1 | AN ACT concerning safety.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Environmental Protection Act is amended by | |||||||||||||||||||
5 | adding Section 22.59a as follows: | |||||||||||||||||||
6 | (415 ILCS 5/22.59a new) | |||||||||||||||||||
7 | Sec. 22.59a. Great Lakes CCR protection. | |||||||||||||||||||
8 | (a) The General Assembly finds that: | |||||||||||||||||||
9 | (1) The State has a long-standing policy to restore, | |||||||||||||||||||
10 | protect, and enhance the environment, and has a particular | |||||||||||||||||||
11 | interest in preserving the quality of Lake Michigan, which | |||||||||||||||||||
12 | serves as a drinking water source for millions of State | |||||||||||||||||||
13 | residents and provides irreplaceable recreational, | |||||||||||||||||||
14 | ecological, and economic value to Illinois. | |||||||||||||||||||
15 | (2) CCR generated by the electric generating industry | |||||||||||||||||||
16 | has contaminated, and continues to contaminate, Lake | |||||||||||||||||||
17 | Michigan, and CCR placed in unlined deposits, including | |||||||||||||||||||
18 | deposits outside of CCR surface impoundments as well as in | |||||||||||||||||||
19 | CCR surface impoundments, continues to threaten the | |||||||||||||||||||
20 | quality of Lake Michigan's water. | |||||||||||||||||||
21 | The purpose of this Section is to protect Lake Michigan | |||||||||||||||||||
22 | against further contamination from CCR. | |||||||||||||||||||
23 | (b) All CCR generated by the electric generating industry |
| |||||||
| |||||||
1 | located in a municipality bordering Lake Michigan with greater | ||||||
2 | than 75,000 inhabitants but fewer than 150,000 inhabitants, | ||||||
3 | based on 2020 census data, shall be removed from the site as | ||||||
4 | follows: | ||||||
5 | (1) CCR in all CCR surface impoundments and any CCR | ||||||
6 | deposits for which an adjusted standard has been sought | ||||||
7 | pursuant to Section 28.1 shall be closed by removal, | ||||||
8 | pursuant to the procedures set out in Section 22.59 and | ||||||
9 | implementing regulations under 35 Ill. Adm. Code Part 845, | ||||||
10 | notwithstanding any operating or construction permit | ||||||
11 | application submitted to the Agency or any permit granted | ||||||
12 | by the Agency under Part 845 of Title 35 of the Illinois | ||||||
13 | Administrative Code. Any permit application or permit | ||||||
14 | allowing a CCR surface impoundment subject to this Section | ||||||
15 | to close in place shall be declared void by the Agency. If | ||||||
16 | the owner or operator of any CCR surface impoundment | ||||||
17 | subject to this Section has submitted a construction | ||||||
18 | permit application to the Agency to close a subject CCR | ||||||
19 | surface impoundment by any method other than removal under | ||||||
20 | Part 845 of Title 35 of the Illinois Administrative Code, | ||||||
21 | the owner or operator shall submit an amended construction | ||||||
22 | permit application that complies with the requirements of | ||||||
23 | this Section. | ||||||
24 | (2) The owner or operator of any electric generating | ||||||
25 | unit shall conduct a site investigation sufficient to | ||||||
26 | identify and characterize the scope and extent of all CCR |
| |||||||
| |||||||
1 | placed, stored, or disposed outside of CCR surface | ||||||
2 | impoundments at the facility. Within one year of the | ||||||
3 | effective date of this amendatory Act of the 102nd General | ||||||
4 | Assembly, the owner or operator shall propose the site | ||||||
5 | investigation in a construction permit application | ||||||
6 | following the procedures for construction permits under | ||||||
7 | Section 22.59, subsection (y) of Section 39, and 35 Ill. | ||||||
8 | Adm. Code Part 845. The Agency shall grant, grant with | ||||||
9 | conditions, or deny the permit application in accordance | ||||||
10 | with those procedures within 6 months of receipt of a | ||||||
11 | complete application. If the Agency denies the | ||||||
12 | application, the owner or operators of the electric | ||||||
13 | generating unit must fix all deficiencies identified by | ||||||
14 | the Agency and submit a corrected permit application | ||||||
15 | within 3 months of the denial. | ||||||
16 | (3) The owner or operator must complete the site | ||||||
17 | investigation set out in this subsection (b) within one | ||||||
18 | year of the Agency's issuance of the permit. | ||||||
19 | (4) Within 6 months of completing the site | ||||||
20 | investigation, the owner or operator of an electric | ||||||
21 | generating unit shall submit a construction permit | ||||||
22 | application to the Agency, which shall be evaluated, | ||||||
23 | granted, or denied by the Agency following the procedures | ||||||
24 | for construction permits under Section 22.59, subsection | ||||||
25 | (y) of Section 39, and 35 Ill. Adm. Code Part 845. The | ||||||
26 | Agency may grant such permit application only if it |
| |||||||
| |||||||
1 | proposes to remove all CCR outside of CCR surface | ||||||
2 | impoundments from the site consistent with the procedures | ||||||
3 | set out in 35 Ill. Adm. Code Part 845 for closure by | ||||||
4 | removal. | ||||||
5 | (5) If the Agency grants or denies a permit under this | ||||||
6 | Section, a third party, other than the permit applicant or | ||||||
7 | the Agency, may petition the Board within 35 days from the | ||||||
8 | date of issuance of the Agency's decision, for a hearing | ||||||
9 | to contest the decision of the Agency. If the Board | ||||||
10 | determines that the petition is not duplicative or | ||||||
11 | frivolous, the Board shall hear the petition (i) in | ||||||
12 | accordance with the terms of subsection (a) of Section 40 | ||||||
13 | as well as the procedural rules governing permit appeals, | ||||||
14 | and (ii) exclusively on the basis of the record before the | ||||||
15 | Agency. The burden of proof shall be on the petitioner. | ||||||
16 | (c) Notwithstanding any other provision of law, this | ||||||
17 | Section does not impact any financial obligation arising | ||||||
18 | before the effective date of this amendatory Act of the 102nd | ||||||
19 | General Assembly, including, but not limited to, any financial | ||||||
20 | obligation imposed or impacted by any change to this Act made | ||||||
21 | by Public Act 101-171.
| ||||||
22 | Section 99. Effective date. This Act takes effect upon | ||||||
23 | becoming law.
|