093_HB1044sam002

 










                                     LRB093 05548 DRJ 15781 a

 1                    AMENDMENT TO HOUSE BILL 1044

 2        AMENDMENT NO.     .  Amend House Bill 1044,  AS  AMENDED,
 3    with  reference  to page and line numbers of Senate Amendment
 4    No. 1, on page 27, by inserting the following after line 14:

 5        "Section 80.  Upon the payment of the sum  of  $84,500.00
 6    to  the  State of Illinois, and subject to the conditions set
 7    forth in Section 900  of  this  Act,  the  Secretary  of  the
 8    Department  of  Transportation  is  authorized  to  convey by
 9    quitclaim deed all right, title and interest in  and  to  the
10    following  described  land  in  DuPage  County,  Illinois, to
11    Harris Trust and Savings Bank as Trustee under Trust  #L-1594
12    and dated August 10, 1987.

13        Parcel No. 1WY0952

14        PART  OF THE NORTHEAST QUARTER OF SECTION 35, TOWNSHIP 38
15        NORTH, RANGE 11 EAST  OF  THE  THIRD  PRINCIPAL  MERIDIAN
16        DESCRIBED AS FOLLOWS:

17        BEGINNING  AT  THE  NORTHWEST CORNER OF LOT 4 OF HINSDALE
18        INDUSTRIAL PARK, UNIT TWO  RECORDED  AS  DOCUMENT  NUMBER
19        R69-42012;  THENCE SOUTH 00 DEGREES 28 MINUTES 44 SECONDS
20        WEST ALONG THE WEST LINE OF SAID LOT, 198.01 FEET TO  THE
21        NORTHERLY  LINE  OF THE F.A. KUBAC PROPERTY; THENCE NORTH
 
                            -2-      LRB093 05548 DRJ 15781 a
 1        89  DEGREES  18  MINUTES  16  SECONDS  WEST  ALONG   SAID
 2        NORTHERLY  LINE,  60.00  FEET  TO A LINE THAT IS PARALLEL
 3        WITH AND 60.00 FEET WESTERLY OF,  AS  MEASURED  AT  RIGHT
 4        ANGLES  TO, THE WESTERLY LINE OF SAID LOT 4; THENCE NORTH
 5        00 DEGREES 28 MINUTES 44 SECONDS EAST ALONG SAID PARALLEL
 6        LINE, 197.35  FEET  TO  THE  WESTERLY  EXTENSION  OF  THE
 7        NORTHERLY  LINE  OF  SAID LOT; THENCE SOUTH 89 DEGREES 55
 8        MINUTES 59 SECOND EAST  ALONG  SAID  WESTERLY  EXTENSION,
 9        60.00  FEET  TO THE POINT OF BEGINNING; IN DUPAGE COUNTY,
10        ILLINOIS.

11        CONTAINING 0.272 ACRE, MORE OR LESS.

12        Section 85.  Upon the payment of the sum of $1,900.00  to
13    the  State  of  Illinois,  and  subject to the conditions set
14    forth in Section 900 of this Act, the  easement  for  highway
15    purposes  acquired  by the People of the State of Illinois is
16    released over and through the  following  described  land  in
17    Livingston County, Illinois:

18        Parcel No. 3LR0075

19        That part of the Southwest Quarter of Section 1, Township
20        29  North,  Range 3 East of the Third Principal Meridian,
21        described as follows:

22        Commencing at the  southwest  corner  of  said  Southwest
23        Quarter;  thence  North  03 degrees 47 minutes 02 seconds
24        East on an assumed bearing 1,158.36 feet along  the  west
25        line  of said Quarter; thence South 86 degrees 56 minutes
26        30 seconds East, 113.20 feet to a point on the east right
27        of way line of F.A. 24 (Illinois Route 23)  as  shown  on
28        the  right  of  way plat recorded in Highway Plat Book 1,
29        Page 82 at the office of the Livingston  County  Recorder
30        said  point  being  the  True  Point of Beginning; thence
31        North 03 degrees 03 minutes 30 seconds East  256.92  feet
 
                            -3-      LRB093 05548 DRJ 15781 a
 1        to  the  west line of the F.A. Route 118 roadway right of
 2        way dedicated per Deed Record Book 199, Page 180  at  the
 3        office of the Livingston County Recorder; thence North 19
 4        degrees 37 minutes 58 seconds East, 73.31 feet along said
 5        west  right  of  way  line;  thence  North  21 degrees 16
 6        minutes 39 seconds East, 58.08 feet along said west right
 7        of way line;  thence  North  17  degrees  51  minutes  39
 8        seconds  East,  190.43  feet along said west right of way
 9        line; thence North 11 degrees 03 minutes 39 seconds East,
10        189.21 feet along said west right  of  way  line;  thence
11        North  04 degrees 14 minutes 39 seconds East, 189.34 feet
12        along said west  right  of  way  line;  thence  North  02
13        degrees  33  minutes  21  seconds West, 189.21 feet along
14        said west right of way line; thence North 11  degrees  27
15        minutes  21  seconds  West,  190.05  feet along said west
16        right of way line; thence North 12 degrees 46 minutes  21
17        seconds  West,  135.86  feet along said west right of way
18        line; thence South 89 degrees 12 minutes 52 seconds East,
19        82.29 feet to said east right of way line;  thence  South
20        12  degrees 46 minutes 32 seconds East, 116.57 feet along
21        said east right of way line; thence South 07  degrees  23
22        minutes  21  seconds  East,  190.84  feet along said east
23        right of way line; thence South 02 degrees 57 minutes  21
24        seconds  East,  188.79  feet along said east right of way
25        line; thence South 04 degrees 14 minutes 39 seconds West,
26        229.43 feet along said east right  of  way  line;  thence
27        South  11 degrees 27 minutes 39 seconds West, 188.79 feet
28        along said east  right  of  way  line;  thence  South  17
29        degrees  59  minutes  39  seconds West, 190.37 feet along
30        said east right of way line; thence South 21  degrees  16
31        minutes 39 seconds West, 58.08 feet along said east right
32        of  way  line;  thence  South  19  degrees  36 minutes 39
33        seconds West, 195.14 feet along said east  right  of  way
34        line; thence South 16 degrees 15 minutes 48 seconds West,
 
                            -4-      LRB093 05548 DRJ 15781 a
 1        122.75  feet  along  said  east  right of way line to the
 2        Point of Beginning, containing 2.100 acres, more or less,
 3        all being situated in  Long  Point  Township,  Livingston
 4        County, Illinois.

 5        Section 90.  Upon the payment of the sum of $51,500.00 to
 6    the  State  of  Illinois,  and  subject to the conditions set
 7    forth in Section 900 of this Act, the  easement  for  highway
 8    purposes  acquired  by the People of the State of Illinois is
 9    released over and through the  following  described  land  in
10    Champaign County, Illinois:

11        Parcel No. 5X05413

12        Part  of the East Half of the South Half of the Northwest
13        Quarter of the Southwest Quarter of Section  4,  Township
14        19  North,  Range 9 East of the Third Principal Meridian,
15        Champaign County, Illinois, being a part of  Federal  Aid
16        Interstate   74   and   U.S.  Route  45  and  being  more
17        particularly described as follows:

18        Commencing at  the  southeast  corner  of  the  Northwest
19        Quarter  of  the Southwest Quarter of Section 4, Township
20        19 North, Range 9 East of the Third  Principal  Meridian,
21        proceed  on  an  assumed  bearing  of North 00 degrees 00
22        minutes 00 seconds East 168.19 feet along the  east  line
23        of the Northwest Quarter of the Southwest Quarter of said
24        Section  4  and  the  east  line  of  a tract surveyed by
25        Charles S. Danner, Illinois  Professional  Land  Surveyor
26        No.  1470 as shown by plat of survey dated March 22, 1965
27        and recorded in Miscellaneous Record Book 784 at Page 456
28        in the  Office  of  the  Recorder  of  Champaign  County,
29        Illinois  and  resurveyed  by  Rex A. Bradfield, Illinois
30        Professional Land Surveyor No. 2537 as shown by  plat  of
31        survey   dated   December   21,  1988  to  the  point  of
32        intersection with the south right-of-way line of  Federal
 
                            -5-      LRB093 05548 DRJ 15781 a
 1        Aid  Interstate  74,  being  the northeast corner of said
 2        tract surveyed by Charles S. Danner and resurveyed by Rex
 3        A. Bradfield, said point of intersection being the  Point
 4        of  Beginning;  thence  South  69  degrees  52 minutes 00
 5        seconds West 149.28 feet  along  the  south  right-of-way
 6        line  of  Federal  Aid  Interstate  74  to  the  point of
 7        intersection with the  east  right-of-way  line  of  U.S.
 8        Route  45,  being  the  northwest  corner  of  said tract
 9        surveyed by Charles S. Danner and resurveyed  by  Rex  A.
10        Bradfield;  thence South 25 degrees 12 minutes 00 seconds
11        West 111.89 feet along the east right-of-way line of U.S.
12        Route 45 to the southwest corner of said  tract  surveyed
13        by  Charles S. Danner and resurveyed by Rex A. Bradfield;
14        thence South 89 degrees 52 minutes 00 seconds West  71.66
15        feet along a westerly extension of the south line of said
16        tract surveyed by Charles S. Danner and resurveyed by Rex
17        A.  Bradfield;  thence  North  24  degrees  35 minutes 16
18        seconds East 49.33  feet;  thence  North  30  degrees  09
19        minutes  16  seconds  East  50.01  feet;  thence North 38
20        degrees 26 minutes 12 seconds  East  49.95  feet;  thence
21        North  53  degrees 23 minutes 00 seconds East 50.03 feet;
22        thence North 63 degrees 50 minutes 10 seconds East  49.96
23        feet;  thence North 73 degrees 32 minutes 38 seconds East
24        49.91 feet; thence North 85 degrees 03 minutes 13 seconds
25        East 50.10 feet to the east line of the Northwest Quarter
26        of the Southwest Quarter of said Section 4; thence  South
27        00  degrees  00  minutes 00 seconds West 44.76 feet along
28        the east line of the Northwest Quarter of  the  Southwest
29        Quarter  of  said  Section  4  to the Point of Beginning,
30        encompassing 0.394  acres,  more  or  less,  situated  in
31        Champaign County, Illinois.

32        It  is  understood  and  agreed that there is no existing
33    right of access nor will access be permitted in the future by
34    the State of Illinois, Department of Transportation, from  or
 
                            -6-      LRB093 05548 DRJ 15781 a
 1    over  the  premises  above  described  to and from either FAI
 2    Route 74, or US Route 45, previously declared freeways.

 3        Section 95.  Upon the payment of the sum of $2,300.00  to
 4    the  State  of  Illinois,  and  subject to the conditions set
 5    forth in Section 900 of this Act, the dedication for  highway
 6    purposes  acquired  by the People of the State of Illinois is
 7    released over and through the  following  described  land  in
 8    Tazewell County, Illinois:

 9        Parcel No. 409559V

10        A  part  of Lot 1 in Block 1 of Homewood Heights, being a
11        subdivision of part of the Northwest Quarter  of  Section
12        7,  Township  25  North,  Range  4  West, and part of the
13        Northeast Quarter of Section 12, Township 25 North, Range
14        5 West of the Third Principal Meridian, Tazewell  County,
15        Illinois, being more particularly described as follows:

16        Commencing  at  the  most  easterly corner of said Lot 1,
17        said point being 54.11  feet  normally  distant  westerly
18        from  centerline  Station  176+51.31  of  S.B.I. Route 24
19        (Illinois Route 29) and the Point  of  Beginning  of  the
20        tract to be described:

21        From  the  Point of Beginning, thence South 32 degrees 46
22        minutes 14 seconds West  (bearings  are  for  descriptive
23        purposes  only),  a  distance  of  150.67 feet to a point
24        59.71 feet normally distant westerly from said centerline
25        Station 178+01.82; thence North 70 degrees 28 minutes  32
26        seconds  West,  a distance of 20.68 feet to a point 80.00
27        feet  normally  distant  westerly  from  said  centerline
28        Station 178+05.80; thence North 18 degrees 10 minutes  12
29        seconds  East, a distance of 92.66 feet to a point 100.00
30        feet  normally  distant  westerly  from  said  centerline
31        Station 177+15.00; thence North 59 degrees 09 minutes  00
 
                            -7-      LRB093 05548 DRJ 15781 a
 1        seconds   East,   a   distance   of  73.31  feet  to  the
 2        northeasterly line of said Lot 1, said point being  65.00
 3        feet  normally  distant  westerly  from  said  centerline
 4        Station  176+50.90; thence South 57 degrees 32 minutes 52
 5        seconds East, along said northeasterly line of Lot  1,  a
 6        distance   of  10.91  feet  to  the  Point  of  Beginning
 7        containing 4591.31 square feet, more or  less,  or  0.105
 8        acre, more or less.

 9        Except:    The   State   of   Illinois,   Department   of
10    Transportation, its successors and assigns, shall  reserve  a
11    permanent   easement,   privilege,  right  and  authority  to
12    construct, reconstruct,  extend,  replace,  repair,  inspect,
13    maintain  and operate a storm sewer system, and appurtenances
14    thereto, upon, under, over, across,  and  through  the  above
15    described  real  estate.  The Department shall reserve access
16    thereto  for  the  purpose  of  inspection,   reconstruction,
17    extension,  repair,  maintenance, operation or replacement of
18    said storm sewer. Further, no new  structure  or  improvement
19    shall  be  constructed,  installed,  or placed upon the above
20    described real estate nor any use or activity conducted which
21    would interfere with the Department's exercise of its  rights
22    herein reserved.

23        Section 100.  Upon the payment of the sum of $2,500.00 to
24    the  State  of  Illinois,  and  subject to the conditions set
25    forth in Section 900  of  this  Act,  the  Secretary  of  the
26    Department  of  Transportation  is  authorized  to  convey by
27    quitclaim deed all right, title and interest in  and  to  the
28    following  described  land  in  Sangamon County, Illinois, to
29    Harold D. Carter and Carol A. Carter:

30        Parcel No. 675X188

31        A part of the Northeast Quarter of the Northwest  Quarter
32        of  Section  4,  Township  17 North, Range 4 West, of the
 
                            -8-      LRB093 05548 DRJ 15781 a
 1        Third  Principal  Meridian,  Sangamon  County,  Illinois,
 2        described as follows:

 3        Commencing at a gas pipe at the north quarter  corner  of
 4        said  Section  4,  thence  South 00 degrees 17 minutes 24
 5        seconds East along  the  quarter  section  line  1,242.96
 6        feet;  thence South 89 degrees 42 minutes 36 seconds West
 7        52.30 feet to the west existing right of way line of  Elm
 8        Street  also  the  Point  of  Beginning;  thence South 00
 9        degrees 46 minutes 49 seconds East  102.67  feet;  thence
10        South  24  degrees  59 minutes 01 second West 90.06 feet;
11        thence southwesterly along a curve to the left  having  a
12        radius of 4,782.15 feet and an arc length of 366.78 feet;
13        thence  North 01 degree 07 minutes 02 seconds West 136.78
14        feet to the north existing right of way line  of  Federal
15        Aid Route 5; thence along said existing right of way line
16        northeasterly  along a curve to the right having a radius
17        of 4,884.65 feet and an arc length of 386.05 feet; thence
18        continuing along said northerly right of way line,  North
19        27  degrees  05 minutes 13 seconds East 44.80 feet to the
20        Point  of  Beginning,  containing  0.950  acres  more  or
21        less."; and

22    on page 27, by inserting the following after line 24:

23        "Section   905.  According   to   the   terms    of    an
24    intergovernmental  agreement between the County of DuPage and
25    the State of Illinois, and  subject  to  the  conditions  set
26    forth  in  Section  917  of  this  Act,  the  Director of the
27    Illinois Department of Corrections is authorized to convey by
28    quitclaim deed to the County of DuPage, Illinois, all  right,
29    title, and interest in and to the following described land in
30    the  following  described  Parcel 26 in the County of DuPage,
31    Illinois, in exchange for the fair market value of that land,
32    less  any  improvements  requested  by  the   Department   of
 
                            -9-      LRB093 05548 DRJ 15781 a
 1    Corrections,  including but not limited to lighting, fencing,
 2    and signage  that  constitute  part  of  the  Illinois  Youth
 3    Center-Warrenville:

 4        Parcel 26:

 5        That part of the Northeast Quarter of Section 4, Township
 6        38  North, Range 9, East of the Third Principal Meridian,
 7        lying North of the Center line of Ferry Road, which  lies
 8        west of a line described as follows: Beginning at a point
 9        in  the  center  line  of  said Ferry Road, 65.380 meters
10        (214.50 feet) west of the northerly right of way line  of
11        the  Chicago,  Aurora and Elgin Railroad; thence North 02
12        Degrees 38 Minutes West to the North line of said Section
13        4, and east of a line described as follows: Beginning  at
14        a  point  on  said  north line of said Section 4 which is
15        90.123 meters (4.48 chains) east of the  Quarter  Section
16        post  in the south line of Section 33, Township 39 North,
17        Range 9 East of the Third Principal Meridian, and running
18        thence  South  3  Degrees  West,  243.615  meters  (12.11
19        chains) to the center line of said Ferry Road (except the
20        east 98.146 meters (322.00 feet), as measured  along  the
21        south line thereof) in DuPage County, Illinois.

22        Parcel  26  is  that  part  of the above described parcel
23        taken  for  roadway  purposes,  described   as   follows:
24        Commencing  at  the intersection of the northerly line of
25        the Chicago, Aurora and Elgin  Railroad  and  the  center
26        line of Ferry Road; thence North 89 Degrees 12 Minutes 36
27        Seconds west along said center line, a distance of 65.332
28        meters;  thence  North  89  Degrees 16 Minutes 36 Seconds
29        west along said center line, a distance of 98.147  meters
30        for  a  point  of  beginning;  thence North 89 Degrees 17
31        Minutes  01  Seconds  west  along  said  center  line,  a
32        distance of 350.744 meters; thence North  03  Degrees  03
33        Minutes  30  Seconds  east,  a distance of 21.226 meters;
 
                            -10-     LRB093 05548 DRJ 15781 a
 1        thence South 89 Degrees 39 Minutes  43  Seconds  east,  a
 2        distance  of  350.758  meters; thence South 02 Degrees 50
 3        Minutes 34 Seconds west, a distance of 23.539  meters  to
 4        the point of beginning, in DuPage County, Illinois.

 5        The  property  shall  be used only for public purposes or
 6        title shall revert without further action to the State of
 7        Illinois.

 8        Section   910.  According   to   the    terms    of    an
 9    intergovernmental  agreement between the County of DuPage and
10    the State of Illinois, and  subject  to  the  conditions  set
11    forth  in  Section  917  of  this  Act,  the  Director of the
12    Illinois Department of Corrections is authorized to execute a
13    Grant of Temporary Construction Easement over  the  following
14    described  land  in the following described parcel 26.1 TE in
15    the County of DuPage in exchange for the fair market value of
16    that easement:

17        Parcel 26.1 TE:

18        That part of the Northeast Quarter of Section 4, Township
19        38 North, Range 9, East of the Third Principal  Meridian,
20        lying  North of the Center line of Ferry Road, which lies
21        west of a line described as follows: Beginning at a point
22        in the center line of  said  Ferry  Road,  65.380  meters
23        (214.50  feet) west of the northerly right of way line of
24        the Chicago, Aurora and Elgin Railroad; thence  North  02
25        Degrees 38 Minutes West to the North line of said Section
26        4,  and east of a line described as follows: Beginning at
27        a point on said north line of said  Section  4  which  is
28        90.123  meters  (4.48 chains) east of the Quarter Section
29        post in the south line of Section 33, Township 39  North,
30        Range 9 East of the Third Principal Meridian, and running
31        thence  South  3  Degrees  West,  243.615  meters  (12.11
32        chains) to the center line of said Ferry Road (except the
 
                            -11-     LRB093 05548 DRJ 15781 a
 1        east  98.146  meters (322.00 feet), as measured along the
 2        south line thereof) in DuPage County, Illinois.

 3        Parcel 26.1 TE is that part of the above described parcel
 4        taken  for  Temporary  Easement  Purposes,  described  as
 5        follows: Commencing at the intersection of the  Northerly
 6        line  of  the  Chicago, Aurora and Elgin Railroad and the
 7        Center line of Ferry Road; thence  North  89  Degrees  12
 8        Minutes  36  Seconds  west  along  said  center  line,  a
 9        distance  of  65.332  meters;  thence North 89 Degrees 16
10        Minutes  36  Seconds  west  along  said  center  line,  a
11        distance of 98.147 meters; thence  North  02  Degrees  50
12        Minutes  34  Seconds  East,  a distance of 23.539 meters;
13        thence North 89 Degrees 39 Minutes  43  Seconds  west,  a
14        distance  of  92.216  meters  for  a  point of beginning;
15        thence continuing northwesterly along the last  described
16        course,  a  distance  of  18.800  meters; thence North 00
17        Degrees 20 Minutes 21 Seconds east, a distance  of  5.012
18        meters;  thence  South  89  Degrees 39 Minutes 42 Seconds
19        East, a  distance  of  18.800  meters;  thence  South  00
20        Degrees  20  Minutes 17 Seconds West, a distance of 5.012
21        meters to the  point  of  beginning,  in  DuPage  County,
22        Illinois.

23        The  property may be used only for public purposes or the
24        easement shall revert without further action to the State
25        of Illinois.

26        Section   915.  According   to   the    terms    of    an
27    intergovernmental  agreement between the County of DuPage and
28    the State of Illinois, and  subject  to  the  conditions  set
29    forth  in  Section  917  of  this  Act,  the  Director of the
30    Illinois Department of Corrections is authorized to execute a
31    Grant of Temporary Construction Easement over  the  following
32    described  land  in the following described parcel 26.2 TE in
 
                            -12-     LRB093 05548 DRJ 15781 a
 1    the County of DuPage in exchange for the fair market value of
 2    that easement:

 3        Parcel 26.2 TE:

 4        That part of the Northeast Quarter of Section 4, Township
 5        38 North, Range 9 East of the Third  Principal  Meridian,
 6        lying  North of the Center line of Ferry Road, which lies
 7        west of a line described as follows: Beginning at a point
 8        in the center line of  said  Ferry  Road,  65.380  meters
 9        (214.50  feet) west of the northerly right of way line of
10        the Chicago, Aurora and Elgin Railroad; thence  North  02
11        Degrees 38 Minutes West to the North line of said Section
12        4,  and east of a line described as follows: Beginning at
13        a point on said north line of said  Section  4  which  is
14        90.123  meters  (4.48 chains) east of the Quarter Section
15        post in the south line of Section 33, Township 39  North,
16        Range 9 East of the Third Principal Meridian, and running
17        thence  South  3  Degrees  West,  243.615  meters  (12.11
18        chains) to the center line of said Ferry Road (except the
19        east  98.146  meters (322.00 feet), as measured along the
20        south line thereof) in DuPage County, Illinois.

21        Parcel 26.2 TE is that part of the above described parcel
22        taken  for  Temporary  Easement  Purposes,  described  as
23        follows: Commencing at the intersection of the  northerly
24        line  of  the  Chicago, Aurora and Elgin Railroad and the
25        center line of Ferry Road; thence  North  89  Degrees  12
26        Minutes  36  Seconds  west  along  said  center  line,  a
27        distance  of  65.332  meters;  thence North 89 Degrees 16
28        Minutes  36  Seconds  west  along  said  center  line,  a
29        distance of 98.147 meters  thence  North  02  Degrees  50
30        Minutes  34 Seconds east, a distance of 23.539 meters for
31        a point of beginning, thence North 89 Degrees 39  Minutes
32        43 Seconds west, a distance of 2.116 meters; thence North
33        00  Degrees  20  Minutes  21  Seconds east, a distance of
 
                            -13-     LRB093 05548 DRJ 15781 a
 1        5.012 meters; thence  South  89  Degrees  39  Minutes  43
 2        Seconds east, a distance of 2.335 meters; thence South 02
 3        Degrees  50  Minutes 34 Seconds west, a distance of 5.017
 4        meters to the  point  of  beginning,  in  DuPage  County,
 5        Illinois.

 6        The  property may be used only for public purposes or the
 7        easement shall revert without further action to the State
 8        of Illinois.

 9        Section 917.  The Director of the Illinois Department  of
10    Corrections  shall obtain a certified copy of the portions of
11    this Act containing the title, enacting clause, the effective
12    date, the appropriate Section or Sections containing the land
13    descriptions of the property to be transferred  or  otherwise
14    affected, and this Section within 60 days after its effective
15    date  and, upon receipt of payment required by the Section or
16    Sections, if  any  payment  is  required,  shall  record  the
17    certified  document in the Recorder's Office in the county in
18    which the land is located.

19        Section 920.  Subject to  the  conditions  set  forth  in
20    Section  927  of  this Act, the Director of the Department of
21    Natural Resources, on behalf of the  State  of  Illinois,  is
22    authorized  to  execute  and deliver to Springfield Plastics,
23    Inc., a Nevada Corporation, with offices at 7300 West  State,
24    Route   104,   Auburn,  Illinois,  hereinafter  "Grantee",  a
25    quitclaim deed to the following described real property,  for
26    and  in consideration of the fencing and trees to be provided
27    by Grantee as hereinafter specified under Section 2, to wit:
28        Part of the Southwest Quarter of Section 8,  Township  13
29        North,  Range  6  West  of  the Third Principal Meridian,
30        Sangamon  County,   Illinois,   described   as   follows:
31        Beginning  at  an  iron  pipe  at the intersection of the
32        Southerly right-of-way line of State Route  104  and  the
 
                            -14-     LRB093 05548 DRJ 15781 a
 1        Easterly  line  of the abandoned Chicago and Northwestern
 2        Railroad right-of-way;  thence  Southwesterly  along  the
 3        Easterly  line  of  said abandoned Railroad right-of-way,
 4        1563.58 feet to an iron pin; thence  West  parallel  with
 5        the  North  line of the Southeast Quarter of said Section
 6        8, to a point 20.00 feet Westerly of and  perpendicularly
 7        distant from the Easterly line of said abandoned Railroad
 8        right-of-way;  thence  Northeasterly  parallel  with  the
 9        Easterly line of said abandoned Railroad right-of-way, to
10        the  Southerly  right-of-way  line of Illinois Route 104;
11        thence Easterly along said Southerly  right-of-way  line,
12        to the Point of Beginning, containing 0.71 acres, more or
13        less.

14        Section 925.  As full consideration for the conveyance of
15    the  real  property  described in Section 920, Grantee shall:
16    (1) provide all material, equipment  and  labor  required  to
17    erect  a  chain-link  fence, with a minimum height of 6 feet,
18    along the Westerly line of such real property, running from a
19    point  near  the  Southwest  corner  of  Grantee's   existing
20    building to the Southwest corner of such real property, being
21    approximately  700  feet  in  length;  and  (2)  provide  all
22    material,  equipment  and  labor  required to plant 4 (2 inch
23    minimum caliper) oak trees on adjoining real property  to  be
24    retained  by the Department of Natural Resources, as directed
25    by the Department.

26        Section 927.  The Director of the Department  of  Natural
27    Resources  shall  obtain  a certified copy of the portions of
28    this Act containing the title, enacting clause, the effective
29    date, the appropriate Section or Sections containing the land
30    descriptions of the property to be transferred  or  otherwise
31    affected, and this Section within 60 days after its effective
32    date  and, upon receipt of payment required by the Section or
 
                            -15-     LRB093 05548 DRJ 15781 a
 1    Sections, if  any  payment  is  required,  shall  record  the
 2    certified  document in the Recorder's Office in the county in
 3    which the land is located.".