Services for the project hereinafter enumerated:
ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE
(From Article 99, Section 125 of Public Act 93-0842)
For replacing dorm doors......................... 1,962,500
JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN
For upgrading the mechanicals in the
power plant, in addition to funds
previously appropriated....................... 1,000,000
SINGER MENTAL HEALTH CENTER
For repair and/or replacement of roofs.............. 71,994
TINLEY PARK MENTAL HEALTH CENTER
For upgrading fire/life safety systems
and lighting, in addition to funds
previously appropriated.......................... 281,942
FOX DEVELOPMENTAL CENTER - DWIGHT
For renovating the water treatment plant........... 884,788
Total $4,201,224
Section 130. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriation and reappropriations heretofore made in Article 99, Section 130 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:
ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO
(From Article 99, Section 130 of Public Act 93-0842)
For upgrading utility and infrastructure,
in addition to funds previously
appropriated..................................... 650,000
For upgrading core utilities....................... 211,806
For upgrading research center...................... 373,362
For constructing a Lab and Research
Biotech Grad Facility............................. 94,638
Total $1,329,806
Section 140. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 140 of Public Act 93-0842, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
BLOOMINGTON ARMORY - McLEAN COUNTY
(From Article 99, Section 140 of Public Act 93-0842)
For rehabilitating the mechanical/electrical
systems and renovating the interior............ 2,971,900
CAIRO ARMORY
For replacing roof and renovating the
interior and exterior............................ 623,311
CAMP LINCOLN - SPRINGFIELD
For converting commissary to a military
museum, in addition to funds
previously appropriated.......................... 110,832
For construction of a military academy
facility......................................... 541,339
ELGIN ARMORY - KANE COUNTY
For upgrading the interior and exterior............ 843,352
GENERAL JONES ARMORY
For rehabilitating the armory building,
in addition to funds previously
appropriated..................................... 140,401
LITCHFIELD ARMORY
For remodeling and installing a
kitchen.......................................... 362,450
MACOMB ARMORY - McDONOUGH
For completing the mechanical/electrical
systems upgrade, renovating the interior,
and installing a kitchen, in addition to
funds previously appropriated.................. 2,565,000
For replacing the mechanical and electrical
systems and installing a kitchen................. 837,345
MATTOON ARMORY
For replacing the roof and renovating
the interior and exterior........................ 467,035
NORTH RIVERSIDE ARMORY
For rehabilitating the interior and
exterior......................................... 302,380
NORTHWEST ARMORY - CHICAGO
For upgrading the electrical system.............. 2,815,000
For replacing the mechanical systems............... 549,233
For renovation of interior and exterior,
in addition to funds previously
appropriated for such purposes................... 303,337
ROCK FALLS ARMORY
For replacing the mechanical and
electrical systems and upgrading
the interior..................................... 715,866
SALEM ARMORY
For remodeling and installing a
kitchen.......................................... 279,780
SYCAMORE ARMORY
For replacing the electrical system,
renovating the interior and installing
air conditioning................................. 934,832
STATEWIDE
For replacing roofing systems, windows
and doors, and rehabilitating the
exterior walls at the following
locations, at the approximate cost
set forth below................................... 76,244
Bloomington Armory................... 15,248
Kewanee Armory....................... 15,249
Macomb Armory........................ 15,249
Rock Falls Armory.................... 15,249
Sycamore Armory...................... 15,249
Total $15,439,637
Section 145. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 145, of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:
NORTHWEST ARMORY - CHICAGO
(From Article 99, Section 145 of Public Act 93-0842)
For renovating the mechanical systems,
in addition to funds previously
appropriated..................................... 351,715
LAWRENCEVILLE ARMORY
For rehabilitating the exterior and
replacing roofing systems....................... 177,017
Total $528,732
Section 150. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 150 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:
WILLARD ICE BUILDING - SPRINGFIELD
(From Article 99, Section 150 of Public Act 93-0842)
For completing the upgrade of
building management controls,
in addition to funds
previously appropriated.......................... 400,000
For replacing the dock exhaust system.............. 555,000
For replacing and repairing concrete
stairway and completing of parking
deck, in addition to funds
previously appropriated.......................... 285,000
For upgrading building management
controls....................................... 3,496,768
For upgrading the plumbing system.................. 931,655
For upgrading parking lot/parking deck
structural repair................................ 830,119
For renovating the interior and
upgrading HVAC................................. 3,300,768
Total $9,799,310
Section 155. The following named amounts, or so much thereof as may be necessary and as remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 155 of Public Act 93-0842, are reappropriated from the Tobacco Settlement Recovery Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:
WILLARD ICE BUILDING - SPRINGFIELD
(From Article 99, Section 155 of Public Act 93-0842)
For completing security system upgrade, in
addition to funds previously appropriated....... $110,394
Total $110,394
Section 160. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 160 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:
WILLARD ICE BUILDING – SPRINGFIELD
(From Article 99, Section 160 of Public Act 93-0842)
For completing the upgrade of the
Plumbing System.................................. 600,000
For planning the curtain wall renovation........... 38,950
Total $638,950
Section 165. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 165 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:
CHICAGO FORENSIC LABORATORY
(From Article 99, Section 165 of Public Act 93-0842)
For construction of a laboratory and
parking facilities................................ 84,737
DISTRICT 13 HEADQUARTERS - DuQUOIN
For constructing a district 13
headquarters..................................... 132,840
DISTRICT 6 HEADQUARTERS - PONTIAC
For planning, construction, reconstruction,
demolition of existing buildings, and
all costs related to replacing
the facilities................................... 196,259
SPRINGFIELD ARMORY
For planning and design of the rehabilitation
and site improvements of the Springfield
Armory, in addition to funds previously
appropriated................................... 1,216,439
STATEWIDE
For replacing communications towers
equipment and tower buildings.................. 1,850,902
For upgrading generators and UPS systems............ 39,996
For replacing roofing system at the
following locations at the approximate
cost set forth below............................. 297,191
District 13 Headquarters,
DuQuoin............................ 46,752
Joliet Laboratory.................... 40,000
District 6 Headquarters,
Pontiac............................ 38,900
District 9 Headquarters,
Springfield....................... 109,510
State Police Training Center,
Pawnee............................. 10,000
District 18 Headquarters,
Litchfield......................... 45,000
District 19 Headquarters,
Carmi............................... 7,029
For replacing radio communication towers,
equipment buildings and installing emergency
power generators at the following locations at the approximate costs set forth below.................................. 1,109,792
Harlem & Irving – Cook County......... 93,966
Savanna – Carroll County.............. 95,000
Fairfield – Wayne County............. 225,000
Niota – Hancock County............... 695,826
Pecatonica, Elwood, Kingston, Mason
City........................................... 1,109,792
Total $4,928,156
Section 170. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 170 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of State Police for the project hereinafter enumerated:
SPRINGFIELD STATE POLICE, PAWNEE FACILITY
(From Article 99, Section 170 of Public Act 93-0842)
For safety improvements at
the firing range................................ 178,106
STATEWIDE
For upgrading firing range facilities.............. 375,233
Total $553,339
Section 175. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 175 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:
ANNA VETERANS HOME
(From Article 99, Section 175 of Public Act 93-0842)
For constructing a garage.......................... 315,292
LASALLE VETERANS' HOME
For replacing the roofing system................... 310,000
For replacing the domestic water system............ 110,000
MANTENO VETERANS' HOME - KANKAKEE COUNTY
For replacing air conditioner chillers........... 1,170,000
For replacing condensing units..................... 176,939
For upgrading or constructing
roads and parking lots............................ 55,922
For planning and constructing
additional storage and support areas.............. 95,233
For upgrading courtyard program spaces............. 346,362
For upgrading storm sewer........................... 99,428
QUINCY VETERANS' HOME - ADAMS COUNTY
For constructing a bus and ambulance
garage........................................... 849,073
For improvements to various buildings
and replacement of Fletcher Building
to meet licensure standards.................... 2,528,743
Total $6,056,992
Section 180. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 180 of Public Act 93-0842, are reappropriated from the Tobacco Settlement Recovery Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:
MANTENO VETERANS' HOME - KANKAKEE COUNTY
(From Article 99, Section 180 of Public Act 93-0842)
For installing humidifiers and
dehumidifiers.................................... 407,950
For resurfacing roads and parking lots.............. 40,355
For demolishing buildings........................ 1,224,881
Total $1,673,186
Section 185. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 185 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Veterans' Affairs for the project hereinafter enumerated:
MANTENO VETERANS HOME
(From Article 99, Section 185 of Public Act 93-0842)
For completing the upgrade of emergency
generators....................................... 600,000
For installing humidifiers and
dehumidifiers, in addition to funds
previously appropriated....................... 1,000,000
LASALLE VETERANS HOME - LASALLE COUNTY
For planning expansion of facility .............. 379,045
MANTENO VETERANS HOME - KANKAKEE COUNTY
For constructing an equipment storage
building......................................... 667,966
Total $2,647,011
Section 190. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 190 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:
EXECUTIVE MANSION - SPRINGFIELD
(From Article 99, Section 190 of Public Act 93-0842)
For building improvements.......................... 376,011
ATTORNEY GENERAL BUILDING - SPRINGFIELD
For planning an annex or addition and
beginning construction of
parking facilities................................ 35,932
For upgrading environmental equipment
and HVAC, in addition to funds previously
appropriated - Archives Building................. 255,609
STATE CAPITOL BUILDING
For upgrading the life/safety and
security systems, in addition to
funds previously appropriated.................... 161,784
STATEWIDE
For the purposes of capital planning
and condition assessment and analysis
of State capital facilities, to be
expended only upon the direction of
the Director of the Bureau of
the Budget..................................... 3,389,055
For abating hazardous materials.................. 1,627,855
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs)................... 650,000
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act (ADA)............ 593,405
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act (ADA)............ 973,346
For abating hazardous materials.................... 135,878
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs)................. 4,000,000
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act................ 2,717,127
For abating hazardous materials.................... 468,800
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs)................. 2,901,557
For upgrading and remediating
aboveground and underground storage tanks...... 2,000,000
For surveys and modifications to buildings
to meet requirements of the federal
Americans With Disabilities Act.................. 101,945
For retrofitting or upgrading mechanized
refrigeration equipment (CFCs)................... 782,922
For abating hazardous materials.................... 375,029
For surveys and modifications to
buildings to meet requirements of the
federal Americans with Disabilities Act.......... 153,701
For abatement of hazardous materials............... 320,187
For upgrading/retrofitting mechanized
refrigeration equipment (CFCs).................... 53,118
For abatement of hazardous materials............... 146,234
For survey for and abatement of
asbestos-containing materials..................... 59,592
For upgrade/retrofit of mechanized
refrigeration equipment (CFCs).................... 36,346
For surveys and modifications to buildings
to meet requirements of the federal
Americans with Disabilities Act................ 1,256,572
For demolition of buildings......................... 82,050
For retrofitting/upgrading mechanical
refrigeration equipment........................... 30,551
For the planning, upgrade
and replacement of potentially
hazardous underground storage tanks............... 64,692
For surveys and abatement of asbestos-
containing materials.............................. 41,423
Total $22,961,385
Section 195. The amount of $530,819, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 195 of Public Act 93-0842, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for surveying and abating asbestos-containing materials statewide.
Section 200. The amount of $994,978, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 200 of Public Act 93-0842, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for asbestos surveys and emergency abatement in relation to asbestos abatement in state governmental buildings or higher education residential and auxiliary enterprise buildings.
Section 205. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 205 of Public Act 93-0842, are reappropriated from the Tobacco Settlement Recovery Fund to the Capital Development Board for the projects hereinafter enumerated:
STATEWIDE
(From Article 99, Section 205 of Public Act 93-0842)
Survey for and abate hazardous
materials........................................ 710,011
For repairing minor problems and
emergencies...................................... 985,117
For tuckpointing and repairing exterior
of buildings..................................... 182,900
For demolition of buildings........................ 393,437
For archeological studies of
construction sites............................... 100,000
For repairing minor problems and
emergencies.................................... 1,180,186
Total $3,551,651
Section 210. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 210 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:
CARL SANDBURG COLLEGE
(From Article 99, Section 210 of Public Act 93-0842)
For constructing a computer/
student center.................................... 33,928
CITY COLLEGES OF CHICAGO
For various bondable capital improvements........ 8,116,582
CITY COLLEGES OF CHICAGO/KENNEDY KING
For remodeling for Workforce Preparation
Centers........................................ 3,642,334
For remodeling for a culinary arts
educational facility.......................... 10,875,000
CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE
For remodeling the Allied Health
program facilities............................. 4,304,223
COLLEGE OF DUPAGE
For upgrading the Instructional Center
heating, ventilating and air
conditioning systems............................. 273,534
COLLEGE OF LAKE COUNTY
For planning and beginning construction
of a technology building -
Phase 1.......................................... 296,283
ILLINOIS VALLEY COMMUNITY COLLEGE
For planning, construction and renovations
necessary to abate asbestos containing
materials at campus facilities................. 1,062,277
JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE
For planning, construction, utilities,
site improvements, equipment and other
costs necessary for a new Workforce
Development and Community Education
Facility. The provisions of Article V
of the Public Community College Act
are not applicable to this appropriation........ 31,185
KANKAKEE COMMUNITY COLLEGE
For constructing a laboratory/classroom
facility......................................... 628,881
LAKELAND COLLEGE
Student Services Building addition............... 6,602,331
LEWIS and CLARK COLLEGE - GODFREY
For constructing classroom
and office building and additions,
and remodeling of Haskell Hall.................... 27,425
LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
For constructing an addition and remodeling
Sangamon and Menard Halls......................... 31,388
MCHENRY COUNTY COLLEGE
For constructing classrooms and a
student services building and remodeling
space, in addition to funds previously
appropriated..................................... 572,723
MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
For constructing a classroom/administration
building, providing site improvements and
purchasing equipment, in addition to
funds previously appropriated..................... 42,688
PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
For constructing an addition to the Adult
Training/Outreach Center, in addition to
funds previously appropriated.................. 2,236,307
RICHLAND COMMUNITY COLLEGE - DECATUR
For remodeling and constructing additions.......... 147,526
SOUTHWESTERN ILLINOIS COLLEGE
(Formerly BELLEVILLE AREA COLLEGE)
For renovating campus buildings and site
improvements at the Belleville and Red
Bud campuses...................................... 39,334
SOUTH SUBURBAN COLLEGE
For improving flood retention...................... 437,000
SPOON RIVER COLLEGE
For remodeling Engle Hall and
constructing a maintenance building.............. 145,625
TRITON COMMUNITY COLLEGE - RIVER GROVE
For rehabilitating the Liberal Arts
Building....................................... 1,553,487
For rehabilitating the potable water
distribution system............................... 70,146
STATEWIDE
For the Illinois Community College Board
miscellaneous capital improvements including
construction, capital facilities, cost of
planning, supplies, equipment, materials,
services and all other expenses required to
complete the work at the various community
Colleges. This appropriated amount shall be
in addition to any other appropriated amounts
which can be expended for this purpose......... 1,679,988
STATEWIDE
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various community colleges. This appropriated
amount shall be in addition to any other
appropriated amounts which can be
expended for these purposes.................... 5,139,784
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various community colleges. This appropriated
amount shall be in addition to any other
appropriated amounts which can be
expended for these purposes.................... 4,007,063
STATEWIDE - CONSTRUCTION DEFECTS
For planning, construction and renovation
to correct defectively designed or
constructed community college facilities,
provided that monies recovered based upon
claims arising out of such defective design
or construction shall be paid to the state
as required by Section 105.12 of the Public
Community College Act as reimbursement for
monies expended pursuant to this
appropriation.................................... 395,324
Total $52,392,366
Section 220. The amount of $431,062, or so much thereof as may be necessary, and remains unexpended on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 220 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges repair, renovation, and miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 225. The sum of $1,471,018, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 225 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 230. The sum of $1,801,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 230 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 235. The sum of $2,594,875, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 235 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 240. The sum of $696,475, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 240 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges for miscellaneous capital improvements including construction, reconstruction, remodeling, improvements, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 245. The sum of $3,009,481, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 245 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for miscellaneous capital improvements at various educational facilities statewide, in addition to funds previously appropriated.
Section 250. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 250 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:
ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
To plan and begin construction of a
space for the delivery of teacher
training and development and student
enrichment programs.............................. 108,843
Section 255. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 255 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
STATEWIDE
(From Article 99, Section 255 of Public Act 93-0842)
For miscellaneous capital improvements
including construction, capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the various
universities. This appropriated amount
shall be in addition to any other appropriated
amounts which can be expended for these
purposes...................................... 19,716,312
Chicago State University............ 322,100
Eastern Illinois University......... 515,500
Governors State University.......... 189,700
Illinois State University......... 1,021,300
Northeastern Illinois University.... 383,700
Northern Illinois University...... 1,159,000
Western Illinois University......... 792,200
Southern Illinois University -
Carbondale....................... 1,520,564
Southern Illinois University -
Edwardsville....................... 763,100
University of Illinois -
Chicago.......................... 2,777,300
University of Illinois -
Springfield........................ 229,100
University of Illinois -
Urbana/Champaign................. 4,131,963
Illinois Community
College Board.................... 5,910,785
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes...... 18,829,241
Chicago State University............ 322,100
Eastern Illinois University......... 515,500
Governors State University.......... 132,852
Illinois State University......... 1,021,300
Northeastern Illinois
University......................... 383,700
Northern Illinois University...... 1,159,000
Western Illinois University......... 792,200
Southern Illinois University -
Carbondale......................... 522,333
Southern Illinois University -
Edwardsville....................... 763,100
University of Illinois -
Chicago.......................... 2,777,300
University of Illinois -
Springfield........................ 217,856
University of Illinois -
Urbana/Champaign................. 4,150,300
Illinois Community
College Board.................... 6,071,700
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes....... 6,481,377
Chicago State University............ 211,574
Eastern Illinois University......... 515,500
Illinois State University........... 506,274
Northern Illinois University...... 1,159,000
Western Illinois University......... 596,046
Southern Illinois University -
Carbondale......................... 180,242
University of Illinois -
Chicago.......................... 2,199,079
University of Illinois -
Springfield........................ 209,126
University of Illinois -
Urbana/Champaign................... 904,536
For miscellaneous capital improvements,
including construction, capital
facilities, cost of planning,
supplies, equipment, materials, services
and all other expenses required to
complete the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated
amounts which can be expended
for these purposes............................. 4,194,758
Eastern Illinois University......... 477,768
Illinois State University........... 413,841
Northeastern Illinois
University.......................... 46,499
Northern Illinois University...... 1,217,700
Western Illinois University......... 198,034
Southern Illinois University -
Carbondale......................... 103,987
University of Illinois -
Chicago............................ 506,116
University of Illinois -
Urbana/Champaign................. 1,230,813
For miscellaneous capital improvements
including construction, reconstruction
remodeling, improvements, repair
and installation of capital
facilities, cost of planning, supplies,
equipment, materials, services and all
other expenses required to complete
the work at the various universities set
forth below. This appropriated amount
shall be in addition to any other
appropriated amounts which can
be expended for these purposes................. 2,341,715
Chicago State University............. 191,127
Eastern Illinois University........... 42,140
Illinois State University............. 85,627
Northeastern Illinois University..... 151,480
Northern Illinois University......... 861,486
Western Illinois University........... 53,892
Southern Illinois University -
Carbondale............................ 9,130
University of Illinois -
Chicago Campus....................... 41,721
University of Illinois -
Champaign/Urbana Campus............. 905,112
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to
complete the work at the various
universities set forth below. This
appropriation shall be in addition
to any other appropriated amounts
which can be expended for these purposes....... 1,419,262
For Eastern Illinois University........ 261,412
For Northeastern Illinois University .. 143,597
For Northern Illinois University....... 248,136
For Western Illinois University......... 39,423
For University of Illinois –
Chicago.............................. 91,348
For University of Illinois -
Urbana-Champaign..................... 635,346
For miscellaneous capital improvements,
including construction, reconstruction,
remodeling, improvement, repair and
installation of capital facilities, cost of
planning, supplies, equipment, materials,
services and all other expenses
required to complete the work at the various
universities set forth below. This
appropriation shall be in addition to
any other appropriated amounts which
can be expended for these purposes............... 707,360
For Northern Illinois University..... 153,202
For Southern Illinois University -
Carbondale........................... 22,188
For Southern Illinois University -
Edwardsville......................... 35,137
For University of Illinois -
Chicago............................. 362,299
For University of Illinois -
Urbana-Champaign.................... 134,534
For miscellaneous capital improvements
including construction, reconstruction,
remodeling, improvement, repair and
installation of capital facilities,
cost of planning, supplies, equipment,
materials, services and all other expenses
required to complete the work at the
various universities set forth below.
This appropriation shall be in addition
to any other appropriated amounts which
can be expended for these purposes............... 813,375
For Chicago State University.......... 37,159
For Eastern Illinois University...... 150,380
For Governors State University........ 71,798
For Illinois State University......... 85,165
For Northeastern Illinois University . 36,177
For Northern Illinois University..... 207,446
For University of Illinois........... 225,250
SOUTHERN ILLINOIS UNIVERSITY
For Southern Illinois University
for miscellaneous capital improvements
including construction, reconstruction,
remodeling, improvements, repair and
installation of capital facilities, cost
of planning, supplies, equipment, materials
services and all other expenses
required to complete the work. This
appropriation shall be in addition to any
other appropriated amounts which can
be expended for these purposes................... 121,599
UNIVERSITY OF ILLINOIS
For the Board of Trustees of the University of
Illinois for miscellaneous capital
improvements including construction,
reconstruction, remodeling, improvement,
repair and installation of capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required for completing
the work at the colleges and
universities. This appropriation shall
be in addition to any other
appropriated amounts which can be
expended for these purposes....................... 89,723
For the Board of Higher Education for
miscellaneous capital improvements,
including construction, reconstruction,
remodeling, improvements, repair and
installation of capital facilities, cost
of planning, supplies, equipment,
materials, services, and all other
expenses required to complete the
work at the colleges and universities
hereinafter enumerated. This appropriation
shall be in addition to any other
appropriated amounts which can be
expended for these purposes:
Northern Illinois University........................ 24,118
Section 260. The sum of $145,472, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 260 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required for completing the work at the colleges and universities. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 265. The following named amounts, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 265 of Public Act 93-0842, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
(From Article 99, Section 265 of Public Act 93-0842)
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Chicago State University........................... 150,676
Eastern Illinois University........................ 257,800
Governors State University.......................... 94,900
Illinois State University.......................... 510,700
Northeastern Illinois
University....................................... 191,800
Northern Illinois University....................... 579,500
Western Illinois University........................ 396,100
Southern Illinois University - Carbondale.......... 704,001
Southern Illinois University - Edwardsville ....... 381,500
University of Illinois - Chicago................. 1,388,600
University of Illinois - Springfield............... 114,600
University of Illinois - Urbana/Champaign........ 2,075,100
Illinois Community College Board................. 2,899,808
Total $9,745,085
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Chicago State University.......................... 161,000
Eastern Illinois University........................ 256,301
Governors State University.......................... 94,900
Illinois State University.......................... 510,700
Northeastern Illinois University................... 191,800
Northern Illinois University....................... 579,500
Western Illinois University........................ 396,100
Southern Illinois University - Carbondale.......... 266,056
Southern Illinois University - Edwardsville........ 366,202
University of Illinois - Chicago................. 1,388,600
University of Illinois - Springfield............... 114,600
University of Illinois - Urbana/Champaign........ 2,075,100
Illinois Community College Board................. 2,943,540
Total $9,344,399
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Chicago State University.......................... 160,400
Eastern Illinois University........................ 185,800
Governors State University.......................... 45,618
Illinois State University........................... 57,613
Northeastern Illinois University.................... 17,303
Northern Illinois University....................... 579,500
Western Illinois University......................... 75,413
Southern Illinois University - Carbondale........... 88,789
University of Illinois - Chicago................. 1,156,733
University of Illinois - Springfield................ 78,866
University of Illinois - Urbana/Champaign........ 1,579,289
Total $4,025,324
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Eastern Illinois University......................... 96,014
Governors State University.......................... 26,826
Illinois State University.......................... 237,820
Northeastern Illinois University.................... 87,701
Northern Illinois University....................... 624,700
Western Illinois University......................... 11,275
University of Illinois - Chicago................... 176,727
University of Illinois - Springfield................ 30,052
University of Illinois - Urbana/Champaign.......... 268,540
Total $1,559,655
For miscellaneous capital improvements
including construction, capital
facilities, cost of planning, supplies,
equipment, materials, services and
all other expenses required to complete
the work at the various universities.
This appropriated amount shall be in
addition to any other appropriated amounts
which can be expended for these purposes.
Chicago State University............................ 92,223
Eastern Illinois University........................ 134,474
Illinois State University........................... 11,254
Northeastern Illinois University.................... 74,725
Northern Illinois University....................... 340,000
Western Illinois University......................... 38,564
University of Illinois- Champaign/Urbana............ 65,946
Total $757,186
Section 270. The sum of $2,285,308, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 270 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 275. The sum of $1,444,090, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 275 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 280. The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 99, Section 280 of Public Act 93-0842, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:
CHICAGO STATE UNIVERSITY
(From Article 99, Section 280 of Public Act 93-0842)
For replacing primary electrical
feeder cable..................................... 978,753
For roof replacement projects.................... 4,286,667
For the construction of a conference
center......................................... 5,000,000
For the construction of a day care
facility....................................... 4,927,811
For the construction of a student
financial outreach building.................... 5,000,000
For constructing a new library facility,
site improvements, utilities, and
purchasing equipment, in addition
to funds previously appropriated.............. 10,375,477
For technology improvements and
deferred maintenance........................... 1,790,400
For remodeling Building K, in addition
to funds previously appropriated............... 8,769,881
For planning and beginning to remodel
Building K and improving site.................. 1,005,474
For planning, site improvements, utilities,
construction, equipment and other costs
necessary for a new library facility........... 3,272,481
For a grant to Chicago State University for
all costs associated with construction of
a Convocation Center........................... 8,146,687
For upgrading campus infrastructure,
in addition to the funds
previously appropriated.......................... 589,681
For renovating buildings and upgrading
mechanical systems............................... 456,091
EASTERN ILLINOIS UNIVERSITY
For upgrading the electrical
distribution system............................ 4,145,823
For renovating and expanding the
Fine Arts Center, in addition to
funds previously appropriated................. 39,702,200
For planning and beginning to renovate
and expand the Fine Arts Center -
Phase 1, in addition to funds
previously appropriated........................ 1,471,247
For planning and beginning to renovate
and expand the Fine Arts Center................ 1,824,490
For upgrading campus buildings for health,
safety and environmental improvements............ 386,432
GOVERNORS STATE UNIVERSITY
For constructing addition and
remodeling the teaching & learning
complex, in addition to funds
previously appropriated....................... 14,665,099
For costs associated with establishing
a campus-wide fire alarm system at
Governor's State University...................... 680,870
For constructing a child development center
and an addition to the main building
and remodeling Wings E and F...................... 88,290
ILLINOIS STATE UNIVERSITY
For renovating Stevenson and Turner
Halls for life/safety......................... 22,092,850
For the upgrade and remodeling
of Schroeder Hall.............................. 8,663,848
For planning and beginning to rehabilitate
Schroeder Hall................................... 185,319
For planning, site improvements, utilities,
construction, equipment and other costs
necessary for a new facility for the
College of Business.............................. 735,054
For remodeling Julian and Moulton Halls............ 510,501
NORTHEASTERN ILLINOIS UNIVERSITY
For renovating Building "C" and
remodeling and expanding Building "E"
and Building "F"............................... 6,586,254
For planning and beginning to remodel
Buildings A, B and E........................... 3,666,246
For remodeling in the Science Building
to upgrade heating, ventilating and air
conditioning systems........................... 2,021,400
For replacing fire alarm systems, lighting
and ceilings..................................... 672,525
NORTHERN ILLINOIS UNIVERSITY
For renovating the Founders Library
basement, in addition to funds previously
appropriated..................................... 669,635
For planning a classroom building and
developing site in Hoffman Estates............. 1,314,500
For completing the construction of the
Engineering Building, in addition to
amounts previously appropriated for
such purpose................................... 3,638,856
For renovating Altgeld Hall and
purchasing equipment........................... 1,327,625
For upgrading storm waterway controls in
addition to funds previously appropriated........ 424,233
SOUTHERN ILLINOIS UNIVERSITY
For planning, construction and equipment
for a cancer center........................... 13,162,762
SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
For renovating and constructing an
addition to the Morris Library, in
addition to funds previously
appropriated.................................. 25,690,000
For planning a renovation and
addition to the Morris Library................... 714,077
For renovating Altgeld Hall and Old
Baptist Foundation, in addition to funds
previously appropriated........................... 60,861
SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
For planning, construction and equipment
for an advanced technical worker
training facility................................ 482,034
For replacement of the high temperature water
distribution system.............................. 168,709
SIU SCHOOL OF MEDICINE - SPRINGFIELD
For constructing and for equipment for
an addition to the combined laboratory,
in addition to funds previously
appropriated..................................... 865,835
UNIVERSITY OF ILLINOIS AT CHICAGO
Plan, construct, and equip the Chemical
Sciences Building............................. 57,600,000
For planning, construction and equipment
for a chemical sciences building............... 4,934,349
To plan and begin construction of
a medical imaging research/clinical
facility....................................... 2,197,561
For remodeling the Clinical
Sciences Building................................ 884,715
For the renovation of the court area and
Lecture Center, in addition to funds
previously appropriated.......................... 237,122
UNIVERSITY OF ILLINOIS AT CHAMPAIGN-URBANA
For planning, analysis and design
of Lincoln Hall. Design cannot proceed
beyond Program Analysis/Preliminary
Design unless approved in writing by
the Governor................................... 2,000,000
Expansion of Microelectronics Lab............... 17,151,200
For planning, construction and equipment
for a biotechnology genomic facility.......... 55,887,983
For planning, construction and equipment
for a supercomputing application facility...... 8,832,152
To plan and begin construction of a
biotechnology/genomic facility................. 1,600,780
To plan and begin construction of a
supercomputing application
facility......................................... 432,842
To plan and begin construction of a
technology transfer incubator
facility.......................................... 58,263
For remodeling the Mechanical Engineering
Laboratory Building............................... 36,644
For initiating a campus flood
control project................................... 60,806
UNIVERSITY CENTER OF LAKE COUNTY
For constructing a university center and
purchasing equipment, in addition to
funds previously appropriated.................. 3,494,909
For land, planning, remodeling, construction
and all costs necessary to construct a
facility....................................... 8,574,716
WESTERN ILLINOIS UNIVERSITY - MACOMB
Plan and construct performing arts center........ 4,000,000
For improvements to Memorial
Hall.......................................... 11,889,325
Section 285. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 99, Section 285 of Public Act 93-0842 is reappropriated from the Capital Development Fund to the Capital Development Board for Southern Illinois University School of Medicine, Springfield, for the project hereinafter enumerated:
SOUTHERN ILLINOIS UNIVERSITY SCHOOL
OF MEDICINE – SPRINGFIELD
(From Article 99, Section 285 of Public Act 93-0842)
For construction and equipment
for an addition to the combined
laboratory for Illinois State Police
Crime Lab..................................... 1,738,475
Section 290. The following named amounts, or so much thereof as may be necessary, and remain unexpended on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 290 of Public Act 93-0842, as amended, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:
NORTHERN ILLINOIS UNIVERSITY - DEKALB
(From Article 99, Section 290 of Public Act 93-0842)
To construct and equip the Engineering
Building.......................................... 30,308
To purchase equipment and complete
construction for Faraday Hall Addition............ 93,085
Section 295. The following named amount, or so much thereof as may be necessary, and remains unexpended on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 295 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the University of Illinois for the projects hereinafter enumerated:
UNIVERSITY OF ILLINOIS URBANA-CHAMPAIGN
(From Article 99, Section 295 of Public Act 93-0842)
To construct and equip the Chemical and Life
Sciences Building................................. 41,746
Section 300. The following named amount, or so much thereof as may be necessary, and remains unexpended on June 30, 2005, from reappropriations heretofore made for such purposes in Article 99, Section 300 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:
NORTHERN ILLINOIS UNIVERSITY - DE KALB
(From Article 99, Section 300 of Public Act 93-0842)
For construction of the Engineering Building
including extension of utilities, in
addition to funds previously appropriated
for such purpose.................................. 39,614
Section 305. The amount of $73,780, or so much thereof as may be necessary, and remains unexpended on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 305 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the University of Illinois for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 310. The sum of $22,390, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 310 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Trustees of the University of Illinois (formerly for the Department of Human Services) for renovation of the School of Public Health and Psychiatric Institute (formerly the ISPI building).
Section 315. The sum of $1,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 315 Public Act 93-0842, is reappropriated from the Tobacco Settlement Recovery Fund to the Capital Development Board for a grant to the University of Illinois College of Medicine at Peoria for planning a Clinical and Basic Research Oncology Center.
Section 320. The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 320 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for the project hereinafter enumerated:
EAST ST. LOUIS COLLEGE CENTER
(From Article 99, Section 320 of Public Act 93-0842)
For construction of facilities, remodeling,
site improvements, utilities and other
costs necessary for adapting the former
campus of Metropolitan Community College
for a Community College Center and Southern
Illinois University, in addition to funds
previously appropriated........................ 3,986,581
Section 325. The following named amount or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 325 of Public Act 93-0842, is reappropriated from the School Construction Fund to the Capital Development Board for the State Board of Education for the projects hereinafter enumerated:
STATEWIDE
(From Article 99, Section 325 of Public Act 93-0842)
Grants for facility construction............... 185,039,757
Section 330. The sum of $119,133,286, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 330 of Public Act 93-0842, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 335. The sum of $26,121,120, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 335 Public Act 93-0842, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 340. The sum of $38,356,618, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 340 of Public Act 93-0842, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 345. The sum of $6,602,038, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 345 of Public Act 93-0842, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.
Section 350. The sum of $456,208, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purposes in Article 99, Section 350 of Public Act 93-0842, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law.
Section 360. The amount of $11,618,001 or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 360 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to units of local government and other eligible entities for all costs associated with land acquisition, construction and rehabilitation projects.
Section 365. The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 365 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 370. The sum of $42,293,889, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 370 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 380. The sum of $17,606,687, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 380 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 385. The sum of $5,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 385 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning and construction of a Bio-Medical Research Facility. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 390. The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 390 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction, and equipment for a Nanofabrication and Molecular Center. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Section 410. The amount of $1,100,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 99, Section 410 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction and equipment for a nanofabrication and molecular center.
Section 415. The sum of $58,584, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 99, Section 415 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for miscellaneous capital improvements to state facilities including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the facilities. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Total, Article 11 $2,235,126,843
ARTICLE 12
ILLINOIS COMMERCE COMMISSION
Section 5. The sum of $430,753, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 100, Section 5 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Illinois Commerce Commission for train whistle abatement in counties with over 3,000,000 in population, where a public highway crosses a railroad at grade.
Total, Article 12 $430,753
ARTICLE 13
ENVIRONMENTAL PROTECTION AGENCY
Section 5. The sum of $19,000,000, or so much thereof as may be necessary, is appropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 7. The sum of $19,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for site remediations, including the Lake Calumet area, in accordance with Section 22.2 and Title XVII of the Environmental Protection Act.
Section 10. The sum of $8,942,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 101, Section 10 of Public Act 93-842, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 15. The sum of $6,657,600, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made for such purpose in Article 101, Section 15 of Public Act 93-0842, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.
Section 20. The sum of $5,848,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 101, Section 20 of Public Act 93-0842, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for grants to units of local government for wastewater facilities, pursuant to provisions of the "Anti-Pollution Bond Act."
Section 25. The amount of $69,056,000, or so much thereof as may be necessary and remains unexpended on June 30, 2005, from reappropriations heretofore made for such purposes in Article 101, Section 25 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for wastewater compliance grants to units of local government or sewer systems and wastewater treatment facilities pursuant to procedures and rules established under the Anti-Pollution Bond Act. These grants are limited to projects for which the local government provides at least 30% of the project cost. There is an approved project compliance plan, and there is an enforceable compliance schedule prior to the grant award. The grant award will be based on eligible project cost contained in the approved compliance plan.
Section 30. The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 101, Section 30 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.
Section 35. The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 101, Section 35 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.
Section 40. The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 101, Section 40 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 of the Environmental Protection Act.
Section 45. The sum of $1,082,400, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 101, Section 45 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for public drinking water infrastructure, including design and construction, where private drinking water wells have been contaminated by a hazardous substance.
Section 50. The sum of $180,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 55. The sum of $133,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 24, Section 200 of Public Act 93-842, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 60. The sum of $249,859,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 24, Section 200 of Public Act 93-842, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 65. The sum of $63,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged program.
Section 70. The sum of $43,000,000, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 24, Section 205 of Public Act 93-842, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Section 75. The sum of $133,016,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2005, from reappropriations heretofore made in Article 24, Section 205 of Public Act 93-842, as amended, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.
Total, Article 13 $945,462,600
ARTICLE 14
HISTORIC PRESERVATION AGENCY
Section 5. The sum of $1,000,000, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2005, from appropriations heretofore made in Article 102, Section 5 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for a grant to the Lake County Forest Preserve District for planning, construction and renovation of the Adlai Stevenson Home State Historic Site.
Section 10. The sum of $437,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 102, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for costs associated with the acquisition or improvements of Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.
Section 15. The sum of $460,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 102, Section 15 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for support facilities, acquisition or improvements for Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.
Total, Article 14 $1,897,800
ARTICLE 15
ILLINOIS FINANCE AUTHORITY
Section 5. The sum of $500,000, or so much thereof as may be necessary, is appropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.
Total, Article 15 $500,000
ARTICLE 16
ILLINOIS FINANCE AUTHORITY
Section 10. The sum of $5,500,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 103, Section 5 of Public Act 93-0842, is reappropriated from the Build Illinois Bond Fund to the Illinois Finance Authority for deposit into the Fire Truck Revolving Loan Fund for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.
Section 15. The sum of $9,025,632, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 103, Section 10 of Public Act 93-0842, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.
Total, Article 16 $14,525,632
ARTICLE 17
MEDICAL DISTRICT COMMISSION
Section 5. The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Illinois Medical District Commission for acquisition of property, demolition and site improvements, and related costs within the Medical Center District, City of Chicago for Phase IV of District Development Initiative.
Total, Article 17 $3,000,000
ARTICLE 18
MEDICAL DISTRICT COMMISSION
Section 5. The sum of $10,768, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 104, Section 5 of Public Act 93-842, is reappropriated from the Capital Development Fund to the Illinois Medical District Commission for acquisition of property, demolition and site improvements, and related costs within the Medical Center District, City of Chicago for Phase III and IV of District Development Initiative.
Section 10. The sum of $149,012, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made in Article 104, Section 10 of Public Act 93-842, is reappropriated from the Capital Development Fund to the Illinois Medical District Commission for acquisition of property, demolition and site improvements, and related costs within the Medical Center District, City of Chicago for Phase IV of District Development Initiative.
Section 20. No contract shall be entered into or obligation incurred for any expenditures from appropriations in Sections 10 and 15 of this Article until the purposes and amounts have been approved in writing by the Governor.
Total, Article 18 $159,780
ARTICLE 19
ILLINOIS EMERGENCY MANAGEMENT AGENCY
Section 10. The sum of $436,600, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Public Act 93-0842, Article 76, Section 100, as amended, is reappropriated from the Build Illinois Bond Fund to the Illinois Emergency Management Agency for the capital costs associated with the Gubernatorial Proclamation of disaster dated April 21, 2004 relating to Kankakee, LaSalle, Putnam, and Will Counties.
Total, Article 19 $436,600
ARTICLE 20
EASTERN ILLINOIS UNIVERSITY
Section 5. The sum of $9,422, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 106, Section 10 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University for digitalization infrastructure for WEIU-TV, in addition to amounts previously appropriated for such purpose for this fiscal year. No contract shall be entered into or obligation incurred for any expenditure from the appropriation made in this Section until after the purposes and amounts have been approved in writing by the Governor.
Section 10. The sum of $5,430,384, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made for such purpose in Article 106, Section 15 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment for the renovation and expansion of the Fine Arts Center. No contract shall be entered into or obligation incurred for any expenditure from the appropriation made in this Section until after the purpose and amounts have been approved in writing by the Governor.
Section 15. The sum of $404,157, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 106, Section 20 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment for the renovation and expansion of Booth Library. No contract shall be entered into or obligation incurred for any expenditure from the appropriation made in this Section until after the purposes and amounts have been approved in writing by the Governor.
Total, Article 20 $5,843,963
ARTICLE 21
NORTHEASTERN ILLINOIS UNIVERSITY
Section 5. The sum of $2,071,805, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 107, Section 5 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Northeastern Illinois University to purchase equipment and remodel buildings A, B and E. This appropriation is in addition to any funds previously appropriated.
Total, Article 21 $2,071,805
ARTICLE 22
NORTHERN ILLINOIS UNIVERSITY
Section 5. The sum of $523,827, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for that purpose in Article 108, Section 5 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Northern Illinois University for technology infrastructure improvements at Northern Illinois University. No contract shall be entered into or obligation incurred for any expenditures from the reappropriation made in this Section until after the purposes and amounts have been approved in writing by the Governor.
Section 10. The sum of $43,366, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for that purpose in Article 108, Section 10 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Northern Illinois University for purchasing Engineering Building equipment.
Total, Article 22 $567,193
ARTICLE 23
SOUTHERN ILLINOIS UNIVERSITY
Section 5. The amount of $28,497, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 109, Section 10 of Public Act 93-0842, is reappropriated to Southern Illinois University from the Capital Development Fund for digitalization infrastructure for WUSI-TV (Olney).
Section 10. The sum of $800,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 109, Section 20 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University at Carbondale to purchase equipment for Altgeld Hall and the Old Baptist Foundation Building. This appropriation is in addition to any funds previously appropriated.
Total, Article 23 $828,497
ARTICLE 24
UNIVERSITY OF ILLINOIS
Section 5. The sum of $10,599,574, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 110, Section 10 of Public Act 93-0842, as amended, is reappropriated from the Capital Development Fund to the Board of Trustees of the University of Illinois for all costs associated with the space needs of the Department of Natural Resources, Illinois Natural History Survey Division and State Water Survey Division on the campus of the University of Illinois in Champaign, including construction, capital facilities, planning, relocation, renovation and rehabilitation, mechanical systems, materials, services and all other costs required to complete the work.
Section 10. The sum of $3,775,922, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 110, Section 15 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of the University of Illinois to plan and construct an Education and Research facility for the College of Medicine in Chicago, including planning, land acquisition, demolition, construction, remodeling, landscaping, site improvements, equipment, extension or modification of campus utility systems, relocation of programs, and such expenses as may be necessary to complete the facility. This appropriation is in addition to any other funds appropriated for this purpose for this fiscal year.
Section 15. The sum of $688,089, or so much thereof as may be necessary and remains unexpended on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 110, Section 25 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the University of Illinois for digitalization infrastructure for WILL-TV (Urbana-Champaign).
Section 20. The sum of $814,444, or so much thereof as may be necessary and remains unexpended on June 30, 2005, from an appropriation heretofore made for such purpose in Article 110, Section 30 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the University of Illinois for digitalization infrastructure for WILL-TV (Urbana-Champaign).
Section 25. The sum of $431,068, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made in Article 110, Section 35 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the Board of Trustees of the University of Illinois to plan and construct a Classroom and Office Building at the Springfield Campus and related utility systems, including planning, land acquisition, demolition, construction, remodeling, landscaping, site improvements, equipment, extension or modification of campus utility systems, and such expenses as may be necessary to complete the facility. This appropriation is in addition to any other funds appropriated for this purpose for this fiscal year.
Section 30. The sum of $2,949,074, or so much thereof as may be necessary and remains unexpended on June 30, 2005, from an appropriation heretofore made for such purpose in Article 110, Section 45 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the University of Illinois at Springfield for constructing a classroom and office building, in addition to funds previously appropriated.
Total, Article 24 $19,258,171
ARTICLE 25
ILLINOIS COMMUNITY COLLEGE BOARD
Section 5. The sum of $2,019,599, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from a reappropriation heretofore made for such purpose in Article 111, Section 15 of Public Act 93-0842, as amended, is reappropriated from the Build Illinois Bond Fund for the Illinois Community College Board for remodeling of facilities for compliance with the Americans with Disabilities Act. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.
Total, Article 25 $2,019,599
ARTICLE 26
STATE BOARD OF EDUCATION
Section 5. The following named amount, or so much thereof as may be necessary, is appropriated from the School Construction Fund to the State Board of Education for School Construction Maintenance Grants:
For School Construction Grants............... $50,000,000
Total, Article 26 $50,000,000
ARTICLE 27
STATE BOARD OF ELECTIONS
Section 5. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2005, from an appropriation heretofore made for such purpose in Article 22, Section 15 of Public Act 93-0842, is reappropriated from the Capital Development Fund to the State Board of Elections for grants to local governments for the purchase of handicapped accessible polling machines.
Total, Article 27 $5,000,000
ARTICLE 99
Section 999-99. Effective date. This Act takes effect on July 1, 2005.