1 | AN ACT concerning finance.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Illinois Procurement Code is amended by | |||||||||||||||||||
5 | changing Section 33-5 as follows: | |||||||||||||||||||
6 | (30 ILCS 500/33-5)
| |||||||||||||||||||
7 | Sec. 33-5. Definitions. In this Article:
| |||||||||||||||||||
8 | "Construction management services" includes:
| |||||||||||||||||||
9 | (1) services provided in the planning and | |||||||||||||||||||
10 | pre-construction phases of a
construction project | |||||||||||||||||||
11 | including, but not limited to, consulting with,
advising, | |||||||||||||||||||
12 | assisting, and making recommendations to the Board and
| |||||||||||||||||||
13 | architect, engineer, or licensed land surveyor on all | |||||||||||||||||||
14 | aspects
of planning for project construction; reviewing | |||||||||||||||||||
15 | all plans and
specifications as they are being developed | |||||||||||||||||||
16 | and making recommendations
with respect to construction | |||||||||||||||||||
17 | feasibility, availability of material and
labor, time | |||||||||||||||||||
18 | requirements for procurement and construction, and
| |||||||||||||||||||
19 | projected costs; making, reviewing, and refining budget | |||||||||||||||||||
20 | estimates based
on the Board's program and other available | |||||||||||||||||||
21 | information; making
recommendations to the Board and the | |||||||||||||||||||
22 | architect or engineer
regarding the division of work in | |||||||||||||||||||
23 | the plans and specifications to
facilitate the bidding and |
| |||||||
| |||||||
1 | awarding of contracts; soliciting the
interest of capable | ||||||
2 | contractors and taking bids on the project;
analyzing the | ||||||
3 | bids received; and preparing and maintaining a progress
| ||||||
4 | schedule during the design phase of the project and | ||||||
5 | preparation of a
proposed construction schedule; and
| ||||||
6 | (2) services provided in the construction phase of the | ||||||
7 | project
including, but not limited to, maintaining | ||||||
8 | competent supervisory staff
to coordinate and provide | ||||||
9 | general direction of the work and progress
of the | ||||||
10 | contractors on the project; directing the work as it is | ||||||
11 | being
performed for general conformance with working | ||||||
12 | drawings and
specifications; establishing procedures for | ||||||
13 | coordinating among the
Board, architect or engineer, | ||||||
14 | contractors, and construction
manager with respect to all | ||||||
15 | aspects of the project and
implementing those procedures; | ||||||
16 | maintaining job site records
and making appropriate | ||||||
17 | progress reports; implementing labor policy
in conformance | ||||||
18 | with the requirements of the public owner; reviewing
the | ||||||
19 | safety and equal opportunity programs of each contractor | ||||||
20 | for
conformance with the public owner's policy and making
| ||||||
21 | recommendations; reviewing and processing
all applications | ||||||
22 | for payment by involved contractors and material
suppliers | ||||||
23 | in accordance with the terms of the contract; making
| ||||||
24 | recommendations and processing requests for changes in the | ||||||
25 | work and
maintaining records of change orders; scheduling | ||||||
26 | and conducting job
meetings to ensure orderly progress of |
| |||||||
| |||||||
1 | the work; developing and
monitoring a project progress | ||||||
2 | schedule, coordinating and expediting
the work of all | ||||||
3 | contractors and providing periodic status reports to
the | ||||||
4 | owner and the architect or engineer; and establishing and
| ||||||
5 | maintaining a cost control system and conducting meetings | ||||||
6 | to review
costs.
| ||||||
7 | "Construction manager" means any individual, sole
| ||||||
8 | proprietorship, firm, partnership, corporation, or other legal | ||||||
9 | entity
providing construction management services for the | ||||||
10 | Board and
prequalified by the State in accordance with 30 ILCS
| ||||||
11 | 500/33-10.
| ||||||
12 | "Board" means the Capital Development Board or, to the | ||||||
13 | extent that the services are to be procured by for a public | ||||||
14 | institution of higher education, the public institution of | ||||||
15 | higher education.
| ||||||
16 | (Source: P.A. 102-1119, eff. 1-23-23.)
| ||||||
17 | Section 99. Effective date. This Act takes effect upon | ||||||
18 | becoming law.
|