Amends the Illinois Power Agency Act. Provides that there shall be created a low-income community hydropower pilot project program. Provides that under this program, persons shall propose pilot community hydropower projects. Provides that community hydropower projects proposed may exceed 2,000 kilowatts in nameplate capacity, and the amount paid per project under this program may not exceed $20,000,000. Provides that pilot projects must result in economic benefits for the members of the community in which the project will be located. Provides that the proposed pilot project must include a partnership with at least one community-based organization. Provides that approved pilot projects shall be competitively bid by the Illinois Power Agency, subject to fair and equitable guidelines developed by the Agency. Provides that contracts entered into under this program may be entered into with an entity that will develop and administer the program or with developers and shall also include contracts for renewable energy credits related to the program. Provides that a project proposed by a utility shall not be included in the utility's rate base. Makes corresponding changes to the Act and the Public Utilities Act.
|
| |
| | A BILL FOR |
|
|
| | SB1474 | | LRB103 29372 AMQ 55761 b |
|
|
1 | | AN ACT concerning State government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Power Agency Act is amended by |
5 | | changing Sections 1-10 and 1-56 as follows:
|
6 | | (20 ILCS 3855/1-10)
|
7 | | Sec. 1-10. Definitions. |
8 | | "Agency" means the Illinois Power Agency. |
9 | | "Agency loan agreement" means any agreement pursuant to |
10 | | which the Illinois Finance Authority agrees to loan the |
11 | | proceeds of revenue bonds issued with respect to a project to |
12 | | the Agency upon terms providing for loan repayment |
13 | | installments at least sufficient to pay when due all principal |
14 | | of, interest and premium, if any, on those revenue bonds, and |
15 | | providing for maintenance, insurance, and other matters in |
16 | | respect of the project. |
17 | | "Authority" means the Illinois Finance Authority. |
18 | | "Brownfield site photovoltaic project" means photovoltaics |
19 | | that are either: |
20 | | (1) interconnected to an electric utility as defined |
21 | | in this Section, a municipal utility as defined in this |
22 | | Section, a public utility as defined in Section 3-105 of |
23 | | the Public Utilities Act, or an electric cooperative as |
|
| | SB1474 | - 2 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | defined in Section 3-119 of the Public Utilities Act and |
2 | | located at a site that is regulated by any of the following |
3 | | entities under the following programs: |
4 | | (A) the United States Environmental Protection |
5 | | Agency under the federal Comprehensive Environmental |
6 | | Response, Compensation, and Liability Act of 1980, as |
7 | | amended; |
8 | | (B) the United States Environmental Protection |
9 | | Agency under the Corrective Action Program of the |
10 | | federal Resource Conservation and Recovery Act, as |
11 | | amended; |
12 | | (C) the Illinois Environmental Protection Agency |
13 | | under the Illinois Site Remediation Program; or |
14 | | (D) the Illinois Environmental Protection Agency |
15 | | under the Illinois Solid Waste Program; or |
16 | | (2) located at the site of a coal mine that has
|
17 | | permanently ceased coal production, permanently halted any |
18 | | re-mining operations, and is no longer accepting any coal |
19 | | combustion residues; has both completed all clean-up and |
20 | | remediation obligations under
the federal Surface Mining |
21 | | and Reclamation Act of 1977 and all applicable Illinois |
22 | | rules and any other clean-up, remediation, or ongoing |
23 | | monitoring to safeguard the health and well-being of the |
24 | | people of the State of Illinois, as well as demonstrated |
25 | | compliance with all applicable federal and State |
26 | | environmental rules and regulations, including, but not |
|
| | SB1474 | - 3 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | limited, to 35 Ill. Adm. Code Part 845 and any rules for |
2 | | historic fill of coal combustion residuals, including any |
3 | | rules finalized in Subdocket A of Illinois Pollution |
4 | | Control Board docket R2020-019. |
5 | | "Clean coal facility" means an electric generating |
6 | | facility that uses primarily coal as a feedstock and that |
7 | | captures and sequesters carbon dioxide emissions at the |
8 | | following levels: at least 50% of the total carbon dioxide |
9 | | emissions that the facility would otherwise emit if, at the |
10 | | time construction commences, the facility is scheduled to |
11 | | commence operation before 2016, at least 70% of the total |
12 | | carbon dioxide emissions that the facility would otherwise |
13 | | emit if, at the time construction commences, the facility is |
14 | | scheduled to commence operation during 2016 or 2017, and at |
15 | | least 90% of the total carbon dioxide emissions that the |
16 | | facility would otherwise emit if, at the time construction |
17 | | commences, the facility is scheduled to commence operation |
18 | | after 2017. The power block of the clean coal facility shall |
19 | | not exceed allowable emission rates for sulfur dioxide, |
20 | | nitrogen oxides, carbon monoxide, particulates and mercury for |
21 | | a natural gas-fired combined-cycle facility the same size as |
22 | | and in the same location as the clean coal facility at the time |
23 | | the clean coal facility obtains an approved air permit. All |
24 | | coal used by a clean coal facility shall have high volatile |
25 | | bituminous rank and greater than 1.7 pounds of sulfur per |
26 | | million Btu btu content, unless the clean coal facility does |
|
| | SB1474 | - 4 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | not use gasification technology and was operating as a |
2 | | conventional coal-fired electric generating facility on June |
3 | | 1, 2009 (the effective date of Public Act 95-1027). |
4 | | "Clean coal SNG brownfield facility" means a facility that |
5 | | (1) has commenced construction by July 1, 2015 on an urban |
6 | | brownfield site in a municipality with at least 1,000,000 |
7 | | residents; (2) uses a gasification process to produce |
8 | | substitute natural gas; (3) uses coal as at least 50% of the |
9 | | total feedstock over the term of any sourcing agreement with a |
10 | | utility and the remainder of the feedstock may be either |
11 | | petroleum coke or coal, with all such coal having a high |
12 | | bituminous rank and greater than 1.7 pounds of sulfur per |
13 | | million Btu content unless the facility reasonably determines
|
14 | | that it is necessary to use additional petroleum coke to
|
15 | | deliver additional consumer savings, in which case the
|
16 | | facility shall use coal for at least 35% of the total
feedstock |
17 | | over the term of any sourcing agreement; and (4) captures and |
18 | | sequesters at least 85% of the total carbon dioxide emissions |
19 | | that the facility would otherwise emit. |
20 | | "Clean coal SNG facility" means a facility that uses a |
21 | | gasification process to produce substitute natural gas, that |
22 | | sequesters at least 90% of the total carbon dioxide emissions |
23 | | that the facility would otherwise emit, that uses at least 90% |
24 | | coal as a feedstock, with all such coal having a high |
25 | | bituminous rank and greater than 1.7 pounds of sulfur per |
26 | | million Btu btu content, and that has a valid and effective |
|
| | SB1474 | - 5 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | permit to construct emission sources and air pollution control |
2 | | equipment and approval with respect to the federal regulations |
3 | | for Prevention of Significant Deterioration of Air Quality |
4 | | (PSD) for the plant pursuant to the federal Clean Air Act; |
5 | | provided, however, a clean coal SNG brownfield facility shall |
6 | | not be a clean coal SNG facility. |
7 | | "Clean energy" means energy generation that is 90% or |
8 | | greater free of carbon dioxide emissions. |
9 | | "Commission" means the Illinois Commerce Commission. |
10 | | "Community renewable generation project" means an electric |
11 | | generating facility that: |
12 | | (1) is powered by wind, solar thermal energy, |
13 | | photovoltaic cells or panels, biodiesel, crops and |
14 | | untreated and unadulterated organic waste biomass, and |
15 | | hydropower that does not involve new construction or |
16 | | significant expansion of hydropower dams ; |
17 | | (2) is interconnected at the distribution system level |
18 | | of an electric utility as defined in this Section, a |
19 | | municipal utility as defined in this Section that owns or |
20 | | operates electric distribution facilities, a public |
21 | | utility as defined in Section 3-105 of the Public |
22 | | Utilities Act, or an electric cooperative, as defined in |
23 | | Section 3-119 of the Public Utilities Act; |
24 | | (3) credits the value of electricity generated by the |
25 | | facility to the subscribers of the facility; and |
26 | | (4) is limited in nameplate capacity to less than or |
|
| | SB1474 | - 6 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | equal to 5,000 kilowatts. |
2 | | "Costs incurred in connection with the development and |
3 | | construction of a facility" means: |
4 | | (1) the cost of acquisition of all real property, |
5 | | fixtures, and improvements in connection therewith and |
6 | | equipment, personal property, and other property, rights, |
7 | | and easements acquired that are deemed necessary for the |
8 | | operation and maintenance of the facility; |
9 | | (2) financing costs with respect to bonds, notes, and |
10 | | other evidences of indebtedness of the Agency; |
11 | | (3) all origination, commitment, utilization, |
12 | | facility, placement, underwriting, syndication, credit |
13 | | enhancement, and rating agency fees; |
14 | | (4) engineering, design, procurement, consulting, |
15 | | legal, accounting, title insurance, survey, appraisal, |
16 | | escrow, trustee, collateral agency, interest rate hedging, |
17 | | interest rate swap, capitalized interest, contingency, as |
18 | | required by lenders, and other financing costs, and other |
19 | | expenses for professional services; and |
20 | | (5) the costs of plans, specifications, site study and |
21 | | investigation, installation, surveys, other Agency costs |
22 | | and estimates of costs, and other expenses necessary or |
23 | | incidental to determining the feasibility of any project, |
24 | | together with such other expenses as may be necessary or |
25 | | incidental to the financing, insuring, acquisition, and |
26 | | construction of a specific project and starting up, |
|
| | SB1474 | - 7 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | commissioning, and placing that project in operation. |
2 | | "Delivery services" has the same definition as found in |
3 | | Section 16-102 of the Public Utilities Act. |
4 | | "Delivery year" means the consecutive 12-month period |
5 | | beginning June 1 of a given year and ending May 31 of the |
6 | | following year. |
7 | | "Department" means the Department of Commerce and Economic |
8 | | Opportunity. |
9 | | "Director" means the Director of the Illinois Power |
10 | | Agency. |
11 | | "Demand-response" means measures that decrease peak |
12 | | electricity demand or shift demand from peak to off-peak |
13 | | periods. |
14 | | "Distributed renewable energy generation device" means a |
15 | | device that is: |
16 | | (1) powered by wind, solar thermal energy, |
17 | | photovoltaic cells or panels, biodiesel, crops and |
18 | | untreated and unadulterated organic waste biomass, tree |
19 | | waste, and hydropower that does not involve new |
20 | | construction or significant expansion of hydropower dams , |
21 | | waste heat to power systems, or qualified combined heat |
22 | | and power systems; |
23 | | (2) interconnected at the distribution system level of |
24 | | either an electric utility as defined in this Section, a |
25 | | municipal utility as defined in this Section that owns or |
26 | | operates electric distribution facilities, or a rural |
|
| | SB1474 | - 8 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | electric cooperative as defined in Section 3-119 of the |
2 | | Public Utilities Act; |
3 | | (3) located on the customer side of the customer's |
4 | | electric meter and is primarily used to offset that |
5 | | customer's electricity load; and |
6 | | (4) (blank). |
7 | | "Energy efficiency" means measures that reduce the amount |
8 | | of electricity or natural gas consumed in order to achieve a |
9 | | given end use. "Energy efficiency" includes voltage |
10 | | optimization measures that optimize the voltage at points on |
11 | | the electric distribution voltage system and thereby reduce |
12 | | electricity consumption by electric customers' end use |
13 | | devices. "Energy efficiency" also includes measures that |
14 | | reduce the total Btus of electricity, natural gas, and other |
15 | | fuels needed to meet the end use or uses. |
16 | | "Electric utility" has the same definition as found in |
17 | | Section 16-102 of the Public Utilities Act. |
18 | | "Equity investment eligible community" or "eligible |
19 | | community" are synonymous and mean the geographic areas |
20 | | throughout Illinois which would most benefit from equitable |
21 | | investments by the State designed to combat discrimination. |
22 | | Specifically, the eligible communities shall be defined as the |
23 | | following areas: |
24 | | (1) R3 Areas as established pursuant to Section 10-40 |
25 | | of the Cannabis Regulation and Tax Act, where residents |
26 | | have historically been excluded from economic |
|
| | SB1474 | - 9 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | opportunities, including opportunities in the energy |
2 | | sector; and |
3 | | (2) environmental Environmental justice communities, |
4 | | as defined by the Illinois Power Agency pursuant to the |
5 | | Illinois Power Agency Act, where residents have |
6 | | historically been subject to disproportionate burdens of |
7 | | pollution, including pollution from the energy sector. |
8 | | "Equity eligible persons" or "eligible persons" means |
9 | | persons who would most benefit from equitable investments by |
10 | | the State designed to combat discrimination, specifically: |
11 | | (1) persons who graduate from or are current or former |
12 | | participants in the Clean Jobs Workforce Network Program, |
13 | | the Clean Energy Contractor Incubator Program, the |
14 | | Illinois Climate Works Preapprenticeship Program, |
15 | | Returning Residents Clean Jobs Training Program, or the |
16 | | Clean Energy Primes Contractor Accelerator Program, and |
17 | | the solar training pipeline and multi-cultural jobs |
18 | | program created in paragraphs (a)(1) and (a)(3) of Section |
19 | | 16-208.12 16-108.21 of the Public Utilities Act; |
20 | | (2) persons who are graduates of or currently enrolled |
21 | | in the foster care system; |
22 | | (3) persons who were formerly incarcerated; |
23 | | (4) persons whose primary residence is in an equity |
24 | | investment eligible community. |
25 | | "Equity eligible contractor" means a business that is |
26 | | majority-owned by eligible persons, or a nonprofit or |
|
| | SB1474 | - 10 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | cooperative that is majority-governed by eligible persons, or |
2 | | is a natural person that is an eligible person offering |
3 | | personal services as an independent contractor. |
4 | | "Facility" means an electric generating unit or a |
5 | | co-generating unit that produces electricity along with |
6 | | related equipment necessary to connect the facility to an |
7 | | electric transmission or distribution system. |
8 | | "General contractor Contractor " means the entity or |
9 | | organization with main responsibility for the building of a |
10 | | construction project and who is the party signing the prime |
11 | | construction contract for the project. |
12 | | "Governmental aggregator" means one or more units of local |
13 | | government that individually or collectively procure |
14 | | electricity to serve residential retail electrical loads |
15 | | located within its or their jurisdiction. |
16 | | "High voltage direct current converter station" means the |
17 | | collection of equipment that converts direct current energy |
18 | | from a high voltage direct current transmission line into |
19 | | alternating current using Voltage Source Conversion technology |
20 | | and that is interconnected with transmission or distribution |
21 | | assets located in Illinois. |
22 | | "High voltage direct current renewable energy credit" |
23 | | means a renewable energy credit associated with a renewable |
24 | | energy resource where the renewable energy resource has |
25 | | entered into a contract to transmit the energy associated with |
26 | | such renewable energy credit over high voltage direct current |
|
| | SB1474 | - 11 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | transmission facilities. |
2 | | "High voltage direct current transmission facilities" |
3 | | means the collection of installed equipment that converts |
4 | | alternating current energy in one location to direct current |
5 | | and transmits that direct current energy to a high voltage |
6 | | direct current converter station using Voltage Source |
7 | | Conversion technology. "High voltage direct current |
8 | | transmission facilities" includes the high voltage direct |
9 | | current converter station itself and associated high voltage |
10 | | direct current transmission lines. Notwithstanding the |
11 | | preceding, after September 15, 2021 ( the effective date of |
12 | | Public Act 102-662) this amendatory Act of the 102nd General |
13 | | Assembly , an otherwise qualifying collection of equipment does |
14 | | not qualify as high voltage direct current transmission |
15 | | facilities unless its developer entered into a project labor |
16 | | agreement, is capable of transmitting electricity at 525kv |
17 | | with an Illinois converter station located and interconnected |
18 | | in the region of the PJM Interconnection, LLC, and the system |
19 | | does not operate as a public utility, as that term is defined |
20 | | in Section 3-105 of the Public Utilities Act. |
21 | | "Index price" means the real-time energy settlement price |
22 | | at the applicable Illinois trading hub, such as PJM-NIHUB or |
23 | | MISO-IL, for a given settlement period. |
24 | | "Indexed renewable energy credit" means a tradable credit |
25 | | that represents the environmental attributes of one megawatt |
26 | | hour of energy produced from a renewable energy resource, the |
|
| | SB1474 | - 12 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | price of which shall be calculated by subtracting the strike |
2 | | price offered by a new utility-scale wind project or a new |
3 | | utility-scale photovoltaic project from the index price in a |
4 | | given settlement period. |
5 | | "Indexed renewable energy credit counterparty" has the |
6 | | same meaning as "public utility" as defined in Section 3-105 |
7 | | of the Public Utilities Act. |
8 | | "Local government" means a unit of local government as |
9 | | defined in Section 1 of Article VII of the Illinois |
10 | | Constitution. |
11 | | "Municipality" means a city, village, or incorporated |
12 | | town. |
13 | | "Municipal utility" means a public utility owned and |
14 | | operated by any subdivision or municipal corporation of this |
15 | | State. |
16 | | "Nameplate capacity" means the aggregate inverter |
17 | | nameplate capacity in kilowatts AC. |
18 | | "Person" means any natural person, firm, partnership, |
19 | | corporation, either domestic or foreign, company, association, |
20 | | limited liability company, joint stock company, or association |
21 | | and includes any trustee, receiver, assignee, or personal |
22 | | representative thereof. |
23 | | "Project" means the planning, bidding, and construction of |
24 | | a facility. |
25 | | "Project labor agreement" means a pre-hire collective |
26 | | bargaining agreement that covers all terms and conditions of |
|
| | SB1474 | - 13 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | employment on a specific construction project and must include |
2 | | the following: |
3 | | (1) provisions establishing the minimum hourly wage |
4 | | for each class of labor organization employee; |
5 | | (2) provisions establishing the benefits and other |
6 | | compensation for each class of labor organization |
7 | | employee; |
8 | | (3) provisions establishing that no strike or disputes |
9 | | will be engaged in by the labor organization employees; |
10 | | (4) provisions establishing that no lockout or |
11 | | disputes will be engaged in by the general contractor |
12 | | building the project; and |
13 | | (5) provisions for minorities and women, as defined |
14 | | under the Business Enterprise for Minorities, Women, and |
15 | | Persons with Disabilities Act, setting forth goals for |
16 | | apprenticeship hours to be performed by minorities and |
17 | | women and setting forth goals for total hours to be |
18 | | performed by underrepresented minorities and women. |
19 | | A labor organization and the general contractor building |
20 | | the project shall have the authority to include other terms |
21 | | and conditions as they deem necessary. |
22 | | "Public utility" has the same definition as found in |
23 | | Section 3-105 of the Public Utilities Act. |
24 | | "Qualified combined heat and power systems" means systems |
25 | | that, either simultaneously or sequentially, produce |
26 | | electricity and useful thermal energy from a single fuel |
|
| | SB1474 | - 14 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | source. Such systems are eligible for "renewable energy |
2 | | credits" in an amount equal to its total energy output where a |
3 | | renewable fuel is consumed or in an amount equal to the net |
4 | | reduction in nonrenewable fuel consumed on a total energy |
5 | | output basis. |
6 | | "Real property" means any interest in land together with |
7 | | all structures, fixtures, and improvements thereon, including |
8 | | lands under water and riparian rights, any easements, |
9 | | covenants, licenses, leases, rights-of-way, uses, and other |
10 | | interests, together with any liens, judgments, mortgages, or |
11 | | other claims or security interests related to real property. |
12 | | "Renewable energy credit" means a tradable credit that |
13 | | represents the environmental attributes of one megawatt hour |
14 | | of energy produced from a renewable energy resource. |
15 | | "Renewable energy resources" includes energy and its |
16 | | associated renewable energy credit or renewable energy credits |
17 | | from wind, solar thermal energy, photovoltaic cells and |
18 | | panels, biodiesel, anaerobic digestion, crops and untreated |
19 | | and unadulterated organic waste biomass, and hydropower that |
20 | | does not involve new construction or significant expansion of |
21 | | hydropower dams , waste heat to power systems, or qualified |
22 | | combined heat and power systems. For purposes of this Act, |
23 | | landfill gas produced in the State is considered a renewable |
24 | | energy resource. "Renewable energy resources" does not include |
25 | | the incineration or burning of tires, garbage, general |
26 | | household, institutional, and commercial waste, industrial |
|
| | SB1474 | - 15 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | lunchroom or office waste, landscape waste, railroad |
2 | | crossties, utility poles, or construction or demolition |
3 | | debris, other than untreated and unadulterated waste wood. |
4 | | "Renewable energy resources" also includes high voltage direct |
5 | | current renewable energy credits and the associated energy |
6 | | converted to alternating current by a high voltage direct |
7 | | current converter station to the extent that: (1) the |
8 | | generator of such renewable energy resource contracted with a |
9 | | third party to transmit the energy over the high voltage |
10 | | direct current transmission facilities, and (2) the |
11 | | third-party contracting for delivery of renewable energy |
12 | | resources over the high voltage direct current transmission |
13 | | facilities have ownership rights over the unretired associated |
14 | | high voltage direct current renewable energy credit. |
15 | | "Retail customer" has the same definition as found in |
16 | | Section 16-102 of the Public Utilities Act. |
17 | | "Revenue bond" means any bond, note, or other evidence of |
18 | | indebtedness issued by the Authority, the principal and |
19 | | interest of which is payable solely from revenues or income |
20 | | derived from any project or activity of the Agency. |
21 | | "Sequester" means permanent storage of carbon dioxide by |
22 | | injecting it into a saline aquifer, a depleted gas reservoir, |
23 | | or an oil reservoir, directly or through an enhanced oil |
24 | | recovery process that may involve intermediate storage, |
25 | | regardless of whether these activities are conducted by a |
26 | | clean coal facility, a clean coal SNG facility, a clean coal |
|
| | SB1474 | - 16 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | SNG brownfield facility, or a party with which a clean coal |
2 | | facility, clean coal SNG facility, or clean coal SNG |
3 | | brownfield facility has contracted for such purposes. |
4 | | "Service area" has the same definition as found in Section |
5 | | 16-102 of the Public Utilities Act. |
6 | | "Settlement period" means the period of time utilized by |
7 | | MISO and PJM and their successor organizations as the basis |
8 | | for settlement calculations in the real-time energy market. |
9 | | "Sourcing agreement" means (i) in the case of an electric |
10 | | utility, an agreement between the owner of a clean coal |
11 | | facility and such electric utility, which agreement shall have |
12 | | terms and conditions meeting the requirements of paragraph (3) |
13 | | of subsection (d) of Section 1-75, (ii) in the case of an |
14 | | alternative retail electric supplier, an agreement between the |
15 | | owner of a clean coal facility and such alternative retail |
16 | | electric supplier, which agreement shall have terms and |
17 | | conditions meeting the requirements of Section 16-115(d)(5) of |
18 | | the Public Utilities Act, and (iii) in case of a gas utility, |
19 | | an agreement between the owner of a clean coal SNG brownfield |
20 | | facility and the gas utility, which agreement shall have the |
21 | | terms and conditions meeting the requirements of subsection |
22 | | (h-1) of Section 9-220 of the Public Utilities Act. |
23 | | "Strike price" means a contract price for energy and |
24 | | renewable energy credits from a new utility-scale wind project |
25 | | or a new utility-scale photovoltaic project. |
26 | | "Subscriber" means a person who (i) takes delivery service |
|
| | SB1474 | - 17 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | from an electric utility, and (ii) has a subscription of no |
2 | | less than 200 watts to a community renewable generation |
3 | | project that is located in the electric utility's service |
4 | | area. No subscriber's subscriptions may total more than 40% of |
5 | | the nameplate capacity of an individual community renewable |
6 | | generation project. Entities that are affiliated by virtue of |
7 | | a common parent shall not represent multiple subscriptions |
8 | | that total more than 40% of the nameplate capacity of an |
9 | | individual community renewable generation project. |
10 | | "Subscription" means an interest in a community renewable |
11 | | generation project expressed in kilowatts, which is sized |
12 | | primarily to offset part or all of the subscriber's |
13 | | electricity usage. |
14 | | "Substitute natural gas" or "SNG" means a gas manufactured |
15 | | by gasification of hydrocarbon feedstock, which is |
16 | | substantially interchangeable in use and distribution with |
17 | | conventional natural gas.
|
18 | | "Total resource cost test" or "TRC test" means a standard |
19 | | that is met if, for an investment in energy efficiency or |
20 | | demand-response measures, the benefit-cost ratio is greater |
21 | | than one. The benefit-cost ratio is the ratio of the net |
22 | | present value of the total benefits of the program to the net |
23 | | present value of the total costs as calculated over the |
24 | | lifetime of the measures. A total resource cost test compares |
25 | | the sum of avoided electric utility costs, representing the |
26 | | benefits that accrue to the system and the participant in the |
|
| | SB1474 | - 18 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | delivery of those efficiency measures and including avoided |
2 | | costs associated with reduced use of natural gas or other |
3 | | fuels, avoided costs associated with reduced water |
4 | | consumption, and avoided costs associated with reduced |
5 | | operation and maintenance costs, as well as other quantifiable |
6 | | societal benefits, to the sum of all incremental costs of |
7 | | end-use measures that are implemented due to the program |
8 | | (including both utility and participant contributions), plus |
9 | | costs to administer, deliver, and evaluate each demand-side |
10 | | program, to quantify the net savings obtained by substituting |
11 | | the demand-side program for supply resources. In calculating |
12 | | avoided costs of power and energy that an electric utility |
13 | | would otherwise have had to acquire, reasonable estimates |
14 | | shall be included of financial costs likely to be imposed by |
15 | | future regulations and legislation on emissions of greenhouse |
16 | | gases. In discounting future societal costs and benefits for |
17 | | the purpose of calculating net present values, a societal |
18 | | discount rate based on actual, long-term Treasury bond yields |
19 | | should be used. Notwithstanding anything to the contrary, the |
20 | | TRC test shall not include or take into account a calculation |
21 | | of market price suppression effects or demand reduction |
22 | | induced price effects. |
23 | | "Utility-scale solar project" means an electric generating |
24 | | facility that: |
25 | | (1) generates electricity using photovoltaic cells; |
26 | | and |
|
| | SB1474 | - 19 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | (2) has a nameplate capacity that is greater than |
2 | | 5,000 kilowatts. |
3 | | "Utility-scale wind project" means an electric generating |
4 | | facility that: |
5 | | (1) generates electricity using wind; and |
6 | | (2) has a nameplate capacity that is greater than |
7 | | 5,000 kilowatts. |
8 | | "Waste Heat to Power Systems" means systems that capture |
9 | | and generate electricity from energy that would otherwise be |
10 | | lost to the atmosphere without the use of additional fuel. |
11 | | "Zero emission credit" means a tradable credit that |
12 | | represents the environmental attributes of one megawatt hour |
13 | | of energy produced from a zero emission facility. |
14 | | "Zero emission facility" means a facility that: (1) is |
15 | | fueled by nuclear power; and (2) is interconnected with PJM |
16 | | Interconnection, LLC or the Midcontinent Independent System |
17 | | Operator, Inc., or their successors. |
18 | | (Source: P.A. 102-662, eff. 9-15-21; revised 6-2-22.)
|
19 | | (20 ILCS 3855/1-56) |
20 | | Sec. 1-56. Illinois Power Agency Renewable Energy |
21 | | Resources Fund; Illinois Solar for All Program. |
22 | | (a) The Illinois Power Agency Renewable Energy Resources |
23 | | Fund is created as a special fund in the State treasury. |
24 | | (b) The Illinois Power Agency Renewable Energy Resources |
25 | | Fund shall be administered by the Agency as described in this |
|
| | SB1474 | - 20 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | subsection (b), provided that the changes to this subsection |
2 | | (b) made by this amendatory Act of the 99th General Assembly |
3 | | shall not interfere with existing contracts under this |
4 | | Section. |
5 | | (1) The Illinois Power Agency Renewable Energy |
6 | | Resources Fund shall be used to purchase renewable energy |
7 | | credits according to any approved procurement plan |
8 | | developed by the Agency prior to June 1, 2017. |
9 | | (2) The Illinois Power Agency Renewable Energy |
10 | | Resources Fund shall also be used to create the Illinois |
11 | | Solar for All Program, which provides incentives for |
12 | | low-income distributed generation and community solar |
13 | | projects, and other associated approved expenditures. The |
14 | | objectives of the Illinois Solar for All Program are to |
15 | | bring photovoltaics to low-income communities in this |
16 | | State in a manner that maximizes the development of new |
17 | | photovoltaic generating facilities, to create a long-term, |
18 | | low-income solar marketplace throughout this State, to |
19 | | integrate, through interaction with stakeholders, with |
20 | | existing energy efficiency initiatives, and to minimize |
21 | | administrative costs. The Illinois Solar for All Program |
22 | | shall be implemented in a manner that seeks to minimize |
23 | | administrative costs, and maximize efficiencies and |
24 | | synergies available through coordination with similar |
25 | | initiatives, including the Adjustable Block program |
26 | | described in subparagraphs (K) through (M) of paragraph |
|
| | SB1474 | - 21 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | (1) of subsection (c) of Section 1-75, energy efficiency |
2 | | programs, job training programs, and community action |
3 | | agencies. The Agency shall strive to ensure that renewable |
4 | | energy credits procured through the Illinois Solar for All |
5 | | Program and each of its subprograms are purchased from |
6 | | projects across the breadth of low-income and |
7 | | environmental justice communities in Illinois, including |
8 | | both urban and rural communities, are not concentrated in |
9 | | a few communities, and do not exclude particular |
10 | | low-income or environmental justice communities. The |
11 | | Agency shall include a description of its proposed |
12 | | approach to the design, administration, implementation and |
13 | | evaluation of the Illinois Solar for All Program, as part |
14 | | of the long-term renewable resources procurement plan |
15 | | authorized by subsection (c) of Section 1-75 of this Act, |
16 | | and the program shall be designed to grow the low-income |
17 | | solar market. The Agency or utility, as applicable, shall |
18 | | purchase renewable energy credits from the (i) |
19 | | photovoltaic distributed renewable energy generation |
20 | | projects and (ii) community solar projects that are |
21 | | procured under procurement processes authorized by the |
22 | | long-term renewable resources procurement plans approved |
23 | | by the Commission. |
24 | | The Illinois Solar for All Program shall include the |
25 | | program offerings described in subparagraphs (A) through |
26 | | (E) of this paragraph (2), which the Agency shall |
|
| | SB1474 | - 22 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | implement through contracts with third-party providers |
2 | | and, subject to appropriation, pay the approximate amounts |
3 | | identified using monies available in the Illinois Power |
4 | | Agency Renewable Energy Resources Fund. Each contract that |
5 | | provides for the installation of solar facilities shall |
6 | | provide that the solar facilities will produce energy and |
7 | | economic benefits, at a level determined by the Agency to |
8 | | be reasonable, for the participating low income customers. |
9 | | The monies available in the Illinois Power Agency |
10 | | Renewable Energy Resources Fund and not otherwise |
11 | | committed to contracts executed under subsection (i) of |
12 | | this Section, as well as, in the case of the programs |
13 | | described under subparagraphs (A) through (E) of this |
14 | | paragraph (2), funding authorized pursuant to subparagraph |
15 | | (O) of paragraph (1) of subsection (c) of Section 1-75 of |
16 | | this Act, shall initially be allocated among the programs |
17 | | described in this paragraph (2), as follows: 35% of these |
18 | | funds shall be allocated to programs described in |
19 | | subparagraphs (A) and (E) of this paragraph (2), 40% of |
20 | | these funds shall be allocated to programs described in |
21 | | subparagraph (B) of this paragraph (2), and 25% of these |
22 | | funds shall be allocated to programs described in |
23 | | subparagraph (C) of this paragraph (2). The allocation of |
24 | | funds among subparagraphs (A), (B), (C), and (E) of this |
25 | | paragraph (2) may be changed if the Agency, after |
26 | | receiving input through a stakeholder process, determines |
|
| | SB1474 | - 23 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | incentives in subparagraphs (A), (B), (C), or (E) of this |
2 | | paragraph (2) have not been adequately subscribed to fully |
3 | | utilize available Illinois Solar for All Program funds. |
4 | | Contracts that will be paid with funds in the Illinois |
5 | | Power Agency Renewable Energy Resources Fund shall be |
6 | | executed by the Agency. Contracts that will be paid with |
7 | | funds collected by an electric utility shall be executed |
8 | | by the electric utility. |
9 | | Contracts under the Illinois Solar for All Program |
10 | | shall include an approach, as set forth in the long-term |
11 | | renewable resources procurement plans, to ensure the |
12 | | wholesale market value of the energy is credited to |
13 | | participating low-income customers or organizations and to |
14 | | ensure tangible economic benefits flow directly to program |
15 | | participants, except in the case of low-income |
16 | | multi-family housing where the low-income customer does |
17 | | not directly pay for energy. Priority shall be given to |
18 | | projects that demonstrate meaningful involvement of |
19 | | low-income community members in designing the initial |
20 | | proposals. Acceptable proposals to implement projects must |
21 | | demonstrate the applicant's ability to conduct initial |
22 | | community outreach, education, and recruitment of |
23 | | low-income participants in the community. Projects must |
24 | | include job training opportunities if available, with the |
25 | | specific level of trainee usage to be determined through |
26 | | the Agency's long-term renewable resources procurement |
|
| | SB1474 | - 24 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | plan, and the Illinois Solar for All Program Administrator |
2 | | shall coordinate with the job training programs described |
3 | | in paragraph (1) of subsection (a) of Section 16-108.12 of |
4 | | the Public Utilities Act and in the Energy Transition Act. |
5 | | The Agency shall make every effort to ensure that |
6 | | small and emerging businesses, particularly those located |
7 | | in low-income and environmental justice communities, are |
8 | | able to participate in the Illinois Solar for All Program. |
9 | | These efforts may include, but shall not be limited to, |
10 | | proactive support from the program administrator, |
11 | | different or preferred access to subprograms and |
12 | | administrator-identified customers or grassroots |
13 | | education provider-identified customers, and different |
14 | | incentive levels. The Agency shall report on progress and |
15 | | barriers to participation of small and emerging businesses |
16 | | in the Illinois Solar for All Program at least once a year. |
17 | | The report shall be made available on the Agency's website |
18 | | and, in years when the Agency is updating its long-term |
19 | | renewable resources procurement plan, included in that |
20 | | Plan. |
21 | | (A) Low-income single-family and small multifamily |
22 | | solar incentive. This program will provide incentives |
23 | | to low-income customers, either directly or through |
24 | | solar providers, to increase the participation of |
25 | | low-income households in photovoltaic on-site |
26 | | distributed generation at residential buildings |
|
| | SB1474 | - 25 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | containing one to 4 units. Companies participating in |
2 | | this program that install solar panels shall commit to |
3 | | hiring job trainees for a portion of their low-income |
4 | | installations, and an administrator shall facilitate |
5 | | partnering the companies that install solar panels |
6 | | with entities that provide solar panel installation |
7 | | job training. It is a goal of this program that a |
8 | | minimum of 25% of the incentives for this program be |
9 | | allocated to projects located within environmental |
10 | | justice communities. Contracts entered into under this |
11 | | paragraph may be entered into with an entity that will |
12 | | develop and administer the program and shall also |
13 | | include contracts for renewable energy credits from |
14 | | the photovoltaic distributed generation that is the |
15 | | subject of the program, as set forth in the long-term |
16 | | renewable resources procurement plan. Additionally: |
17 | | (i) The Agency shall reserve a portion of this |
18 | | program for projects that promote energy |
19 | | sovereignty through ownership of projects by |
20 | | low-income households, not-for-profit |
21 | | organizations providing services to low-income |
22 | | households, affordable housing owners, community |
23 | | cooperatives, or community-based limited liability |
24 | | companies providing services to low-income |
25 | | households. Projects that feature energy ownership |
26 | | should ensure that local people have control of |
|
| | SB1474 | - 26 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | the project and reap benefits from the project |
2 | | over and above energy bill savings. The Agency may |
3 | | consider the inclusion of projects that promote |
4 | | ownership over time or that involve partial |
5 | | project ownership by communities, as promoting |
6 | | energy sovereignty. Incentives for projects that |
7 | | promote energy sovereignty may be higher than |
8 | | incentives for equivalent projects that do not |
9 | | promote energy sovereignty under this same |
10 | | program. |
11 | | (ii) Through its long-term renewable resources |
12 | | procurement plan, the Agency shall consider |
13 | | additional program and contract requirements to |
14 | | ensure faithful compliance by applicants |
15 | | benefiting from preferences for projects |
16 | | designated to promote energy sovereignty. The |
17 | | Agency shall make every effort to enable solar |
18 | | providers already participating in the Adjustable |
19 | | Block-Program under subparagraph (K) of paragraph |
20 | | (1) of subsection (c) of Section 1-75 of this Act, |
21 | | and particularly solar providers developing |
22 | | projects under item (i) of subparagraph (K) of |
23 | | paragraph (1) of subsection (c) of Section 1-75 of |
24 | | this Act to easily participate in the Low-Income |
25 | | Distributed Generation Incentive program described |
26 | | under this subparagraph (A), and vice versa. This |
|
| | SB1474 | - 27 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | effort may include, but shall not be limited to, |
2 | | utilizing similar or the same application systems |
3 | | and processes, similar or the same forms and |
4 | | formats of communication, and providing active |
5 | | outreach to companies participating in one program |
6 | | but not the other. The Agency shall report on |
7 | | efforts made to encourage this cross-participation |
8 | | in its long-term renewable resources procurement |
9 | | plan. |
10 | | (B) Low-Income Community Solar Project Initiative. |
11 | | Incentives shall be offered to low-income customers, |
12 | | either directly or through developers, to increase the |
13 | | participation of low-income subscribers of community |
14 | | solar projects. The developer of each project shall |
15 | | identify its partnership with community stakeholders |
16 | | regarding the location, development, and participation |
17 | | in the project, provided that nothing shall preclude a |
18 | | project from including an anchor tenant that does not |
19 | | qualify as low-income. Companies participating in this |
20 | | program that develop or install solar projects shall |
21 | | commit to hiring job trainees for a portion of their |
22 | | low-income installations, and an administrator shall |
23 | | facilitate partnering the companies that install solar |
24 | | projects with entities that provide solar installation |
25 | | and related job training. It is a goal of this program |
26 | | that a minimum of 25% of the incentives for this |
|
| | SB1474 | - 28 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | program be allocated to community photovoltaic |
2 | | projects in environmental justice communities. The |
3 | | Agency shall reserve a portion of this program for |
4 | | projects that promote energy sovereignty through |
5 | | ownership of projects by low-income households, |
6 | | not-for-profit organizations providing services to |
7 | | low-income households, affordable housing owners, or |
8 | | community-based limited liability companies providing |
9 | | services to low-income households. Projects that |
10 | | feature energy ownership should ensure that local |
11 | | people have control of the project and reap benefits |
12 | | from the project over and above energy bill savings. |
13 | | The Agency may consider the inclusion of projects that |
14 | | promote ownership over time or that involve partial |
15 | | project ownership by communities, as promoting energy |
16 | | sovereignty. Incentives for projects that promote |
17 | | energy sovereignty may be higher than incentives for |
18 | | equivalent projects that do not promote energy |
19 | | sovereignty under this same program. Contracts entered |
20 | | into under this paragraph may be entered into with |
21 | | developers and shall also include contracts for |
22 | | renewable energy credits related to the program. |
23 | | (C) Incentives for non-profits and public |
24 | | facilities. Under this program funds shall be used to |
25 | | support on-site photovoltaic distributed renewable |
26 | | energy generation devices to serve the load associated |
|
| | SB1474 | - 29 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | with not-for-profit customers and to support |
2 | | photovoltaic distributed renewable energy generation |
3 | | that uses photovoltaic technology to serve the load |
4 | | associated with public sector customers taking service |
5 | | at public buildings. Companies participating in this |
6 | | program that develop or install solar projects shall |
7 | | commit to hiring job trainees for a portion of their |
8 | | low-income installations, and an administrator shall |
9 | | facilitate partnering the companies that install solar |
10 | | projects with entities that provide solar installation |
11 | | and related job training. Through its long-term |
12 | | renewable resources procurement plan, the Agency shall |
13 | | consider additional program and contract requirements |
14 | | to ensure faithful compliance by applicants benefiting |
15 | | from preferences for projects designated to promote |
16 | | energy sovereignty. It is a goal of this program that |
17 | | at least 25% of the incentives for this program be |
18 | | allocated to projects located in environmental justice |
19 | | communities. Contracts entered into under this |
20 | | paragraph may be entered into with an entity that will |
21 | | develop and administer the program or with developers |
22 | | and shall also include contracts for renewable energy |
23 | | credits related to the program. |
24 | | (D) (Blank). |
25 | | (E) Low-income large multifamily solar incentive.
|
26 | | This program shall provide incentives to low-income
|
|
| | SB1474 | - 30 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | customers, either directly or through solar providers,
|
2 | | to increase the participation of low-income households
|
3 | | in photovoltaic on-site distributed generation at
|
4 | | residential buildings with 5 or more units. Companies
|
5 | | participating in this program that develop or install
|
6 | | solar projects shall commit to hiring job trainees for
|
7 | | a portion of their low-income installations, and an
|
8 | | administrator shall facilitate partnering the
|
9 | | companies that install solar projects with entities
|
10 | | that provide solar installation and related job
|
11 | | training. It is a goal of this program that a minimum
|
12 | | of 25% of the incentives for this program be allocated
|
13 | | to projects located within environmental justice
|
14 | | communities. The Agency shall reserve a portion of
|
15 | | this program for projects that promote energy
|
16 | | sovereignty through ownership of projects by
|
17 | | low-income households, not-for-profit organizations
|
18 | | providing services to low-income households,
|
19 | | affordable housing owners, or community-based limited
|
20 | | liability companies providing services to low-income
|
21 | | households. Projects that feature energy ownership |
22 | | should ensure that local people have control of the |
23 | | project and reap benefits from the project over and |
24 | | above energy bill savings. The Agency may consider the |
25 | | inclusion of projects that promote ownership over time |
26 | | or that involve partial project ownership by |
|
| | SB1474 | - 31 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | communities, as promoting energy sovereignty. |
2 | | Incentives for projects that promote energy
|
3 | | sovereignty may be higher than incentives for
|
4 | | equivalent projects that do not promote energy
|
5 | | sovereignty under this same program. |
6 | | The requirement that a qualified person, as defined in |
7 | | paragraph (1) of subsection (i) of this Section, install |
8 | | photovoltaic devices does not apply to the Illinois Solar |
9 | | for All Program described in this subsection (b). |
10 | | In addition to the programs outlined in paragraphs (A) |
11 | | through (E), the Agency and other parties may propose |
12 | | additional programs through the Long-Term Renewable |
13 | | Resources Procurement Plan developed and approved under |
14 | | paragraph (5) of subsection (b) of Section 16-111.5 of the |
15 | | Public Utilities Act. Additional programs may target |
16 | | market segments not specified above and may also include |
17 | | incentives targeted to increase the uptake of |
18 | | nonphotovoltaic technologies by low-income customers, |
19 | | including energy storage paired with photovoltaics, if the |
20 | | Commission determines that the Illinois Solar for All |
21 | | Program would provide greater benefits to the public |
22 | | health and well-being of low-income residents through also |
23 | | supporting that additional program versus supporting |
24 | | programs already authorized. |
25 | | (3) Costs associated with the Illinois Solar for All |
26 | | Program and its components described in paragraph (2) of |
|
| | SB1474 | - 32 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | this subsection (b), including, but not limited to, costs |
2 | | associated with procuring experts, consultants, and the |
3 | | program administrator referenced in this subsection (b) |
4 | | and related incremental costs, costs related to income |
5 | | verification and facilitating customer participation in |
6 | | the program, and costs related to the evaluation of the |
7 | | Illinois Solar for All Program, may be paid for using |
8 | | monies in the Illinois Power Agency Renewable Energy |
9 | | Resources Fund, and funds allocated pursuant to |
10 | | subparagraph (O) of paragraph (1) of subsection (c) of |
11 | | Section 1-75, but the Agency or program administrator |
12 | | shall strive to minimize costs in the implementation of |
13 | | the program. The Agency or contracting electric utility |
14 | | shall purchase renewable energy credits from generation |
15 | | that is the subject of a contract under subparagraphs (A) |
16 | | through (E) of paragraph (2) of this subsection (b), and |
17 | | may pay for such renewable energy credits through an |
18 | | upfront payment per installed kilowatt of nameplate |
19 | | capacity paid once the device is interconnected at the |
20 | | distribution system level of the interconnecting utility |
21 | | and verified as energized. Payments for renewable energy |
22 | | credits shall be in exchange for all renewable energy |
23 | | credits generated by the system during the first 15 years |
24 | | of operation and shall be structured to overcome barriers |
25 | | to participation in the solar market by the low-income |
26 | | community. The incentives provided for in this Section may |
|
| | SB1474 | - 33 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | be implemented through the pricing of renewable energy |
2 | | credits where the prices paid for the credits are higher |
3 | | than the prices from programs offered under subsection (c) |
4 | | of Section 1-75 of this Act to account for the additional |
5 | | capital necessary to successfully access targeted market |
6 | | segments. The Agency or contracting electric utility shall |
7 | | retire any renewable energy credits purchased under this |
8 | | program and the credits shall count towards the obligation |
9 | | under subsection (c) of Section 1-75 of this Act for the |
10 | | electric utility to which the project is interconnected, |
11 | | if applicable. |
12 | | The Agency shall direct that up to 5% of the funds |
13 | | available under the Illinois Solar for All Program to |
14 | | community-based groups and other qualifying organizations |
15 | | to assist in community-driven education efforts related to |
16 | | the Illinois Solar for All Program, including general |
17 | | energy education, job training program outreach efforts, |
18 | | and other activities deemed to be qualified by the Agency. |
19 | | Grassroots education funding shall not be used to support |
20 | | the marketing by solar project development firms and |
21 | | organizations, unless such education provides equal |
22 | | opportunities for all applicable firms and organizations. |
23 | | (4) The Agency shall, consistent with the requirements |
24 | | of this subsection (b), propose the Illinois Solar for All |
25 | | Program terms, conditions, and requirements, including the |
26 | | prices to be paid for renewable energy credits, and which |
|
| | SB1474 | - 34 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | prices may be determined through a formula, through the |
2 | | development, review, and approval of the Agency's |
3 | | long-term renewable resources procurement plan described |
4 | | in subsection (c) of Section 1-75 of this Act and Section |
5 | | 16-111.5 of the Public Utilities Act. In the course of the |
6 | | Commission proceeding initiated to review and approve the |
7 | | plan, including the Illinois Solar for All Program |
8 | | proposed by the Agency, a party may propose an additional |
9 | | low-income solar or solar incentive program, or |
10 | | modifications to the programs proposed by the Agency, and |
11 | | the Commission may approve an additional program, or |
12 | | modifications to the Agency's proposed program, if the |
13 | | additional or modified program more effectively maximizes |
14 | | the benefits to low-income customers after taking into |
15 | | account all relevant factors, including, but not limited |
16 | | to, the extent to which a competitive market for |
17 | | low-income solar has developed. Following the Commission's |
18 | | approval of the Illinois Solar for All Program, the Agency |
19 | | or a party may propose adjustments to the program terms, |
20 | | conditions, and requirements, including the price offered |
21 | | to new systems, to ensure the long-term viability and |
22 | | success of the program. The Commission shall review and |
23 | | approve any modifications to the program through the plan |
24 | | revision process described in Section 16-111.5 of the |
25 | | Public Utilities Act. |
26 | | (5) The Agency shall issue a request for |
|
| | SB1474 | - 35 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | qualifications for a third-party program administrator or |
2 | | administrators to administer all or a portion of the |
3 | | Illinois Solar for All Program. The third-party program |
4 | | administrator shall be chosen through a competitive bid |
5 | | process based on selection criteria and requirements |
6 | | developed by the Agency, including, but not limited to, |
7 | | experience in administering low-income energy programs and |
8 | | overseeing statewide clean energy or energy efficiency |
9 | | services. If the Agency retains a program administrator or |
10 | | administrators to implement all or a portion of the |
11 | | Illinois Solar for All Program, each administrator shall |
12 | | periodically submit reports to the Agency and Commission |
13 | | for each program that it administers, at appropriate |
14 | | intervals to be identified by the Agency in its long-term |
15 | | renewable resources procurement plan, provided that the |
16 | | reporting interval is at least quarterly. The third-party |
17 | | program administrator may be, but need not be, the same |
18 | | administrator as for the Adjustable Block program |
19 | | described in subparagraphs (K) through (M) of paragraph |
20 | | (1) of subsection (c) of Section 1-75. The Agency, through |
21 | | its long-term renewable resources procurement plan |
22 | | approval process, shall also determine if individual |
23 | | subprograms of the Illinois Solar for All Program are |
24 | | better served by a different or separate Program |
25 | | Administrator. |
26 | | The third-party administrator's responsibilities |
|
| | SB1474 | - 36 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | shall also include facilitating placement for graduates of |
2 | | Illinois-based renewable energy-specific job training |
3 | | programs, including the Clean Jobs Workforce Network |
4 | | Program and the Illinois Climate Works Preapprenticeship |
5 | | Program administered by the Department of Commerce and |
6 | | Economic Opportunity and programs administered under |
7 | | Section 16-108.12 of the Public Utilities Act. To increase |
8 | | the uptake of trainees by participating firms, the |
9 | | administrator shall also develop a web-based clearinghouse |
10 | | for information available to both job training program |
11 | | graduates and firms participating, directly or indirectly, |
12 | | in Illinois solar incentive programs. The program |
13 | | administrator shall also coordinate its activities with |
14 | | entities implementing electric and natural gas |
15 | | income-qualified energy efficiency programs, including |
16 | | customer referrals to and from such programs, and connect |
17 | | prospective low-income solar customers with any existing |
18 | | deferred maintenance programs where applicable. |
19 | | (6) The long-term renewable resources procurement plan |
20 | | shall also provide for an independent evaluation of the |
21 | | Illinois Solar for All Program. At least every 2 years, |
22 | | the Agency shall select an independent evaluator to review |
23 | | and report on the Illinois Solar for All Program and the |
24 | | performance of the third-party program administrator of |
25 | | the Illinois Solar for All Program. The evaluation shall |
26 | | be based on objective criteria developed through a public |
|
| | SB1474 | - 37 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | stakeholder process. The process shall include feedback |
2 | | and participation from Illinois Solar for All Program |
3 | | stakeholders, including participants and organizations in |
4 | | environmental justice and historically underserved |
5 | | communities. The report shall include a summary of the |
6 | | evaluation of the Illinois Solar for All Program based on |
7 | | the stakeholder developed objective criteria. The report |
8 | | shall include the number of projects installed; the total |
9 | | installed capacity in kilowatts; the average cost per |
10 | | kilowatt of installed capacity to the extent reasonably |
11 | | obtainable by the Agency; the number of jobs or job |
12 | | opportunities created; economic, social, and environmental |
13 | | benefits created; and the total administrative costs |
14 | | expended by the Agency and program administrator to |
15 | | implement and evaluate the program. The report shall be |
16 | | delivered to the Commission and posted on the Agency's |
17 | | website, and shall be used, as needed, to revise the |
18 | | Illinois Solar for All Program. The Commission shall also |
19 | | consider the results of the evaluation as part of its |
20 | | review of the long-term renewable resources procurement |
21 | | plan under subsection (c) of Section 1-75 of this Act. |
22 | | (7) If additional funding for the programs described |
23 | | in this subsection (b) is available under subsection (k) |
24 | | of Section 16-108 of the Public Utilities Act, then the |
25 | | Agency shall submit a procurement plan to the Commission |
26 | | no later than September 1, 2018, that proposes how the |
|
| | SB1474 | - 38 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | Agency will procure programs on behalf of the applicable |
2 | | utility. After notice and hearing, the Commission shall |
3 | | approve, or approve with modification, the plan no later |
4 | | than November 1, 2018. |
5 | | (8) As part of the development and update of the
|
6 | | long-term renewable resources procurement plan authorized
|
7 | | by subsection (c) of Section 1-75 of this Act, the Agency
|
8 | | shall plan for: (A) actions to refer customers from the
|
9 | | Illinois Solar for All Program to electric and natural gas
|
10 | | income-qualified energy efficiency programs, and vice
|
11 | | versa, with the goal of increasing participation in both
|
12 | | of these programs; (B) effective procedures for data
|
13 | | sharing, as needed, to effectuate referrals between the
|
14 | | Illinois Solar for All Program and both electric and
|
15 | | natural gas income-qualified energy efficiency programs,
|
16 | | including sharing customer information directly with the
|
17 | | utilities, as needed and appropriate; and (C) efforts to
|
18 | | identify any existing deferred maintenance programs for
|
19 | | which prospective Solar for All Program customers may be |
20 | | eligible
and connect prospective customers for whom |
21 | | deferred
maintenance is or may be a barrier to solar |
22 | | installation
to those programs. |
23 | | As used in this subsection (b), "low-income households" |
24 | | means persons and families whose income does not exceed 80% of |
25 | | area median income, adjusted for family size and revised every |
26 | | 5 years. |
|
| | SB1474 | - 39 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | For the purposes of this subsection (b), the Agency shall |
2 | | define "environmental justice community" based on the |
3 | | methodologies and findings established by the Agency and the |
4 | | Administrator for the Illinois Solar for All Program in its |
5 | | initial long-term renewable resources procurement plan and as |
6 | | updated by the Agency and the Administrator for the Illinois |
7 | | Solar for All Program as part of the long-term renewable |
8 | | resources procurement plan update. |
9 | | (b-5) After the receipt of all payments required by |
10 | | Section 16-115D of the Public Utilities Act, no additional |
11 | | funds shall be deposited into the Illinois Power Agency |
12 | | Renewable Energy Resources Fund unless directed by order of |
13 | | the Commission. |
14 | | (b-10) After the receipt of all payments required by |
15 | | Section 16-115D of the Public Utilities Act and payment in |
16 | | full of all contracts executed by the Agency under subsections |
17 | | (b) and (i) of this Section, if the balance of the Illinois |
18 | | Power Agency Renewable Energy Resources Fund is under $5,000, |
19 | | then the Fund shall be inoperative and any remaining funds and |
20 | | any funds submitted to the Fund after that date, shall be |
21 | | transferred to the Supplemental Low-Income Energy Assistance |
22 | | Fund for use in the Low-Income Home Energy Assistance Program, |
23 | | as authorized by the Energy Assistance Act. |
24 | | (c) (Blank). |
25 | | (d) (Blank). |
26 | | (e) All renewable energy credits procured using monies |
|
| | SB1474 | - 40 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | from the Illinois Power Agency Renewable Energy Resources Fund |
2 | | shall be permanently retired. |
3 | | (f) The selection of one or more third-party program |
4 | | managers or administrators, the selection of the independent |
5 | | evaluator, and the procurement processes described in this |
6 | | Section are exempt from the requirements of the Illinois |
7 | | Procurement Code, under Section 20-10 of that Code. |
8 | | (g) All disbursements from the Illinois Power Agency |
9 | | Renewable Energy Resources Fund shall be made only upon |
10 | | warrants of the Comptroller drawn upon the Treasurer as |
11 | | custodian of the Fund upon vouchers signed by the Director or |
12 | | by the person or persons designated by the Director for that |
13 | | purpose. The Comptroller is authorized to draw the warrant |
14 | | upon vouchers so signed. The Treasurer shall accept all |
15 | | warrants so signed and shall be released from liability for |
16 | | all payments made on those warrants. |
17 | | (h) The Illinois Power Agency Renewable Energy Resources |
18 | | Fund shall not be subject to sweeps, administrative charges, |
19 | | or chargebacks, including, but not limited to, those |
20 | | authorized under Section 8h of the State Finance Act, that |
21 | | would in any way result in the transfer of any funds from this |
22 | | Fund to any other fund of this State or in having any such |
23 | | funds utilized for any purpose other than the express purposes |
24 | | set forth in this Section.
|
25 | | (h-5) The Agency may assess fees to each bidder to recover |
26 | | the costs incurred in connection with a procurement process |
|
| | SB1474 | - 41 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | held under this Section. Fees collected from bidders shall be |
2 | | deposited into the Renewable Energy Resources Fund. |
3 | | (i) Supplemental procurement process. |
4 | | (1) Within 90 days after the effective date of this |
5 | | amendatory Act of the 98th General Assembly, the Agency |
6 | | shall develop a one-time supplemental procurement plan |
7 | | limited to the procurement of renewable energy credits, if |
8 | | available, from new or existing photovoltaics, including, |
9 | | but not limited to, distributed photovoltaic generation. |
10 | | Nothing in this subsection (i) requires procurement of |
11 | | wind generation through the supplemental procurement. |
12 | | Renewable energy credits procured from new |
13 | | photovoltaics, including, but not limited to, distributed |
14 | | photovoltaic generation, under this subsection (i) must be |
15 | | procured from devices installed by a qualified person. In |
16 | | its supplemental procurement plan, the Agency shall |
17 | | establish contractually enforceable mechanisms for |
18 | | ensuring that the installation of new photovoltaics is |
19 | | performed by a qualified person. |
20 | | For the purposes of this paragraph (1), "qualified |
21 | | person" means a person who performs installations of |
22 | | photovoltaics, including, but not limited to, distributed |
23 | | photovoltaic generation, and who: (A) has completed an |
24 | | apprenticeship as a journeyman electrician from a United |
25 | | States Department of Labor registered electrical |
26 | | apprenticeship and training program and received a |
|
| | SB1474 | - 42 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | certification of satisfactory completion; or (B) does not |
2 | | currently meet the criteria under clause (A) of this |
3 | | paragraph (1), but is enrolled in a United States |
4 | | Department of Labor registered electrical apprenticeship |
5 | | program, provided that the person is directly supervised |
6 | | by a person who meets the criteria under clause (A) of this |
7 | | paragraph (1); or (C) has obtained one of the following |
8 | | credentials in addition to attesting to satisfactory |
9 | | completion of at least 5 years or 8,000 hours of |
10 | | documented hands-on electrical experience: (i) a North |
11 | | American Board of Certified Energy Practitioners (NABCEP) |
12 | | Installer Certificate for Solar PV; (ii) an Underwriters |
13 | | Laboratories (UL) PV Systems Installer Certificate; (iii) |
14 | | an Electronics Technicians Association, International |
15 | | (ETAI) Level 3 PV Installer Certificate; or (iv) an |
16 | | Associate in Applied Science degree from an Illinois |
17 | | Community College Board approved community college program |
18 | | in renewable energy or a distributed generation |
19 | | technology. |
20 | | For the purposes of this paragraph (1), "directly |
21 | | supervised" means that there is a qualified person who |
22 | | meets the qualifications under clause (A) of this |
23 | | paragraph (1) and who is available for supervision and |
24 | | consultation regarding the work performed by persons under |
25 | | clause (B) of this paragraph (1), including a final |
26 | | inspection of the installation work that has been directly |
|
| | SB1474 | - 43 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | supervised to ensure safety and conformity with applicable |
2 | | codes. |
3 | | For the purposes of this paragraph (1), "install" |
4 | | means the major activities and actions required to |
5 | | connect, in accordance with applicable building and |
6 | | electrical codes, the conductors, connectors, and all |
7 | | associated fittings, devices, power outlets, or |
8 | | apparatuses mounted at the premises that are directly |
9 | | involved in delivering energy to the premises' electrical |
10 | | wiring from the photovoltaics, including, but not limited |
11 | | to, to distributed photovoltaic generation. |
12 | | The renewable energy credits procured pursuant to the |
13 | | supplemental procurement plan shall be procured using up |
14 | | to $30,000,000 from the Illinois Power Agency Renewable |
15 | | Energy Resources Fund. The Agency shall not plan to use |
16 | | funds from the Illinois Power Agency Renewable Energy |
17 | | Resources Fund in excess of the monies on deposit in such |
18 | | fund or projected to be deposited into such fund. The |
19 | | supplemental procurement plan shall ensure adequate, |
20 | | reliable, affordable, efficient, and environmentally |
21 | | sustainable renewable energy resources (including credits) |
22 | | at the lowest total cost over time, taking into account |
23 | | any benefits of price stability. |
24 | | To the extent available, 50% of the renewable energy |
25 | | credits procured from distributed renewable energy |
26 | | generation shall come from devices of less than 25 |
|
| | SB1474 | - 44 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | kilowatts in nameplate capacity. Procurement of renewable |
2 | | energy credits from distributed renewable energy |
3 | | generation devices shall be done through multi-year |
4 | | contracts of no less than 5 years. The Agency shall create |
5 | | credit requirements for counterparties. In order to |
6 | | minimize the administrative burden on contracting |
7 | | entities, the Agency shall solicit the use of third |
8 | | parties to aggregate distributed renewable energy. These |
9 | | third parties shall enter into and administer contracts |
10 | | with individual distributed renewable energy generation |
11 | | device owners. An individual distributed renewable energy |
12 | | generation device owner shall
have the ability to measure |
13 | | the output of his or her distributed renewable energy |
14 | | generation device. |
15 | | In developing the supplemental procurement plan, the |
16 | | Agency shall hold at least one workshop open to the public |
17 | | within 90 days after the effective date of this amendatory |
18 | | Act of the 98th General Assembly and shall consider any |
19 | | comments made by stakeholders or the public. Upon |
20 | | development of the supplemental procurement plan within |
21 | | this 90-day period, copies of the supplemental procurement |
22 | | plan shall be posted and made publicly available on the |
23 | | Agency's and Commission's websites. All interested parties |
24 | | shall have 14 days following the date of posting to |
25 | | provide comment to the Agency on the supplemental |
26 | | procurement plan. All comments submitted to the Agency |
|
| | SB1474 | - 45 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | shall be specific, supported by data or other detailed |
2 | | analyses, and, if objecting to all or a portion of the |
3 | | supplemental procurement plan, accompanied by specific |
4 | | alternative wording or proposals. All comments shall be |
5 | | posted on the Agency's and Commission's websites. Within |
6 | | 14 days following the end of the 14-day review period, the |
7 | | Agency shall revise the supplemental procurement plan as |
8 | | necessary based on the comments received and file its |
9 | | revised supplemental procurement plan with the Commission |
10 | | for approval. |
11 | | (2) Within 5 days after the filing of the supplemental |
12 | | procurement plan at the Commission, any person objecting |
13 | | to the supplemental procurement plan shall file an |
14 | | objection with the Commission. Within 10 days after the |
15 | | filing, the Commission shall determine whether a hearing |
16 | | is necessary. The Commission shall enter its order |
17 | | confirming or modifying the supplemental procurement plan |
18 | | within 90 days after the filing of the supplemental |
19 | | procurement plan by the Agency. |
20 | | (3) The Commission shall approve the supplemental |
21 | | procurement plan of renewable energy credits to be |
22 | | procured from new or existing photovoltaics, including, |
23 | | but not limited to, distributed photovoltaic generation, |
24 | | if the Commission determines that it will ensure adequate, |
25 | | reliable, affordable, efficient, and environmentally |
26 | | sustainable electric service in the form of renewable |
|
| | SB1474 | - 46 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | energy credits at the lowest total cost over time, taking |
2 | | into account any benefits of price stability. |
3 | | (4) The supplemental procurement process under this |
4 | | subsection (i) shall include each of the following |
5 | | components: |
6 | | (A) Procurement administrator. The Agency may |
7 | | retain a procurement administrator in the manner set |
8 | | forth in item (2) of subsection (a) of Section 1-75 of |
9 | | this Act to conduct the supplemental procurement or |
10 | | may elect to use the same procurement administrator |
11 | | administering the Agency's annual procurement under |
12 | | Section 1-75. |
13 | | (B) Procurement monitor. The procurement monitor |
14 | | retained by the Commission pursuant to Section |
15 | | 16-111.5 of the Public Utilities Act shall: |
16 | | (i) monitor interactions among the procurement |
17 | | administrator and bidders and suppliers; |
18 | | (ii) monitor and report to the Commission on |
19 | | the progress of the supplemental procurement |
20 | | process; |
21 | | (iii) provide an independent confidential |
22 | | report to the Commission regarding the results of |
23 | | the procurement events; |
24 | | (iv) assess compliance with the procurement |
25 | | plan approved by the Commission for the |
26 | | supplemental procurement process; |
|
| | SB1474 | - 47 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | (v) preserve the confidentiality of supplier |
2 | | and bidding information in a manner consistent |
3 | | with all applicable laws, rules, regulations, and |
4 | | tariffs; |
5 | | (vi) provide expert advice to the Commission |
6 | | and consult with the procurement administrator |
7 | | regarding issues related to procurement process |
8 | | design, rules, protocols, and policy-related |
9 | | matters; |
10 | | (vii) consult with the procurement |
11 | | administrator regarding the development and use of |
12 | | benchmark criteria, standard form contracts, |
13 | | credit policies, and bid documents; and |
14 | | (viii) perform, with respect to the |
15 | | supplemental procurement process, any other |
16 | | procurement monitor duties specifically delineated |
17 | | within subsection (i) of this Section. |
18 | | (C) Solicitation, pre-qualification, and |
19 | | registration of bidders. The procurement administrator |
20 | | shall disseminate information to potential bidders to |
21 | | promote a procurement event, notify potential bidders |
22 | | that the procurement administrator may enter into a |
23 | | post-bid price negotiation with bidders that meet the |
24 | | applicable benchmarks, provide supply requirements, |
25 | | and otherwise explain the competitive procurement |
26 | | process. In addition to such other publication as the |
|
| | SB1474 | - 48 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | procurement administrator determines is appropriate, |
2 | | this information shall be posted on the Agency's and |
3 | | the Commission's websites. The procurement |
4 | | administrator shall also administer the |
5 | | prequalification process, including evaluation of |
6 | | credit worthiness, compliance with procurement rules, |
7 | | and agreement to the standard form contract developed |
8 | | pursuant to item (D) of this paragraph (4). The |
9 | | procurement administrator shall then identify and |
10 | | register bidders to participate in the procurement |
11 | | event. |
12 | | (D) Standard contract forms and credit terms and |
13 | | instruments. The procurement administrator, in |
14 | | consultation with the Agency, the Commission, and |
15 | | other interested parties and subject to Commission |
16 | | oversight, shall develop and provide standard contract |
17 | | forms for the supplier contracts that meet generally |
18 | | accepted industry practices as well as include any |
19 | | applicable State of Illinois terms and conditions that |
20 | | are required for contracts entered into by an agency |
21 | | of the State of Illinois. Standard credit terms and |
22 | | instruments that meet generally accepted industry |
23 | | practices shall be similarly developed. Contracts for |
24 | | new photovoltaics shall include a provision attesting |
25 | | that the supplier will use a qualified person for the |
26 | | installation of the device pursuant to paragraph (1) |
|
| | SB1474 | - 49 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | of subsection (i) of this Section. The procurement |
2 | | administrator shall make available to the Commission |
3 | | all written comments it receives on the contract |
4 | | forms,
credit terms, or instruments. If the |
5 | | procurement administrator cannot reach agreement with |
6 | | the parties as to the contract terms and conditions, |
7 | | the procurement administrator must notify the |
8 | | Commission of any disputed terms and the Commission |
9 | | shall resolve the dispute. The terms of the contracts |
10 | | shall not be subject to negotiation by winning |
11 | | bidders, and the bidders must agree to the terms of the |
12 | | contract in advance so that winning bids are selected |
13 | | solely on the basis of price. |
14 | | (E) Requests for proposals; competitive |
15 | | procurement process. The procurement administrator |
16 | | shall design and issue requests for proposals to |
17 | | supply renewable energy credits in accordance with the |
18 | | supplemental procurement plan, as approved by the |
19 | | Commission. The requests for proposals shall set forth |
20 | | a procedure for sealed, binding commitment bidding |
21 | | with pay-as-bid settlement, and provision for |
22 | | selection of bids on the basis of price, provided, |
23 | | however, that no bid shall be accepted if it exceeds |
24 | | the benchmark developed pursuant to item (F) of this |
25 | | paragraph (4). |
26 | | (F) Benchmarks. Benchmarks for each product to be |
|
| | SB1474 | - 50 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | procured shall be developed by the procurement |
2 | | administrator in consultation with Commission staff, |
3 | | the Agency, and the procurement monitor for use in |
4 | | this supplemental procurement. |
5 | | (G) A plan for implementing contingencies in the |
6 | | event of supplier default, Commission rejection of |
7 | | results, or any other cause. |
8 | | (5) Within 2 business days after opening the sealed |
9 | | bids, the procurement administrator shall submit a |
10 | | confidential report to the Commission. The report shall |
11 | | contain the results of the bidding for each of the |
12 | | products along with the procurement administrator's |
13 | | recommendation for the acceptance and rejection of bids |
14 | | based on the price benchmark criteria and other factors |
15 | | observed in the process. The procurement monitor also |
16 | | shall submit a confidential report to the Commission |
17 | | within 2 business days after opening the sealed bids. The |
18 | | report shall contain the procurement monitor's assessment |
19 | | of bidder behavior in the process as well as an assessment |
20 | | of the procurement administrator's compliance with the |
21 | | procurement process and rules. The Commission shall review |
22 | | the confidential reports submitted by the procurement |
23 | | administrator and procurement monitor and shall accept or |
24 | | reject the recommendations of the procurement |
25 | | administrator within 2 business days after receipt of the |
26 | | reports. |
|
| | SB1474 | - 51 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | (6) Within 3 business days after the Commission |
2 | | decision approving the results of a procurement event, the |
3 | | Agency shall enter into binding contractual arrangements |
4 | | with the winning suppliers using the standard form |
5 | | contracts. |
6 | | (7) The names of the successful bidders and the |
7 | | average of the winning bid prices for each contract type |
8 | | and for each contract term shall be made available to the |
9 | | public within 2 days after the supplemental procurement |
10 | | event. The Commission, the procurement monitor, the |
11 | | procurement administrator, the Agency, and all |
12 | | participants in the procurement process shall maintain the |
13 | | confidentiality of all other supplier and bidding |
14 | | information in a manner consistent with all applicable |
15 | | laws, rules, regulations, and tariffs. Confidential |
16 | | information, including the confidential reports submitted |
17 | | by the procurement administrator and procurement monitor |
18 | | pursuant to this Section, shall not be made publicly |
19 | | available and shall not be discoverable by any party in |
20 | | any proceeding, absent a compelling demonstration of need, |
21 | | nor shall those reports be admissible in any proceeding |
22 | | other than one for law enforcement purposes. |
23 | | (8) The supplemental procurement provided in this |
24 | | subsection (i) shall not be subject to the requirements |
25 | | and limitations of subsections (c) and (d) of this |
26 | | Section. |
|
| | SB1474 | - 52 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | (9) Expenses incurred in connection with the |
2 | | procurement process held pursuant to this Section, |
3 | | including, but not limited to, the cost of developing the |
4 | | supplemental procurement plan, the procurement |
5 | | administrator, procurement monitor, and the cost of the |
6 | | retirement of renewable energy credits purchased pursuant |
7 | | to the supplemental procurement shall be paid for from the |
8 | | Illinois Power Agency Renewable Energy Resources Fund. The |
9 | | Agency shall enter into an interagency agreement with the |
10 | | Commission to reimburse the Commission for its costs |
11 | | associated with the procurement monitor for the |
12 | | supplemental procurement process. |
13 | | (j) There shall be created a low-income community |
14 | | hydropower pilot project program. Under this program, persons, |
15 | | and entities including, but not limited to, electric |
16 | | utilities, shall propose pilot community hydropower projects. |
17 | | Community hydropower projects proposed under this subsection |
18 | | may exceed 2,000 kilowatts in nameplate capacity, and the |
19 | | amount paid per project under this program may not exceed |
20 | | $20,000,000. Pilot projects must result in economic benefits |
21 | | for the members of the community in which the project will be |
22 | | located. The proposed pilot project must include a partnership |
23 | | with at least one community-based organization. Approved pilot |
24 | | projects shall be competitively bid by the Agency, subject to |
25 | | fair and equitable guidelines developed by the Agency. Funding |
26 | | available under this subsection must include a project |
|
| | SB1474 | - 53 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | partnership that includes community ownership for the project |
2 | | subscribers. Contracts entered into under this subsection may |
3 | | be entered into with an entity that will develop and |
4 | | administer the program or with developers and shall also |
5 | | include contracts for renewable energy credits related to the |
6 | | program. A project proposed by a utility that is implemented |
7 | | under this subsection shall not be included in the utility's |
8 | | rate base. |
9 | | (Source: P.A. 102-662, eff. 9-15-21.) |
10 | | Section 10. The Public Utilities Act is amended by |
11 | | changing Section 8-512 as follows: |
12 | | (220 ILCS 5/8-512) |
13 | | Sec. 8-512. Renewable energy access plan. |
14 | | (a) It is the policy of this State to promote |
15 | | cost-effective transmission system development that ensures |
16 | | reliability of the electric transmission system, lowers carbon |
17 | | emissions, minimizes long-term costs for consumers, and |
18 | | supports the electric policy goals of this State. The General |
19 | | Assembly finds that: |
20 | | (1) Transmission planning, primarily for reliability |
21 | | purposes, but also for economic and public policy reasons |
22 | | is conducted by regional transmission organizations in |
23 | | which transmission-owning Illinois utilities and other |
24 | | stakeholders are members. |
|
| | SB1474 | - 54 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | (2) Order No. 1000 of the Federal Energy Regulatory |
2 | | Commission requires regional transmission organizations to |
3 | | plan for transmission system needs in light of State |
4 | | public policies and to accept input from states during the |
5 | | transmission system planning processes. |
6 | | (3) The State of Illinois does not currently have a |
7 | | comprehensive power and environmental policy planning |
8 | | process to identify transmission infrastructure needs that
|
9 | | can serve as a vital input into the regional and |
10 | | interregional transmission organization planning |
11 | | processes conducted under Order No. 1000 and other laws |
12 | | and regulations. |
13 | | (4) This State is an electricity generation and power |
14 | | transmission hub, and can leverage that position to invest |
15 | | in infrastructure that enables new and existing Illinois
|
16 | | generators to meet the public policy goals of the State of |
17 | | Illinois and of interconnected states while |
18 | | cost-effectively supporting tens of thousands of jobs in |
19 | | the renewable energy sector in this State. |
20 | | (5) The nation has a need to readily access this |
21 | | State's low-cost, clean electric power, and this State |
22 | | also desires access to clean energy resources in other |
23 | | states to develop and support its low-carbon economy and |
24 | | keep electricity prices low in Illinois and interconnected |
25 | | States. |
26 | | (6) Existing transmission infrastructure may constrain |
|
| | SB1474 | - 55 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | the State's achievement of 100% renewable energy by 2050, |
2 | | the accelerated adoption of electric vehicles in a just
|
3 | | and equitable way, and electrification of additional |
4 | | sectors of the Illinois economy. |
5 | | (7) Transmission system congestion within this State |
6 | | and the regional transmission organizations serving this |
7 | | State limits the ability of this State's existing and new |
8 | | electric generation facilities that do not emit carbon |
9 | | dioxide, including renewable energy resources and zero |
10 | | emission facilities, to serve the public policy goals of |
11 | | this State and other states, which constrains investment |
12 | | in this State. |
13 | | (8) Investment in infrastructure to support existing |
14 | | and new electric generation facilities that do not emit |
15 | | carbon dioxide, including renewable energy resources and
|
16 | | zero emission facilities, stimulates significant economic |
17 | | development and job growth in this State, as well as |
18 | | creates environmental and public health benefits in this |
19 | | State. |
20 | | (9) Creating a forward-looking plan for this State's |
21 | | electric transmission infrastructure, as opposed to |
22 | | relying on case-by-case development and repeated marginal |
23 | | upgrades, will achieve a lower-cost system for Illinois' |
24 | | electricity customers. A forward-looking plan can also |
25 | | help integrate and achieve a comprehensive set of |
26 | | objectives and multiple state, regional, and national |
|
| | SB1474 | - 56 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | policy goals. |
2 | | (10) Alternatives to overhead electric transmission |
3 | | lines can achieve cost-effective resolution of system |
4 | | impacts and warrant investigation of the circumstances |
5 | | under which those alternatives should be considered and |
6 | | approved. The alternatives are likely to be beneficial as |
7 | | investment in electric transmission infrastructure moves |
8 | | forward. |
9 | | (11) Because transmission planning is conducted |
10 | | primarily by the regional transmission organizations, the |
11 | | Commission should be advocating for the State's interests |
12 | | at the regional transmission organizations to ensure that |
13 | | such planning facilitates the State's policies and goals, |
14 | | including overall consumer savings, power system |
15 | | reliability, economic development, environmental |
16 | | improvement, and carbon reduction. |
17 | | (b) Consistent with the findings identified in subsection |
18 | | (a), the Commission shall open an investigation to develop and |
19 | | adopt a renewable energy access plan no later than December
|
20 | | 31, 2022. To assist and support the Commission in the |
21 | | development of the plan, the Commission shall retain the |
22 | | services of technical and policy experts with relevant fields
|
23 | | of expertise, solicit technical and policy analysis from the |
24 | | public, and provide for a 120-day open public comment period |
25 | | after publication of a draft report, which shall be published |
26 | | no later than 90 days after the comment period ends. The plan |
|
| | SB1474 | - 57 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | shall, at a minimum, do the following: |
2 | | (1) designate renewable energy access plan zones |
3 | | throughout this State in areas in which renewable energy |
4 | | resources and suitable land areas are sufficient for |
5 | | developing generating capacity from renewable energy |
6 | | technologies; |
7 | | (2) develop a plan to achieve transmission capacity |
8 | | necessary to deliver the electric output from renewable |
9 | | energy technologies in the renewable energy access plan |
10 | | zones to customers in Illinois and other states in a |
11 | | manner that is most beneficial and cost-effective to |
12 | | customers; |
13 | | (3) use this State's position as an electricity |
14 | | generation and power transmission hub to create new |
15 | | investment in this State's renewable energy resources; |
16 | | (4) consider programs, policies, and electric |
17 | | transmission projects that can be adopted within this |
18 | | State that promote the cost-effective delivery of power |
19 | | from renewable energy resources interconnected to the bulk |
20 | | electric system to meet the renewable portfolio standard |
21 | | targets under subsection (c) of Section 1-75 of the |
22 | | Illinois Power Agency Act; |
23 | | (5) consider proposals to improve regional |
24 | | transmission organizations' regional and interregional |
25 | | system planning processes, especially proposals that |
26 | | reduce costs and emissions, create jobs, and increase |
|
| | SB1474 | - 58 - | LRB103 29372 AMQ 55761 b |
|
|
1 | | State and regional power system reliability to prevent |
2 | | high-cost outages that can endanger lives, and analyze of |
3 | | how those proposals would improve reliability and |
4 | | cost-effective delivery of electricity in Illinois and the |
5 | | region; |
6 | | (6) make findings and policy recommendations based on |
7 | | technical and policy analysis regarding locations of |
8 | | renewable energy access plan zones and the transmission |
9 | | system developments needed to cost-effectively achieve the |
10 | | public policy goals identified herein; and |
11 | | (6.5) make findings and policy recommendations based |
12 | | on technical and policy analysis regarding the impact of |
13 | | converting nonpowered dams to hydropower dams relative to |
14 | | alternative renewal energy resources; and |
15 | | (7) present the Commission's conclusions and proposed |
16 | | recommendations based on its analysis and use the findings |
17 | | and policy recommendations to determine actions that the |
18 | | Commission should take. |
19 | | (c) No later than December 31, 2025, and every other year |
20 | | thereafter, the Commission shall open an investigation to |
21 | | develop and adopt an updated renewable energy access plan
|
22 | | that, at a minimum, evaluates the implementation and |
23 | | effectiveness of the renewable energy access plan, recommends |
24 | | improvements to the renewable energy access plan, and provides |
25 | | changes to transmission capacity necessary to deliver electric |
26 | | output from the renewable energy access plan zones.
|