Amends the Illinois Procurement Code. Amends the Illinois Procurement Code. Modifies the term "single prime" to mean the design-bid-build procurement delivery method for a building construction project in which the Capital Development Board or a public institution of higher education (currently, only the Capital Development Board) is the construction agency procuring 2 or more specified subdivisions of work. Provides that for building construction contracts in excess of $250,000, separate specifications may be prepared for all equipment, labor, and materials in connection with the 5 subdivisions of the work to be performed. Modifies requirements concerning specifications to be drawn so as to permit separate and independent bidding. Provides requirements for single prime projects in which the Capital Development Board or an institution of higher education is the construction agency procuring for building construction contracts in excess of $250,000. Amends the Design-Build Procurement Act. Provides that the term "State construction agency" as used in the Act includes institutions of higher education. Extends repeal and inoperative dates. Makes conforming and other changes. Effective December 15, 2021.
|
| |
| | A BILL FOR |
|
|
| | SB1535 | | LRB102 15919 RJF 21288 b |
|
|
1 | | AN ACT concerning finance.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Procurement Code is amended by |
5 | | changing Sections 1-15.93, 30-30, 33-5, and 33-50 as follows: |
6 | | (30 ILCS 500/1-15.93) |
7 | | (Section scheduled to be repealed on January 1, 2022) |
8 | | Sec. 1-15.93. Single prime. "Single prime" means the |
9 | | design-bid-build procurement delivery method for a building |
10 | | construction project in which the Capital Development Board or |
11 | | a public institution of higher education is the construction |
12 | | agency procuring 2 or more subdivisions of work enumerated in |
13 | | paragraphs (1) through (5) of subsection (a) of Section 30-30 |
14 | | of this Code under a single contract. This Section is repealed |
15 | | on January 1, 2032 2022 .
|
16 | | (Source: P.A. 101-369, eff. 12-15-19; 101-645, eff. 6-26-20.)
|
17 | | (30 ILCS 500/30-30)
|
18 | | Sec. 30-30. Design-bid-build construction. |
19 | | (a) The provisions of this subsection are operative |
20 | | through December 31, 2031 2021 . |
21 | | Except as provided in subsections (a-5) or (a-10), for For
|
22 | | building construction contracts in excess of
$250,000, |
|
| | SB1535 | - 2 - | LRB102 15919 RJF 21288 b |
|
|
1 | | separate specifications may be prepared for all
equipment, |
2 | | labor, and materials in
connection with the following 5 |
3 | | subdivisions of the work to be
performed:
|
4 | | (1) plumbing;
|
5 | | (2) heating, piping, refrigeration, and automatic
|
6 | | temperature control systems,
including the testing and |
7 | | balancing of those systems;
|
8 | | (3) ventilating and distribution systems for
|
9 | | conditioned air, including the testing
and balancing of |
10 | | those systems;
|
11 | | (4) electric wiring; and
|
12 | | (5) general contract work.
|
13 | | Except as provided in subsections (a-5) or (a-10), the The |
14 | | specifications may be so drawn as to permit separate and
|
15 | | independent bidding upon
each of the 5 subdivisions of work , |
16 | | and all . All contracts awarded
for any part thereof may
award |
17 | | the 5 subdivisions of work separately to responsible and
|
18 | | reliable persons, firms, or
corporations engaged in these |
19 | | classes of work. The contracts, at
the discretion of the
|
20 | | construction agency, may be assigned to the successful bidder |
21 | | on
the general contract work or
to the successful bidder on the |
22 | | subdivision of work designated by
the construction agency |
23 | | before
the bidding as the prime subdivision of work, provided |
24 | | that all
payments will be made directly
to the contractors for |
25 | | the 5 subdivisions of work upon compliance
with the conditions |
26 | | of the
contract.
|
|
| | SB1535 | - 3 - | LRB102 15919 RJF 21288 b |
|
|
1 | | (a-5) Beginning on the effective date of this amendatory |
2 | | Act of the 102nd General Assembly and through December 31, |
3 | | 2031, for single prime projects in which the Capital |
4 | | Development Board is the construction agency procuring for |
5 | | building construction contracts in excess of $250,000, |
6 | | separate specifications may be prepared for all equipment, |
7 | | labor, and materials in connection with the 5 subdivisions of |
8 | | work enumerated in subsection (a). Any Capital Development |
9 | | Board construction contracts awarded for any part thereof may |
10 | | award 2 or more of the 5 subdivisions of work together or |
11 | | separately to responsible and reliable persons, firms, or |
12 | | corporations engaged in these classes of work. |
13 | | For Capital Development Board single prime projects: (i) |
14 | | the bid of the successful low bidder shall identify the name of |
15 | | the subcontractor, if any, and the bid proposal costs for each |
16 | | of the 5 subdivisions of work set forth in subsection (a); (ii) |
17 | | the contract entered into with the successful bidder shall |
18 | | provide that no identified subcontractor may be terminated |
19 | | without the written consent of the Capital Development Board; |
20 | | (iii) the contract shall comply with the disadvantaged |
21 | | business practices of the Business Enterprise for Minorities, |
22 | | Women, and Persons with Disabilities Act and the equal |
23 | | employment practices of Section 2-105 of the Illinois Human |
24 | | Rights Act; (iv) the successful low bidder shall be |
25 | | prequalified by the Capital Development Board; and (v) until |
26 | | December 31, 2026, for building construction projects with a |
|
| | SB1535 | - 4 - | LRB102 15919 RJF 21288 b |
|
|
1 | | total construction cost valued at $5,000,000 or less, the |
2 | | Capital Development Board shall not use the single prime |
3 | | delivery method for more than 50% of the total number of |
4 | | projects bid for each fiscal year. |
5 | | With respect to any construction project described in this |
6 | | subsection (a-5), the Capital Development Board shall: (i) |
7 | | specify in writing as a public record that the project shall |
8 | | comply with the Business Enterprise for Minorities, Women, and |
9 | | Persons with Disabilities Act and the equal employment |
10 | | practices of Section 2-105 of the Illinois Human Rights Act; |
11 | | and (ii) report annually to the Governor and General Assembly |
12 | | on the bidding, award, and performance of all single prime |
13 | | projects. |
14 | | (a-10) Beginning on the effective date of this amendatory |
15 | | Act of the 102nd General Assembly and through December 31, |
16 | | 2031, for single prime projects in which a public institution |
17 | | of higher education is a construction agency procuring for |
18 | | building construction contracts in excess of $250,000, |
19 | | separate specifications may be prepared for all equipment, |
20 | | labor, and materials in connection with the 5 subdivisions of |
21 | | work enumerated in subsection (a). Any public institution of |
22 | | higher education contract awarded for any part thereof may |
23 | | award 2 or more of the 5 subdivisions of work together or |
24 | | separately to responsible and reliable persons, firms, or |
25 | | corporations engaged in these classes of work if: (i) the |
26 | | public institution of higher education has submitted to the |
|
| | SB1535 | - 5 - | LRB102 15919 RJF 21288 b |
|
|
1 | | Procurement Policy Board a written notice that shall include |
2 | | the reasons for using the single prime method and an |
3 | | explanation of why the use of that method is in the best |
4 | | interest of the State. The notice provided under this item (i) |
5 | | shall be posted on the public institution of higher |
6 | | education's online procurement webpage and on the online |
7 | | Procurement Bulletin at least 3 business days following |
8 | | submission to the Procurement Policy Board; (ii) the |
9 | | successful low bidder has prequalified with the public |
10 | | institution of higher education; (iii) the bid of the |
11 | | successful low bidder identifies the name of the |
12 | | subcontractor, if any, and the bid proposal costs for each of |
13 | | the 5 subdivisions of work set forth in subsection (a); (iv) |
14 | | the contract entered into with the successful bidder provides |
15 | | that no identified subcontractor may be terminated without the |
16 | | written consent of the public institution of higher education; |
17 | | and (v) the successful low bidder has prequalified with the |
18 | | University of Illinois or with Capital Development Board. |
19 | | For building construction projects with a total |
20 | | construction cost valued at $20,000,000 or less, public |
21 | | institutions of higher education shall not use the single |
22 | | prime delivery method for more than 50% of the total number of |
23 | | projects bid for each fiscal year. Projects with a total |
24 | | construction cost valued greater than $20,000,000 may be bid |
25 | | using the single prime delivery method at the discretion of |
26 | | the public institution of higher education. |
|
| | SB1535 | - 6 - | LRB102 15919 RJF 21288 b |
|
|
1 | | With respect to any construction project described in this |
2 | | subsection (a-10), the public institution of higher education |
3 | | shall: (i) specify in writing as a public record that the |
4 | | project shall comply with the Business Enterprise for |
5 | | Minorities, Women, and Persons with Disabilities Act and the |
6 | | equal employment practices of Section 2-105 of the Illinois |
7 | | Human Rights Act; and (ii) report annually to the Governor, |
8 | | General Assembly, Procurement Policy Board, and Auditor |
9 | | General on the bidding, award, and performance of all single |
10 | | prime projects. On or after the effective date of this |
11 | | amendatory Act of the 102nd General Assembly, the public |
12 | | institution of higher education may award in each fiscal year |
13 | | single prime contracts with an aggregate total value of no |
14 | | more than $100,000,000. The Board of Trustees of the |
15 | | University of Illinois may award in each fiscal year single |
16 | | prime contracts with an aggregate total value of no more than |
17 | | $300,000,000. |
18 | | Beginning on the effective date of this amendatory Act of |
19 | | the 101st General Assembly and through December 31, 2020, for |
20 | | single prime projects: (i) the bid of the successful low |
21 | | bidder shall identify the name of the subcontractor, if any, |
22 | | and the bid proposal costs for each of the 5 subdivisions of |
23 | | work set forth in this Section; (ii) the contract entered into |
24 | | with the successful bidder shall provide that no identified |
25 | | subcontractor may be terminated without the written consent of |
26 | | the Capital Development Board; (iii) the contract shall comply |
|
| | SB1535 | - 7 - | LRB102 15919 RJF 21288 b |
|
|
1 | | with the disadvantaged business practices of the Business |
2 | | Enterprise for Minorities, Women, and Persons with |
3 | | Disabilities Act and the equal employment practices of Section |
4 | | 2-105 of the Illinois Human Rights Act; and (iv) the Capital |
5 | | Development Board shall submit an annual report to the General |
6 | | Assembly and Governor on the bidding, award, and performance |
7 | | of all single prime projects. |
8 | | For building construction projects with a total |
9 | | construction cost valued at $5,000,000 or less, the Capital |
10 | | Development Board shall not use the single prime procurement |
11 | | delivery method for more than 50% of the total number of |
12 | | projects bid for each fiscal year. Any project with a total |
13 | | construction cost valued greater than $5,000,000 may be bid |
14 | | using single prime at the discretion of the Executive Director |
15 | | of the Capital Development Board. |
16 | | (b) The provisions of this subsection are operative on and |
17 | | after January 1, 2032 2022 .
For building construction |
18 | | contracts in excess of $250,000, separate specifications shall |
19 | | be prepared for all equipment, labor, and materials in |
20 | | connection with the following 5 subdivisions of the work to be |
21 | | performed: |
22 | | (1) plumbing; |
23 | | (2) heating, piping, refrigeration, and automatic |
24 | | temperature control systems, including the testing and |
25 | | balancing of those systems; |
26 | | (3) ventilating and distribution systems for |
|
| | SB1535 | - 8 - | LRB102 15919 RJF 21288 b |
|
|
1 | | conditioned air, including the testing and balancing of |
2 | | those systems; |
3 | | (4) electric wiring; and |
4 | | (5) general contract work. |
5 | | The specifications must be so drawn as to permit separate |
6 | | and independent bidding upon each of the 5 subdivisions of |
7 | | work. All contracts awarded for any part thereof shall award |
8 | | the 5 subdivisions of work separately to responsible and |
9 | | reliable persons, firms, or corporations engaged in these |
10 | | classes of work. The contracts, at the discretion of the |
11 | | construction agency, may be assigned to the successful bidder |
12 | | on the general contract work or to the successful bidder on the |
13 | | subdivision of work designated by the construction agency |
14 | | before the bidding as the prime subdivision of work, provided |
15 | | that all payments will be made directly to the contractors for |
16 | | the 5 subdivisions of work upon compliance with the conditions |
17 | | of the contract. |
18 | | (Source: P.A. 100-391, eff. 8-25-17; 101-369, eff. 12-15-19; |
19 | | 101-645, eff. 6-26-20.)
|
20 | | (30 ILCS 500/33-5)
|
21 | | Sec. 33-5. Definitions. In this Article:
|
22 | | "Construction management services" includes:
|
23 | | (1) services provided in the planning and |
24 | | pre-construction phases of a
construction project |
25 | | including, but not limited to, consulting with,
advising, |
|
| | SB1535 | - 9 - | LRB102 15919 RJF 21288 b |
|
|
1 | | assisting, and making recommendations to the Capital |
2 | | Development Board and
architect, engineer, or licensed |
3 | | land surveyor on all aspects
of planning for project |
4 | | construction; reviewing all plans and
specifications as |
5 | | they are being developed and making recommendations
with |
6 | | respect to construction feasibility, availability of |
7 | | material and
labor, time requirements for procurement and |
8 | | construction, and
projected costs; making, reviewing, and |
9 | | refining budget estimates based
on the Board's program and |
10 | | other available information; making
recommendations to the |
11 | | Board and the architect or engineer
regarding the division |
12 | | of work in the plans and specifications to
facilitate the |
13 | | bidding and awarding of contracts; soliciting the
interest |
14 | | of capable contractors and taking bids on the project;
|
15 | | analyzing the bids received; and preparing and maintaining |
16 | | a progress
schedule during the design phase of the project |
17 | | and preparation of a
proposed construction schedule; and
|
18 | | (2) services provided in the construction phase of the |
19 | | project
including, but not limited to, maintaining |
20 | | competent supervisory staff
to coordinate and provide |
21 | | general direction of the work and progress
of the |
22 | | contractors on the project; directing the work as it is |
23 | | being
performed for general conformance with working |
24 | | drawings and
specifications; establishing procedures for |
25 | | coordinating among the
Board, architect or engineer, |
26 | | contractors, and construction
manager with respect to all |
|
| | SB1535 | - 10 - | LRB102 15919 RJF 21288 b |
|
|
1 | | aspects of the project and
implementing those procedures; |
2 | | maintaining job site records
and making appropriate |
3 | | progress reports; implementing labor policy
in conformance |
4 | | with the requirements of the public owner; reviewing
the |
5 | | safety and equal opportunity programs of each contractor |
6 | | for
conformance with the public owner's policy and making
|
7 | | recommendations; reviewing and processing
all applications |
8 | | for payment by involved contractors and material
suppliers |
9 | | in accordance with the terms of the contract; making
|
10 | | recommendations and processing requests for changes in the |
11 | | work and
maintaining records of change orders; scheduling |
12 | | and conducting job
meetings to ensure orderly progress of |
13 | | the work; developing and
monitoring a project progress |
14 | | schedule, coordinating and expediting
the work of all |
15 | | contractors and providing periodic status reports to
the |
16 | | owner and the architect or engineer; and establishing and
|
17 | | maintaining a cost control system and conducting meetings |
18 | | to review
costs.
|
19 | | "Construction manager" means any individual, sole
|
20 | | proprietorship, firm, partnership, corporation, or other legal |
21 | | entity
providing construction management services for the |
22 | | Board and
prequalified by the State in accordance with 30 ILCS
|
23 | | 500/33-10.
|
24 | | "Board" means the Capital Development Board and public |
25 | | institutions of higher education .
|
26 | | (Source: P.A. 94-532, eff. 8-10-05.) |
|
| | SB1535 | - 11 - | LRB102 15919 RJF 21288 b |
|
|
1 | | (30 ILCS 500/33-50)
|
2 | | Sec. 33-50. Duties of construction manager; additional
|
3 | | requirements for persons performing construction work.
|
4 | | (a) Upon the award of a construction management services
|
5 | | contract, a construction manager must contract with the Board |
6 | | to
furnish his or her skill and judgment in cooperation with, |
7 | | and reliance
upon, the services of the project architect or |
8 | | engineer. The
construction manager must furnish business |
9 | | administration, management
of the construction process, and |
10 | | other specified services to the Board and must perform his or |
11 | | her obligations in an expeditious and
economical manner |
12 | | consistent with the interest of the Board. If
it is in the |
13 | | State's best interest, the construction manager may
provide or |
14 | | perform basic services for which reimbursement is provided
in |
15 | | the general conditions to the construction management services
|
16 | | contract.
|
17 | | (b) The actual construction work on the project must be |
18 | | awarded to
contractors under this Code. The Capital |
19 | | Development Board may further separate additional divisions of |
20 | | work under this Article. This subsection is
subject to the |
21 | | applicable provisions of the following Acts:
|
22 | | (1) the Prevailing Wage Act;
|
23 | | (2) the Public Construction Bond Act;
|
24 | | (3) the Public Works Employment Discrimination Act;
|
25 | | (4) the Public Works Preference Act (repealed on June |
|
| | SB1535 | - 12 - | LRB102 15919 RJF 21288 b |
|
|
1 | | 16, 2010 by Public Act 96-929);
|
2 | | (5) the Employment of Illinois Workers on Public
Works |
3 | | Act;
|
4 | | (6) the Public Contract Fraud Act;
|
5 | | (7) (blank); and
|
6 | | (8) the Illinois Architecture Practice Act of 1989, |
7 | | the Professional
Engineering
Practice Act of 1989, the |
8 | | Illinois Professional Land Surveyor Act of 1989, and
the |
9 | | Structural
Engineering Practice Act of 1989.
|
10 | | (Source: P.A. 101-149, eff. 7-26-19.) |
11 | | Section 10. The Design-Build
Procurement Act is amended by |
12 | | changing Sections 5 and 10 as follows: |
13 | | (30 ILCS 537/5) |
14 | | (Section scheduled to be repealed on July 1, 2022)
|
15 | | Sec. 5. Legislative policy. It is the intent of the |
16 | | General Assembly
that
the State construction agency Capital |
17 | | Development Board be allowed to use the design-build delivery |
18 | | method
for public
projects if it is shown to be in the State's |
19 | | best interest for that particular
project. It shall be the |
20 | | policy of the State construction agency Capital Development |
21 | | Board in the
procurement of
design-build services to publicly |
22 | | announce all requirements for design-build
services and to |
23 | | procure these services on the basis of demonstrated competence
|
24 | | and qualifications and with due regard for the principles of |
|
| | SB1535 | - 13 - | LRB102 15919 RJF 21288 b |
|
|
1 | | competitive
selection.
|
2 | | The State construction agency Capital Development Board |
3 | | shall, prior to issuing requests for proposals,
promulgate
and |
4 | | publish procedures for the solicitation and award of contracts |
5 | | pursuant to
this Act.
|
6 | | The State construction agency Capital Development Board |
7 | | shall, for each public project or projects
permitted under
|
8 | | this Act, make a written determination, including a |
9 | | description as to the
particular advantages of the |
10 | | design-build procurement method, that it is in the
best |
11 | | interests of this State to enter into a design-build contract |
12 | | for the
project or projects. In making that determination, the |
13 | | following factors shall
be considered:
|
14 | | (1) The probability that the design-build procurement |
15 | | method will be in
the best interests of the State by |
16 | | providing a material savings of time or
cost over the |
17 | | design-bid-build or other delivery system.
|
18 | | (2) The type and size of the project and its |
19 | | suitability to the
design-build procurement method.
|
20 | | (3) The ability of the State construction agency to |
21 | | define and provide
comprehensive
scope and performance |
22 | | criteria for the project.
|
23 | | No State construction agency may use a design-build |
24 | | procurement method unless the agency determines in writing |
25 | | that the project will comply with the disadvantaged business |
26 | | and equal employment practices of the State as established in |
|
| | SB1535 | - 14 - | LRB102 15919 RJF 21288 b |
|
|
1 | | the Business Enterprise for Minorities, Women, and Persons |
2 | | with Disabilities Act and Section 2-105 of the Illinois Human |
3 | | Rights Act.
|
4 | | The State construction agency Capital Development Board |
5 | | shall within 15 days after the initial
determination provide |
6 | | an advisory copy to the Procurement Policy Board and
maintain |
7 | | the full record of determination for 5 years.
|
8 | | (Source: P.A. 100-391, eff. 8-25-17 .) |
9 | | (30 ILCS 537/10) |
10 | | (Section scheduled to be repealed on July 1, 2022)
|
11 | | Sec. 10. Definitions. As used in this Act:
|
12 | | "State construction agency" means the Capital Development |
13 | | Board and public institutions of higher education .
|
14 | | "Delivery system" means the design and construction |
15 | | approach used to develop
and construct a project.
|
16 | | "Design-bid-build" means the traditional delivery system |
17 | | used on public
projects in this State that incorporates the |
18 | | Architectural, Engineering, and
Land Surveying Qualification |
19 | | Based Selection Act (30 ILCS 535/) and the
principles of |
20 | | competitive selection in the Illinois Procurement Code (30 |
21 | | ILCS
500/).
|
22 | | "Design-build" means a delivery system that provides |
23 | | responsibility within a
single contract for the furnishing of |
24 | | architecture, engineering, land surveying
and related services |
25 | | as required, and the labor, materials, equipment, and
other |
|
| | SB1535 | - 15 - | LRB102 15919 RJF 21288 b |
|
|
1 | | construction services for the project.
|
2 | | "Design-build contract" means a contract for a public |
3 | | project under this Act
between the State construction agency |
4 | | and a design-build entity to furnish
architecture,
|
5 | | engineering, land surveying, and related services as required, |
6 | | and to furnish
the labor, materials, equipment, and other |
7 | | construction services for the
project. The design-build |
8 | | contract may be conditioned upon subsequent
refinements in |
9 | | scope and price and may allow the State construction agency to
|
10 | | make
modifications in the project scope without invalidating |
11 | | the design-build
contract.
|
12 | | "Design-build entity" means any individual, sole |
13 | | proprietorship, firm,
partnership, joint venture, corporation, |
14 | | professional corporation, or other
entity that proposes to |
15 | | design and construct any public project under this Act.
A |
16 | | design-build entity and associated design-build professionals |
17 | | shall conduct themselves in accordance with the laws of this |
18 | | State and the related provisions of the Illinois |
19 | | Administrative Code, as referenced by the licensed design |
20 | | professionals Acts of this State.
|
21 | | "Design professional" means any individual, sole |
22 | | proprietorship, firm,
partnership, joint venture, corporation, |
23 | | professional corporation, or other
entity that offers services |
24 | | under the Illinois Architecture Practice Act of
1989 (225 ILCS |
25 | | 305/), the Professional Engineering Practice Act of 1989 (225
|
26 | | ILCS 325/),
the Structural Engineering Licensing Act of 1989 |
|
| | SB1535 | - 16 - | LRB102 15919 RJF 21288 b |
|
|
1 | | (225 ILCS 340/), or the
Illinois Professional
Land Surveyor |
2 | | Act of 1989 (225 ILCS 330/).
|
3 | | "Evaluation criteria" means the requirements for the |
4 | | separate phases of the
selection process as defined in this |
5 | | Act and may include the specialized
experience, technical |
6 | | qualifications and competence, capacity to perform, past
|
7 | | performance, experience with similar projects, assignment of |
8 | | personnel to the
project, and other appropriate factors. Price |
9 | | may not be used as a factor in
the evaluation of Phase I |
10 | | proposals.
|
11 | | "Proposal" means the offer to enter into a design-build |
12 | | contract as submitted
by a design-build entity in accordance |
13 | | with this Act.
|
14 | | "Request for proposal" means the document used by the |
15 | | State construction agency
to solicit
proposals for a |
16 | | design-build contract.
|
17 | | "Scope and performance criteria" means the requirements |
18 | | for the public
project, including but not limited to, the |
19 | | intended usage, capacity, size,
scope, quality and performance |
20 | | standards, life-cycle costs, and other
programmatic criteria |
21 | | that are expressed in performance-oriented and
quantifiable |
22 | | specifications and drawings that can be reasonably inferred |
23 | | and
are suited to allow a design-build entity to develop a |
24 | | proposal.
|
25 | | (Source: P.A. 94-716, eff. 12-13-05 .)
|
26 | | Section 99. Effective date. This Act takes effect December |