|
| | 102ND GENERAL ASSEMBLY
State of Illinois
2021 and 2022 HB2659 Introduced 2/19/2021, by Rep. Anna Moeller SYNOPSIS AS INTRODUCED: |
| |
Amends the Illinois Power Agency Act. Makes changes in provisions concerning the Illinois Solar for All Program. Provides that the Illinois Power Agency shall make every effort to ensure that small and emerging businesses, particularly those located in low-income and environmental justice communities are able to participate in the Illinois Solar for All Program. Makes changes to incentive programs provided for under the Illinois Solar for All Program. Makes changes in provisions concerning legislative declarations and findings; definitions; and general powers and duties of the Agency. Amends the Public Utilities Act. Provides that the Illinois Commerce Commission shall open an investigation to deliberate, develop, and adopt a renewable energy access plan no later than December 31, 2022. Provides that within 90 days after the effective date of the amendatory Act, the Commission shall open a proceeding to update the interconnection standards and applicable utility tariffs and establish an interconnection working group. Makes changes in provisions concerning net electricity metering; distributed generation rebate; recovery of costs associated with the provision of delivery and other services; and provisions relating to procurement. Amends the Illinois Administrative Procedure Act. Permits the Illinois Commerce Commission to adopt emergency rules. Effective immediately.
|
| |
| | | FISCAL NOTE ACT MAY APPLY | |
| | A BILL FOR |
|
|
| | HB2659 | | LRB102 15746 SPS 21112 b |
|
|
1 | | AN ACT concerning regulation.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 1. Findings. The General Assembly finds that: |
5 | | (a) The growing clean energy economy in Illinois can be a |
6 | | vehicle for expanding equitable access to public health, |
7 | | safety, a cleaner environment, quality jobs, economic |
8 | | opportunity, and wealth-building, particularly in economically |
9 | | disadvantaged communities and communities of black, |
10 | | indigenous, and people of color that have had to bear the |
11 | | disproportionate burden of dirty fossil fuel pollution. |
12 | | (b) Placing Illinois on a path to 100% renewable energy is |
13 | | vital to a clean energy future. To bring this vision to |
14 | | fruition, our energy policy must prioritize a just transition |
15 | | that incentivizes renewable development and other |
16 | | carbon-reducing policies, such as energy efficiency, |
17 | | beneficial electrification, and peak demand reduction, while |
18 | | ensuring that the benefits and opportunities of a carbon-free |
19 | | future are accessible in economically disadvantaged |
20 | | communities, environmental justice communities, and |
21 | | communities of black, indigenous, and people of color. |
22 | | Section 5. The Illinois Administrative Procedure Act is |
23 | | amended by adding Section 5-45.8 as follows: |
|
| | HB2659 | - 2 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (5 ILCS 100/5-45.8 new) |
2 | | Sec. 5-45.8. Emergency rulemaking; Public Utilities Act. |
3 | | To provide for the expeditious and timely implementation of |
4 | | this amendatory Act of the 102nd General Assembly, emergency |
5 | | rules may be adopted in accordance with Section 5-45 by the |
6 | | Illinois Commerce Commission to implement the changes made by |
7 | | this amendatory Act of the 102nd General Assembly to the |
8 | | Public Utilities Act. The adoption of emergency rules |
9 | | authorized by Section 5-45 and this Section is deemed to be |
10 | | necessary for the public interest, safety, and welfare. |
11 | | Section 10. The Illinois Power Agency Act is amended by |
12 | | changing Sections 1-5, 1-10, 1-20, 1-56, and 1-75 as follows: |
13 | | (20 ILCS 3855/1-5) |
14 | | Sec. 1-5. Legislative declarations and findings. The |
15 | | General Assembly finds and declares: |
16 | | (1) The health, welfare, and prosperity of all |
17 | | Illinois residents citizens require the provision of |
18 | | adequate, reliable, affordable, efficient, and |
19 | | environmentally sustainable electric service at the lowest |
20 | | total cost over time, taking into account any benefits of |
21 | | price stability. |
22 | | (1.5) To provide the highest quality of life for the |
23 | | residents of Illinois, and to provide for a clean and |
|
| | HB2659 | - 3 - | LRB102 15746 SPS 21112 b |
|
|
1 | | healthy environment, it is the policy of this State to |
2 | | rapidly transition to 100% renewable energy. |
3 | | (2) (Blank). |
4 | | (3) (Blank). |
5 | | (4) It is necessary to improve the process of |
6 | | procuring electricity to serve Illinois residents, to |
7 | | promote investment in energy efficiency and |
8 | | demand-response measures, and to maintain and support |
9 | | development of clean coal technologies, generation |
10 | | resources that operate at all hours of the day and under |
11 | | all weather conditions, zero emission facilities, and |
12 | | renewable resources. |
13 | | (5) Procuring a diverse electricity supply portfolio |
14 | | will ensure the lowest total cost over time for adequate, |
15 | | reliable, efficient, and environmentally sustainable |
16 | | electric service. |
17 | | (6) Including renewable resources and zero emission |
18 | | credits from zero emission facilities in that portfolio |
19 | | will reduce long-term direct and indirect costs to |
20 | | consumers by decreasing environmental impacts and by |
21 | | avoiding or delaying the need for new generation, |
22 | | transmission, and distribution infrastructure. Developing |
23 | | new renewable energy resources in Illinois, including |
24 | | brownfield solar projects and community solar projects, |
25 | | will help to diversify Illinois electricity supply, avoid |
26 | | and reduce pollution, reduce peak demand, and enhance |
|
| | HB2659 | - 4 - | LRB102 15746 SPS 21112 b |
|
|
1 | | public health and well-being of Illinois residents. |
2 | | (7) Developing community solar projects in Illinois |
3 | | will help to expand access to renewable energy resources |
4 | | to more Illinois residents. |
5 | | (8) Developing brownfield solar projects in Illinois |
6 | | will help return blighted or contaminated land to |
7 | | productive use while enhancing public health and the |
8 | | well-being of Illinois residents , including those in |
9 | | environmental justice communities . |
10 | | (9) Energy efficiency, demand-response measures, zero |
11 | | emission energy, and renewable energy are resources |
12 | | currently underused in Illinois. These resources should be |
13 | | used, when cost effective, to reduce costs to consumers, |
14 | | improve reliability, and improve environmental quality and |
15 | | public health. |
16 | | (10) The State should encourage the use of advanced |
17 | | clean coal technologies that capture and sequester carbon |
18 | | dioxide emissions to advance environmental protection |
19 | | goals and to demonstrate the viability of coal and |
20 | | coal-derived fuels in a carbon-constrained economy. |
21 | | (11) The General Assembly enacted Public Act 96-0795 |
22 | | to reform the State's purchasing processes, recognizing |
23 | | that government procurement is susceptible to abuse if |
24 | | structural and procedural safeguards are not in place to |
25 | | ensure independence, insulation, oversight, and |
26 | | transparency. |
|
| | HB2659 | - 5 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (12) The principles that underlie the procurement |
2 | | reform legislation apply also in the context of power |
3 | | purchasing. |
4 | | (13) To ensure that the benefits of installing |
5 | | renewable resources are available to all Illinois |
6 | | residents and located across the State, subject to |
7 | | appropriation, it is necessary for the Illinois Power |
8 | | Agency to provide public information and educational |
9 | | resources on how residents can benefit from the expansion |
10 | | of renewable energy in Illinois and participate in the |
11 | | Illinois Solar for All Program established in Section 1-56 |
12 | | of this Act, the Adjustable Block Program established in |
13 | | Section 1-75 of this Act, the job training programs |
14 | | established by paragraph (1) of subsection (a) of Section |
15 | | 16-108.12 of the Public Utilities Act, and the programs |
16 | | and resources established by the Clean Jobs Workforce and |
17 | | Contractor Equity Act. |
18 | | The General Assembly therefore finds that it is necessary |
19 | | to create the Illinois Power Agency and that the goals and |
20 | | objectives of that Agency are to accomplish each of the |
21 | | following: |
22 | | (A) Develop electricity procurement plans to ensure |
23 | | adequate, reliable, affordable, efficient, and |
24 | | environmentally sustainable electric service at the lowest |
25 | | total cost over time, taking into account any benefits of |
26 | | price stability, for electric utilities that on December |
|
| | HB2659 | - 6 - | LRB102 15746 SPS 21112 b |
|
|
1 | | 31, 2005 provided electric service to at least 100,000 |
2 | | customers in Illinois and for small multi-jurisdictional |
3 | | electric utilities that (i) on December 31, 2005 served |
4 | | less than 100,000 customers in Illinois and (ii) request a |
5 | | procurement plan for their Illinois jurisdictional load. |
6 | | The procurement plan shall be updated on an annual basis |
7 | | and shall include renewable energy resources and, |
8 | | beginning with the delivery year commencing June 1, 2017, |
9 | | zero emission credits from zero emission facilities |
10 | | sufficient to achieve the standards specified in this Act. |
11 | | (B) Conduct the competitive procurement processes |
12 | | identified in this Act. |
13 | | (C) Develop electric generation and co-generation |
14 | | facilities that use indigenous coal or renewable |
15 | | resources, or both, financed with bonds issued by the |
16 | | Illinois Finance Authority. |
17 | | (D) Supply electricity from the Agency's facilities at |
18 | | cost to one or more of the following: municipal electric |
19 | | systems, governmental aggregators, or rural electric |
20 | | cooperatives in Illinois.
|
21 | | (E) Ensure that the process of power procurement is |
22 | | conducted in an ethical and transparent fashion, immune |
23 | | from improper influence. |
24 | | (F) Continue to review its policies and practices to |
25 | | determine how best to meet its mission of providing the |
26 | | lowest cost power to the greatest number of people, at any |
|
| | HB2659 | - 7 - | LRB102 15746 SPS 21112 b |
|
|
1 | | given point in time, in accordance with applicable law. |
2 | | (G) Operate in a structurally insulated, independent, |
3 | | and transparent fashion so that nothing impedes the |
4 | | Agency's mission to secure power at the best prices the |
5 | | market will bear, provided that the Agency meets all |
6 | | applicable legal requirements. |
7 | | (H) Implement renewable energy procurement and |
8 | | training programs throughout the State to diversify |
9 | | Illinois electricity supply, improve reliability, avoid |
10 | | and reduce pollution, reduce peak demand, and enhance |
11 | | public health and well-being of Illinois residents, |
12 | | including low-income residents. |
13 | | (Source: P.A. 99-906, eff. 6-1-17 .)
|
14 | | (20 ILCS 3855/1-10)
|
15 | | Sec. 1-10. Definitions. |
16 | | "Agency" means the Illinois Power Agency. |
17 | | "Agency loan agreement" means any agreement pursuant to |
18 | | which the Illinois Finance Authority agrees to loan the |
19 | | proceeds of revenue bonds issued with respect to a project to |
20 | | the Agency upon terms providing for loan repayment |
21 | | installments at least sufficient to pay when due all principal |
22 | | of, interest and premium, if any, on those revenue bonds, and |
23 | | providing for maintenance, insurance, and other matters in |
24 | | respect of the project. |
25 | | "Authority" means the Illinois Finance Authority. |
|
| | HB2659 | - 8 - | LRB102 15746 SPS 21112 b |
|
|
1 | | "Brownfield site photovoltaic project" means photovoltaics |
2 | | that are: |
3 | | (1) interconnected to an electric utility as defined |
4 | | in this Section, a municipal utility as defined in this |
5 | | Section, a public utility as defined in Section 3-105 of |
6 | | the Public Utilities Act, or an electric cooperative, as |
7 | | defined in Section 3-119 of the Public Utilities Act; and |
8 | | (2) located at a site that is regulated by any of the |
9 | | following entities under the following programs: |
10 | | (A) the United States Environmental Protection |
11 | | Agency under the federal Comprehensive Environmental |
12 | | Response, Compensation, and Liability Act of 1980, as |
13 | | amended; |
14 | | (B) the United States Environmental Protection |
15 | | Agency under the Corrective Action Program of the |
16 | | federal Resource Conservation and Recovery Act, as |
17 | | amended; |
18 | | (C) the Illinois Environmental Protection Agency |
19 | | under the Illinois Site Remediation Program; or |
20 | | (D) the Illinois Environmental Protection Agency |
21 | | under the Illinois Solid Waste Program. |
22 | | "Clean coal facility" means an electric generating |
23 | | facility that uses primarily coal as a feedstock and that |
24 | | captures and sequesters carbon dioxide emissions at the |
25 | | following levels: at least 50% of the total carbon dioxide |
26 | | emissions that the facility would otherwise emit if, at the |
|
| | HB2659 | - 9 - | LRB102 15746 SPS 21112 b |
|
|
1 | | time construction commences, the facility is scheduled to |
2 | | commence operation before 2016, at least 70% of the total |
3 | | carbon dioxide emissions that the facility would otherwise |
4 | | emit if, at the time construction commences, the facility is |
5 | | scheduled to commence operation during 2016 or 2017, and at |
6 | | least 90% of the total carbon dioxide emissions that the |
7 | | facility would otherwise emit if, at the time construction |
8 | | commences, the facility is scheduled to commence operation |
9 | | after 2017. The power block of the clean coal facility shall |
10 | | not exceed allowable emission rates for sulfur dioxide, |
11 | | nitrogen oxides, carbon monoxide, particulates and mercury for |
12 | | a natural gas-fired combined-cycle facility the same size as |
13 | | and in the same location as the clean coal facility at the time |
14 | | the clean coal facility obtains an approved air permit. All |
15 | | coal used by a clean coal facility shall have high volatile |
16 | | bituminous rank and greater than 1.7 pounds of sulfur per |
17 | | million btu content, unless the clean coal facility does not |
18 | | use gasification technology and was operating as a |
19 | | conventional coal-fired electric generating facility on June |
20 | | 1, 2009 (the effective date of Public Act 95-1027). |
21 | | "Clean coal SNG brownfield facility" means a facility that |
22 | | (1) has commenced construction by July 1, 2015 on an urban |
23 | | brownfield site in a municipality with at least 1,000,000 |
24 | | residents; (2) uses a gasification process to produce |
25 | | substitute natural gas; (3) uses coal as at least 50% of the |
26 | | total feedstock over the term of any sourcing agreement with a |
|
| | HB2659 | - 10 - | LRB102 15746 SPS 21112 b |
|
|
1 | | utility and the remainder of the feedstock may be either |
2 | | petroleum coke or coal, with all such coal having a high |
3 | | bituminous rank and greater than 1.7 pounds of sulfur per |
4 | | million Btu content unless the facility reasonably determines
|
5 | | that it is necessary to use additional petroleum coke to
|
6 | | deliver additional consumer savings, in which case the
|
7 | | facility shall use coal for at least 35% of the total
feedstock |
8 | | over the term of any sourcing agreement; and (4) captures and |
9 | | sequesters at least 85% of the total carbon dioxide emissions |
10 | | that the facility would otherwise emit. |
11 | | "Clean coal SNG facility" means a facility that uses a |
12 | | gasification process to produce substitute natural gas, that |
13 | | sequesters at least 90% of the total carbon dioxide emissions |
14 | | that the facility would otherwise emit, that uses at least 90% |
15 | | coal as a feedstock, with all such coal having a high |
16 | | bituminous rank and greater than 1.7 pounds of sulfur per |
17 | | million btu content, and that has a valid and effective permit |
18 | | to construct emission sources and air pollution control |
19 | | equipment and approval with respect to the federal regulations |
20 | | for Prevention of Significant Deterioration of Air Quality |
21 | | (PSD) for the plant pursuant to the federal Clean Air Act; |
22 | | provided, however, a clean coal SNG brownfield facility shall |
23 | | not be a clean coal SNG facility. |
24 | | "Commission" means the Illinois Commerce Commission. |
25 | | "Community renewable generation project" means an electric |
26 | | generating facility that: |
|
| | HB2659 | - 11 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (1) is powered by wind, solar thermal energy, |
2 | | photovoltaic cells or panels, biodiesel, crops and |
3 | | untreated and unadulterated organic waste biomass, tree |
4 | | waste, and hydropower that does not involve new |
5 | | construction or significant expansion of hydropower dams; |
6 | | (2) is interconnected at the distribution system level |
7 | | of an electric utility as defined in this Section, a |
8 | | municipal utility as defined in this Section that owns or |
9 | | operates electric distribution facilities, a public |
10 | | utility as defined in Section 3-105 of the Public |
11 | | Utilities Act, or an electric cooperative, as defined in |
12 | | Section 3-119 of the Public Utilities Act; |
13 | | (3) credits the value of electricity generated by the |
14 | | facility to the subscribers of the facility; and |
15 | | (4) is limited in nameplate capacity to less than or |
16 | | equal to 5,000 2,000 kilowatts. |
17 | | "Costs incurred in connection with the development and |
18 | | construction of a facility" means: |
19 | | (1) the cost of acquisition of all real property, |
20 | | fixtures, and improvements in connection therewith and |
21 | | equipment, personal property, and other property, rights, |
22 | | and easements acquired that are deemed necessary for the |
23 | | operation and maintenance of the facility; |
24 | | (2) financing costs with respect to bonds, notes, and |
25 | | other evidences of indebtedness of the Agency; |
26 | | (3) all origination, commitment, utilization, |
|
| | HB2659 | - 12 - | LRB102 15746 SPS 21112 b |
|
|
1 | | facility, placement, underwriting, syndication, credit |
2 | | enhancement, and rating agency fees; |
3 | | (4) engineering, design, procurement, consulting, |
4 | | legal, accounting, title insurance, survey, appraisal, |
5 | | escrow, trustee, collateral agency, interest rate hedging, |
6 | | interest rate swap, capitalized interest, contingency, as |
7 | | required by lenders, and other financing costs, and other |
8 | | expenses for professional services; and |
9 | | (5) the costs of plans, specifications, site study and |
10 | | investigation, installation, surveys, other Agency costs |
11 | | and estimates of costs, and other expenses necessary or |
12 | | incidental to determining the feasibility of any project, |
13 | | together with such other expenses as may be necessary or |
14 | | incidental to the financing, insuring, acquisition, and |
15 | | construction of a specific project and starting up, |
16 | | commissioning, and placing that project in operation. |
17 | | "Delivery services" has the same definition as found in |
18 | | Section 16-102 of the Public Utilities Act. |
19 | | "Delivery year" means the consecutive 12-month period |
20 | | beginning June 1 of a given year and ending May 31 of the |
21 | | following year. |
22 | | "Department" means the Department of Commerce and Economic |
23 | | Opportunity. |
24 | | "Director" means the Director of the Illinois Power |
25 | | Agency. |
26 | | "Demand-response" means measures that decrease peak |
|
| | HB2659 | - 13 - | LRB102 15746 SPS 21112 b |
|
|
1 | | electricity demand or shift demand from peak to off-peak |
2 | | periods. |
3 | | "Distributed renewable energy generation device" means a |
4 | | device that is: |
5 | | (1) powered by wind, solar thermal energy, |
6 | | photovoltaic cells or panels, biodiesel, crops and |
7 | | untreated and unadulterated organic waste biomass, tree |
8 | | waste, and hydropower that does not involve new |
9 | | construction or significant expansion of hydropower dams; |
10 | | (2) interconnected at the distribution system level of |
11 | | either an electric utility as defined in this Section, a |
12 | | municipal utility as defined in this Section that owns or |
13 | | operates electric distribution facilities, or a rural |
14 | | electric cooperative as defined in Section 3-119 of the |
15 | | Public Utilities Act; |
16 | | (3) located on the customer side of the customer's |
17 | | electric meter and is primarily used to offset that |
18 | | customer's electricity load; and |
19 | | (4) limited in nameplate capacity to less than or |
20 | | equal to 2,000 kilowatts. |
21 | | "Energy efficiency" means measures that reduce the amount |
22 | | of electricity or natural gas consumed in order to achieve a |
23 | | given end use. "Energy efficiency" includes voltage |
24 | | optimization measures that optimize the voltage at points on |
25 | | the electric distribution voltage system and thereby reduce |
26 | | electricity consumption by electric customers' end use |
|
| | HB2659 | - 14 - | LRB102 15746 SPS 21112 b |
|
|
1 | | devices. "Energy efficiency" also includes measures that |
2 | | reduce the total Btus of electricity, natural gas, and other |
3 | | fuels needed to meet the end use or uses. |
4 | | "Electric utility" has the same definition as found in |
5 | | Section 16-102 of the Public Utilities Act. |
6 | | "Facility" means an electric generating unit or a |
7 | | co-generating unit that produces electricity along with |
8 | | related equipment necessary to connect the facility to an |
9 | | electric transmission or distribution system. |
10 | | "Governmental aggregator" means one or more units of local |
11 | | government that individually or collectively procure |
12 | | electricity to serve residential retail electrical loads |
13 | | located within its or their jurisdiction. |
14 | | "Local government" means a unit of local government as |
15 | | defined in Section 1 of Article VII of the Illinois |
16 | | Constitution. |
17 | | "Municipality" means a city, village, or incorporated |
18 | | town. |
19 | | "Municipal utility" means a public utility owned and |
20 | | operated by any subdivision or municipal corporation of this |
21 | | State. |
22 | | "Nameplate capacity" means the aggregate inverter |
23 | | nameplate capacity in kilowatts AC. |
24 | | "Person" means any natural person, firm, partnership, |
25 | | corporation, either domestic or foreign, company, association, |
26 | | limited liability company, joint stock company, or association |
|
| | HB2659 | - 15 - | LRB102 15746 SPS 21112 b |
|
|
1 | | and includes any trustee, receiver, assignee, or personal |
2 | | representative thereof. |
3 | | "Project" means the planning, bidding, and construction of |
4 | | a facility. |
5 | | "Public utility" has the same definition as found in |
6 | | Section 3-105 of the Public Utilities Act. |
7 | | "Real property" means any interest in land together with |
8 | | all structures, fixtures, and improvements thereon, including |
9 | | lands under water and riparian rights, any easements, |
10 | | covenants, licenses, leases, rights-of-way, uses, and other |
11 | | interests, together with any liens, judgments, mortgages, or |
12 | | other claims or security interests related to real property. |
13 | | "Renewable energy credit" means a tradable credit that |
14 | | represents the environmental attributes of one megawatt hour |
15 | | of energy produced from a renewable energy resource. |
16 | | "Renewable energy resources" includes energy and its |
17 | | associated renewable energy credit or renewable energy credits |
18 | | from wind, solar thermal energy, photovoltaic cells and |
19 | | panels, biodiesel, anaerobic digestion, crops and untreated |
20 | | and unadulterated organic waste biomass, tree waste, and |
21 | | hydropower that does not involve new construction or |
22 | | significant expansion of hydropower dams. For purposes of this |
23 | | Act, landfill gas produced in the State is considered a |
24 | | renewable energy resource. "Renewable energy resources" does |
25 | | not include the incineration or burning of tires, garbage, |
26 | | general household, institutional, and commercial waste, |
|
| | HB2659 | - 16 - | LRB102 15746 SPS 21112 b |
|
|
1 | | industrial lunchroom or office waste, landscape waste other |
2 | | than tree waste , railroad crossties, utility poles, or |
3 | | construction or demolition debris, other than untreated and |
4 | | unadulterated waste wood. |
5 | | "Retail customer" has the same definition as found in |
6 | | Section 16-102 of the Public Utilities Act. |
7 | | "Revenue bond" means any bond, note, or other evidence of |
8 | | indebtedness issued by the Authority, the principal and |
9 | | interest of which is payable solely from revenues or income |
10 | | derived from any project or activity of the Agency. |
11 | | "Sequester" means permanent storage of carbon dioxide by |
12 | | injecting it into a saline aquifer, a depleted gas reservoir, |
13 | | or an oil reservoir, directly or through an enhanced oil |
14 | | recovery process that may involve intermediate storage, |
15 | | regardless of whether these activities are conducted by a |
16 | | clean coal facility, a clean coal SNG facility, a clean coal |
17 | | SNG brownfield facility, or a party with which a clean coal |
18 | | facility, clean coal SNG facility, or clean coal SNG |
19 | | brownfield facility has contracted for such purposes. |
20 | | "Service area" has the same definition as found in Section |
21 | | 16-102 of the Public Utilities Act. |
22 | | "Sourcing agreement" means (i) in the case of an electric |
23 | | utility, an agreement between the owner of a clean coal |
24 | | facility and such electric utility, which agreement shall have |
25 | | terms and conditions meeting the requirements of paragraph (3) |
26 | | of subsection (d) of Section 1-75, (ii) in the case of an |
|
| | HB2659 | - 17 - | LRB102 15746 SPS 21112 b |
|
|
1 | | alternative retail electric supplier, an agreement between the |
2 | | owner of a clean coal facility and such alternative retail |
3 | | electric supplier, which agreement shall have terms and |
4 | | conditions meeting the requirements of Section 16-115(d)(5) of |
5 | | the Public Utilities Act, and (iii) in case of a gas utility, |
6 | | an agreement between the owner of a clean coal SNG brownfield |
7 | | facility and the gas utility, which agreement shall have the |
8 | | terms and conditions meeting the requirements of subsection |
9 | | (h-1) of Section 9-220 of the Public Utilities Act. |
10 | | "Subscriber" means a person who (i) takes delivery service |
11 | | from an electric utility, and (ii) has a subscription of no |
12 | | less than 200 watts to a community renewable generation |
13 | | project that is located in the electric utility's service |
14 | | area. No subscriber's subscriptions may total more than 40% of |
15 | | the nameplate capacity of an individual community renewable |
16 | | generation project. Entities that are affiliated by virtue of |
17 | | a common parent shall not represent multiple subscriptions |
18 | | that total more than 40% of the nameplate capacity of an |
19 | | individual community renewable generation project. |
20 | | "Subscription" means an interest in a community renewable |
21 | | generation project expressed in kilowatts, which is sized |
22 | | primarily to offset part or all of the subscriber's |
23 | | electricity usage. |
24 | | "Substitute natural gas" or "SNG" means a gas manufactured |
25 | | by gasification of hydrocarbon feedstock, which is |
26 | | substantially interchangeable in use and distribution with |
|
| | HB2659 | - 18 - | LRB102 15746 SPS 21112 b |
|
|
1 | | conventional natural gas.
|
2 | | "Total resource cost test" or "TRC test" means a standard |
3 | | that is met if, for an investment in energy efficiency or |
4 | | demand-response measures, the benefit-cost ratio is greater |
5 | | than one. The benefit-cost ratio is the ratio of the net |
6 | | present value of the total benefits of the program to the net |
7 | | present value of the total costs as calculated over the |
8 | | lifetime of the measures. A total resource cost test compares |
9 | | the sum of avoided electric utility costs, representing the |
10 | | benefits that accrue to the system and the participant in the |
11 | | delivery of those efficiency measures and including avoided |
12 | | costs associated with reduced use of natural gas or other |
13 | | fuels, avoided costs associated with reduced water |
14 | | consumption, and avoided costs associated with reduced |
15 | | operation and maintenance costs, as well as other quantifiable |
16 | | societal benefits, to the sum of all incremental costs of |
17 | | end-use measures that are implemented due to the program |
18 | | (including both utility and participant contributions), plus |
19 | | costs to administer, deliver, and evaluate each demand-side |
20 | | program, to quantify the net savings obtained by substituting |
21 | | the demand-side program for supply resources. In calculating |
22 | | avoided costs of power and energy that an electric utility |
23 | | would otherwise have had to acquire, reasonable estimates |
24 | | shall be included of financial costs likely to be imposed by |
25 | | future regulations and legislation on emissions of greenhouse |
26 | | gases. In discounting future societal costs and benefits for |
|
| | HB2659 | - 19 - | LRB102 15746 SPS 21112 b |
|
|
1 | | the purpose of calculating net present values, a societal |
2 | | discount rate based on actual, long-term Treasury bond yields |
3 | | should be used. Notwithstanding anything to the contrary, the |
4 | | TRC test shall not include or take into account a calculation |
5 | | of market price suppression effects or demand reduction |
6 | | induced price effects. |
7 | | "Utility-scale solar project" means an electric generating |
8 | | facility that: |
9 | | (1) generates electricity using photovoltaic cells; |
10 | | and |
11 | | (2) has a nameplate capacity that is greater than |
12 | | 2,000 kilowatts. |
13 | | "Utility-scale wind project" means an electric generating |
14 | | facility that: |
15 | | (1) generates electricity using wind; and |
16 | | (2) has a nameplate capacity that is greater than |
17 | | 2,000 kilowatts. |
18 | | "Zero emission credit" means a tradable credit that |
19 | | represents the environmental attributes of one megawatt hour |
20 | | of energy produced from a zero emission facility. |
21 | | "Zero emission facility" means a facility that: (1) is |
22 | | fueled by nuclear power; and (2) is interconnected with PJM |
23 | | Interconnection, LLC or the Midcontinent Independent System |
24 | | Operator, Inc., or their successors. |
25 | | (Source: P.A. 98-90, eff. 7-15-13; 99-906, eff. 6-1-17 .)
|
|
| | HB2659 | - 20 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (20 ILCS 3855/1-20) |
2 | | Sec. 1-20. General powers and duties of the Agency. |
3 | | (a) The Agency is authorized to do each of the following: |
4 | | (1) Develop electricity procurement plans to ensure |
5 | | adequate, reliable, affordable, efficient, and |
6 | | environmentally sustainable electric service at the lowest |
7 | | total cost over time, taking into account any benefits of |
8 | | price stability, for electric utilities that on December |
9 | | 31, 2005 provided electric service to at least 100,000 |
10 | | customers in Illinois and for small multi-jurisdictional |
11 | | electric utilities that (A) on December 31, 2005 served |
12 | | less than 100,000 customers in Illinois and (B) request a |
13 | | procurement plan for their Illinois jurisdictional load. |
14 | | Except as provided in paragraph (1.5) of this subsection |
15 | | (a), the electricity procurement plans shall be updated on |
16 | | an annual basis and shall include electricity generated |
17 | | from renewable resources sufficient to achieve the |
18 | | standards specified in this Act. Beginning with the |
19 | | delivery year commencing June 1, 2017, develop procurement |
20 | | plans to include zero emission credits generated from zero |
21 | | emission facilities sufficient to achieve the standards |
22 | | specified in this Act. Beginning with the procurement for |
23 | | the delivery year commencing June 1, 2022, the Agency |
24 | | shall for each year develop a plan, as part of its |
25 | | procurement plan, to conduct a procurement of capacity |
26 | | from qualified resources needed to meet capacity |
|
| | HB2659 | - 21 - | LRB102 15746 SPS 21112 b |
|
|
1 | | requirements of the retail customers of electric utilities |
2 | | that serve more than 3,000,000 retail customers and are |
3 | | located in the PJM Interconnection, subject to the open |
4 | | access tariff and manuals of PJM Interconnection and |
5 | | approved by the Federal Energy Regulatory Commission. The |
6 | | capacity procurement plan shall be updated annually and |
7 | | shall include electricity generated from renewable |
8 | | resources sufficient to achieve the renewable portfolio |
9 | | standards as specified in this Act. |
10 | | (1.5) Develop a long-term renewable resources |
11 | | procurement plan in accordance with subsection (c) of |
12 | | Section 1-75 of this Act for renewable energy credits in |
13 | | amounts sufficient to achieve the standards specified in |
14 | | this Act for delivery years commencing June 1, 2017 and |
15 | | for the programs and renewable energy credits specified in |
16 | | Section 1-56 of this Act. Electricity procurement plans |
17 | | for delivery years commencing after May 31, 2017, shall |
18 | | not include procurement of renewable energy resources. |
19 | | (2) Conduct competitive procurement processes to |
20 | | procure the supply resources identified in the electricity |
21 | | procurement plan, pursuant to Section 16-111.5 of the |
22 | | Public Utilities Act, and, for the delivery year |
23 | | commencing June 1, 2017, conduct procurement processes to |
24 | | procure zero emission credits from zero emission |
25 | | facilities, under subsection (d-5) of Section 1-75 of this |
26 | | Act. |
|
| | HB2659 | - 22 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (2.5) Beginning with the procurement for the 2017 |
2 | | delivery year, conduct competitive procurement processes |
3 | | and implement programs to procure renewable energy credits |
4 | | identified in the long-term renewable resources |
5 | | procurement plan developed and approved under subsection |
6 | | (c) of Section 1-75 of this Act and Section 16-111.5 of the |
7 | | Public Utilities Act. |
8 | | (3) Develop electric generation and co-generation |
9 | | facilities that use indigenous coal or renewable |
10 | | resources, or both, financed with bonds issued by the |
11 | | Illinois Finance Authority. |
12 | | (4) Supply electricity from the Agency's facilities at |
13 | | cost to one or more of the following: municipal electric |
14 | | systems, governmental aggregators, or rural electric |
15 | | cooperatives in Illinois. |
16 | | (b) Except as otherwise limited by this Act, the Agency |
17 | | has all of the powers necessary or convenient to carry out the |
18 | | purposes and provisions of this Act, including without |
19 | | limitation, each of the following: |
20 | | (1) To have a corporate seal, and to alter that seal at |
21 | | pleasure, and to use it by causing it or a facsimile to be |
22 | | affixed or impressed or reproduced in any other manner. |
23 | | (2) To use the services of the Illinois Finance |
24 | | Authority necessary to carry out the Agency's purposes. |
25 | | (3) To negotiate and enter into loan agreements and |
26 | | other agreements with the Illinois Finance Authority. |
|
| | HB2659 | - 23 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (4) To obtain and employ personnel and hire |
2 | | consultants that are necessary to fulfill the Agency's |
3 | | purposes, and to make expenditures for that purpose within |
4 | | the appropriations for that purpose. |
5 | | (5) To purchase, receive, take by grant, gift, devise, |
6 | | bequest, or otherwise, lease, or otherwise acquire, own, |
7 | | hold, improve, employ, use, and otherwise deal in and |
8 | | with, real or personal property whether tangible or |
9 | | intangible, or any interest therein, within the State. |
10 | | (6) To acquire real or personal property, whether |
11 | | tangible or intangible, including without limitation |
12 | | property rights, interests in property, franchises, |
13 | | obligations, contracts, and debt and equity securities, |
14 | | and to do so by the exercise of the power of eminent domain |
15 | | in accordance with Section 1-21; except that any real |
16 | | property acquired by the exercise of the power of eminent |
17 | | domain must be located within the State. |
18 | | (7) To sell, convey, lease, exchange, transfer, |
19 | | abandon, or otherwise dispose of, or mortgage, pledge, or |
20 | | create a security interest in, any of its assets, |
21 | | properties, or any interest therein, wherever situated. |
22 | | (8) To purchase, take, receive, subscribe for, or |
23 | | otherwise acquire, hold, make a tender offer for, vote, |
24 | | employ, sell, lend, lease, exchange, transfer, or |
25 | | otherwise dispose of, mortgage, pledge, or grant a |
26 | | security interest in, use, and otherwise deal in and with, |
|
| | HB2659 | - 24 - | LRB102 15746 SPS 21112 b |
|
|
1 | | bonds and other obligations, shares, or other securities |
2 | | (or interests therein) issued by others, whether engaged |
3 | | in a similar or different business or activity. |
4 | | (9) To make and execute agreements, contracts, and |
5 | | other instruments necessary or convenient in the exercise |
6 | | of the powers and functions of the Agency under this Act, |
7 | | including contracts with any person, including personal |
8 | | service contracts, or with any local government, State |
9 | | agency, or other entity; and all State agencies and all |
10 | | local governments are authorized to enter into and do all |
11 | | things necessary to perform any such agreement, contract, |
12 | | or other instrument with the Agency. No such agreement, |
13 | | contract, or other instrument shall exceed 40 years. |
14 | | (10) To lend money, invest and reinvest its funds in |
15 | | accordance with the Public Funds Investment Act, and take |
16 | | and hold real and personal property as security for the |
17 | | payment of funds loaned or invested. |
18 | | (11) To borrow money at such rate or rates of interest |
19 | | as the Agency may determine, issue its notes, bonds, or |
20 | | other obligations to evidence that indebtedness, and |
21 | | secure any of its obligations by mortgage or pledge of its |
22 | | real or personal property, machinery, equipment, |
23 | | structures, fixtures, inventories, revenues, grants, and |
24 | | other funds as provided or any interest therein, wherever |
25 | | situated. |
26 | | (12) To enter into agreements with the Illinois |
|
| | HB2659 | - 25 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Finance Authority to issue bonds whether or not the income |
2 | | therefrom is exempt from federal taxation. |
3 | | (13) To procure insurance against any loss in |
4 | | connection with its properties or operations in such |
5 | | amount or amounts and from such insurers, including the |
6 | | federal government, as it may deem necessary or desirable, |
7 | | and to pay any premiums therefor. |
8 | | (14) To negotiate and enter into agreements with |
9 | | trustees or receivers appointed by United States |
10 | | bankruptcy courts or federal district courts or in other |
11 | | proceedings involving adjustment of debts and authorize |
12 | | proceedings involving adjustment of debts and authorize |
13 | | legal counsel for the Agency to appear in any such |
14 | | proceedings. |
15 | | (15) To file a petition under Chapter 9 of Title 11 of |
16 | | the United States Bankruptcy Code or take other similar |
17 | | action for the adjustment of its debts. |
18 | | (16) To enter into management agreements for the |
19 | | operation of any of the property or facilities owned by |
20 | | the Agency. |
21 | | (17) To enter into an agreement to transfer and to |
22 | | transfer any land, facilities, fixtures, or equipment of |
23 | | the Agency to one or more municipal electric systems, |
24 | | governmental aggregators, or rural electric agencies or |
25 | | cooperatives, for such consideration and upon such terms |
26 | | as the Agency may determine to be in the best interest of |
|
| | HB2659 | - 26 - | LRB102 15746 SPS 21112 b |
|
|
1 | | the residents citizens of Illinois. |
2 | | (18) To enter upon any lands and within any building |
3 | | whenever in its judgment it may be necessary for the |
4 | | purpose of making surveys and examinations to accomplish |
5 | | any purpose authorized by this Act. |
6 | | (19) To maintain an office or offices at such place or |
7 | | places in the State as it may determine. |
8 | | (20) To request information, and to make any inquiry, |
9 | | investigation, survey, or study that the Agency may deem |
10 | | necessary to enable it effectively to carry out the |
11 | | provisions of this Act. |
12 | | (21) To accept and expend appropriations. |
13 | | (22) To engage in any activity or operation that is |
14 | | incidental to and in furtherance of efficient operation to |
15 | | accomplish the Agency's purposes, including hiring |
16 | | employees that the Director deems essential for the |
17 | | operations of the Agency. |
18 | | (23) To adopt, revise, amend, and repeal rules with |
19 | | respect to its operations, properties, and facilities as |
20 | | may be necessary or convenient to carry out the purposes |
21 | | of this Act, subject to the provisions of the Illinois |
22 | | Administrative Procedure Act and Sections 1-22 and 1-35 of |
23 | | this Act. |
24 | | (24) To establish and collect charges and fees as |
25 | | described in this Act.
|
26 | | (25) To conduct competitive gasification feedstock |
|
| | HB2659 | - 27 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement processes to procure the feedstocks for the |
2 | | clean coal SNG brownfield facility in accordance with the |
3 | | requirements of Section 1-78 of this Act. |
4 | | (26) To review, revise, and approve sourcing |
5 | | agreements and mediate and resolve disputes between gas |
6 | | utilities and the clean coal SNG brownfield facility |
7 | | pursuant to subsection (h-1) of Section 9-220 of the |
8 | | Public Utilities Act. |
9 | | (27) To request, review and accept proposals, execute |
10 | | contracts, purchase renewable energy credits and otherwise |
11 | | dedicate funds from the Illinois Power Agency Renewable |
12 | | Energy Resources Fund to create and carry out the |
13 | | objectives of the Illinois Solar for All program in |
14 | | accordance with Section 1-56 of this Act. |
15 | | (Source: P.A. 99-906, eff. 6-1-17 .) |
16 | | (20 ILCS 3855/1-56) |
17 | | Sec. 1-56. Illinois Power Agency Renewable Energy |
18 | | Resources Fund; Illinois Solar for All Program. |
19 | | (a) The Illinois Power Agency Renewable Energy Resources |
20 | | Fund is created as a special fund in the State treasury. |
21 | | (b) The Illinois Power Agency Renewable Energy Resources |
22 | | Fund shall be administered by the Agency as described in this |
23 | | subsection (b), provided that the changes to this subsection |
24 | | (b) made by this amendatory Act of the 99th General Assembly |
25 | | shall not interfere with existing contracts under this |
|
| | HB2659 | - 28 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Section. |
2 | | (1) The Illinois Power Agency Renewable Energy |
3 | | Resources Fund shall be used to purchase renewable energy |
4 | | credits according to any approved procurement plan |
5 | | developed by the Agency prior to June 1, 2017. |
6 | | (2) The Illinois Power Agency Renewable Energy |
7 | | Resources Fund shall also be used to create the Illinois |
8 | | Solar for All Program, which shall include incentives for |
9 | | low-income distributed generation and community solar |
10 | | projects, and other associated approved expenditures. The |
11 | | objectives of the Illinois Solar for All Program are to |
12 | | bring photovoltaics to low-income communities in this |
13 | | State in a manner that maximizes the development of new |
14 | | photovoltaic generating facilities, to create a long-term, |
15 | | low-income solar marketplace throughout this State, to |
16 | | integrate, through interaction with stakeholders, with |
17 | | existing energy efficiency initiatives, and to minimize |
18 | | administrative costs. The Agency shall strive to ensure |
19 | | that renewable energy credits procured through the |
20 | | Illinois Solar for All Program and each of its subprograms |
21 | | are purchased from projects across the breadth of |
22 | | low-income and environmental justice communities in |
23 | | Illinois, including both urban and rural communities, and |
24 | | are neither concentrated in a few communities nor |
25 | | excluding particular low-income or environmental justice |
26 | | communities. The Agency shall include a description of its |
|
| | HB2659 | - 29 - | LRB102 15746 SPS 21112 b |
|
|
1 | | proposed approach to the design, administration, |
2 | | implementation and evaluation of the Illinois Solar for |
3 | | All Program, as part of the long-term renewable resources |
4 | | procurement plan authorized by subsection (c) of Section |
5 | | 1-75 of this Act, and the program shall be designed to grow |
6 | | the low-income solar market. The Agency or utility, as |
7 | | applicable, shall purchase renewable energy credits from |
8 | | the (i) photovoltaic distributed renewable energy |
9 | | generation projects and (ii) community solar projects that |
10 | | are procured under procurement processes authorized by the |
11 | | long-term renewable resources procurement plans approved |
12 | | by the Commission. |
13 | | The Illinois Solar for All Program shall include the |
14 | | program offerings described in subparagraphs (A) through |
15 | | (E) (D) of this paragraph (2), which the Agency shall |
16 | | implement through contracts with third-party providers |
17 | | and, subject to appropriation, pay the approximate amounts |
18 | | identified using monies available in the Illinois Power |
19 | | Agency Renewable Energy Resources Fund. Each contract that |
20 | | provides for the installation of solar facilities shall |
21 | | provide that the solar facilities will produce energy and |
22 | | economic benefits, at a level determined by the Agency to |
23 | | be reasonable, for the participating low income customers. |
24 | | The monies available in the Illinois Power Agency |
25 | | Renewable Energy Resources Fund and not otherwise |
26 | | committed to contracts executed under subsection (i) of |
|
| | HB2659 | - 30 - | LRB102 15746 SPS 21112 b |
|
|
1 | | this Section shall be allocated among the programs |
2 | | described in this paragraph (2), as follows: 22.5% of |
3 | | these funds shall be allocated to programs described in |
4 | | subparagraphs subparagraph (A) and (E) of this paragraph |
5 | | (2), 37.5% of these funds shall be allocated to programs |
6 | | described in subparagraph (B) of this paragraph (2), 15% |
7 | | of these funds shall be allocated to programs described in |
8 | | subparagraph (C) of this paragraph (2), and 25% of these |
9 | | funds, but in no event more than $50,000,000, shall be |
10 | | allocated to programs described in subparagraph (D) of |
11 | | this paragraph (2). The allocation of funds among |
12 | | subparagraphs (A), (B), or (C) , and (E) of this paragraph |
13 | | (2) may be changed if the Agency or administrator, through |
14 | | delegated authority, determines incentives in subparagraph |
15 | | subparagraphs (A), (B), or (C) , or (E) of this paragraph |
16 | | (2) have not been adequately subscribed to fully utilize |
17 | | the Illinois Power Agency Renewable Energy Resources Fund. |
18 | | The determination of reallocation shall include |
19 | | consideration of input obtained input through a |
20 | | stakeholder process. The program offerings described in |
21 | | subparagraphs (A) through (E) (D) of this paragraph (2) |
22 | | shall also be implemented through contracts funded from |
23 | | such additional amounts as are allocated to one or more of |
24 | | the programs in the long-term renewable resources |
25 | | procurement plans as specified in subsection (c) of |
26 | | Section 1-75 of this Act and subparagraph (O) of paragraph |
|
| | HB2659 | - 31 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (1) of such subsection (c). |
2 | | Contracts that will be paid with funds in the Illinois |
3 | | Power Agency Renewable Energy Resources Fund shall be |
4 | | executed by the Agency. Contracts that will be paid with |
5 | | funds collected by an electric utility shall be executed |
6 | | by the electric utility. |
7 | | Contracts under the Illinois Solar for All Program |
8 | | shall include an approach, as set forth in the long-term |
9 | | renewable resources procurement plans, to ensure the |
10 | | wholesale market value of the energy is credited to |
11 | | participating low-income customers or organizations and to |
12 | | ensure tangible economic benefits flow directly to program |
13 | | participants, except in the case of low-income |
14 | | multi-family housing where the low-income customer does |
15 | | not directly pay for energy. Priority shall be given to |
16 | | projects that demonstrate meaningful involvement of |
17 | | low-income community members in designing the initial |
18 | | proposals. Acceptable proposals to implement projects must |
19 | | demonstrate the applicant's ability to conduct initial |
20 | | community outreach, education, and recruitment of |
21 | | low-income participants in the community. Projects must |
22 | | include job training opportunities if available, and shall |
23 | | endeavor to coordinate with the job training programs |
24 | | described in paragraph (1) of subsection (a) of Section |
25 | | 16-108.12 of the Public Utilities Act. |
26 | | The Agency shall make every effort to ensure that |
|
| | HB2659 | - 32 - | LRB102 15746 SPS 21112 b |
|
|
1 | | small and emerging businesses, particularly those located |
2 | | in low-income and environmental justice communities are |
3 | | able to participate in the Illinois Solar for All Program. |
4 | | These efforts may include, but shall not be limited to, |
5 | | proactive support from the program administrator, |
6 | | different or preferred access to subprograms and |
7 | | administrator-identified customers or grassroots |
8 | | education provider-identified customers, and different |
9 | | incentive levels. The Agency shall report on progress and |
10 | | barriers to participation of small and emerging businesses |
11 | | in the Illinois Solar for All Program at least once a year. |
12 | | The report shall be made available on the Agency's website |
13 | | and, in years when the Agency is updating its long-term |
14 | | renewable resources procurement plan, included in that |
15 | | plan. |
16 | | (A) Low-income single-family and small multifamily |
17 | | solar distributed generation incentive. This program |
18 | | will provide incentives to low-income customers, |
19 | | either directly or through solar providers, to |
20 | | increase the participation of low-income households in |
21 | | photovoltaic on-site distributed generation at |
22 | | residential buildings containing one to 4 units . |
23 | | Companies participating in this program that install |
24 | | solar panels shall commit to hiring job trainees for a |
25 | | portion of their low-income installations, and an |
26 | | administrator shall facilitate partnering the |
|
| | HB2659 | - 33 - | LRB102 15746 SPS 21112 b |
|
|
1 | | companies that install solar panels with entities that |
2 | | provide solar panel installation job training. It is a |
3 | | goal of this program that a minimum of 25% of the |
4 | | incentives for this program be allocated to projects |
5 | | located within environmental justice communities. The |
6 | | Agency shall reserve a portion of this program for |
7 | | projects that promote energy sovereignty through |
8 | | ownership of projects by low-income households, |
9 | | not-for-profit organizations providing services to |
10 | | low-income households, affordable housing owners, or |
11 | | community-based limited liability companies providing |
12 | | services to low-income households. To count as |
13 | | promoting energy sovereignty, 49% of the ownership |
14 | | interest of the project must be held by low-income |
15 | | households, not-for-profit organizations providing |
16 | | direct services to low-income households, affordable |
17 | | housing owners, or community-based limited liability |
18 | | companies providing services to low-income households, |
19 | | by no later than 6 years after the device is |
20 | | interconnected at the distribution system level of the |
21 | | utility and energized. Incentives for projects that |
22 | | promote energy sovereignty may be higher than |
23 | | incentives for equivalent projects that do not promote |
24 | | energy sovereignty under this same program. Contracts |
25 | | entered into under this paragraph may be entered into |
26 | | with an entity that will develop and administer the |
|
| | HB2659 | - 34 - | LRB102 15746 SPS 21112 b |
|
|
1 | | program and shall also include contracts for renewable |
2 | | energy credits from the photovoltaic distributed |
3 | | generation that is the subject of the program, as set |
4 | | forth in the long-term renewable resources procurement |
5 | | plan. |
6 | | (B) Low-Income Community Solar Project Initiative. |
7 | | Incentives shall be offered to low-income customers, |
8 | | either directly or through developers, to increase the |
9 | | participation of low-income subscribers of community |
10 | | solar projects. The developer of each project shall |
11 | | identify its partnership with community stakeholders |
12 | | regarding the location, development, and participation |
13 | | in the project, provided that nothing shall preclude a |
14 | | project from including an anchor tenant that does not |
15 | | qualify as low-income . Incentives should also be |
16 | | offered to community solar projects that are 100% |
17 | | low-income subscriber owned, which includes low-income |
18 | | households, not-for-profit organizations, and |
19 | | affordable housing owners . Companies participating in |
20 | | this program that develop or install solar projects |
21 | | shall commit to hiring job trainees for a portion of |
22 | | their low-income installations, and an administrator |
23 | | shall facilitate partnering the companies that install |
24 | | solar projects with entities that provide solar |
25 | | installation and related job training. It is a goal of |
26 | | this program that a minimum of 25% of the incentives |
|
| | HB2659 | - 35 - | LRB102 15746 SPS 21112 b |
|
|
1 | | for this program be allocated to community |
2 | | photovoltaic projects in environmental justice |
3 | | communities. The Agency shall reserve a portion of |
4 | | this program for projects that promote energy |
5 | | sovereignty through ownership of projects by |
6 | | low-income households, not-for-profit organizations |
7 | | providing services to low-income households, |
8 | | affordable housing owners, or community-based limited |
9 | | liability companies providing services to low-income |
10 | | households. To count as promoting energy sovereignty, |
11 | | 49% of the ownership interest of the project must be |
12 | | held by low-income subscribers, not-for-profit |
13 | | organizations providing direct services to low-income |
14 | | households, affordable housing owners, or |
15 | | community-based limited liability companies providing |
16 | | services to low-income households, by no later than 6 |
17 | | years after the device is interconnected at the |
18 | | distribution system level of the utility and |
19 | | energized. Incentives for projects that promote energy |
20 | | sovereignty may be higher than incentives for |
21 | | equivalent projects that do not promote energy |
22 | | sovereignty under this same program. Contracts entered |
23 | | into under this paragraph may be entered into with |
24 | | developers and shall also include contracts for |
25 | | renewable energy credits related to the program. |
26 | | (C) Incentives for non-profits and public |
|
| | HB2659 | - 36 - | LRB102 15746 SPS 21112 b |
|
|
1 | | facilities. Under this program funds shall be used to |
2 | | support on-site photovoltaic distributed renewable |
3 | | energy generation devices to serve the load associated |
4 | | with not-for-profit customers and to support |
5 | | photovoltaic distributed renewable energy generation |
6 | | that uses photovoltaic technology to serve the load |
7 | | associated with public sector customers taking service |
8 | | at public buildings. Companies participating in this |
9 | | program that develop or install solar projects shall |
10 | | commit to hiring job trainees for a portion of their |
11 | | low-income installations, and an administrator shall |
12 | | facilitate partnering the companies that install solar |
13 | | projects with entities that provide solar installation |
14 | | and related job training. It is a goal of this program |
15 | | that at least 25% of the incentives for this program be |
16 | | allocated to projects located in environmental justice |
17 | | communities. Contracts entered into under this |
18 | | paragraph may be entered into with an entity that will |
19 | | develop and administer the program or with developers |
20 | | and shall also include contracts for renewable energy |
21 | | credits related to the program. |
22 | | (D) Low-Income Community Solar Pilot Projects. |
23 | | Under this program, persons, including, but not |
24 | | limited to, electric utilities, shall propose pilot |
25 | | community solar projects. Community solar projects |
26 | | proposed under this subparagraph (D) may exceed 2,000 |
|
| | HB2659 | - 37 - | LRB102 15746 SPS 21112 b |
|
|
1 | | kilowatts in nameplate capacity, but the amount paid |
2 | | per project under this program may not exceed |
3 | | $20,000,000. Pilot projects must result in economic |
4 | | benefits for the members of the community in which the |
5 | | project will be located. The proposed pilot project |
6 | | must include a partnership with at least one |
7 | | community-based organization. Approved pilot projects |
8 | | shall be competitively bid by the Agency, subject to |
9 | | fair and equitable guidelines developed by the Agency. |
10 | | Funding available under this subparagraph (D) may not |
11 | | be distributed solely to a utility, and at least some |
12 | | funds under this subparagraph (D) must include a |
13 | | project partnership that includes community ownership |
14 | | by the project subscribers. Contracts entered into |
15 | | under this paragraph may be entered into with an |
16 | | entity that will develop and administer the program or |
17 | | with developers and shall also include contracts for |
18 | | renewable energy credits related to the program. A |
19 | | project proposed by a utility that is implemented |
20 | | under this subparagraph (D) shall not be included in |
21 | | the utility's rate base ratebase . |
22 | | (E) Low-income large multifamily solar incentive. |
23 | | This program shall provide incentives to low-income |
24 | | customers, either directly or through solar providers, |
25 | | to increase the participation of low-income households |
26 | | in photovoltaic on-site distributed generation at |
|
| | HB2659 | - 38 - | LRB102 15746 SPS 21112 b |
|
|
1 | | residential buildings with 5 or more units. Companies |
2 | | participating in this program that develop or install |
3 | | solar projects shall commit to hiring job trainees for |
4 | | a portion of their low-income installations, and an |
5 | | administrator shall facilitate partnering the |
6 | | companies that install solar projects with entities |
7 | | that provide solar installation and related job |
8 | | training. It is a goal of this program that a minimum |
9 | | of 25% of the incentives for this program be allocated |
10 | | to projects located within environmental justice |
11 | | communities. The Agency shall reserve a portion of |
12 | | this program for projects that promote energy |
13 | | sovereignty through ownership of projects by |
14 | | low-income households, not-for-profit organizations |
15 | | providing services to low-income households, |
16 | | affordable housing owners, or community-based limited |
17 | | liability companies providing services to low-income |
18 | | households. To count as promoting energy sovereignty, |
19 | | 49% of the ownership interest of the project must be |
20 | | held by low-income households, not-for-profit |
21 | | organizations providing direct services to low-income |
22 | | households, affordable housing owners, or |
23 | | community-based limited liability companies providing |
24 | | services to low-income households, by no later than 6 |
25 | | years after the device is interconnected at the |
26 | | distribution system level of the utility and |
|
| | HB2659 | - 39 - | LRB102 15746 SPS 21112 b |
|
|
1 | | energized. Incentives for projects that promote energy |
2 | | sovereignty may be higher than incentives for |
3 | | equivalent projects that do not promote energy |
4 | | sovereignty under this same program. Contracts entered |
5 | | into under this paragraph may be entered into with an |
6 | | entity that will develop and administer the program |
7 | | and shall include contracts for renewable energy |
8 | | credits from the photovoltaic distributed generation |
9 | | that is the subject of the program, as set forth in the |
10 | | long-term renewable resources procurement plan. |
11 | | The requirement that a qualified person, as defined in |
12 | | paragraph (1) of subsection (i) of this Section, install |
13 | | photovoltaic devices does not apply to the Illinois Solar |
14 | | for All Program described in this subsection (b). |
15 | | (3) Costs associated with the Illinois Solar for All |
16 | | Program and its components described in paragraph (2) of |
17 | | this subsection (b), including, but not limited to, costs |
18 | | associated with procuring experts, consultants, and the |
19 | | program administrator referenced in this subsection (b) |
20 | | and related incremental costs, costs related to income |
21 | | verification and facilitating customer participation in |
22 | | the program, and costs related to the evaluation of the |
23 | | Illinois Solar for All Program, may be paid for using |
24 | | monies in the Illinois Power Agency Renewable Energy |
25 | | Resources Fund, but the Agency or program administrator |
26 | | shall strive to minimize costs in the implementation of |
|
| | HB2659 | - 40 - | LRB102 15746 SPS 21112 b |
|
|
1 | | the program. The Agency shall purchase renewable energy |
2 | | credits from generation that is the subject of a contract |
3 | | under subparagraphs (A) through (E) (D) of this paragraph |
4 | | (2) of this subsection (b), and may pay for such renewable |
5 | | energy credits through an upfront payment per installed |
6 | | kilowatt of nameplate capacity paid once the device is |
7 | | interconnected at the distribution system level of the |
8 | | utility and is energized. The payment shall be in exchange |
9 | | for an assignment of all renewable energy credits |
10 | | generated by the system during the first 15 years of |
11 | | operation and shall be structured to overcome barriers to |
12 | | participation in the solar market by the low-income |
13 | | community. The incentives provided for in this Section may |
14 | | be implemented through the pricing of renewable energy |
15 | | credits where the prices paid for the credits are higher |
16 | | than the prices from programs offered under subsection (c) |
17 | | of Section 1-75 of this Act to account for the incentives. |
18 | | The Agency shall ensure collaboration with community |
19 | | agencies, and allocate up to 5% of the funds available |
20 | | under the Illinois Solar for All Program to |
21 | | community-based groups to assist in grassroots education |
22 | | efforts related to the Illinois Solar for All Program. The |
23 | | Agency shall retire any renewable energy credits purchased |
24 | | from this program and the credits shall count towards the |
25 | | obligation under subsection (c) of Section 1-75 of this |
26 | | Act for the electric utility to which the project is |
|
| | HB2659 | - 41 - | LRB102 15746 SPS 21112 b |
|
|
1 | | interconnected. The Agency may combine the funding for the |
2 | | Adjustable Block Program established in subparagraph (K) |
3 | | of paragraph (1) of subsection (c) of Section 1-75 and the |
4 | | Illinois Solar for All Program to purchase renewable |
5 | | energy credits from new photovoltaic projects that would |
6 | | be eligible for either program so long as: the annual |
7 | | ratepayer funds collected to purchase renewable resources |
8 | | pursuant to subsection (c) of Section 1-75 is at least |
9 | | double the amount collected in the 2019-2020 delivery |
10 | | year, no more than 20% of any individual block within the |
11 | | Adjustable Block Program is allocated to Solar for |
12 | | All-eligible projects, and the funding sources for both |
13 | | programs are the same for projects so funded. Any |
14 | | renewable energy credits purchased from this program in |
15 | | combination with the Adjustable Block Program shall count |
16 | | toward the obligation for new photovoltaic projects under |
17 | | subparagraph (C) of paragraph (1) of subsection (c) of |
18 | | Section 1-75 of this Act. Any photovoltaic projects |
19 | | selected for this program in combination with the |
20 | | Adjustable Block Program are subject to the requirements |
21 | | of the Illinois Solar for All Program and may receive |
22 | | Illinois Solar for All Program pricing, with the Illinois |
23 | | Solar for All Program budget covering the difference |
24 | | between the renewable energy credit price from the |
25 | | currently open block of the Adjustable Block Program and |
26 | | the Solar for All renewable energy credit price. Illinois |
|
| | HB2659 | - 42 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Solar for All subprograms providing funding for |
2 | | installation of distributed renewable energy generation |
3 | | devices shall use funding in this manner from Adjustable |
4 | | Block Program distributed renewable energy generation |
5 | | device blocks. The Illinois Solar for All Low-Income |
6 | | Community Solar subprogram shall use funding in this |
7 | | manner from the Adjustable Block Program community |
8 | | renewable generation project blocks, if such blocks are |
9 | | legally authorized. If no Adjustable Block Program |
10 | | community renewable generation project block is currently |
11 | | legally authorized and if a competitively procured |
12 | | Community Solar Program is legally authorized under |
13 | | Section 1-75 of this Act, then (i) a portion of the |
14 | | utility-held renewable resources budget allocated by the |
15 | | Agency to such competitive Community Solar Program each |
16 | | year shall be reserved for the Solar for All Low-Income |
17 | | Community Solar subprogram as if such budget came from an |
18 | | Adjustable Block Program block for purposes of this |
19 | | paragraph (3) and (ii) the average renewable energy credit |
20 | | price of Community Solar Program selected projects from |
21 | | the prior delivery year (or a shorter period, if a full |
22 | | delivery year of the Community Solar Program has not been |
23 | | completed) shall be used for allocating funding to the |
24 | | Solar for All Low-Income Community Solar subprogram in |
25 | | lieu of the Adjustable Block Program renewable energy |
26 | | credit block price mentioned earlier in this paragraph |
|
| | HB2659 | - 43 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (3). The Agency shall try to manage program capacities and |
2 | | budgets to make the fullest use of this option to |
3 | | accommodate Solar for All project applications. |
4 | | (4) The Agency shall, consistent with the requirements |
5 | | of this subsection (b), propose the Illinois Solar for All |
6 | | Program terms, conditions, and requirements, including the |
7 | | prices to be paid for renewable energy credits, and which |
8 | | prices may be determined through a formula, through the |
9 | | development, review, and approval of the Agency's |
10 | | long-term renewable resources procurement plan described |
11 | | in subsection (c) of Section 1-75 of this Act and Section |
12 | | 16-111.5 of the Public Utilities Act. In the course of the |
13 | | Commission proceeding initiated to review and approve the |
14 | | plan, including the Illinois Solar for All Program |
15 | | proposed by the Agency, a party may propose an additional |
16 | | low-income solar or solar incentive program, or |
17 | | modifications to the programs proposed by the Agency, and |
18 | | the Commission may approve an additional program, or |
19 | | modifications to the Agency's proposed program, if the |
20 | | additional or modified program more effectively maximizes |
21 | | the benefits to low-income customers after taking into |
22 | | account all relevant factors, including, but not limited |
23 | | to, the extent to which a competitive market for |
24 | | low-income solar has developed. Following the Commission's |
25 | | approval of the Illinois Solar for All Program, the Agency |
26 | | or a party may propose adjustments to the program terms, |
|
| | HB2659 | - 44 - | LRB102 15746 SPS 21112 b |
|
|
1 | | conditions, and requirements, including the price offered |
2 | | to new systems, to ensure the long-term viability and |
3 | | success of the program. The Commission shall review and |
4 | | approve any modifications to the program through the plan |
5 | | revision process described in Section 16-111.5 of the |
6 | | Public Utilities Act. |
7 | | (5) The Agency shall issue a request for |
8 | | qualifications for a third-party program administrator or |
9 | | administrators to administer all or a portion of the |
10 | | Illinois Solar for All Program. The third-party program |
11 | | administrator shall be chosen through a competitive bid |
12 | | process based on selection criteria and requirements |
13 | | developed by the Agency, including, but not limited to, |
14 | | experience in administering low-income energy programs and |
15 | | overseeing statewide clean energy or energy efficiency |
16 | | services. If the Agency retains a program administrator or |
17 | | administrators to implement all or a portion of the |
18 | | Illinois Solar for All Program, each administrator shall |
19 | | periodically submit reports to the Agency and Commission |
20 | | for each program that it administers, at appropriate |
21 | | intervals to be identified by the Agency in its long-term |
22 | | renewable resources procurement plan, provided that the |
23 | | reporting interval is at least quarterly. Administration |
24 | | of the Illinois Solar for All Program shall include |
25 | | facilitation of the partnering of companies that develop |
26 | | or install solar projects through this program or any |
|
| | HB2659 | - 45 - | LRB102 15746 SPS 21112 b |
|
|
1 | | other Illinois program with graduates of Illinois-based |
2 | | job training programs, particularly graduates who reside |
3 | | in environmental justice communities. |
4 | | (6) The long-term renewable resources procurement plan |
5 | | shall also provide for an independent evaluation of the |
6 | | Illinois Solar for All Program. At least every 2 years, |
7 | | the Agency shall select an independent evaluator to review |
8 | | and report on the Illinois Solar for All Program and the |
9 | | performance of the third-party program administrator of |
10 | | the Illinois Solar for All Program. The evaluation shall |
11 | | be based on objective criteria developed through a public |
12 | | stakeholder process. The process shall include feedback |
13 | | and participation from Illinois Solar for All Program |
14 | | stakeholders, including participants and organizations in |
15 | | environmental justice and historically underserved |
16 | | communities. The report shall include a summary of the |
17 | | evaluation of the Illinois Solar for All Program based on |
18 | | the stakeholder developed objective criteria. The report |
19 | | shall include the number of projects installed; the total |
20 | | installed capacity in kilowatts; the average cost per |
21 | | kilowatt of installed capacity to the extent reasonably |
22 | | obtainable by the Agency; the number of jobs or job |
23 | | opportunities created; economic, social, and environmental |
24 | | benefits created; and the total administrative costs |
25 | | expended by the Agency and program administrator to |
26 | | implement and evaluate the program. The report shall be |
|
| | HB2659 | - 46 - | LRB102 15746 SPS 21112 b |
|
|
1 | | delivered to the Commission and posted on the Agency's |
2 | | website, and shall be used, as needed, to revise the |
3 | | Illinois Solar for All Program. The Commission shall also |
4 | | consider the results of the evaluation as part of its |
5 | | review of the long-term renewable resources procurement |
6 | | plan under subsection (c) of Section 1-75 of this Act. |
7 | | (7) If additional funding for the programs described |
8 | | in this subsection (b) is available under subsection (k) |
9 | | of Section 16-108 of the Public Utilities Act, then the |
10 | | Agency shall submit a procurement plan to the Commission |
11 | | no later than September 1, 2018, that proposes how the |
12 | | Agency will procure programs on behalf of the applicable |
13 | | utility. After notice and hearing, the Commission shall |
14 | | approve, or approve with modification, the plan no later |
15 | | than November 1, 2018. |
16 | | (8) As part of the development and update of the |
17 | | long-term renewable resources procurement plan authorized |
18 | | by subsection (c) of Section 1-75 of this Act, the Agency |
19 | | shall plan for: (A) actions to refer customers from the |
20 | | Illinois Solar for All Program to electric and natural gas |
21 | | income-qualified energy efficiency programs, and vice |
22 | | versa, with the goal of increasing participation in both |
23 | | of these programs; (B) effective procedures for data |
24 | | sharing, as needed, to effectuate referrals between the |
25 | | Illinois Solar for All Program and both electric and |
26 | | natural gas income-qualified energy efficiency programs, |
|
| | HB2659 | - 47 - | LRB102 15746 SPS 21112 b |
|
|
1 | | including sharing customer information directly with the |
2 | | utilities, as needed and appropriate; and (C) efforts to |
3 | | identify any existing deferred maintenance programs for |
4 | | which prospective Solar for All customers may be eligible |
5 | | and connect prospective customers for whom deferred |
6 | | maintenance is or may be a barrier to solar installation |
7 | | to those programs. |
8 | | As used in this subsection (b), "low-income households" |
9 | | means persons and families whose income does not exceed 80% of |
10 | | area median income, adjusted for family size and revised every |
11 | | 5 years. |
12 | | For the purposes of this subsection (b), the Agency shall |
13 | | define "environmental justice community" based on |
14 | | methodologies and findings established by the Illinois Power |
15 | | Agency and its Administrator for the Illinois Solar for All |
16 | | Program in its initial long-term renewable resources |
17 | | procurement plan and updated by the Illinois Power Agency and |
18 | | its Administrator for the Illinois Solar for All Program as |
19 | | part of the long-term renewable resources procurement plan |
20 | | update as part of long-term renewable resources procurement |
21 | | plan development, to ensure, to the extent practicable, |
22 | | compatibility with other agencies' definitions and may, for |
23 | | guidance, look to the definitions used by federal, state, or |
24 | | local governments . |
25 | | (b-5) After the receipt of all payments required by |
26 | | Section 16-115D of the Public Utilities Act, no additional |
|
| | HB2659 | - 48 - | LRB102 15746 SPS 21112 b |
|
|
1 | | funds shall be deposited into the Illinois Power Agency |
2 | | Renewable Energy Resources Fund unless directed by order of |
3 | | the Commission. |
4 | | (b-10) After the receipt of all payments required by |
5 | | Section 16-115D of the Public Utilities Act and payment in |
6 | | full of all contracts executed by the Agency under subsections |
7 | | (b) and (i) of this Section, if the balance of the Illinois |
8 | | Power Agency Renewable Energy Resources Fund is under $5,000, |
9 | | then the Fund shall be inoperative and any remaining funds and |
10 | | any funds submitted to the Fund after that date, shall be |
11 | | transferred to the Supplemental Low-Income Energy Assistance |
12 | | Fund for use in the Low-Income Home Energy Assistance Program, |
13 | | as authorized by the Energy Assistance Act. |
14 | | (c) (Blank). |
15 | | (d) (Blank). |
16 | | (e) All renewable energy credits procured using monies |
17 | | from the Illinois Power Agency Renewable Energy Resources Fund |
18 | | shall be permanently retired. |
19 | | (f) The selection of one or more third-party program |
20 | | managers or administrators, the selection of the independent |
21 | | evaluator, and the procurement processes described in this |
22 | | Section are exempt from the requirements of the Illinois |
23 | | Procurement Code, under Section 20-10 of that Code. |
24 | | (g) All disbursements from the Illinois Power Agency |
25 | | Renewable Energy Resources Fund shall be made only upon |
26 | | warrants of the Comptroller drawn upon the Treasurer as |
|
| | HB2659 | - 49 - | LRB102 15746 SPS 21112 b |
|
|
1 | | custodian of the Fund upon vouchers signed by the Director or |
2 | | by the person or persons designated by the Director for that |
3 | | purpose. The Comptroller is authorized to draw the warrant |
4 | | upon vouchers so signed. The Treasurer shall accept all |
5 | | warrants so signed and shall be released from liability for |
6 | | all payments made on those warrants. |
7 | | (h) The Illinois Power Agency Renewable Energy Resources |
8 | | Fund shall not be subject to sweeps, administrative charges, |
9 | | or chargebacks, including, but not limited to, those |
10 | | authorized under Section 8h of the State Finance Act, that |
11 | | would in any way result in the transfer of any funds from this |
12 | | Fund to any other fund of this State or in having any such |
13 | | funds utilized for any purpose other than the express purposes |
14 | | set forth in this Section.
|
15 | | (h-5) The Agency may assess fees to each bidder to recover |
16 | | the costs incurred in connection with a procurement process |
17 | | held under this Section. Fees collected from bidders shall be |
18 | | deposited into the Renewable Energy Resources Fund. |
19 | | (i) Supplemental procurement process. |
20 | | (1) Within 90 days after the effective date of this |
21 | | amendatory Act of the 98th General Assembly, the Agency |
22 | | shall develop a one-time supplemental procurement plan |
23 | | limited to the procurement of renewable energy credits, if |
24 | | available, from new or existing photovoltaics, including, |
25 | | but not limited to, distributed photovoltaic generation. |
26 | | Nothing in this subsection (i) requires procurement of |
|
| | HB2659 | - 50 - | LRB102 15746 SPS 21112 b |
|
|
1 | | wind generation through the supplemental procurement. |
2 | | Renewable energy credits procured from new |
3 | | photovoltaics, including, but not limited to, distributed |
4 | | photovoltaic generation, under this subsection (i) must be |
5 | | procured from devices installed by a qualified person. In |
6 | | its supplemental procurement plan, the Agency shall |
7 | | establish contractually enforceable mechanisms for |
8 | | ensuring that the installation of new photovoltaics is |
9 | | performed by a qualified person. |
10 | | For the purposes of this paragraph (1), "qualified |
11 | | person" means a person who performs installations of |
12 | | photovoltaics, including, but not limited to, distributed |
13 | | photovoltaic generation, and who: (A) has completed an |
14 | | apprenticeship as a journeyman electrician from a United |
15 | | States Department of Labor registered electrical |
16 | | apprenticeship and training program and received a |
17 | | certification of satisfactory completion; or (B) does not |
18 | | currently meet the criteria under clause (A) of this |
19 | | paragraph (1), but is enrolled in a United States |
20 | | Department of Labor registered electrical apprenticeship |
21 | | program, provided that the person is directly supervised |
22 | | by a person who meets the criteria under clause (A) of this |
23 | | paragraph (1); or (C) has obtained one of the following |
24 | | credentials in addition to attesting to satisfactory |
25 | | completion of at least 5 years or 8,000 hours of |
26 | | documented hands-on electrical experience: (i) a North |
|
| | HB2659 | - 51 - | LRB102 15746 SPS 21112 b |
|
|
1 | | American Board of Certified Energy Practitioners (NABCEP) |
2 | | Installer Certificate for Solar PV; (ii) an Underwriters |
3 | | Laboratories (UL) PV Systems Installer Certificate; (iii) |
4 | | an Electronics Technicians Association, International |
5 | | (ETAI) Level 3 PV Installer Certificate; or (iv) an |
6 | | Associate in Applied Science degree from an Illinois |
7 | | Community College Board approved community college program |
8 | | in renewable energy or a distributed generation |
9 | | technology. |
10 | | For the purposes of this paragraph (1), "directly |
11 | | supervised" means that there is a qualified person who |
12 | | meets the qualifications under clause (A) of this |
13 | | paragraph (1) and who is available for supervision and |
14 | | consultation regarding the work performed by persons under |
15 | | clause (B) of this paragraph (1), including a final |
16 | | inspection of the installation work that has been directly |
17 | | supervised to ensure safety and conformity with applicable |
18 | | codes. |
19 | | For the purposes of this paragraph (1), "install" |
20 | | means the major activities and actions required to |
21 | | connect, in accordance with applicable building and |
22 | | electrical codes, the conductors, connectors, and all |
23 | | associated fittings, devices, power outlets, or |
24 | | apparatuses mounted at the premises that are directly |
25 | | involved in delivering energy to the premises' electrical |
26 | | wiring from the photovoltaics, including, but not limited |
|
| | HB2659 | - 52 - | LRB102 15746 SPS 21112 b |
|
|
1 | | to, to distributed photovoltaic generation. |
2 | | The renewable energy credits procured pursuant to the |
3 | | supplemental procurement plan shall be procured using up |
4 | | to $30,000,000 from the Illinois Power Agency Renewable |
5 | | Energy Resources Fund. The Agency shall not plan to use |
6 | | funds from the Illinois Power Agency Renewable Energy |
7 | | Resources Fund in excess of the monies on deposit in such |
8 | | fund or projected to be deposited into such fund. The |
9 | | supplemental procurement plan shall ensure adequate, |
10 | | reliable, affordable, efficient, and environmentally |
11 | | sustainable renewable energy resources (including credits) |
12 | | at the lowest total cost over time, taking into account |
13 | | any benefits of price stability. |
14 | | To the extent available, 50% of the renewable energy |
15 | | credits procured from distributed renewable energy |
16 | | generation shall come from devices of less than 25 |
17 | | kilowatts in nameplate capacity. Procurement of renewable |
18 | | energy credits from distributed renewable energy |
19 | | generation devices shall be done through multi-year |
20 | | contracts of no less than 5 years. The Agency shall create |
21 | | credit requirements for counterparties. In order to |
22 | | minimize the administrative burden on contracting |
23 | | entities, the Agency shall solicit the use of third |
24 | | parties to aggregate distributed renewable energy. These |
25 | | third parties shall enter into and administer contracts |
26 | | with individual distributed renewable energy generation |
|
| | HB2659 | - 53 - | LRB102 15746 SPS 21112 b |
|
|
1 | | device owners. An individual distributed renewable energy |
2 | | generation device owner shall
have the ability to measure |
3 | | the output of his or her distributed renewable energy |
4 | | generation device. |
5 | | In developing the supplemental procurement plan, the |
6 | | Agency shall hold at least one workshop open to the public |
7 | | within 90 days after the effective date of this amendatory |
8 | | Act of the 98th General Assembly and shall consider any |
9 | | comments made by stakeholders or the public. Upon |
10 | | development of the supplemental procurement plan within |
11 | | this 90-day period, copies of the supplemental procurement |
12 | | plan shall be posted and made publicly available on the |
13 | | Agency's and Commission's websites. All interested parties |
14 | | shall have 14 days following the date of posting to |
15 | | provide comment to the Agency on the supplemental |
16 | | procurement plan. All comments submitted to the Agency |
17 | | shall be specific, supported by data or other detailed |
18 | | analyses, and, if objecting to all or a portion of the |
19 | | supplemental procurement plan, accompanied by specific |
20 | | alternative wording or proposals. All comments shall be |
21 | | posted on the Agency's and Commission's websites. Within |
22 | | 14 days following the end of the 14-day review period, the |
23 | | Agency shall revise the supplemental procurement plan as |
24 | | necessary based on the comments received and file its |
25 | | revised supplemental procurement plan with the Commission |
26 | | for approval. |
|
| | HB2659 | - 54 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (2) Within 5 days after the filing of the supplemental |
2 | | procurement plan at the Commission, any person objecting |
3 | | to the supplemental procurement plan shall file an |
4 | | objection with the Commission. Within 10 days after the |
5 | | filing, the Commission shall determine whether a hearing |
6 | | is necessary. The Commission shall enter its order |
7 | | confirming or modifying the supplemental procurement plan |
8 | | within 90 days after the filing of the supplemental |
9 | | procurement plan by the Agency. |
10 | | (3) The Commission shall approve the supplemental |
11 | | procurement plan of renewable energy credits to be |
12 | | procured from new or existing photovoltaics, including, |
13 | | but not limited to, distributed photovoltaic generation, |
14 | | if the Commission determines that it will ensure adequate, |
15 | | reliable, affordable, efficient, and environmentally |
16 | | sustainable electric service in the form of renewable |
17 | | energy credits at the lowest total cost over time, taking |
18 | | into account any benefits of price stability. |
19 | | (4) The supplemental procurement process under this |
20 | | subsection (i) shall include each of the following |
21 | | components: |
22 | | (A) Procurement administrator. The Agency may |
23 | | retain a procurement administrator in the manner set |
24 | | forth in item (2) of subsection (a) of Section 1-75 of |
25 | | this Act to conduct the supplemental procurement or |
26 | | may elect to use the same procurement administrator |
|
| | HB2659 | - 55 - | LRB102 15746 SPS 21112 b |
|
|
1 | | administering the Agency's annual procurement under |
2 | | Section 1-75. |
3 | | (B) Procurement monitor. The procurement monitor |
4 | | retained by the Commission pursuant to Section |
5 | | 16-111.5 of the Public Utilities Act shall: |
6 | | (i) monitor interactions among the procurement |
7 | | administrator and bidders and suppliers; |
8 | | (ii) monitor and report to the Commission on |
9 | | the progress of the supplemental procurement |
10 | | process; |
11 | | (iii) provide an independent confidential |
12 | | report to the Commission regarding the results of |
13 | | the procurement events; |
14 | | (iv) assess compliance with the procurement |
15 | | plan approved by the Commission for the |
16 | | supplemental procurement process; |
17 | | (v) preserve the confidentiality of supplier |
18 | | and bidding information in a manner consistent |
19 | | with all applicable laws, rules, regulations, and |
20 | | tariffs; |
21 | | (vi) provide expert advice to the Commission |
22 | | and consult with the procurement administrator |
23 | | regarding issues related to procurement process |
24 | | design, rules, protocols, and policy-related |
25 | | matters; |
26 | | (vii) consult with the procurement |
|
| | HB2659 | - 56 - | LRB102 15746 SPS 21112 b |
|
|
1 | | administrator regarding the development and use of |
2 | | benchmark criteria, standard form contracts, |
3 | | credit policies, and bid documents; and |
4 | | (viii) perform, with respect to the |
5 | | supplemental procurement process, any other |
6 | | procurement monitor duties specifically delineated |
7 | | within subsection (i) of this Section. |
8 | | (C) Solicitation, pre-qualification, and |
9 | | registration of bidders. The procurement administrator |
10 | | shall disseminate information to potential bidders to |
11 | | promote a procurement event, notify potential bidders |
12 | | that the procurement administrator may enter into a |
13 | | post-bid price negotiation with bidders that meet the |
14 | | applicable benchmarks, provide supply requirements, |
15 | | and otherwise explain the competitive procurement |
16 | | process. In addition to such other publication as the |
17 | | procurement administrator determines is appropriate, |
18 | | this information shall be posted on the Agency's and |
19 | | the Commission's websites. The procurement |
20 | | administrator shall also administer the |
21 | | prequalification process, including evaluation of |
22 | | credit worthiness, compliance with procurement rules, |
23 | | and agreement to the standard form contract developed |
24 | | pursuant to item (D) of this paragraph (4). The |
25 | | procurement administrator shall then identify and |
26 | | register bidders to participate in the procurement |
|
| | HB2659 | - 57 - | LRB102 15746 SPS 21112 b |
|
|
1 | | event. |
2 | | (D) Standard contract forms and credit terms and |
3 | | instruments. The procurement administrator, in |
4 | | consultation with the Agency, the Commission, and |
5 | | other interested parties and subject to Commission |
6 | | oversight, shall develop and provide standard contract |
7 | | forms for the supplier contracts that meet generally |
8 | | accepted industry practices as well as include any |
9 | | applicable State of Illinois terms and conditions that |
10 | | are required for contracts entered into by an agency |
11 | | of the State of Illinois. Standard credit terms and |
12 | | instruments that meet generally accepted industry |
13 | | practices shall be similarly developed. Contracts for |
14 | | new photovoltaics shall include a provision attesting |
15 | | that the supplier will use a qualified person for the |
16 | | installation of the device pursuant to paragraph (1) |
17 | | of subsection (i) of this Section. The procurement |
18 | | administrator shall make available to the Commission |
19 | | all written comments it receives on the contract |
20 | | forms,
credit terms, or instruments. If the |
21 | | procurement administrator cannot reach agreement with |
22 | | the parties as to the contract terms and conditions, |
23 | | the procurement administrator must notify the |
24 | | Commission of any disputed terms and the Commission |
25 | | shall resolve the dispute. The terms of the contracts |
26 | | shall not be subject to negotiation by winning |
|
| | HB2659 | - 58 - | LRB102 15746 SPS 21112 b |
|
|
1 | | bidders, and the bidders must agree to the terms of the |
2 | | contract in advance so that winning bids are selected |
3 | | solely on the basis of price. |
4 | | (E) Requests for proposals; competitive |
5 | | procurement process. The procurement administrator |
6 | | shall design and issue requests for proposals to |
7 | | supply renewable energy credits in accordance with the |
8 | | supplemental procurement plan, as approved by the |
9 | | Commission. The requests for proposals shall set forth |
10 | | a procedure for sealed, binding commitment bidding |
11 | | with pay-as-bid settlement, and provision for |
12 | | selection of bids on the basis of price, provided, |
13 | | however, that no bid shall be accepted if it exceeds |
14 | | the benchmark developed pursuant to item (F) of this |
15 | | paragraph (4). |
16 | | (F) Benchmarks. Benchmarks for each product to be |
17 | | procured shall be developed by the procurement |
18 | | administrator in consultation with Commission staff, |
19 | | the Agency, and the procurement monitor for use in |
20 | | this supplemental procurement. |
21 | | (G) A plan for implementing contingencies in the |
22 | | event of supplier default, Commission rejection of |
23 | | results, or any other cause. |
24 | | (5) Within 2 business days after opening the sealed |
25 | | bids, the procurement administrator shall submit a |
26 | | confidential report to the Commission. The report shall |
|
| | HB2659 | - 59 - | LRB102 15746 SPS 21112 b |
|
|
1 | | contain the results of the bidding for each of the |
2 | | products along with the procurement administrator's |
3 | | recommendation for the acceptance and rejection of bids |
4 | | based on the price benchmark criteria and other factors |
5 | | observed in the process. The procurement monitor also |
6 | | shall submit a confidential report to the Commission |
7 | | within 2 business days after opening the sealed bids. The |
8 | | report shall contain the procurement monitor's assessment |
9 | | of bidder behavior in the process as well as an assessment |
10 | | of the procurement administrator's compliance with the |
11 | | procurement process and rules. The Commission shall review |
12 | | the confidential reports submitted by the procurement |
13 | | administrator and procurement monitor and shall accept or |
14 | | reject the recommendations of the procurement |
15 | | administrator within 2 business days after receipt of the |
16 | | reports. |
17 | | (6) Within 3 business days after the Commission |
18 | | decision approving the results of a procurement event, the |
19 | | Agency shall enter into binding contractual arrangements |
20 | | with the winning suppliers using the standard form |
21 | | contracts. |
22 | | (7) The names of the successful bidders and the |
23 | | average of the winning bid prices for each contract type |
24 | | and for each contract term shall be made available to the |
25 | | public within 2 days after the supplemental procurement |
26 | | event. The Commission, the procurement monitor, the |
|
| | HB2659 | - 60 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement administrator, the Agency, and all |
2 | | participants in the procurement process shall maintain the |
3 | | confidentiality of all other supplier and bidding |
4 | | information in a manner consistent with all applicable |
5 | | laws, rules, regulations, and tariffs. Confidential |
6 | | information, including the confidential reports submitted |
7 | | by the procurement administrator and procurement monitor |
8 | | pursuant to this Section, shall not be made publicly |
9 | | available and shall not be discoverable by any party in |
10 | | any proceeding, absent a compelling demonstration of need, |
11 | | nor shall those reports be admissible in any proceeding |
12 | | other than one for law enforcement purposes. |
13 | | (8) The supplemental procurement provided in this |
14 | | subsection (i) shall not be subject to the requirements |
15 | | and limitations of subsections (c) and (d) of this |
16 | | Section. |
17 | | (9) Expenses incurred in connection with the |
18 | | procurement process held pursuant to this Section, |
19 | | including, but not limited to, the cost of developing the |
20 | | supplemental procurement plan, the procurement |
21 | | administrator, procurement monitor, and the cost of the |
22 | | retirement of renewable energy credits purchased pursuant |
23 | | to the supplemental procurement shall be paid for from the |
24 | | Illinois Power Agency Renewable Energy Resources Fund. The |
25 | | Agency shall enter into an interagency agreement with the |
26 | | Commission to reimburse the Commission for its costs |
|
| | HB2659 | - 61 - | LRB102 15746 SPS 21112 b |
|
|
1 | | associated with the procurement monitor for the |
2 | | supplemental procurement process. |
3 | | (Source: P.A. 98-672, eff. 6-30-14; 99-906, eff. 6-1-17 .) |
4 | | (20 ILCS 3855/1-75) |
5 | | Sec. 1-75. Planning and Procurement Bureau. The Planning |
6 | | and Procurement Bureau has the following duties and |
7 | | responsibilities: |
8 | | (a) The Planning and Procurement Bureau shall each year, |
9 | | beginning in 2008, develop procurement plans and conduct |
10 | | competitive procurement processes in accordance with the |
11 | | requirements of Section 16-111.5 of the Public Utilities Act |
12 | | for the eligible retail customers of electric utilities that |
13 | | on December 31, 2005 provided electric service to at least |
14 | | 100,000 customers in Illinois. Beginning with the delivery |
15 | | year commencing on June 1, 2017, the Planning and Procurement |
16 | | Bureau shall develop plans and processes for the procurement |
17 | | of zero emission credits from zero emission facilities in |
18 | | accordance with the requirements of subsection (d-5) of this |
19 | | Section. The Planning and Procurement Bureau shall also |
20 | | develop procurement plans and conduct competitive procurement |
21 | | processes in accordance with the requirements of Section |
22 | | 16-111.5 of the Public Utilities Act for the eligible retail |
23 | | customers of small multi-jurisdictional electric utilities |
24 | | that (i) on December 31, 2005 served less than 100,000 |
25 | | customers in Illinois and (ii) request a procurement plan for |
|
| | HB2659 | - 62 - | LRB102 15746 SPS 21112 b |
|
|
1 | | their Illinois jurisdictional load. This Section shall not |
2 | | apply to a small multi-jurisdictional utility until such time |
3 | | as a small multi-jurisdictional utility requests the Agency to |
4 | | prepare a procurement plan for their Illinois jurisdictional |
5 | | load. For the purposes of this Section, the term "eligible |
6 | | retail customers" has the same definition as found in Section |
7 | | 16-111.5(a) of the Public Utilities Act. |
8 | | Beginning with the plan or plans to be implemented in the |
9 | | 2017 delivery year, the Agency shall no longer include the |
10 | | procurement of renewable energy resources in the annual |
11 | | procurement plans required by this subsection (a), except as |
12 | | provided in subsection (q) of Section 16-111.5 of the Public |
13 | | Utilities Act and subsection (j) of this Section , and shall |
14 | | instead develop a long-term renewable resources procurement |
15 | | plan in accordance with subsection (c) of this Section and |
16 | | Section 16-111.5 of the Public Utilities Act. |
17 | | (1) The Agency shall each year, beginning in 2008, as |
18 | | needed, issue a request for qualifications for experts or |
19 | | expert consulting firms to develop the procurement plans |
20 | | in accordance with Section 16-111.5 of the Public |
21 | | Utilities Act. In order to qualify an expert or expert |
22 | | consulting firm must have: |
23 | | (A) direct previous experience assembling |
24 | | large-scale power supply plans or portfolios for |
25 | | end-use customers; |
26 | | (B) an advanced degree in economics, mathematics, |
|
| | HB2659 | - 63 - | LRB102 15746 SPS 21112 b |
|
|
1 | | engineering, risk management, or a related area of |
2 | | study; |
3 | | (C) 10 years of experience in the electricity |
4 | | sector, including managing supply risk; |
5 | | (D) expertise in wholesale electricity market |
6 | | rules, including those established by the Federal |
7 | | Energy Regulatory Commission and regional transmission |
8 | | organizations; |
9 | | (E) expertise in credit protocols and familiarity |
10 | | with contract protocols; |
11 | | (F) adequate resources to perform and fulfill the |
12 | | required functions and responsibilities; and |
13 | | (G) the absence of a conflict of interest and |
14 | | inappropriate bias for or against potential bidders or |
15 | | the affected electric utilities. |
16 | | (2) The Agency shall each year, as needed, issue a |
17 | | request for qualifications for a procurement administrator |
18 | | to conduct the competitive procurement processes in |
19 | | accordance with Section 16-111.5 of the Public Utilities |
20 | | Act. In order to qualify an expert or expert consulting |
21 | | firm must have: |
22 | | (A) direct previous experience administering a |
23 | | large-scale competitive procurement process; |
24 | | (B) an advanced degree in economics, mathematics, |
25 | | engineering, or a related area of study; |
26 | | (C) 10 years of experience in the electricity |
|
| | HB2659 | - 64 - | LRB102 15746 SPS 21112 b |
|
|
1 | | sector, including risk management experience; |
2 | | (D) expertise in wholesale electricity market |
3 | | rules, including those established by the Federal |
4 | | Energy Regulatory Commission and regional transmission |
5 | | organizations; |
6 | | (E) expertise in credit and contract protocols; |
7 | | (F) adequate resources to perform and fulfill the |
8 | | required functions and responsibilities; and |
9 | | (G) the absence of a conflict of interest and |
10 | | inappropriate bias for or against potential bidders or |
11 | | the affected electric utilities. |
12 | | (3) The Agency shall provide affected utilities and |
13 | | other interested parties with the lists of qualified |
14 | | experts or expert consulting firms identified through the |
15 | | request for qualifications processes that are under |
16 | | consideration to develop the procurement plans and to |
17 | | serve as the procurement administrator. The Agency shall |
18 | | also provide each qualified expert's or expert consulting |
19 | | firm's response to the request for qualifications. All |
20 | | information provided under this subparagraph shall also be |
21 | | provided to the Commission. The Agency may provide by rule |
22 | | for fees associated with supplying the information to |
23 | | utilities and other interested parties. These parties |
24 | | shall, within 5 business days, notify the Agency in |
25 | | writing if they object to any experts or expert consulting |
26 | | firms on the lists. Objections shall be based on: |
|
| | HB2659 | - 65 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (A) failure to satisfy qualification criteria; |
2 | | (B) identification of a conflict of interest; or |
3 | | (C) evidence of inappropriate bias for or against |
4 | | potential bidders or the affected utilities. |
5 | | The Agency shall remove experts or expert consulting |
6 | | firms from the lists within 10 days if there is a |
7 | | reasonable basis for an objection and provide the updated |
8 | | lists to the affected utilities and other interested |
9 | | parties. If the Agency fails to remove an expert or expert |
10 | | consulting firm from a list, an objecting party may seek |
11 | | review by the Commission within 5 days thereafter by |
12 | | filing a petition, and the Commission shall render a |
13 | | ruling on the petition within 10 days. There is no right of |
14 | | appeal of the Commission's ruling. |
15 | | (4) The Agency shall issue requests for proposals to |
16 | | the qualified experts or expert consulting firms to |
17 | | develop a procurement plan for the affected utilities and |
18 | | to serve as procurement administrator. |
19 | | (5) The Agency shall select an expert or expert |
20 | | consulting firm to develop procurement plans based on the |
21 | | proposals submitted and shall award contracts of up to 5 |
22 | | years to those selected. |
23 | | (6) The Agency shall select an expert or expert |
24 | | consulting firm, with approval of the Commission, to serve |
25 | | as procurement administrator based on the proposals |
26 | | submitted. If the Commission rejects, within 5 days, the |
|
| | HB2659 | - 66 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Agency's selection, the Agency shall submit another |
2 | | recommendation within 3 days based on the proposals |
3 | | submitted. The Agency shall award a 5-year contract to the |
4 | | expert or expert consulting firm so selected with |
5 | | Commission approval. |
6 | | (b) The experts or expert consulting firms retained by the |
7 | | Agency shall, as appropriate, prepare procurement plans, and |
8 | | conduct a competitive procurement process as prescribed in |
9 | | Section 16-111.5 of the Public Utilities Act, to ensure |
10 | | adequate, reliable, affordable, efficient, and environmentally |
11 | | sustainable electric service at the lowest total cost over |
12 | | time, taking into account any benefits of price stability, for |
13 | | eligible retail customers of electric utilities that on |
14 | | December 31, 2005 provided electric service to at least |
15 | | 100,000 customers in the State of Illinois, and for eligible |
16 | | Illinois retail customers of small multi-jurisdictional |
17 | | electric utilities that (i) on December 31, 2005 served less |
18 | | than 100,000 customers in Illinois and (ii) request a |
19 | | procurement plan for their Illinois jurisdictional load. |
20 | | (c) Renewable portfolio standard. |
21 | | (1)(A) The Agency shall develop a long-term renewable |
22 | | resources procurement plan that shall include procurement |
23 | | programs and competitive procurement events necessary to |
24 | | meet the goals set forth in this subsection (c). The |
25 | | initial long-term renewable resources procurement plan |
26 | | shall be released for comment no later than 160 days after |
|
| | HB2659 | - 67 - | LRB102 15746 SPS 21112 b |
|
|
1 | | June 1, 2017 (the effective date of Public Act 99-906). |
2 | | The Agency shall review, and may revise on an expedited |
3 | | basis, the long-term renewable resources procurement plan |
4 | | at least every 2 years, which shall be conducted in |
5 | | conjunction with the procurement plan under Section |
6 | | 16-111.5 of the Public Utilities Act to the extent |
7 | | practicable to minimize administrative expense. No later
|
8 | | than 90 days after the effective date of this amendatory |
9 | | Act of the 102nd General Assembly, the Agency shall |
10 | | release for comment a
revision to the long-term renewable |
11 | | resources procurement
plan, updating only elements of the |
12 | | most recently approved
plan as needed to comply with this |
13 | | amendatory Act of the
102nd General Assembly. The |
14 | | long-term renewable resources procurement plans shall be |
15 | | subject to review and approval by the Commission under |
16 | | Section 16-111.5 of the Public Utilities Act. |
17 | | (B) Subject to subparagraph (F) of this paragraph (1), |
18 | | the long-term renewable resources procurement plan shall |
19 | | include the goals for procurement of renewable energy |
20 | | credits to meet at least the following overall |
21 | | percentages: 13% by the 2017 delivery year; increasing by |
22 | | at least 1.5% each delivery year thereafter to at least |
23 | | 25% by the 2025 delivery year; increasing by at least 4% |
24 | | each delivery year
after the 2025 delivery year to at |
25 | | least 45% by 2030;
increasing by at least 3% each delivery |
26 | | year after the 2030
delivery year to at least 60% by 2035, |
|
| | HB2659 | - 68 - | LRB102 15746 SPS 21112 b |
|
|
1 | | 75% by 2040, and 90%
by 2045; increasing by at least 2% |
2 | | each delivery year after
the 2045 delivery year to 100% by |
3 | | the 2050 delivery year and continuing at 100% no less than |
4 | | 25% for each delivery year thereafter. In the event of a |
5 | | conflict between these goals and the new wind and new |
6 | | photovoltaic procurement requirements described in items |
7 | | (i) through (iii) of subparagraph (C) of this paragraph |
8 | | (1), the long-term plan shall prioritize compliance with |
9 | | the new wind and new photovoltaic procurement requirements |
10 | | described in items (i) through (iii) of subparagraph (C) |
11 | | of this paragraph (1) over the annual percentage targets |
12 | | described in this subparagraph (B). The Agency shall not |
13 | | comply with the
annual percentage targets described in |
14 | | this subparagraph
(B) by procuring renewable energy |
15 | | credits on the spot
market that are unlikely to lead to the |
16 | | development of new
renewable resources. |
17 | | For the delivery year beginning June 1, 2017, the |
18 | | procurement plan shall include cost-effective renewable |
19 | | energy resources equal to at least 13% of each utility's |
20 | | load for eligible retail customers and 13% of the |
21 | | applicable portion of each utility's load for retail |
22 | | customers who are not eligible retail customers, which |
23 | | applicable portion shall equal 50% of the utility's load |
24 | | for retail customers who are not eligible retail customers |
25 | | on February 28, 2017. |
26 | | For the delivery year beginning June 1, 2018, the |
|
| | HB2659 | - 69 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement plan shall include cost-effective renewable |
2 | | energy resources equal to at least 14.5% of each utility's |
3 | | load for eligible retail customers and 14.5% of the |
4 | | applicable portion of each utility's load for retail |
5 | | customers who are not eligible retail customers, which |
6 | | applicable portion shall equal 75% of the utility's load |
7 | | for retail customers who are not eligible retail customers |
8 | | on February 28, 2017. |
9 | | For the delivery year beginning June 1, 2019, and for |
10 | | each year thereafter, the procurement plans shall include |
11 | | cost-effective renewable energy resources equal to a |
12 | | minimum percentage of each utility's load for all retail |
13 | | customers as follows: 16% by June 1, 2019; increasing by |
14 | | 1.5% each year thereafter to 25% by June 1, 2025; |
15 | | increasing by at least 4% each year thereafter to at least
|
16 | | 45% by June 1, 2030; increasing by at least 3% each year
|
17 | | thereafter to at least 90% by June 1, 2045; increasing by
|
18 | | at least 2% each year thereafter to at least 100% by June
|
19 | | 1, 2050 and 25% by June 1, 2026 and each year thereafter. |
20 | | For each delivery year, the Agency shall first |
21 | | recognize each utility's obligations for that delivery |
22 | | year under existing contracts. Any renewable energy |
23 | | credits under existing contracts, including renewable |
24 | | energy credits as part of renewable energy resources, |
25 | | shall be used to meet the goals set forth in this |
26 | | subsection (c) for the delivery year. |
|
| | HB2659 | - 70 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (C) Of the renewable energy credits procured under |
2 | | this subsection (c), at least 75% shall come from wind and |
3 | | photovoltaic projects. The long-term renewable resources |
4 | | procurement plan described in subparagraph (A) of this |
5 | | paragraph (1) shall include the procurement of renewable |
6 | | energy credits in amounts equal to at least the following : |
7 | | at least 5,000,000 renewable energy credits from
|
8 | | new wind and new photovoltaic projects for each
|
9 | | delivery year by the end of the delivery year |
10 | | beginning
June 1, 2020, unless the project has delays |
11 | | in the
establishment of an operating interconnection |
12 | | with the
applicable transmission or distribution |
13 | | system as a
result of the actions or inactions of the |
14 | | transmission
or distribution provider, or other causes |
15 | | for force
majeure as outlined in the procurement |
16 | | contract, in
which case, not later than June 1, 2022; |
17 | | at least 13,000,000 renewable energy credits from
|
18 | | new wind and new photovoltaic projects for each
|
19 | | delivery year by the end of the delivery year |
20 | | beginning
June 1, 2021; |
21 | | at least 18,000,000 renewable energy credits from
|
22 | | new wind and new photovoltaic projects for each
|
23 | | delivery year by the end of the delivery year |
24 | | beginning
June 1, 2022; |
25 | | at least 23,000,000 renewable energy credits from
|
26 | | new wind and new photovoltaic projects for each
|
|
| | HB2659 | - 71 - | LRB102 15746 SPS 21112 b |
|
|
1 | | delivery year by the end of the delivery year |
2 | | beginning June 1, 2023; |
3 | | at least 28,000,000 renewable energy credits from
|
4 | | new wind and new photovoltaic projects for each
|
5 | | delivery year by the end of the delivery year |
6 | | beginning
June 1, 2024; |
7 | | at least 33,000,000 renewable energy credits from
|
8 | | new wind and new photovoltaic projects for each
|
9 | | delivery year by the end of the delivery year |
10 | | beginning
June 1, 2025; |
11 | | at least 38,000,000 renewable energy credits from
|
12 | | new wind and new photovoltaic projects for each
|
13 | | delivery year by the end of the delivery year |
14 | | beginning
June 1, 2026; |
15 | | at least 43,000,000 renewable energy credits from
|
16 | | new wind and new photovoltaic projects for each
|
17 | | delivery year by the end of the delivery year |
18 | | beginning
June 1, 2027; |
19 | | at least 48,000,000 renewable energy credits from
|
20 | | new wind and new photovoltaic projects for each
|
21 | | delivery year by the end of the delivery year |
22 | | beginning
June 1, 2028; |
23 | | at least 53,000,000 renewable energy credits from
|
24 | | new wind and new photovoltaic projects for each
|
25 | | delivery year by the end of the delivery year |
26 | | beginning
June 1, 2029; and |
|
| | HB2659 | - 72 - | LRB102 15746 SPS 21112 b |
|
|
1 | | at least 58,000,000 renewable energy credits from |
2 | | new wind and new photovoltaic projects for each
|
3 | | delivery year by the end of the delivery year |
4 | | beginning
June 1, 2030. |
5 | | (i) By the end of the 2020 delivery year: |
6 | | At least 2,000,000 renewable energy credits |
7 | | for each delivery year shall come from new wind |
8 | | projects; and |
9 | | Of the renewable energy credits procured from |
10 | | new
wind and new photovoltaic projects for each |
11 | | delivery
year At least 2,000,000 renewable energy |
12 | | credits for each delivery year shall come from new |
13 | | photovoltaic projects; of that amount , to the |
14 | | extent possible, the Agency shall procure 50% from |
15 | | new wind projects and 50%
from new photovoltaic |
16 | | projects. Of the amount to be
procured from new |
17 | | photovoltaic projects, the Agency
shall procure, |
18 | | to the extent reasonably practicable : at least 33% |
19 | | 50% from distributed and community solar |
20 | | photovoltaic projects using the programs program |
21 | | outlined in subparagraphs subparagraph (K) and (N) |
22 | | of this paragraph (1) through the 2021 delivery |
23 | | year,
increasing ratably beginning in the 2022 |
24 | | delivery year
to at least 50% by the 2038 delivery |
25 | | year and for each
delivery year thereafter from |
26 | | distributed renewable energy generation devices or |
|
| | HB2659 | - 73 - | LRB102 15746 SPS 21112 b |
|
|
1 | | community renewable generation projects; at least |
2 | | 40% from utility-scale solar projects; at least 7% |
3 | | 2% from brownfield site photovoltaic projects that |
4 | | are not community renewable generation projects; |
5 | | and the remainder shall be determined through the |
6 | | long-term planning process described in |
7 | | subparagraph (A) of this paragraph (1). |
8 | | In developing the long-term renewable resources
|
9 | | procurement plan, the Agency shall consider other
|
10 | | approaches, in addition to competitive procurements,
that |
11 | | can be used to procure renewable energy credits
from |
12 | | brownfield site photovoltaic projects and thereby
help |
13 | | return blighted or contaminated land to
productive use |
14 | | while enhancing public health and the
well-being of |
15 | | Illinois residents, including those in
environmental |
16 | | justice communities, as defined using
existing |
17 | | methodologies and findings used by the
Illinois Power |
18 | | Agency and its Administrator in its
Illinois Solar for All |
19 | | Program. |
20 | | Of the amount of renewable energy credits to be
|
21 | | procured from either distributed or community solar
|
22 | | photovoltaic projects using the programs outlined in
|
23 | | subparagraph (K) of this paragraph (1), the
long-term plan |
24 | | developed through the process described
in subparagraph |
25 | | (A) of this paragraph (1) shall use
the following initial |
26 | | breakdown, which may be adjusted
upon review by the Agency |
|
| | HB2659 | - 74 - | LRB102 15746 SPS 21112 b |
|
|
1 | | and approval by the
Commission: |
2 | | (i) at least 25% from distributed renewable energy |
3 | | generation devices with a nameplate
capacity of no |
4 | | more than 25 kilowatts; |
5 | | (ii) at least 25% from distributed renewable
|
6 | | energy generation devices with a nameplate
capacity of |
7 | | more than 25 kilowatts and no more than
2,000 |
8 | | kilowatts; |
9 | | (iii) at least 25% from photovoltaic community
|
10 | | renewable generation projects; and |
11 | | (iv) the remaining 25% shall be allocated as
|
12 | | specified by the Agency in the long-term renewable
|
13 | | resources procurement plan. |
14 | | The ratable procurement of new renewable resources
|
15 | | discussed in this subparagraph (C) shall involve
annual |
16 | | procurements of new wind and new photovoltaic
projects |
17 | | and, in the case of the Adjustable Block
Program created |
18 | | by subparagraph (K) of this paragraph (1), the annual |
19 | | release of new blocks of capacity each
year with the goal |
20 | | of encouraging stability and steady
growth in the |
21 | | renewable resources market and avoiding
boom-bust cycles. |
22 | | (ii) By the end of the 2025 delivery year: |
23 | | At least 3,000,000 renewable energy credits |
24 | | for each delivery year shall come from new wind |
25 | | projects; and |
26 | | At least 3,000,000 renewable energy credits |
|
| | HB2659 | - 75 - | LRB102 15746 SPS 21112 b |
|
|
1 | | for each delivery year shall come from new |
2 | | photovoltaic projects; of that amount, to the |
3 | | extent possible, the Agency shall procure: at |
4 | | least 50% from solar photovoltaic projects using |
5 | | the program outlined in subparagraph (K) of this |
6 | | paragraph (1) from distributed renewable energy |
7 | | devices or community renewable generation |
8 | | projects; at least 40% from utility-scale solar |
9 | | projects; at least 2% from brownfield site |
10 | | photovoltaic projects that are not community |
11 | | renewable generation projects; and the remainder |
12 | | shall be determined through the long-term planning |
13 | | process described in subparagraph (A) of this |
14 | | paragraph (1). |
15 | | (iii) By the end of the 2030 delivery year: |
16 | | At least 4,000,000 renewable energy credits |
17 | | for each delivery year shall come from new wind |
18 | | projects; and |
19 | | At least 4,000,000 renewable energy credits |
20 | | for each delivery year shall come from new |
21 | | photovoltaic projects; of that amount, to the |
22 | | extent possible, the Agency shall procure: at |
23 | | least 50% from solar photovoltaic projects using |
24 | | the program outlined in subparagraph (K) of this |
25 | | paragraph (1) from distributed renewable energy |
26 | | devices or community renewable generation |
|
| | HB2659 | - 76 - | LRB102 15746 SPS 21112 b |
|
|
1 | | projects; at least 40% from utility-scale solar |
2 | | projects; at least 2% from brownfield site |
3 | | photovoltaic projects that are not community |
4 | | renewable generation projects; and the remainder |
5 | | shall be determined through the long-term planning |
6 | | process described in subparagraph (A) of this |
7 | | paragraph (1). |
8 | | For purposes of this Section: |
9 | | "New wind projects" means wind renewable |
10 | | energy facilities that are energized after June 1, |
11 | | 2017 for the delivery year commencing June 1, 2017 |
12 | | or within 3 years after the date the Commission |
13 | | approves contracts for subsequent delivery years. |
14 | | "New photovoltaic projects" means photovoltaic |
15 | | renewable energy facilities that are energized |
16 | | after June 1, 2017. Photovoltaic projects |
17 | | developed under Section 1-56 of this Act shall not |
18 | | apply towards the new photovoltaic project |
19 | | requirements in this subparagraph (C) unless they
|
20 | | are purchased in combination with the Adjustable
|
21 | | Block Program established in subparagraph (K) of
|
22 | | this paragraph (1), as described in paragraph
|
23 | | (3.5) of subsection (b) of Section 1-56 of this
|
24 | | Act . |
25 | | (D) Renewable energy credits shall be cost effective. |
26 | | For purposes of this subsection (c), "cost effective" |
|
| | HB2659 | - 77 - | LRB102 15746 SPS 21112 b |
|
|
1 | | means that the costs of procuring renewable energy |
2 | | resources do not cause the limit stated in subparagraph |
3 | | (E) of this paragraph (1) to be exceeded and, for |
4 | | renewable energy credits procured through a competitive |
5 | | procurement event, do not exceed benchmarks based on |
6 | | market prices for like products in the region. For |
7 | | purposes of this subsection (c), "like products" means |
8 | | contracts for renewable energy credits from the same or |
9 | | substantially similar technology, same or substantially |
10 | | similar vintage (new or existing), the same or |
11 | | substantially similar quantity, and the same or |
12 | | substantially similar contract length and structure. |
13 | | Benchmarks shall be developed by the procurement |
14 | | administrator, in consultation with the Commission staff, |
15 | | Agency staff, and the procurement monitor and shall be |
16 | | subject to Commission review and approval. If price |
17 | | benchmarks for like products in the region are not |
18 | | available, the procurement administrator shall establish |
19 | | price benchmarks based on publicly available data on |
20 | | regional technology costs and expected current and future |
21 | | regional energy prices. The benchmarks in this Section |
22 | | shall not be used to curtail or otherwise reduce |
23 | | contractual obligations entered into by or through the |
24 | | Agency prior to June 1, 2017 (the effective date of Public |
25 | | Act 99-906). |
26 | | (E) For purposes of this subsection (c), the required |
|
| | HB2659 | - 78 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement of cost-effective renewable energy resources |
2 | | for a particular year commencing prior to June 1, 2017 |
3 | | shall be measured as a percentage of the actual amount of |
4 | | electricity (megawatt-hours) supplied by the electric |
5 | | utility to eligible retail customers in the delivery year |
6 | | ending immediately prior to the procurement, and, for |
7 | | delivery years commencing on and after June 1, 2017, the |
8 | | required procurement of cost-effective renewable energy |
9 | | resources for a particular year shall be measured as a |
10 | | percentage of the actual amount of electricity |
11 | | (megawatt-hours) delivered by the electric utility in the |
12 | | delivery year ending immediately prior to the procurement, |
13 | | to all retail customers in its service territory. For |
14 | | purposes of this subsection (c), the amount paid per |
15 | | kilowatthour means the total amount paid for electric |
16 | | service expressed on a per kilowatthour basis. For |
17 | | purposes of this subsection (c), the total amount paid for |
18 | | electric service includes without limitation amounts paid |
19 | | for supply, transmission, distribution, surcharges, and |
20 | | add-on taxes. |
21 | | Notwithstanding the requirements of this subsection |
22 | | (c), the total of renewable energy resources procured |
23 | | under the procurement plan for any single year shall be |
24 | | subject to the limitations of this subparagraph (E). Until |
25 | | the
delivery year beginning June 1, 2023, such Such |
26 | | procurement shall be reduced for all retail customers |
|
| | HB2659 | - 79 - | LRB102 15746 SPS 21112 b |
|
|
1 | | based on the amount necessary to limit the annual |
2 | | estimated average net increase due to the costs of these |
3 | | resources included in the amounts paid by eligible retail |
4 | | customers in connection with electric service to no more |
5 | | than the greater of 2.67% 2.015% of the amount paid per |
6 | | kilowatthour by those customers during the year ending May |
7 | | 31, 2009 2007 or the incremental amount per kilowatthour |
8 | | paid for these resources in 2011. Beginning with the |
9 | | delivery year
beginning June 1, 2023, such procurement |
10 | | shall be reduced
for all retail customers based on the |
11 | | amount necessary to
limit the annual estimated average net |
12 | | increase due to the
costs of these resources included in |
13 | | the amounts paid by
eligible retail customers in |
14 | | connection with electric
service to no more than the |
15 | | greater of 4.88% of the amount
paid per kilowatt hour by |
16 | | those customers during the year
ending May 31, 2009 or the |
17 | | incremental amount per
kilowatt hour paid for these |
18 | | resources in 2011. To arrive at a maximum dollar amount of |
19 | | renewable energy resources to be procured for the |
20 | | particular delivery year, the resulting per kilowatthour |
21 | | amount shall be applied to the actual amount of |
22 | | kilowatthours of electricity delivered, or applicable |
23 | | portion of such amount as specified in paragraph (1) of |
24 | | this subsection (c), as applicable, by the electric |
25 | | utility in the delivery year immediately prior to the |
26 | | procurement to all retail customers in its service |
|
| | HB2659 | - 80 - | LRB102 15746 SPS 21112 b |
|
|
1 | | territory. The calculations required by this subparagraph |
2 | | (E) shall be made only once for each delivery year at the |
3 | | time that the renewable energy resources are procured. |
4 | | Once the determination as to the amount of renewable |
5 | | energy resources to procure is made based on the |
6 | | calculations set forth in this subparagraph (E) and the |
7 | | contracts procuring those amounts are executed, no |
8 | | subsequent rate impact determinations shall be made and no |
9 | | adjustments to those contract amounts shall be allowed. |
10 | | All costs incurred under such contracts shall be fully |
11 | | recoverable by the electric utility as provided in this |
12 | | Section. |
13 | | (F) If the limitation on the amount of renewable |
14 | | energy resources procured in subparagraph (E) of this |
15 | | paragraph (1) prevents the Agency from meeting all of the |
16 | | goals in this subsection (c), the Agency's long-term plan |
17 | | shall prioritize compliance with the requirements of this |
18 | | subsection (c) regarding renewable energy credits in the |
19 | | following order: |
20 | | (i) renewable energy credits under existing |
21 | | contractual obligations; |
22 | | (i-5) funding for the Illinois Solar for All |
23 | | Program, as described in subparagraph (O) of this |
24 | | paragraph (1); |
25 | | (ii) renewable energy credits necessary to comply |
26 | | with the new wind and new photovoltaic procurement |
|
| | HB2659 | - 81 - | LRB102 15746 SPS 21112 b |
|
|
1 | | requirements described in items (i) through (iii) of |
2 | | subparagraph (C) of this paragraph (1); and |
3 | | (iii) renewable energy credits necessary to meet |
4 | | the remaining requirements of this subsection (c). |
5 | | (G) The following provisions shall apply to the |
6 | | Agency's procurement of renewable energy credits under |
7 | | this subsection (c): |
8 | | (i) Notwithstanding whether a long-term renewable |
9 | | resources procurement plan has been approved, the |
10 | | Agency shall conduct an initial forward procurement |
11 | | for renewable energy credits from new utility-scale |
12 | | wind projects within 160 days after June 1, 2017 (the |
13 | | effective date of Public Act 99-906). For the purposes |
14 | | of this initial forward procurement, the Agency shall |
15 | | solicit 15-year contracts for delivery of 1,000,000 |
16 | | renewable energy credits delivered annually from new |
17 | | utility-scale wind projects to begin delivery on June |
18 | | 1, 2019, if available, but not later than June 1, 2021, |
19 | | unless the project has delays in the establishment of |
20 | | an operating interconnection with the applicable |
21 | | transmission or distribution system as a result of the |
22 | | actions or inactions of the transmission or |
23 | | distribution provider, or other causes for force |
24 | | majeure as outlined in the procurement contract, in |
25 | | which case, not later than June 1, 2022. Payments to |
26 | | suppliers of renewable energy credits shall commence |
|
| | HB2659 | - 82 - | LRB102 15746 SPS 21112 b |
|
|
1 | | upon delivery. Renewable energy credits procured under |
2 | | this initial procurement shall be included in the |
3 | | Agency's long-term plan and shall apply to all |
4 | | renewable energy goals in this subsection (c). |
5 | | (ii) Notwithstanding whether a long-term renewable |
6 | | resources procurement plan has been approved, the |
7 | | Agency shall conduct an initial forward procurement |
8 | | for renewable energy credits from new utility-scale |
9 | | solar projects and brownfield site photovoltaic |
10 | | projects within one year after June 1, 2017 (the |
11 | | effective date of Public Act 99-906). For the purposes |
12 | | of this initial forward procurement, the Agency shall |
13 | | solicit 15-year contracts for delivery of 1,000,000 |
14 | | renewable energy credits delivered annually from new |
15 | | utility-scale solar projects and brownfield site |
16 | | photovoltaic projects to begin delivery on June 1, |
17 | | 2019, if available, but not later than June 1, 2021, |
18 | | unless the project has delays in the establishment of |
19 | | an operating interconnection with the applicable |
20 | | transmission or distribution system as a result of the |
21 | | actions or inactions of the transmission or |
22 | | distribution provider, or other causes for force |
23 | | majeure as outlined in the procurement contract, in |
24 | | which case, not later than June 1, 2022. The Agency may |
25 | | structure this initial procurement in one or more |
26 | | discrete procurement events. Payments to suppliers of |
|
| | HB2659 | - 83 - | LRB102 15746 SPS 21112 b |
|
|
1 | | renewable energy credits shall commence upon delivery. |
2 | | Renewable energy credits procured under this initial |
3 | | procurement shall be included in the Agency's |
4 | | long-term plan and shall apply to all renewable energy |
5 | | goals in this subsection (c). |
6 | | (iii) Notwithstanding whether the Commission has
|
7 | | approved the periodic long-term renewable resources
|
8 | | procurement plan revision described in Section
|
9 | | 16-111.5 of the Public Utilities Act, the Agency shall
|
10 | | conduct at least one subsequent forward procurement
|
11 | | for renewable energy credits from new utility-scale
|
12 | | wind projects, new utility-scale solar, and new
|
13 | | brownfield site photovoltaic projects within 120 days
|
14 | | after the effective date of this amendatory Act of the
|
15 | | 102nd General Assembly in quantities needed to meet |
16 | | the
requirements of subparagraph (C) through the |
17 | | delivery year beginning June 1, 2021. The Agency shall |
18 | | also release additional blocks of capacity into the |
19 | | Adjustable Block Program, as needed to sustain the |
20 | | market for distributed renewable energy generation |
21 | | devices with nameplate capacities both smaller and |
22 | | larger than 25 kilowatts through the subsequent |
23 | | long-term renewable resources procurement plan |
24 | | revision process, within 120 days after the effective |
25 | | date of this amendatory Act of the 102nd General |
26 | | Assembly notwithstanding whether the Commission has |
|
| | HB2659 | - 84 - | LRB102 15746 SPS 21112 b |
|
|
1 | | approved the periodic long-term renewable resources |
2 | | procurement plan revision described in Section |
3 | | 16-111.5 of the Public Utilities Act. Subsequent |
4 | | forward procurements for utility-scale wind projects |
5 | | shall solicit at least 1,000,000 renewable energy |
6 | | credits delivered annually per procurement event and |
7 | | shall be planned, scheduled, and designed such that |
8 | | the cumulative amount of renewable energy credits |
9 | | delivered from all new wind projects in each delivery |
10 | | year shall not exceed the Agency's projection of the |
11 | | cumulative amount of renewable energy credits that |
12 | | will be delivered from all new photovoltaic projects, |
13 | | including utility-scale and distributed photovoltaic |
14 | | devices, in the same delivery year at the time |
15 | | scheduled for wind contract delivery. |
16 | | (iv) If, at any time after the time set for |
17 | | delivery of renewable energy credits pursuant to the |
18 | | initial procurements in items (i) and (ii) of this |
19 | | subparagraph (G), the cumulative amount of renewable |
20 | | energy credits projected to be delivered from all new |
21 | | wind projects in a given delivery year exceeds the |
22 | | cumulative amount of renewable energy credits |
23 | | projected to be delivered from all new photovoltaic |
24 | | projects in that delivery year by 200,000 or more |
25 | | renewable energy credits, then the Agency shall within |
26 | | 60 days adjust the procurement programs in the |
|
| | HB2659 | - 85 - | LRB102 15746 SPS 21112 b |
|
|
1 | | long-term renewable resources procurement plan to |
2 | | ensure that the projected cumulative amount of |
3 | | renewable energy credits to be delivered from all new |
4 | | wind projects does not exceed the projected cumulative |
5 | | amount of renewable energy credits to be delivered |
6 | | from all new photovoltaic projects by 200,000 or more |
7 | | renewable energy credits, provided that nothing in |
8 | | this Section shall preclude the projected cumulative |
9 | | amount of renewable energy credits to be delivered |
10 | | from all new photovoltaic projects from exceeding the |
11 | | projected cumulative amount of renewable energy |
12 | | credits to be delivered from all new wind projects in |
13 | | each delivery year and provided further that nothing |
14 | | in this item (iv) shall require the curtailment of an |
15 | | executed contract. The Agency shall update, on a |
16 | | quarterly basis, its projection of the renewable |
17 | | energy credits to be delivered from all projects in |
18 | | each delivery year. Notwithstanding anything to the |
19 | | contrary, the Agency may adjust the timing of |
20 | | procurement events conducted under this subparagraph |
21 | | (G). The long-term renewable resources procurement |
22 | | plan shall set forth the process by which the |
23 | | adjustments may be made. |
24 | | (iv) (v) All procurements under this subparagraph |
25 | | (G) shall comply with the geographic requirements in |
26 | | subparagraph (I) of this paragraph (1) and shall |
|
| | HB2659 | - 86 - | LRB102 15746 SPS 21112 b |
|
|
1 | | follow the procurement processes and procedures |
2 | | described in this Section and Section 16-111.5 of the |
3 | | Public Utilities Act to the extent practicable, and |
4 | | these processes and procedures may be expedited to |
5 | | accommodate the schedule established by this |
6 | | subparagraph (G). |
7 | | (H) The procurement of renewable energy resources for |
8 | | a given delivery year shall be reduced as described in |
9 | | this subparagraph (H) if an alternative retail electric |
10 | | supplier meets the requirements described in this |
11 | | subparagraph (H). |
12 | | (i) Within 45 days after June 1, 2017 (the |
13 | | effective date of Public Act 99-906), an alternative |
14 | | retail electric supplier or its successor shall submit |
15 | | an informational filing to the Illinois Commerce |
16 | | Commission certifying that, as of December 31, 2015, |
17 | | the alternative retail electric supplier owned one or |
18 | | more electric generating facilities that generates |
19 | | renewable energy resources as defined in Section 1-10 |
20 | | of this Act, provided that such facilities are not |
21 | | powered by wind or photovoltaics, and the facilities |
22 | | generate one renewable energy credit for each |
23 | | megawatthour of energy produced from the facility. |
24 | | The informational filing shall identify each |
25 | | facility that was eligible to satisfy the alternative |
26 | | retail electric supplier's obligations under Section |
|
| | HB2659 | - 87 - | LRB102 15746 SPS 21112 b |
|
|
1 | | 16-115D of the Public Utilities Act as described in |
2 | | this item (i). |
3 | | (ii) For a given delivery year, the alternative |
4 | | retail electric supplier may elect to supply its |
5 | | retail customers with renewable energy credits from |
6 | | the facility or facilities described in item (i) of |
7 | | this subparagraph (H) that continue to be owned by the |
8 | | alternative retail electric supplier. |
9 | | (iii) The alternative retail electric supplier |
10 | | shall notify the Agency and the applicable utility, no |
11 | | later than February 28 of the year preceding the |
12 | | applicable delivery year or 15 days after June 1, 2017 |
13 | | (the effective date of Public Act 99-906), whichever |
14 | | is later, of its election under item (ii) of this |
15 | | subparagraph (H) to supply renewable energy credits to |
16 | | retail customers of the utility. Such election shall |
17 | | identify the amount of renewable energy credits to be |
18 | | supplied by the alternative retail electric supplier |
19 | | to the utility's retail customers and the source of |
20 | | the renewable energy credits identified in the |
21 | | informational filing as described in item (i) of this |
22 | | subparagraph (H), subject to the following |
23 | | limitations: |
24 | | For the delivery year beginning June 1, 2018, |
25 | | the maximum amount of renewable energy credits to |
26 | | be supplied by an alternative retail electric |
|
| | HB2659 | - 88 - | LRB102 15746 SPS 21112 b |
|
|
1 | | supplier under this subparagraph (H) shall be 68% |
2 | | multiplied by 25% multiplied by 14.5% multiplied |
3 | | by the amount of metered electricity |
4 | | (megawatt-hours) delivered by the alternative |
5 | | retail electric supplier to Illinois retail |
6 | | customers during the delivery year ending May 31, |
7 | | 2016. |
8 | | For delivery years beginning June 1, 2019 and |
9 | | each year thereafter, the maximum amount of |
10 | | renewable energy credits to be supplied by an |
11 | | alternative retail electric supplier under this |
12 | | subparagraph (H) shall be 68% multiplied by 50% |
13 | | multiplied by 16% multiplied by the amount of |
14 | | metered electricity (megawatt-hours) delivered by |
15 | | the alternative retail electric supplier to |
16 | | Illinois retail customers during the delivery year |
17 | | ending May 31, 2016, provided that the 16% value |
18 | | shall increase by 1.5% each delivery year |
19 | | thereafter to 25% by the delivery year beginning |
20 | | June 1, 2025, and thereafter the 25% value shall |
21 | | apply to each delivery year. |
22 | | For each delivery year, the total amount of |
23 | | renewable energy credits supplied by all alternative |
24 | | retail electric suppliers under this subparagraph (H) |
25 | | shall not exceed 9% of the Illinois target renewable |
26 | | energy credit quantity. The Illinois target renewable |
|
| | HB2659 | - 89 - | LRB102 15746 SPS 21112 b |
|
|
1 | | energy credit quantity for the delivery year beginning |
2 | | June 1, 2018 is 14.5% multiplied by the total amount of |
3 | | metered electricity (megawatt-hours) delivered in the |
4 | | delivery year immediately preceding that delivery |
5 | | year, provided that the 14.5% shall increase by 1.5% |
6 | | each delivery year thereafter to 25% by the delivery |
7 | | year beginning June 1, 2025, and thereafter the 25% |
8 | | value shall apply to each delivery year. |
9 | | If the requirements set forth in items (i) through |
10 | | (iii) of this subparagraph (H) are met, the charges |
11 | | that would otherwise be applicable to the retail |
12 | | customers of the alternative retail electric supplier |
13 | | under paragraph (6) of this subsection (c) for the |
14 | | applicable delivery year shall be reduced by the ratio |
15 | | of the quantity of renewable energy credits supplied |
16 | | by the alternative retail electric supplier compared |
17 | | to that supplier's target renewable energy credit |
18 | | quantity. The supplier's target renewable energy |
19 | | credit quantity for the delivery year beginning June |
20 | | 1, 2018 is 14.5% multiplied by the total amount of |
21 | | metered electricity (megawatt-hours) delivered by the |
22 | | alternative retail supplier in that delivery year, |
23 | | provided that the 14.5% shall increase by 1.5% each |
24 | | delivery year thereafter to 25% by the delivery year |
25 | | beginning June 1, 2025, and thereafter the 25% value |
26 | | shall apply to each delivery year. |
|
| | HB2659 | - 90 - | LRB102 15746 SPS 21112 b |
|
|
1 | | On or before April 1 of each year, the Agency shall |
2 | | annually publish a report on its website that |
3 | | identifies the aggregate amount of renewable energy |
4 | | credits supplied by alternative retail electric |
5 | | suppliers under this subparagraph (H). |
6 | | (I) The Agency shall design its long-term renewable |
7 | | energy procurement plan to maximize the State's interest |
8 | | in the health, safety, and welfare of its residents, |
9 | | including but not limited to minimizing sulfur dioxide, |
10 | | nitrogen oxide, particulate matter and other pollution |
11 | | that adversely affects public health in this State, |
12 | | increasing fuel and resource diversity in this State, |
13 | | enhancing the reliability and resiliency of the |
14 | | electricity distribution system in this State, meeting |
15 | | goals to limit carbon dioxide emissions under federal or |
16 | | State law, and contributing to a cleaner and healthier |
17 | | environment for the residents citizens of this State. In |
18 | | order to further these legislative purposes, renewable |
19 | | energy credits shall be eligible to be counted toward the |
20 | | renewable energy requirements of this subsection (c) if |
21 | | they are generated from facilities located in this State. |
22 | | The Agency may qualify renewable energy credits from |
23 | | facilities located in states adjacent to Illinois if the |
24 | | generator demonstrates and the Agency determines that the |
25 | | operation of such facility or facilities will help promote |
26 | | the State's interest in the health, safety, and welfare of |
|
| | HB2659 | - 91 - | LRB102 15746 SPS 21112 b |
|
|
1 | | its residents based on the public interest criteria |
2 | | described above. To ensure that the public interest |
3 | | criteria are applied to the procurement and given full |
4 | | effect, the Agency's long-term procurement plan shall |
5 | | describe in detail how each public interest factor shall |
6 | | be considered and weighted for facilities located in |
7 | | states adjacent to Illinois. |
8 | | (J) In order to promote the competitive development of |
9 | | renewable energy resources in furtherance of the State's |
10 | | interest in the health, safety, and welfare of its |
11 | | residents, renewable energy credits shall not be eligible |
12 | | to be counted toward the renewable energy requirements of |
13 | | this subsection (c) if they are sourced from a generating |
14 | | unit whose costs were being recovered through rates |
15 | | regulated by this State or any other state or states on or |
16 | | after January 1, 2017. Each contract executed to purchase |
17 | | renewable energy credits under this subsection (c) shall |
18 | | provide for the contract's termination if the costs of the |
19 | | generating unit supplying the renewable energy credits |
20 | | subsequently begin to be recovered through rates regulated |
21 | | by this State or any other state or states; and each |
22 | | contract shall further provide that, in that event, the |
23 | | supplier of the credits must return 110% of all payments |
24 | | received under the contract. Amounts returned under the |
25 | | requirements of this subparagraph (J) shall be retained by |
26 | | the utility and all of these amounts shall be used for the |
|
| | HB2659 | - 92 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement of additional renewable energy credits from |
2 | | new wind or new photovoltaic resources as defined in this |
3 | | subsection (c). The long-term plan shall provide that |
4 | | these renewable energy credits shall be procured in the |
5 | | next procurement event. |
6 | | Notwithstanding the limitations of this subparagraph |
7 | | (J), renewable energy credits sourced from generating |
8 | | units that are constructed, purchased, owned, or leased by |
9 | | an electric utility as part of an approved project, |
10 | | program, or pilot under Section 1-56 of this Act shall be |
11 | | eligible to be counted toward the renewable energy |
12 | | requirements of this subsection (c), regardless of how the |
13 | | costs of these units are recovered. |
14 | | (K) The long-term renewable resources procurement plan |
15 | | developed by the Agency in accordance with subparagraph |
16 | | (A) of this paragraph (1) shall include an Adjustable |
17 | | Block program for the procurement of renewable energy |
18 | | credits from new photovoltaic projects that are |
19 | | distributed renewable energy generation devices or new |
20 | | photovoltaic community renewable generation projects . The |
21 | | Adjustable Block program shall be designed to provide for |
22 | | the steady,
predictable, and sustainable growth of new |
23 | | solar
photovoltaic development in Illinois. To this end, |
24 | | the
Adjustable Block program shall provide a transparent |
25 | | annual schedule of prices and quantities to enable the |
26 | | photovoltaic market to scale up and for renewable energy |
|
| | HB2659 | - 93 - | LRB102 15746 SPS 21112 b |
|
|
1 | | credit prices to adjust at a predictable rate over time. |
2 | | The prices set by the Adjustable Block program can be |
3 | | reflected as a set value or as the product of a formula. |
4 | | The Adjustable Block program shall include for each |
5 | | category of eligible projects: a schedule of standard |
6 | | block purchase prices to be offered; a series of steps, |
7 | | with associated nameplate capacity and purchase prices |
8 | | that adjust from step to step; and automatic opening of |
9 | | the next step as soon as the nameplate capacity and |
10 | | available purchase prices for an open step are fully |
11 | | committed or reserved. Only projects energized on or after |
12 | | June 1, 2017 shall be eligible for the Adjustable Block |
13 | | program. The
Agency shall develop program features and |
14 | | implementation
processes that create consistent market |
15 | | signals, making
the program predictable and sustainable |
16 | | for solar industry
companies, thus allowing them to scale |
17 | | up long-term hiring
and investment activities. For each |
18 | | block group the Agency shall determine the number of |
19 | | blocks, the amount of generation capacity in each block, |
20 | | and the purchase price for each block, provided that the |
21 | | purchase price provided and the total amount of generation |
22 | | in all blocks for all block groups shall be sufficient to |
23 | | meet the goals in this subsection (c). The Agency shall |
24 | | establish program
eligibility requirements that ensure |
25 | | that projects that
enter the program are sufficiently |
26 | | mature to indicate a
demonstrable path to completion. The |
|
| | HB2659 | - 94 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Agency may periodically review its prior decisions |
2 | | establishing the number of blocks, the amount of |
3 | | generation capacity in each block, and the purchase price |
4 | | for each block, and may propose, on an expedited basis, |
5 | | changes to these previously set values, including but not |
6 | | limited to redistributing these amounts and the available |
7 | | funds as necessary and appropriate, subject to Commission |
8 | | approval as part of the periodic plan revision process |
9 | | described in Section 16-111.5 of the Public Utilities Act. |
10 | | The Agency may define different block sizes, purchase |
11 | | prices, or other distinct terms and conditions for |
12 | | projects located in different utility service territories |
13 | | if the Agency deems it necessary to meet the goals in this |
14 | | subsection (c). |
15 | | The Adjustable Block program shall include at least |
16 | | the following block groups in at least the following |
17 | | amounts , which may be adjusted upon review by the Agency |
18 | | and approval by the Commission as described in this |
19 | | subparagraph (K): |
20 | | (i) At least 25% from distributed renewable energy |
21 | | generation devices with a nameplate capacity of no |
22 | | more than 25 10 kilowatts. |
23 | | (ii) At least 25% from distributed renewable |
24 | | energy generation devices with a nameplate capacity of |
25 | | more than 25 10 kilowatts and no more than 2,000 |
26 | | kilowatts. The Agency may create sub-categories within |
|
| | HB2659 | - 95 - | LRB102 15746 SPS 21112 b |
|
|
1 | | this category to account for the differences between |
2 | | projects for small commercial customers, large |
3 | | commercial customers, and public or non-profit |
4 | | customers. |
5 | | (iii) other block groups as specified by the |
6 | | Agency
and approved by the Commission in the long-term
|
7 | | renewable resources procurement plan in order to meet |
8 | | the goals of this subsection (c) At least 25% from |
9 | | photovoltaic community renewable generation projects . |
10 | | (iv) The remaining 25% shall be allocated as |
11 | | specified by the Agency in the long-term renewable |
12 | | resources procurement plan. |
13 | | The Adjustable Block program shall be designed to |
14 | | ensure that renewable energy credits are procured from |
15 | | photovoltaic distributed renewable energy generation |
16 | | devices and new photovoltaic community renewable energy |
17 | | generation projects in diverse locations , including urban
|
18 | | and rural areas, and are not concentrated in a few |
19 | | geographic areas or excluding particular geographic areas . |
20 | | The Adjustable Block program shall reserve a total of |
21 | | 40% of each block's capacity at the block's price to be |
22 | | available for qualified vendors that score no less than |
23 | | 105 points in the equity points system described in |
24 | | subparagraphs (A) through (H) of paragraph (7) of this |
25 | | subsection (c). Nothing in this paragraph shall prohibit |
26 | | the opening of additional blocks for the unreserved |
|
| | HB2659 | - 96 - | LRB102 15746 SPS 21112 b |
|
|
1 | | capacity of each block. Beginning with the first update to |
2 | | the Long-Term Renewable Resources Procurement Plan after |
3 | | December 31, 2024, the Agency shall review the reserved |
4 | | capacity level for future blocks. In developing its annual |
5 | | budgets, the Agency shall project the amount of |
6 | | development in each block, at the prices of each block, |
7 | | expected to occur in the budget timeframe. |
8 | | Immediately upon the effective date of this amendatory
|
9 | | Act of the 102nd General Assembly, the Adjustable Block
|
10 | | Program shall stop accepting applications from community
|
11 | | renewable generation projects and shall stop allocating
|
12 | | capacity remaining in open or future blocks to community
|
13 | | renewable generation projects. |
14 | | (L) The procurement of photovoltaic renewable energy |
15 | | credits under the Adjustable Block Program established
|
16 | | under items (i) through (iv) of subparagraph (K) and the
|
17 | | Community Solar Program established under subparagraph (N) |
18 | | of this paragraph (1) shall be subject to the following |
19 | | contract and payment terms: |
20 | | (i) The Agency shall procure contracts of at least |
21 | | 15 years in length. |
22 | | (ii) For those renewable energy credits that |
23 | | qualify and are procured from projects with a |
24 | | nameplate
capacity of no more than 10 kilowatts under |
25 | | item (i) of subparagraph (K) of this paragraph (1) , |
26 | | the renewable energy credit purchase price shall be |
|
| | HB2659 | - 97 - | LRB102 15746 SPS 21112 b |
|
|
1 | | paid in full by the contracting utilities at the time |
2 | | that the facility producing the renewable energy |
3 | | credits is interconnected at the distribution system |
4 | | level of the utility and energized. The electric |
5 | | utility shall receive and retire all renewable energy |
6 | | credits generated by the project for the first 15 |
7 | | years of operation. |
8 | | (iii) For those renewable energy credits that |
9 | | qualify and are procured from projects with a |
10 | | nameplate
capacity of more than 10 kilowatts but no |
11 | | more than 200
kilowatts or, if approved at the |
12 | | recommendation of the Agency in its long-term plan, |
13 | | from projects that include a community ownership |
14 | | component or are owned by a nonprofit or public entity |
15 | | under item (ii) and (iii) of subparagraph (K) of this |
16 | | paragraph (1) and any additional categories of |
17 | | distributed generation included in the long-term |
18 | | renewable resources procurement plan and approved by |
19 | | the Commission , 20 percent of the renewable energy |
20 | | credit purchase price shall be paid by the contracting |
21 | | utilities at the time that the facility producing the |
22 | | renewable energy credits is interconnected at the |
23 | | distribution system level of the utility and |
24 | | energized. The remaining portion shall be paid ratably |
25 | | over the subsequent 4-year period. The electric |
26 | | utility shall receive and retire all renewable energy |
|
| | HB2659 | - 98 - | LRB102 15746 SPS 21112 b |
|
|
1 | | credits generated by the project for the first 15 |
2 | | years of operation. |
3 | | (iv) For those renewable energy credits that
|
4 | | qualify and are procured from all other projects under
|
5 | | subparagraph (K) or (N) of this paragraph (1), the
|
6 | | renewable energy credit purchase price shall be paid |
7 | | by
the contracting utilities over the 15-year life of |
8 | | the
contract. The electric utility shall receive and
|
9 | | retire all renewable energy credits generated by the
|
10 | | project for the first 15 years of operation. |
11 | | (v) (iv) Each contract shall include provisions to |
12 | | ensure the delivery of the renewable energy credits |
13 | | for the full term of the contract. |
14 | | (vi) (v) The utility shall be the counterparty to |
15 | | the contracts executed under this subparagraph (L) |
16 | | that are approved by the Commission under the process |
17 | | described in Section 16-111.5 of the Public Utilities |
18 | | Act. No contract shall be executed for an amount that |
19 | | is less than one renewable energy credit per year. |
20 | | (vii) (vi) If, at any time, approved applications |
21 | | for the Adjustable Block program exceed funds |
22 | | collected by the electric utility or would cause the |
23 | | Agency to exceed the limitation described in |
24 | | subparagraph (E) of this paragraph (1) on the amount |
25 | | of renewable energy resources that may be procured, |
26 | | then the Agency shall consider future uncommitted |
|
| | HB2659 | - 99 - | LRB102 15746 SPS 21112 b |
|
|
1 | | funds to be reserved for these contracts on a |
2 | | first-come, first-served basis, with the delivery of |
3 | | renewable energy credits required beginning at the |
4 | | time that the reserved funds become available. |
5 | | (viii) (vii) Nothing in this Section shall require |
6 | | the utility to advance any payment or pay any amounts |
7 | | that exceed , in a given delivery year, (i) the actual |
8 | | amount of revenues collected by the utility in the |
9 | | delivery year and unspent available revenues from |
10 | | prior delivery years, in both cases under paragraph |
11 | | (6) of this subsection (c) and subsection (k) of |
12 | | Section 16-108 of the Public Utilities Act and (ii) |
13 | | other utility-held funds authorized for renewables |
14 | | procurement by order of the Illinois Commerce |
15 | | Commission. Contracts , and contracts executed under |
16 | | this Section shall expressly incorporate this |
17 | | limitation. |
18 | | (ix) Notwithstanding items (ii), (iii), and (iv)
|
19 | | of this subparagraph (L), the Agency shall not be
|
20 | | restricted from offering additional payment structures
|
21 | | if it determines that such adjustments will better
|
22 | | achieve the goals of this subsection (c), as
|
23 | | prioritized in subparagraph (F) of this paragraph (1) |
24 | | of this subsection (c). Any such adjustments shall be |
25 | | approved by the
Commission as a long-term plan |
26 | | amendment under Section
16-111.5 of the Public |
|
| | HB2659 | - 100 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Utilities Act. |
2 | | (x) Notwithstanding other requirements of this |
3 | | subparagraph (L), no modification shall be required to |
4 | | Adjustable Block Program contracts if they were |
5 | | already executed before new contract forms are |
6 | | implemented under the revised long-term plan that |
7 | | follows this amendatory Act of the 102nd General |
8 | | Assembly, as described in subparagraph (A) of this |
9 | | paragraph (1). |
10 | | (M) The Agency shall be authorized to retain one or |
11 | | more experts or expert consulting firms to develop, |
12 | | administer, implement, operate, and evaluate the |
13 | | Adjustable Block program described in subparagraph (K) of |
14 | | this paragraph (1), and the Agency shall retain the |
15 | | consultant or consultants in the same manner, to the |
16 | | extent practicable, as the Agency retains others to |
17 | | administer provisions of this Act, including, but not |
18 | | limited to, the procurement administrator. The selection |
19 | | of experts and expert consulting firms and the procurement |
20 | | process described in this subparagraph (M) are exempt from |
21 | | the requirements of Section 20-10 of the Illinois |
22 | | Procurement Code, under Section 20-10 of that Code. The |
23 | | Agency shall strive to minimize administrative expenses in |
24 | | the implementation of the Adjustable Block program. |
25 | | The Agency and its consultant or consultants shall |
26 | | monitor block activity, share program activity with |
|
| | HB2659 | - 101 - | LRB102 15746 SPS 21112 b |
|
|
1 | | stakeholders and conduct regularly scheduled meetings to |
2 | | discuss program activity and market conditions. If |
3 | | necessary, the Agency may make prospective administrative |
4 | | adjustments to the Adjustable Block program design, such |
5 | | as redistributing available funds or making adjustments to |
6 | | purchase prices as necessary to achieve the goals of this |
7 | | subsection (c). Program modifications to any price, |
8 | | capacity block, or other program element that do not |
9 | | deviate from the Commission's approved value by more than |
10 | | 25% shall take effect immediately and are not subject to |
11 | | Commission review and approval. Program modifications to |
12 | | any price, capacity block, or other program element that |
13 | | deviate more than 25% from the Commission's approved value |
14 | | must be approved by the Commission as a long-term plan |
15 | | amendment under Section 16-111.5 of the Public Utilities |
16 | | Act. The Agency shall consider stakeholder feedback when |
17 | | making adjustments to the Adjustable Block design and |
18 | | shall notify stakeholders in advance of any planned |
19 | | changes. |
20 | | Immediately upon the effective date of this amendatory
|
21 | | Act of the 102nd General Assembly, the Agency shall
|
22 | | consider whether changes to Adjustable Block Program
|
23 | | elements of less than 25% can and should be adopted to
|
24 | | bring the Adjustable Block Program in line with the |
25 | | updated
goals and targets of this subsection (c). |
26 | | (N) The long-term renewable resources procurement plan |
|
| | HB2659 | - 102 - | LRB102 15746 SPS 21112 b |
|
|
1 | | required by this subsection (c) shall include a Community
|
2 | | Solar Program for solar photovoltaic community renewable |
3 | | generation projects and may include additional community
|
4 | | renewable generation programs or procurements open to
|
5 | | other or additional renewable technology program . The |
6 | | Agency shall establish the terms, conditions, and program |
7 | | requirements for the Community Solar Program and for any
|
8 | | other program or procurement for community renewable |
9 | | generation projects with a goal to expand renewable energy |
10 | | generating facility access to a broader group of energy |
11 | | consumers, to ensure robust participation opportunities |
12 | | for residential and small commercial customers and those |
13 | | who cannot install renewable energy on their own |
14 | | properties , create opportunities for subscribers to
|
15 | | participate in local renewables projects in both urban and
|
16 | | rural communities across the State, enable communities to
|
17 | | self-organize their own renewables projects, and increase
|
18 | | community ownership of renewables projects . Any plan |
19 | | approved by the Commission shall allow subscriptions to |
20 | | community renewable generation projects to be portable and |
21 | | transferable. For purposes of this subparagraph (N) : |
22 | | "Community" means: |
23 | | (i) a social unit in which people come |
24 | | together
regularly to effect change; |
25 | | (ii) a social unit in which participants are |
26 | | marked
by a cooperative spirit, a common purpose, |
|
| | HB2659 | - 103 - | LRB102 15746 SPS 21112 b |
|
|
1 | | or
shared interests or characteristics; or |
2 | | (iii) a space understood by its residents to |
3 | | be
delineated through geographic boundaries or
|
4 | | landmarks. |
5 | | "Community benefit" means: |
6 | | (i) a range of services and activities that
|
7 | | provide affirmative, economic, environmental,
|
8 | | social, cultural, or physical value to a
|
9 | | community; or |
10 | | (ii) a mechanism that enables economic |
11 | | development,
high-quality employment, and |
12 | | education
opportunities for local workers and |
13 | | residents, or
formal monitoring and oversight |
14 | | structures such that community members may ensure |
15 | | that those
services and activities respond to |
16 | | local knowledge
and needs. |
17 | | "Community ownership" means an arrangement in
|
18 | | which: |
19 | | (i) an electric generating facility is, or |
20 | | over
time will be, in significant part, owned
|
21 | | collectively by members of the community to which
|
22 | | an electric generating facility provides benefits; |
23 | | (ii) members of that community participate in
|
24 | | decisions regarding the governance, operation,
|
25 | | maintenance, and upgrades of and to that facility;
|
26 | | and |
|
| | HB2659 | - 104 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (iii) members of that community benefit from |
2 | | regular
use of that facility. |
3 | | "Portable" , "portable" means that subscriptions |
4 | | may be retained by the subscriber even if the |
5 | | subscriber relocates or changes its address within the |
6 | | same utility service territory . |
7 | | "Stakeholder" means any person or entity with a
|
8 | | declared or conceivable interest in a project. |
9 | | "Transferable" ; and "transferable" means that a |
10 | | subscriber may assign or sell subscriptions to another |
11 | | person within the same utility service territory. |
12 | | The Community Solar Program established under this
|
13 | | subparagraph (N) shall be designed to give preference to |
14 | | the procurement of renewable energy credits from projects |
15 | | that
meet one or more of the following community criteria |
16 | | for a
portion of the overall renewable energy credits to |
17 | | be
procured under the Community Solar Program: |
18 | | (i) include community ownership; |
19 | | (ii) are put forward by approved vendors or
|
20 | | companies that take higher numbers of the equity
|
21 | | actions described in paragraph (7) of this subsection
|
22 | | (c); |
23 | | (iii) provide additional community benefit, beyond
|
24 | | project participation as a subscriber; |
25 | | (iv) ensure meaningful involvement in project
|
26 | | organization and development by nonprofit
|
|
| | HB2659 | - 105 - | LRB102 15746 SPS 21112 b |
|
|
1 | | organizations, public entities, or community members; |
2 | | (v) increase the geographic diversity of projects
|
3 | | in the Community Solar Program; |
4 | | (vi) are also brownfield site photovoltaic
|
5 | | projects; |
6 | | (vii) ensure engagement in project operations and
|
7 | | management by nonprofit organizations, public
|
8 | | entities, or community members; or |
9 | | (viii) serve only local subscribers. |
10 | | Terms and guidance within these criteria that are not
|
11 | | defined in this subparagraph (N) shall be defined by the
|
12 | | Agency, with stakeholder input, during the development of
|
13 | | the Agency's long-term renewable resources procurement |
14 | | plan. |
15 | | The Community Solar Program shall procure renewable
|
16 | | energy credits in the following manner: |
17 | | (1) For a portion
of the overall renewable energy |
18 | | credits to be procured
under the Community Solar |
19 | | Program, the Agency shall
initiate a request for |
20 | | projects that serve a minimum of 50%
residential and |
21 | | small business subscribers and maximize
the community |
22 | | criteria in this subparagraph (N). The Agency
shall |
23 | | score all projects submitted under this request for
|
24 | | projects based on their ability to meet the community
|
25 | | criteria. Both projects that better meet individual
|
26 | | criteria as well as projects that address a higher |
|
| | HB2659 | - 106 - | LRB102 15746 SPS 21112 b |
|
|
1 | | number
of criteria shall receive a higher score. The |
2 | | Agency shall
also consider renewable energy credit |
3 | | price when
qualifying and scoring projects. The Agency |
4 | | shall select
the highest scoring projects to advance, |
5 | | subject to budget
availability, reserving a portion of |
6 | | the capacity selected
through the request for those |
7 | | projects that include a
community ownership component. |
8 | | (2) Once projects that
maximize the community |
9 | | criteria have been selected, the
Agency shall initiate |
10 | | a procurement for the remaining
renewable energy |
11 | | credits from photovoltaic community
renewable |
12 | | generation projects needed to meet the goals of
|
13 | | subparagraph (C) of this paragraph (1). The Agency |
14 | | shall
strive to procure renewable energy credits |
15 | | through the
Community Solar Program 4 times per |
16 | | delivery year. This manner of procuring renewable |
17 | | energy credits for the
Community Solar Program may be |
18 | | adjusted upon review by the
Agency and approval by the |
19 | | Commission through the long-term
renewable resources |
20 | | procurement plan update process in
order to better |
21 | | meet the goals of this subsection (c) and
the |
22 | | requirements of this subparagraph (N). |
23 | | Electric utilities shall provide a monetary credit to |
24 | | a subscriber's subsequent bill for service for the |
25 | | proportional output of a community renewable generation |
26 | | project attributable to that subscriber as specified in |
|
| | HB2659 | - 107 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Section 16-107.5 of the Public Utilities Act. |
2 | | The Agency shall procure purchase renewable energy |
3 | | credits from subscribed shares of photovoltaic community |
4 | | renewable generation projects through the Community Solar
|
5 | | Program described in this subparagraph (N) Adjustable |
6 | | Block program described in subparagraph (K) of this |
7 | | paragraph (1) or through the Illinois Solar for All |
8 | | Program described in Section 1-56 of this Act. The Agency |
9 | | shall
procure renewable energy credits from unsubscribed |
10 | | shares
of photovoltaic community renewable generation |
11 | | projects
that have achieved a subscription level of 80% or |
12 | | higher at
the average winning price from the most recent |
13 | | procurement
of renewable energy credits from utility-scale |
14 | | solar
photovoltaic projects or another amount established
|
15 | | through the long-term planning process described in
|
16 | | subparagraph (A) of this paragraph (1) of this subsection |
17 | | (c). The electric utility shall purchase any unsubscribed |
18 | | energy from community renewable generation projects that |
19 | | are Qualifying Facilities ("QF") under the electric |
20 | | utility's tariff for purchasing the output from QFs under |
21 | | Public Utilities Regulatory Policies Act of 1978. |
22 | | The owners of and any subscribers to a community |
23 | | renewable generation project shall not be considered |
24 | | public utilities or alternative retail electricity |
25 | | suppliers under the Public Utilities Act solely as a |
26 | | result of their interest in or subscription to a community |
|
| | HB2659 | - 108 - | LRB102 15746 SPS 21112 b |
|
|
1 | | renewable generation project and shall not be required to |
2 | | become an alternative retail electric supplier by |
3 | | participating in a community renewable generation project |
4 | | with a public utility. |
5 | | (O) For the delivery year beginning June 1, 2018, the |
6 | | long-term renewable resources procurement plan required by |
7 | | this subsection (c) shall provide for the Agency to |
8 | | procure contracts to continue offering the Illinois Solar |
9 | | for All Program described in subsection (b) of Section |
10 | | 1-56 of this Act, and the contracts approved by the |
11 | | Commission shall be executed by the utilities that are |
12 | | subject to this subsection (c). The long-term renewable |
13 | | resources procurement plan shall allocate 5% of the funds |
14 | | available under the plan for the applicable delivery year, |
15 | | or $10,000,000 per delivery year, whichever is greater, to |
16 | | fund the programs, and the plan shall determine the amount |
17 | | of funding to be apportioned to the programs identified in |
18 | | subsection (b) of Section 1-56 of this Act; provided that |
19 | | for the delivery years beginning June 1, 2017, June 1, |
20 | | 2021, and June 1, 2025, the long-term renewable resources |
21 | | procurement plan shall allocate 10% of the funds available |
22 | | under the plan for the applicable delivery year, or |
23 | | $20,000,000 per delivery year, whichever is greater, and |
24 | | $10,000,000 of such funds in such year shall be used by an |
25 | | electric utility that serves more than 3,000,000 retail |
26 | | customers in the State to implement a Commission-approved |
|
| | HB2659 | - 109 - | LRB102 15746 SPS 21112 b |
|
|
1 | | plan under Section 16-108.12 of the Public Utilities Act. |
2 | | In making the determinations required under this |
3 | | subparagraph (O), the Commission shall consider the |
4 | | experience and performance under the programs and any |
5 | | evaluation reports. The Commission shall also provide for |
6 | | an independent evaluation of those programs on a periodic |
7 | | basis that are funded under this subparagraph (O). |
8 | | (P) The Agency shall give preference to the |
9 | | procurement of
renewable energy credits from new |
10 | | utility-scale
photovoltaic and wind projects that provide |
11 | | additional
land use and environmental benefits such as: |
12 | | (i) agriculture-friendly benefits; |
13 | | (ii) pollinator-friendly site practices as
|
14 | | identified in the Pollinator-Friendly Solar Site Act; |
15 | | (iii) brownfield redevelopment, through location
|
16 | | at sites regulated under any of the programs |
17 | | identified as a brownfield site photovoltaic project |
18 | | under
Section 1-10; |
19 | | (iv) vegetative buffers, which are areas
|
20 | | consisting of perennial vegetation, excluding invasive
|
21 | | plants and noxious weeds, adjacent to a body of water
|
22 | | that protects the water resources from runoff
|
23 | | pollution, and stabilizes soils, shores, and banks to
|
24 | | protect or provide riparian corridors; |
25 | | (v) commitment to land use practices that result |
26 | | in
carbon sequestration; |
|
| | HB2659 | - 110 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (vi) land use, design, siting, and construction |
2 | | practices that minimize interference
with natural |
3 | | habitat and wildlife; and |
4 | | (vii) other land use or environmental benefits
|
5 | | identified by the Agency with input from stakeholders
|
6 | | received during the long-term renewable resources
|
7 | | procurement plan revision process. |
8 | | (1.5) No Later than May 31, 2022, all Illinois |
9 | | electric
cooperatives and municipal utilities shall |
10 | | develop a plan
to ensure that their members and customers |
11 | | have access to
renewable energy on a reasonably equivalent |
12 | | basis to all
other residents in the State, including the |
13 | | overall
percentage goals listed in subparagraph (A) of |
14 | | paragraph
(1) of this Section and the carbon-free |
15 | | resources goals of
subsection (k) of this Section 1-75. |
16 | | These plans shall be
developed through a public process |
17 | | involving municipal
utility and cooperative members, |
18 | | customers, and other members of the public, and shall be |
19 | | filed with the Illinois
Commerce Commission at least every |
20 | | 2 years. |
21 | | (2) (Blank). |
22 | | (3) (Blank). |
23 | | (4) The electric utility shall retire all renewable |
24 | | energy credits used to comply with the standard. |
25 | | (5) Beginning with the 2010 delivery year and ending |
26 | | June 1, 2017, an electric utility subject to this |
|
| | HB2659 | - 111 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subsection (c) shall apply the lesser of the maximum |
2 | | alternative compliance payment rate or the most recent |
3 | | estimated alternative compliance payment rate for its |
4 | | service territory for the corresponding compliance period, |
5 | | established pursuant to subsection (d) of Section 16-115D |
6 | | of the Public Utilities Act to its retail customers that |
7 | | take service pursuant to the electric utility's hourly |
8 | | pricing tariff or tariffs. The electric utility shall |
9 | | retain all amounts collected as a result of the |
10 | | application of the alternative compliance payment rate or |
11 | | rates to such customers, and, beginning in 2011, the |
12 | | utility shall include in the information provided under |
13 | | item (1) of subsection (d) of Section 16-111.5 of the |
14 | | Public Utilities Act the amounts collected under the |
15 | | alternative compliance payment rate or rates for the prior |
16 | | year ending May 31. Notwithstanding any limitation on the |
17 | | procurement of renewable energy resources imposed by item |
18 | | (2) of this subsection (c), the Agency shall increase its |
19 | | spending on the purchase of renewable energy resources to |
20 | | be procured by the electric utility for the next plan year |
21 | | by an amount equal to the amounts collected by the utility |
22 | | under the alternative compliance payment rate or rates in |
23 | | the prior year ending May 31. |
24 | | (6) The electric utility shall be entitled to recover |
25 | | all of its costs associated with the procurement of |
26 | | renewable energy credits under plans approved under this |
|
| | HB2659 | - 112 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Section and Section 16-111.5 of the Public Utilities Act. |
2 | | These costs shall include associated reasonable expenses |
3 | | for implementing the procurement programs, including, but |
4 | | not limited to, the costs of administering and evaluating |
5 | | the Adjustable Block program, through an automatic |
6 | | adjustment clause tariff in accordance with subsection (k) |
7 | | of Section 16-108 of the Public Utilities Act. |
8 | | (7) Renewable energy credits procured from new |
9 | | photovoltaic projects or new distributed renewable energy |
10 | | generation devices under this Section after June 1, 2017 |
11 | | (the effective date of Public Act 99-906) must be procured |
12 | | from devices installed by a qualified person in compliance |
13 | | with the requirements of Section 16-128A of the Public |
14 | | Utilities Act and any rules or regulations adopted |
15 | | thereunder. |
16 | | In meeting the renewable energy requirements of this |
17 | | subsection (c), to the extent feasible and consistent with |
18 | | State and federal law, the renewable energy credit |
19 | | procurements, Adjustable Block solar program, and |
20 | | community renewable generation program , and Illinois Solar
|
21 | | for All Program shall provide employment opportunities for |
22 | | all segments of the population and workforce, including |
23 | | black, indigenous, and people of color-owned |
24 | | minority-owned and women-owned female-owned business |
25 | | enterprises , as well as black, indigenous, and people of |
26 | | color-owned and women-owned
worker-owned cooperatives or |
|
| | HB2659 | - 113 - | LRB102 15746 SPS 21112 b |
|
|
1 | | other such employee-owned entities , and shall not, |
2 | | consistent with State and federal law, discriminate based |
3 | | on race or socioeconomic status. |
4 | | Specifically, as the Agency conducts competitive |
5 | | procurement processes and implements programs to procure |
6 | | renewable energy credits identified in the long-term |
7 | | renewable resources procurement plan, the Agency must give |
8 | | preference to the procurement of renewable energy credits |
9 | | from those entities, including approved vendors, |
10 | | companies, nonprofit organizations, and worker-owned |
11 | | cooperatives, as described in the equity actions points |
12 | | calculation in this paragraph (7). Entities from whom the |
13 | | Agency procures renewable energy credits shall comply with |
14 | | submitting an annual report of elements described in the |
15 | | equity actions points calculation in this paragraph (7) |
16 | | for the first 3 years after the year of the procurement |
17 | | event in which renewable energy credits were procured on |
18 | | June 1 of each applicable year. For the purposes of this |
19 | | subsection (c): |
20 | | "BIPOC" and "black, indigenous, and people of color" |
21 | | are defined as people who are members of the groups |
22 | | described in subparagraphs (a) through (e) of paragraph |
23 | | (A) of subsection (1) of Section 2 of the Business |
24 | | Enterprise for Minorities, Women, and Persons with |
25 | | Disabilities Act. |
26 | | "Labor peace agreement" means an agreement between an |
|
| | HB2659 | - 114 - | LRB102 15746 SPS 21112 b |
|
|
1 | | entity and any labor organization recognized under the |
2 | | National Labor Relations Act, referred to in this Act as a |
3 | | bona fide labor organization, that may prohibit labor |
4 | | organizations and members from engaging in picketing, work |
5 | | stoppages, boycotts, and any other economic interference |
6 | | with the entity. This agreement means that the entity has |
7 | | agreed not to disrupt efforts by the bona fide labor |
8 | | organization to communicate with, and attempt to organize |
9 | | and represent, the entity's employees. The agreement shall |
10 | | provide a bona fide labor organization access at |
11 | | reasonable times to areas in which the entity's employees |
12 | | work, for the purpose of meeting with employees to discuss |
13 | | their right to representation, employment rights under |
14 | | State law, and terms and conditions of employment. This |
15 | | type of agreement shall not mandate a particular method of |
16 | | election or certification of the bona fide labor |
17 | | organization. |
18 | | "Energy worker" means a person who has been employed |
19 | | full-time for a period of one year or longer, and within |
20 | | the previous 5 years, at a fossil fuel power plant, a |
21 | | nuclear power plant, or a coal mine located within the |
22 | | State of Illinois, whether or not they are employed by the |
23 | | owner of the power plant or mine. Energy workers are |
24 | | considered to be full-time if they work at least 35 hours |
25 | | per week for 45 weeks a year or the 1,820 work-hour |
26 | | equivalent with vacations, paid holidays, and sick time, |
|
| | HB2659 | - 115 - | LRB102 15746 SPS 21112 b |
|
|
1 | | but not overtime, included in this computation. |
2 | | Classification of an individual as an energy worker |
3 | | continues for 5 years from the latest date of employment |
4 | | or the effective date of this Act, whichever is later. |
5 | | The Illinois Power Agency, using alternative bidding |
6 | | procedures as provided for in subsection (i) of Section |
7 | | 20-10 of the Illinois Procurement Code, shall track and |
8 | | award equity actions in bids for the renewable energy |
9 | | credit procurements, Adjustable Block solar program, |
10 | | community renewable generation program, and Illinois Solar |
11 | | for All Program using a points system totaling a maximum |
12 | | of 260 points. This system shall consider both equity |
13 | | actions to meet the goals described in paragraph (7), and |
14 | | the bid prices, as follows: |
15 | | (A) Hiring Equity Action (up to 20 points): |
16 | | awarded based on the percentage of the company's or |
17 | | entity's workforce (measured by full-time equivalents |
18 | | as defined by the Government Accountability Office of |
19 | | the United States Congress) who are BIPOC and who are |
20 | | paid at or above the prevailing wage; one point shall |
21 | | be awarded for each 5% of the workforce which is |
22 | | composed of BIPOC who are also paid at or above the |
23 | | prevailing wage, up to a maximum of 20 points. |
24 | | (B) Clean Jobs Workforce and Returning Residents |
25 | | Action (up to 20 points): awarded based on the |
26 | | percentage of the workers associated with the project |
|
| | HB2659 | - 116 - | LRB102 15746 SPS 21112 b |
|
|
1 | | who are graduates or trainees from equity-focused |
2 | | workforce training programs designated by the Illinois |
3 | | Power Agency, or have equivalent certification, and |
4 | | paid at or above the prevailing wage; one point shall |
5 | | be awarded for each 5% of the workforce which is |
6 | | composed of such graduates or trainees, up to a |
7 | | maximum of 20 points. |
8 | | (C) Minority Business Enterprise Action (30 |
9 | | points): being an entity defined as a minority-owned |
10 | | business under Section 2 of the Business Enterprise |
11 | | for Minorities, Women, and Persons with Disabilities |
12 | | Act or (ii) an entity, including a business, a |
13 | | nonprofit, or a worker-owned cooperative registered |
14 | | with other state, regional, or local programs intended |
15 | | to certify minority-owned businesses. |
16 | | (D) Contracting Equity Action (20 points): awarded |
17 | | based on the percentage of the company's or entity's |
18 | | subcontractors or vendors that are BIPOC-owned |
19 | | businesses, defined as a minority owned-business or a |
20 | | woman-owned business under Section 2 of the Business |
21 | | Enterprise for Minorities, Women, and Persons with |
22 | | Disabilities Act, or awarded based on the percentage |
23 | | of the subcontracted workers associated with the |
24 | | project, including from all subcontractors and vendors |
25 | | that are Black, indigenous, and people of color who |
26 | | are paid at or above the prevailing wage; 5 points |
|
| | HB2659 | - 117 - | LRB102 15746 SPS 21112 b |
|
|
1 | | shall be awarded for each 10% of either subcontractors |
2 | | or subcontractors' workers who are Black, indigenous, |
3 | | and people of color, whichever is greater, up to a |
4 | | maximum of 20 points. Bids may not be eligible for |
5 | | points under this subjection unless they plan to use |
6 | | subcontractors. If a company or entity does not use |
7 | | subcontractors, points awarded for the Contracting |
8 | | Equity Action shall be equivalent to the point value |
9 | | awarded for the Hiring Equity Action under |
10 | | subparagraph (A). |
11 | | (E) Expanding Clean Energy Entrepreneurship Action |
12 | | (20 points): awarded to entities who are current or |
13 | | former participants in contractor incubator programs |
14 | | or entrepreneurship programs designated by the |
15 | | Illinois Power Agency, or have equivalent |
16 | | qualification. |
17 | | (F) Community Benefits Action (15 points): (i) for |
18 | | projects 100 kW in size or larger, project has an |
19 | | executed Community Benefits Agreement that could |
20 | | include, but is not limited to a commitment to hire |
21 | | local workers, union workers, energy workers |
22 | | transitioning to clean energy jobs, graduates or |
23 | | trainees from equity-focused workforce training |
24 | | programs designated by the Illinois Power Agency, or |
25 | | current or former participants in contractor incubator |
26 | | programs or entrepreneurship programs designated by |
|
| | HB2659 | - 118 - | LRB102 15746 SPS 21112 b |
|
|
1 | | the Illinois Power Agency, or have equivalent |
2 | | qualifications, a commitment to pay workers at or |
3 | | above the prevailing wage; and a commitment to give |
4 | | communities ownership opportunities in electric |
5 | | vehicle projects, where relevant; and (ii) for |
6 | | projects under 100 kW in size, companies pay their |
7 | | workforces at or above the prevailing wage. |
8 | | (G) Small Business Action (15 points): company's |
9 | | workforce is composed of 3 or fewer full-time |
10 | | employees (measured by full-time equivalents as |
11 | | defined by the Government Accountability Office of the |
12 | | United States Congress). |
13 | | (H) Labor Peace Agreement Action (10 points): (i) |
14 | | for a bidder with 20 or more employees: the bidder |
15 | | attests that the bidder has entered into a labor peace |
16 | | agreement, will abide by the terms of the agreement, |
17 | | and will submit a copy of the page of the labor peace |
18 | | agreement that contains the signatures of the union |
19 | | representative and the installer, or (ii) for a bidder |
20 | | that is a party to a labor peace agreement with a bona |
21 | | fide labor organization that currently represents, or |
22 | | is actively seeking to represent energy efficiency |
23 | | installers and other workers in Illinois, or (iii) the |
24 | | bidder submits an attestation affirming that the |
25 | | bidder will use best efforts to use union labor in the |
26 | | bidder's projects and in the construction or retrofit |
|
| | HB2659 | - 119 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of the facilities associated with the bidder's |
2 | | renewable energy operations, where applicable. |
3 | | (I) Price of bid (130 points): as scored by the |
4 | | Illinois Power Agency. |
5 | | Bids scoring fewer than 135 points shall not be |
6 | | awarded contracts. |
7 | | (d) Clean coal portfolio standard. |
8 | | (1) The procurement plans shall include electricity |
9 | | generated using clean coal. Each utility shall enter into |
10 | | one or more sourcing agreements with the initial clean |
11 | | coal facility, as provided in paragraph (3) of this |
12 | | subsection (d), covering electricity generated by the |
13 | | initial clean coal facility representing at least 5% of |
14 | | each utility's total supply to serve the load of eligible |
15 | | retail customers in 2015 and each year thereafter, as |
16 | | described in paragraph (3) of this subsection (d), subject |
17 | | to the limits specified in paragraph (2) of this |
18 | | subsection (d). It is the goal of the State that by January |
19 | | 1, 2025, 25% of the electricity used in the State shall be |
20 | | generated by cost-effective clean coal facilities. For |
21 | | purposes of this subsection (d), "cost-effective" means |
22 | | that the expenditures pursuant to such sourcing agreements |
23 | | do not cause the limit stated in paragraph (2) of this |
24 | | subsection (d) to be exceeded and do not exceed cost-based |
25 | | benchmarks, which shall be developed to assess all |
26 | | expenditures pursuant to such sourcing agreements covering |
|
| | HB2659 | - 120 - | LRB102 15746 SPS 21112 b |
|
|
1 | | electricity generated by clean coal facilities, other than |
2 | | the initial clean coal facility, by the procurement |
3 | | administrator, in consultation with the Commission staff, |
4 | | Agency staff, and the procurement monitor and shall be |
5 | | subject to Commission review and approval. |
6 | | A utility party to a sourcing agreement shall |
7 | | immediately retire any emission credits that it receives |
8 | | in connection with the electricity covered by such |
9 | | agreement. |
10 | | Utilities shall maintain adequate records documenting |
11 | | the purchases under the sourcing agreement to comply with |
12 | | this subsection (d) and shall file an accounting with the |
13 | | load forecast that must be filed with the Agency by July 15 |
14 | | of each year, in accordance with subsection (d) of Section |
15 | | 16-111.5 of the Public Utilities Act. |
16 | | A utility shall be deemed to have complied with the |
17 | | clean coal portfolio standard specified in this subsection |
18 | | (d) if the utility enters into a sourcing agreement as |
19 | | required by this subsection (d). |
20 | | (2) For purposes of this subsection (d), the required |
21 | | execution of sourcing agreements with the initial clean |
22 | | coal facility for a particular year shall be measured as a |
23 | | percentage of the actual amount of electricity |
24 | | (megawatt-hours) supplied by the electric utility to |
25 | | eligible retail customers in the planning year ending |
26 | | immediately prior to the agreement's execution. For |
|
| | HB2659 | - 121 - | LRB102 15746 SPS 21112 b |
|
|
1 | | purposes of this subsection (d), the amount paid per |
2 | | kilowatthour means the total amount paid for electric |
3 | | service expressed on a per kilowatthour basis. For |
4 | | purposes of this subsection (d), the total amount paid for |
5 | | electric service includes without limitation amounts paid |
6 | | for supply, transmission, distribution, surcharges and |
7 | | add-on taxes. |
8 | | Notwithstanding the requirements of this subsection |
9 | | (d), the total amount paid under sourcing agreements with |
10 | | clean coal facilities pursuant to the procurement plan for |
11 | | any given year shall be reduced by an amount necessary to |
12 | | limit the annual estimated average net increase due to the |
13 | | costs of these resources included in the amounts paid by |
14 | | eligible retail customers in connection with electric |
15 | | service to: |
16 | | (A) in 2010, no more than 0.5% of the amount paid |
17 | | per kilowatthour by those customers during the year |
18 | | ending May 31, 2009; |
19 | | (B) in 2011, the greater of an additional 0.5% of |
20 | | the amount paid per kilowatthour by those customers |
21 | | during the year ending May 31, 2010 or 1% of the amount |
22 | | paid per kilowatthour by those customers during the |
23 | | year ending May 31, 2009; |
24 | | (C) in 2012, the greater of an additional 0.5% of |
25 | | the amount paid per kilowatthour by those customers |
26 | | during the year ending May 31, 2011 or 1.5% of the |
|
| | HB2659 | - 122 - | LRB102 15746 SPS 21112 b |
|
|
1 | | amount paid per kilowatthour by those customers during |
2 | | the year ending May 31, 2009; |
3 | | (D) in 2013, the greater of an additional 0.5% of |
4 | | the amount paid per kilowatthour by those customers |
5 | | during the year ending May 31, 2012 or 2% of the amount |
6 | | paid per kilowatthour by those customers during the |
7 | | year ending May 31, 2009; and |
8 | | (E) thereafter, the total amount paid under |
9 | | sourcing agreements with clean coal facilities |
10 | | pursuant to the procurement plan for any single year |
11 | | shall be reduced by an amount necessary to limit the |
12 | | estimated average net increase due to the cost of |
13 | | these resources included in the amounts paid by |
14 | | eligible retail customers in connection with electric |
15 | | service to no more than the greater of (i) 2.015% of |
16 | | the amount paid per kilowatthour by those customers |
17 | | during the year ending May 31, 2009 or (ii) the |
18 | | incremental amount per kilowatthour paid for these |
19 | | resources in 2013. These requirements may be altered |
20 | | only as provided by statute. |
21 | | No later than June 30, 2015, the Commission shall |
22 | | review the limitation on the total amount paid under |
23 | | sourcing agreements, if any, with clean coal facilities |
24 | | pursuant to this subsection (d) and report to the General |
25 | | Assembly its findings as to whether that limitation unduly |
26 | | constrains the amount of electricity generated by |
|
| | HB2659 | - 123 - | LRB102 15746 SPS 21112 b |
|
|
1 | | cost-effective clean coal facilities that is covered by |
2 | | sourcing agreements. |
3 | | (3) Initial clean coal facility. In order to promote |
4 | | development of clean coal facilities in Illinois, each |
5 | | electric utility subject to this Section shall execute a |
6 | | sourcing agreement to source electricity from a proposed |
7 | | clean coal facility in Illinois (the "initial clean coal |
8 | | facility") that will have a nameplate capacity of at least |
9 | | 500 MW when commercial operation commences, that has a |
10 | | final Clean Air Act permit on June 1, 2009 (the effective |
11 | | date of Public Act 95-1027), and that will meet the |
12 | | definition of clean coal facility in Section 1-10 of this |
13 | | Act when commercial operation commences. The sourcing |
14 | | agreements with this initial clean coal facility shall be |
15 | | subject to both approval of the initial clean coal |
16 | | facility by the General Assembly and satisfaction of the |
17 | | requirements of paragraph (4) of this subsection (d) and |
18 | | shall be executed within 90 days after any such approval |
19 | | by the General Assembly. The Agency and the Commission |
20 | | shall have authority to inspect all books and records |
21 | | associated with the initial clean coal facility during the |
22 | | term of such a sourcing agreement. A utility's sourcing |
23 | | agreement for electricity produced by the initial clean |
24 | | coal facility shall include: |
25 | | (A) a formula contractual price (the "contract |
26 | | price") approved pursuant to paragraph (4) of this |
|
| | HB2659 | - 124 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subsection (d), which shall: |
2 | | (i) be determined using a cost of service |
3 | | methodology employing either a level or deferred |
4 | | capital recovery component, based on a capital |
5 | | structure consisting of 45% equity and 55% debt, |
6 | | and a return on equity as may be approved by the |
7 | | Federal Energy Regulatory Commission, which in any |
8 | | case may not exceed the lower of 11.5% or the rate |
9 | | of return approved by the General Assembly |
10 | | pursuant to paragraph (4) of this subsection (d); |
11 | | and |
12 | | (ii) provide that all miscellaneous net |
13 | | revenue, including but not limited to net revenue |
14 | | from the sale of emission allowances, if any, |
15 | | substitute natural gas, if any, grants or other |
16 | | support provided by the State of Illinois or the |
17 | | United States Government, firm transmission |
18 | | rights, if any, by-products produced by the |
19 | | facility, energy or capacity derived from the |
20 | | facility and not covered by a sourcing agreement |
21 | | pursuant to paragraph (3) of this subsection (d) |
22 | | or item (5) of subsection (d) of Section 16-115 of |
23 | | the Public Utilities Act, whether generated from |
24 | | the synthesis gas derived from coal, from SNG, or |
25 | | from natural gas, shall be credited against the |
26 | | revenue requirement for this initial clean coal |
|
| | HB2659 | - 125 - | LRB102 15746 SPS 21112 b |
|
|
1 | | facility; |
2 | | (B) power purchase provisions, which shall: |
3 | | (i) provide that the utility party to such |
4 | | sourcing agreement shall pay the contract price |
5 | | for electricity delivered under such sourcing |
6 | | agreement; |
7 | | (ii) require delivery of electricity to the |
8 | | regional transmission organization market of the |
9 | | utility that is party to such sourcing agreement; |
10 | | (iii) require the utility party to such |
11 | | sourcing agreement to buy from the initial clean |
12 | | coal facility in each hour an amount of energy |
13 | | equal to all clean coal energy made available from |
14 | | the initial clean coal facility during such hour |
15 | | times a fraction, the numerator of which is such |
16 | | utility's retail market sales of electricity |
17 | | (expressed in kilowatthours sold) in the State |
18 | | during the prior calendar month and the |
19 | | denominator of which is the total retail market |
20 | | sales of electricity (expressed in kilowatthours |
21 | | sold) in the State by utilities during such prior |
22 | | month and the sales of electricity (expressed in |
23 | | kilowatthours sold) in the State by alternative |
24 | | retail electric suppliers during such prior month |
25 | | that are subject to the requirements of this |
26 | | subsection (d) and paragraph (5) of subsection (d) |
|
| | HB2659 | - 126 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of Section 16-115 of the Public Utilities Act, |
2 | | provided that the amount purchased by the utility |
3 | | in any year will be limited by paragraph (2) of |
4 | | this subsection (d); and |
5 | | (iv) be considered pre-existing contracts in |
6 | | such utility's procurement plans for eligible |
7 | | retail customers; |
8 | | (C) contract for differences provisions, which |
9 | | shall: |
10 | | (i) require the utility party to such sourcing |
11 | | agreement to contract with the initial clean coal |
12 | | facility in each hour with respect to an amount of |
13 | | energy equal to all clean coal energy made |
14 | | available from the initial clean coal facility |
15 | | during such hour times a fraction, the numerator |
16 | | of which is such utility's retail market sales of |
17 | | electricity (expressed in kilowatthours sold) in |
18 | | the utility's service territory in the State |
19 | | during the prior calendar month and the |
20 | | denominator of which is the total retail market |
21 | | sales of electricity (expressed in kilowatthours |
22 | | sold) in the State by utilities during such prior |
23 | | month and the sales of electricity (expressed in |
24 | | kilowatthours sold) in the State by alternative |
25 | | retail electric suppliers during such prior month |
26 | | that are subject to the requirements of this |
|
| | HB2659 | - 127 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subsection (d) and paragraph (5) of subsection (d) |
2 | | of Section 16-115 of the Public Utilities Act, |
3 | | provided that the amount paid by the utility in |
4 | | any year will be limited by paragraph (2) of this |
5 | | subsection (d); |
6 | | (ii) provide that the utility's payment |
7 | | obligation in respect of the quantity of |
8 | | electricity determined pursuant to the preceding |
9 | | clause (i) shall be limited to an amount equal to |
10 | | (1) the difference between the contract price |
11 | | determined pursuant to subparagraph (A) of |
12 | | paragraph (3) of this subsection (d) and the |
13 | | day-ahead price for electricity delivered to the |
14 | | regional transmission organization market of the |
15 | | utility that is party to such sourcing agreement |
16 | | (or any successor delivery point at which such |
17 | | utility's supply obligations are financially |
18 | | settled on an hourly basis) (the "reference |
19 | | price") on the day preceding the day on which the |
20 | | electricity is delivered to the initial clean coal |
21 | | facility busbar, multiplied by (2) the quantity of |
22 | | electricity determined pursuant to the preceding |
23 | | clause (i); and |
24 | | (iii) not require the utility to take physical |
25 | | delivery of the electricity produced by the |
26 | | facility; |
|
| | HB2659 | - 128 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (D) general provisions, which shall: |
2 | | (i) specify a term of no more than 30 years, |
3 | | commencing on the commercial operation date of the |
4 | | facility; |
5 | | (ii) provide that utilities shall maintain |
6 | | adequate records documenting purchases under the |
7 | | sourcing agreements entered into to comply with |
8 | | this subsection (d) and shall file an accounting |
9 | | with the load forecast that must be filed with the |
10 | | Agency by July 15 of each year, in accordance with |
11 | | subsection (d) of Section 16-111.5 of the Public |
12 | | Utilities Act; |
13 | | (iii) provide that all costs associated with |
14 | | the initial clean coal facility will be |
15 | | periodically reported to the Federal Energy |
16 | | Regulatory Commission and to purchasers in |
17 | | accordance with applicable laws governing |
18 | | cost-based wholesale power contracts; |
19 | | (iv) permit the Illinois Power Agency to |
20 | | assume ownership of the initial clean coal |
21 | | facility, without monetary consideration and |
22 | | otherwise on reasonable terms acceptable to the |
23 | | Agency, if the Agency so requests no less than 3 |
24 | | years prior to the end of the stated contract |
25 | | term; |
26 | | (v) require the owner of the initial clean |
|
| | HB2659 | - 129 - | LRB102 15746 SPS 21112 b |
|
|
1 | | coal facility to provide documentation to the |
2 | | Commission each year, starting in the facility's |
3 | | first year of commercial operation, accurately |
4 | | reporting the quantity of carbon emissions from |
5 | | the facility that have been captured and |
6 | | sequestered and report any quantities of carbon |
7 | | released from the site or sites at which carbon |
8 | | emissions were sequestered in prior years, based |
9 | | on continuous monitoring of such sites. If, in any |
10 | | year after the first year of commercial operation, |
11 | | the owner of the facility fails to demonstrate |
12 | | that the initial clean coal facility captured and |
13 | | sequestered at least 50% of the total carbon |
14 | | emissions that the facility would otherwise emit |
15 | | or that sequestration of emissions from prior |
16 | | years has failed, resulting in the release of |
17 | | carbon dioxide into the atmosphere, the owner of |
18 | | the facility must offset excess emissions. Any |
19 | | such carbon offsets must be permanent, additional, |
20 | | verifiable, real, located within the State of |
21 | | Illinois, and legally and practicably enforceable. |
22 | | The cost of such offsets for the facility that are |
23 | | not recoverable shall not exceed $15 million in |
24 | | any given year. No costs of any such purchases of |
25 | | carbon offsets may be recovered from a utility or |
26 | | its customers. All carbon offsets purchased for |
|
| | HB2659 | - 130 - | LRB102 15746 SPS 21112 b |
|
|
1 | | this purpose and any carbon emission credits |
2 | | associated with sequestration of carbon from the |
3 | | facility must be permanently retired. The initial |
4 | | clean coal facility shall not forfeit its |
5 | | designation as a clean coal facility if the |
6 | | facility fails to fully comply with the applicable |
7 | | carbon sequestration requirements in any given |
8 | | year, provided the requisite offsets are |
9 | | purchased. However, the Attorney General, on |
10 | | behalf of the People of the State of Illinois, may |
11 | | specifically enforce the facility's sequestration |
12 | | requirement and the other terms of this contract |
13 | | provision. Compliance with the sequestration |
14 | | requirements and offset purchase requirements |
15 | | specified in paragraph (3) of this subsection (d) |
16 | | shall be reviewed annually by an independent |
17 | | expert retained by the owner of the initial clean |
18 | | coal facility, with the advance written approval |
19 | | of the Attorney General. The Commission may, in |
20 | | the course of the review specified in item (vii), |
21 | | reduce the allowable return on equity for the |
22 | | facility if the facility willfully fails to comply |
23 | | with the carbon capture and sequestration |
24 | | requirements set forth in this item (v); |
25 | | (vi) include limits on, and accordingly |
26 | | provide for modification of, the amount the |
|
| | HB2659 | - 131 - | LRB102 15746 SPS 21112 b |
|
|
1 | | utility is required to source under the sourcing |
2 | | agreement consistent with paragraph (2) of this |
3 | | subsection (d); |
4 | | (vii) require Commission review: (1) to |
5 | | determine the justness, reasonableness, and |
6 | | prudence of the inputs to the formula referenced |
7 | | in subparagraphs (A)(i) through (A)(iii) of |
8 | | paragraph (3) of this subsection (d), prior to an |
9 | | adjustment in those inputs including, without |
10 | | limitation, the capital structure and return on |
11 | | equity, fuel costs, and other operations and |
12 | | maintenance costs and (2) to approve the costs to |
13 | | be passed through to customers under the sourcing |
14 | | agreement by which the utility satisfies its |
15 | | statutory obligations. Commission review shall |
16 | | occur no less than every 3 years, regardless of |
17 | | whether any adjustments have been proposed, and |
18 | | shall be completed within 9 months; |
19 | | (viii) limit the utility's obligation to such |
20 | | amount as the utility is allowed to recover |
21 | | through tariffs filed with the Commission, |
22 | | provided that neither the clean coal facility nor |
23 | | the utility waives any right to assert federal |
24 | | pre-emption or any other argument in response to a |
25 | | purported disallowance of recovery costs; |
26 | | (ix) limit the utility's or alternative retail |
|
| | HB2659 | - 132 - | LRB102 15746 SPS 21112 b |
|
|
1 | | electric supplier's obligation to incur any |
2 | | liability until such time as the facility is in |
3 | | commercial operation and generating power and |
4 | | energy and such power and energy is being |
5 | | delivered to the facility busbar; |
6 | | (x) provide that the owner or owners of the |
7 | | initial clean coal facility, which is the |
8 | | counterparty to such sourcing agreement, shall |
9 | | have the right from time to time to elect whether |
10 | | the obligations of the utility party thereto shall |
11 | | be governed by the power purchase provisions or |
12 | | the contract for differences provisions; |
13 | | (xi) append documentation showing that the |
14 | | formula rate and contract, insofar as they relate |
15 | | to the power purchase provisions, have been |
16 | | approved by the Federal Energy Regulatory |
17 | | Commission pursuant to Section 205 of the Federal |
18 | | Power Act; |
19 | | (xii) provide that any changes to the terms of |
20 | | the contract, insofar as such changes relate to |
21 | | the power purchase provisions, are subject to |
22 | | review under the public interest standard applied |
23 | | by the Federal Energy Regulatory Commission |
24 | | pursuant to Sections 205 and 206 of the Federal |
25 | | Power Act; and |
26 | | (xiii) conform with customary lender |
|
| | HB2659 | - 133 - | LRB102 15746 SPS 21112 b |
|
|
1 | | requirements in power purchase agreements used as |
2 | | the basis for financing non-utility generators. |
3 | | (4) Effective date of sourcing agreements with the |
4 | | initial clean coal facility. Any proposed sourcing |
5 | | agreement with the initial clean coal facility shall not |
6 | | become effective unless the following reports are prepared |
7 | | and submitted and authorizations and approvals obtained: |
8 | | (i) Facility cost report. The owner of the initial |
9 | | clean coal facility shall submit to the Commission, |
10 | | the Agency, and the General Assembly a front-end |
11 | | engineering and design study, a facility cost report, |
12 | | method of financing (including but not limited to |
13 | | structure and associated costs), and an operating and |
14 | | maintenance cost quote for the facility (collectively |
15 | | "facility cost report"), which shall be prepared in |
16 | | accordance with the requirements of this paragraph (4) |
17 | | of subsection (d) of this Section, and shall provide |
18 | | the Commission and the Agency access to the work |
19 | | papers, relied upon documents, and any other backup |
20 | | documentation related to the facility cost report. |
21 | | (ii) Commission report. Within 6 months following |
22 | | receipt of the facility cost report, the Commission, |
23 | | in consultation with the Agency, shall submit a report |
24 | | to the General Assembly setting forth its analysis of |
25 | | the facility cost report. Such report shall include, |
26 | | but not be limited to, a comparison of the costs |
|
| | HB2659 | - 134 - | LRB102 15746 SPS 21112 b |
|
|
1 | | associated with electricity generated by the initial |
2 | | clean coal facility to the costs associated with |
3 | | electricity generated by other types of generation |
4 | | facilities, an analysis of the rate impacts on |
5 | | residential and small business customers over the life |
6 | | of the sourcing agreements, and an analysis of the |
7 | | likelihood that the initial clean coal facility will |
8 | | commence commercial operation by and be delivering |
9 | | power to the facility's busbar by 2016. To assist in |
10 | | the preparation of its report, the Commission, in |
11 | | consultation with the Agency, may hire one or more |
12 | | experts or consultants, the costs of which shall be |
13 | | paid for by the owner of the initial clean coal |
14 | | facility. The Commission and Agency may begin the |
15 | | process of selecting such experts or consultants prior |
16 | | to receipt of the facility cost report. |
17 | | (iii) General Assembly approval. The proposed |
18 | | sourcing agreements shall not take effect unless, |
19 | | based on the facility cost report and the Commission's |
20 | | report, the General Assembly enacts authorizing |
21 | | legislation approving (A) the projected price, stated |
22 | | in cents per kilowatthour, to be charged for |
23 | | electricity generated by the initial clean coal |
24 | | facility, (B) the projected impact on residential and |
25 | | small business customers' bills over the life of the |
26 | | sourcing agreements, and (C) the maximum allowable |
|
| | HB2659 | - 135 - | LRB102 15746 SPS 21112 b |
|
|
1 | | return on equity for the project; and |
2 | | (iv) Commission review. If the General Assembly |
3 | | enacts authorizing legislation pursuant to |
4 | | subparagraph (iii) approving a sourcing agreement, the |
5 | | Commission shall, within 90 days of such enactment, |
6 | | complete a review of such sourcing agreement. During |
7 | | such time period, the Commission shall implement any |
8 | | directive of the General Assembly, resolve any |
9 | | disputes between the parties to the sourcing agreement |
10 | | concerning the terms of such agreement, approve the |
11 | | form of such agreement, and issue an order finding |
12 | | that the sourcing agreement is prudent and reasonable. |
13 | | The facility cost report shall be prepared as follows: |
14 | | (A) The facility cost report shall be prepared by |
15 | | duly licensed engineering and construction firms |
16 | | detailing the estimated capital costs payable to one |
17 | | or more contractors or suppliers for the engineering, |
18 | | procurement and construction of the components |
19 | | comprising the initial clean coal facility and the |
20 | | estimated costs of operation and maintenance of the |
21 | | facility. The facility cost report shall include: |
22 | | (i) an estimate of the capital cost of the |
23 | | core plant based on one or more front end |
24 | | engineering and design studies for the |
25 | | gasification island and related facilities. The |
26 | | core plant shall include all civil, structural, |
|
| | HB2659 | - 136 - | LRB102 15746 SPS 21112 b |
|
|
1 | | mechanical, electrical, control, and safety |
2 | | systems. |
3 | | (ii) an estimate of the capital cost of the |
4 | | balance of the plant, including any capital costs |
5 | | associated with sequestration of carbon dioxide |
6 | | emissions and all interconnects and interfaces |
7 | | required to operate the facility, such as |
8 | | transmission of electricity, construction or |
9 | | backfeed power supply, pipelines to transport |
10 | | substitute natural gas or carbon dioxide, potable |
11 | | water supply, natural gas supply, water supply, |
12 | | water discharge, landfill, access roads, and coal |
13 | | delivery. |
14 | | The quoted construction costs shall be expressed |
15 | | in nominal dollars as of the date that the quote is |
16 | | prepared and shall include capitalized financing costs |
17 | | during construction,
taxes, insurance, and other |
18 | | owner's costs, and an assumed escalation in materials |
19 | | and labor beyond the date as of which the construction |
20 | | cost quote is expressed. |
21 | | (B) The front end engineering and design study for |
22 | | the gasification island and the cost study for the |
23 | | balance of plant shall include sufficient design work |
24 | | to permit quantification of major categories of |
25 | | materials, commodities and labor hours, and receipt of |
26 | | quotes from vendors of major equipment required to |
|
| | HB2659 | - 137 - | LRB102 15746 SPS 21112 b |
|
|
1 | | construct and operate the clean coal facility. |
2 | | (C) The facility cost report shall also include an |
3 | | operating and maintenance cost quote that will provide |
4 | | the estimated cost of delivered fuel, personnel, |
5 | | maintenance contracts, chemicals, catalysts, |
6 | | consumables, spares, and other fixed and variable |
7 | | operations and maintenance costs. The delivered fuel |
8 | | cost estimate will be provided by a recognized third |
9 | | party expert or experts in the fuel and transportation |
10 | | industries. The balance of the operating and |
11 | | maintenance cost quote, excluding delivered fuel |
12 | | costs, will be developed based on the inputs provided |
13 | | by duly licensed engineering and construction firms |
14 | | performing the construction cost quote, potential |
15 | | vendors under long-term service agreements and plant |
16 | | operating agreements, or recognized third party plant |
17 | | operator or operators. |
18 | | The operating and maintenance cost quote |
19 | | (including the cost of the front end engineering and |
20 | | design study) shall be expressed in nominal dollars as |
21 | | of the date that the quote is prepared and shall |
22 | | include taxes, insurance, and other owner's costs, and |
23 | | an assumed escalation in materials and labor beyond |
24 | | the date as of which the operating and maintenance |
25 | | cost quote is expressed. |
26 | | (D) The facility cost report shall also include an |
|
| | HB2659 | - 138 - | LRB102 15746 SPS 21112 b |
|
|
1 | | analysis of the initial clean coal facility's ability |
2 | | to deliver power and energy into the applicable |
3 | | regional transmission organization markets and an |
4 | | analysis of the expected capacity factor for the |
5 | | initial clean coal facility. |
6 | | (E) Amounts paid to third parties unrelated to the |
7 | | owner or owners of the initial clean coal facility to |
8 | | prepare the core plant construction cost quote, |
9 | | including the front end engineering and design study, |
10 | | and the operating and maintenance cost quote will be |
11 | | reimbursed through Coal Development Bonds. |
12 | | (5) Re-powering and retrofitting coal-fired power |
13 | | plants previously owned by Illinois utilities to qualify |
14 | | as clean coal facilities. During the 2009 procurement |
15 | | planning process and thereafter, the Agency and the |
16 | | Commission shall consider sourcing agreements covering |
17 | | electricity generated by power plants that were previously |
18 | | owned by Illinois utilities and that have been or will be |
19 | | converted into clean coal facilities, as defined by |
20 | | Section 1-10 of this Act. Pursuant to such procurement |
21 | | planning process, the owners of such facilities may |
22 | | propose to the Agency sourcing agreements with utilities |
23 | | and alternative retail electric suppliers required to |
24 | | comply with subsection (d) of this Section and item (5) of |
25 | | subsection (d) of Section 16-115 of the Public Utilities |
26 | | Act, covering electricity generated by such facilities. In |
|
| | HB2659 | - 139 - | LRB102 15746 SPS 21112 b |
|
|
1 | | the case of sourcing agreements that are power purchase |
2 | | agreements, the contract price for electricity sales shall |
3 | | be established on a cost of service basis. In the case of |
4 | | sourcing agreements that are contracts for differences, |
5 | | the contract price from which the reference price is |
6 | | subtracted shall be established on a cost of service |
7 | | basis. The Agency and the Commission may approve any such |
8 | | utility sourcing agreements that do not exceed cost-based |
9 | | benchmarks developed by the procurement administrator, in |
10 | | consultation with the Commission staff, Agency staff and |
11 | | the procurement monitor, subject to Commission review and |
12 | | approval. The Commission shall have authority to inspect |
13 | | all books and records associated with these clean coal |
14 | | facilities during the term of any such contract. |
15 | | (6) Costs incurred under this subsection (d) or |
16 | | pursuant to a contract entered into under this subsection |
17 | | (d) shall be deemed prudently incurred and reasonable in |
18 | | amount and the electric utility shall be entitled to full |
19 | | cost recovery pursuant to the tariffs filed with the |
20 | | Commission. |
21 | | (d-5) Zero emission standard. |
22 | | (1) Beginning with the delivery year commencing on |
23 | | June 1, 2017, the Agency shall, for electric utilities |
24 | | that serve at least 100,000 retail customers in this |
25 | | State, procure contracts with zero emission facilities |
26 | | that are reasonably capable of generating cost-effective |
|
| | HB2659 | - 140 - | LRB102 15746 SPS 21112 b |
|
|
1 | | zero emission credits in an amount approximately equal to |
2 | | 16% of the actual amount of electricity delivered by each |
3 | | electric utility to retail customers in the State during |
4 | | calendar year 2014. For an electric utility serving fewer |
5 | | than 100,000 retail customers in this State that |
6 | | requested, under Section 16-111.5 of the Public Utilities |
7 | | Act, that the Agency procure power and energy for all or a |
8 | | portion of the utility's Illinois load for the delivery |
9 | | year commencing June 1, 2016, the Agency shall procure |
10 | | contracts with zero emission facilities that are |
11 | | reasonably capable of generating cost-effective zero |
12 | | emission credits in an amount approximately equal to 16% |
13 | | of the portion of power and energy to be procured by the |
14 | | Agency for the utility. The duration of the contracts |
15 | | procured under this subsection (d-5) shall be for a term |
16 | | of 10 years ending May 31, 2027. The quantity of zero |
17 | | emission credits to be procured under the contracts shall |
18 | | be all of the zero emission credits generated by the zero |
19 | | emission facility in each delivery year; however, if the |
20 | | zero emission facility is owned by more than one entity, |
21 | | then the quantity of zero emission credits to be procured |
22 | | under the contracts shall be the amount of zero emission |
23 | | credits that are generated from the portion of the zero |
24 | | emission facility that is owned by the winning supplier. |
25 | | The 16% value identified in this paragraph (1) is the |
26 | | average of the percentage targets in subparagraph (B) of |
|
| | HB2659 | - 141 - | LRB102 15746 SPS 21112 b |
|
|
1 | | paragraph (1) of subsection (c) of this Section for the 5 |
2 | | delivery years beginning June 1, 2017. |
3 | | The procurement process shall be subject to the |
4 | | following provisions: |
5 | | (A) Those zero emission facilities that intend to |
6 | | participate in the procurement shall submit to the |
7 | | Agency the following eligibility information for each |
8 | | zero emission facility on or before the date |
9 | | established by the Agency: |
10 | | (i) the in-service date and remaining useful |
11 | | life of the zero emission facility; |
12 | | (ii) the amount of power generated annually |
13 | | for each of the years 2005 through 2015, and the |
14 | | projected zero emission credits to be generated |
15 | | over the remaining useful life of the zero |
16 | | emission facility, which shall be used to |
17 | | determine the capability of each facility; |
18 | | (iii) the annual zero emission facility cost |
19 | | projections, expressed on a per megawatthour |
20 | | basis, over the next 6 delivery years, which shall |
21 | | include the following: operation and maintenance |
22 | | expenses; fully allocated overhead costs, which |
23 | | shall be allocated using the methodology developed |
24 | | by the Institute for Nuclear Power Operations; |
25 | | fuel expenditures; non-fuel capital expenditures; |
26 | | spent fuel expenditures; a return on working |
|
| | HB2659 | - 142 - | LRB102 15746 SPS 21112 b |
|
|
1 | | capital; the cost of operational and market risks |
2 | | that could be avoided by ceasing operation; and |
3 | | any other costs necessary for continued |
4 | | operations, provided that "necessary" means, for |
5 | | purposes of this item (iii), that the costs could |
6 | | reasonably be avoided only by ceasing operations |
7 | | of the zero emission facility; and |
8 | | (iv) a commitment to continue operating, for |
9 | | the duration of the contract or contracts executed |
10 | | under the procurement held under this subsection |
11 | | (d-5), the zero emission facility that produces |
12 | | the zero emission credits to be procured in the |
13 | | procurement. |
14 | | The information described in item (iii) of this |
15 | | subparagraph (A) may be submitted on a confidential |
16 | | basis and shall be treated and maintained by the |
17 | | Agency, the procurement administrator, and the |
18 | | Commission as confidential and proprietary and exempt |
19 | | from disclosure under subparagraphs (a) and (g) of |
20 | | paragraph (1) of Section 7 of the Freedom of |
21 | | Information Act. The Office of Attorney General shall |
22 | | have access to, and maintain the confidentiality of, |
23 | | such information pursuant to Section 6.5 of the |
24 | | Attorney General Act. |
25 | | (B) The price for each zero emission credit |
26 | | procured under this subsection (d-5) for each delivery |
|
| | HB2659 | - 143 - | LRB102 15746 SPS 21112 b |
|
|
1 | | year shall be in an amount that equals the Social Cost |
2 | | of Carbon, expressed on a price per megawatthour |
3 | | basis. However, to ensure that the procurement remains |
4 | | affordable to retail customers in this State if |
5 | | electricity prices increase, the price in an |
6 | | applicable delivery year shall be reduced below the |
7 | | Social Cost of Carbon by the amount ("Price |
8 | | Adjustment") by which the market price index for the |
9 | | applicable delivery year exceeds the baseline market |
10 | | price index for the consecutive 12-month period ending |
11 | | May 31, 2016. If the Price Adjustment is greater than |
12 | | or equal to the Social Cost of Carbon in an applicable |
13 | | delivery year, then no payments shall be due in that |
14 | | delivery year. The components of this calculation are |
15 | | defined as follows: |
16 | | (i) Social Cost of Carbon: The Social Cost of |
17 | | Carbon is $16.50 per megawatthour, which is based |
18 | | on the U.S. Interagency Working Group on Social |
19 | | Cost of Carbon's price in the August 2016 |
20 | | Technical Update using a 3% discount rate, |
21 | | adjusted for inflation for each year of the |
22 | | program. Beginning with the delivery year |
23 | | commencing June 1, 2023, the price per |
24 | | megawatthour shall increase by $1 per |
25 | | megawatthour, and continue to increase by an |
26 | | additional $1 per megawatthour each delivery year |
|
| | HB2659 | - 144 - | LRB102 15746 SPS 21112 b |
|
|
1 | | thereafter. |
2 | | (ii) Baseline market price index: The baseline |
3 | | market price index for the consecutive 12-month |
4 | | period ending May 31, 2016 is $31.40 per |
5 | | megawatthour, which is based on the sum of (aa) |
6 | | the average day-ahead energy price across all |
7 | | hours of such 12-month period at the PJM |
8 | | Interconnection LLC Northern Illinois Hub, (bb) |
9 | | 50% multiplied by the Base Residual Auction, or |
10 | | its successor, capacity price for the rest of the |
11 | | RTO zone group determined by PJM Interconnection |
12 | | LLC, divided by 24 hours per day, and (cc) 50% |
13 | | multiplied by the Planning Resource Auction, or |
14 | | its successor, capacity price for Zone 4 |
15 | | determined by the Midcontinent Independent System |
16 | | Operator, Inc., divided by 24 hours per day. |
17 | | (iii) Market price index: The market price |
18 | | index for a delivery year shall be the sum of |
19 | | projected energy prices and projected capacity |
20 | | prices determined as follows: |
21 | | (aa) Projected energy prices: the |
22 | | projected energy prices for the applicable |
23 | | delivery year shall be calculated once for the |
24 | | year using the forward market price for the |
25 | | PJM Interconnection, LLC Northern Illinois |
26 | | Hub. The forward market price shall be |
|
| | HB2659 | - 145 - | LRB102 15746 SPS 21112 b |
|
|
1 | | calculated as follows: the energy forward |
2 | | prices for each month of the applicable |
3 | | delivery year averaged for each trade date |
4 | | during the calendar year immediately preceding |
5 | | that delivery year to produce a single energy |
6 | | forward price for the delivery year. The |
7 | | forward market price calculation shall use |
8 | | data published by the Intercontinental |
9 | | Exchange, or its successor. |
10 | | (bb) Projected capacity prices: |
11 | | (I) For the delivery years commencing |
12 | | June 1, 2017, June 1, 2018, and June 1, |
13 | | 2019, the projected capacity price shall |
14 | | be equal to the sum of (1) 50% multiplied |
15 | | by the Base Residual Auction, or its |
16 | | successor, price for the rest of the RTO |
17 | | zone group as determined by PJM |
18 | | Interconnection LLC, divided by 24 hours |
19 | | per day and, (2) 50% multiplied by the |
20 | | resource auction price determined in the |
21 | | resource auction administered by the |
22 | | Midcontinent Independent System Operator, |
23 | | Inc., in which the largest percentage of |
24 | | load cleared for Local Resource Zone 4, |
25 | | divided by 24 hours per day, and where |
26 | | such price is determined by the |
|
| | HB2659 | - 146 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Midcontinent Independent System Operator, |
2 | | Inc. |
3 | | (II) For the delivery year commencing |
4 | | June 1, 2020, and each year thereafter, |
5 | | the projected capacity price shall be |
6 | | equal to the sum of (1) 50% multiplied by |
7 | | the Base Residual Auction, or its |
8 | | successor, price for the ComEd zone as |
9 | | determined by PJM Interconnection LLC, |
10 | | divided by 24 hours per day, and (2) 50% |
11 | | multiplied by the resource auction price |
12 | | determined in the resource auction |
13 | | administered by the Midcontinent |
14 | | Independent System Operator, Inc., in |
15 | | which the largest percentage of load |
16 | | cleared for Local Resource Zone 4, divided |
17 | | by 24 hours per day, and where such price |
18 | | is determined by the Midcontinent |
19 | | Independent System Operator, Inc. |
20 | | For purposes of this subsection (d-5): |
21 | | "Rest of the RTO" and "ComEd Zone" shall have |
22 | | the meaning ascribed to them by PJM |
23 | | Interconnection, LLC. |
24 | | "RTO" means regional transmission |
25 | | organization. |
26 | | (C) No later than 45 days after June 1, 2017 (the |
|
| | HB2659 | - 147 - | LRB102 15746 SPS 21112 b |
|
|
1 | | effective date of Public Act 99-906), the Agency shall |
2 | | publish its proposed zero emission standard |
3 | | procurement plan. The plan shall be consistent with |
4 | | the provisions of this paragraph (1) and shall provide |
5 | | that winning bids shall be selected based on public |
6 | | interest criteria that include, but are not limited |
7 | | to, minimizing carbon dioxide emissions that result |
8 | | from electricity consumed in Illinois and minimizing |
9 | | sulfur dioxide, nitrogen oxide, and particulate matter |
10 | | emissions that adversely affect the residents citizens |
11 | | of this State. In particular, the selection of winning |
12 | | bids shall take into account the incremental |
13 | | environmental benefits resulting from the procurement, |
14 | | such as any existing environmental benefits that are |
15 | | preserved by the procurements held under Public Act |
16 | | 99-906 and would cease to exist if the procurements |
17 | | were not held, including the preservation of zero |
18 | | emission facilities. The plan shall also describe in |
19 | | detail how each public interest factor shall be |
20 | | considered and weighted in the bid selection process |
21 | | to ensure that the public interest criteria are |
22 | | applied to the procurement and given full effect. |
23 | | For purposes of developing the plan, the Agency |
24 | | shall consider any reports issued by a State agency, |
25 | | board, or commission under House Resolution 1146 of |
26 | | the 98th General Assembly and paragraph (4) of |
|
| | HB2659 | - 148 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subsection (d) of this Section, as well as publicly |
2 | | available analyses and studies performed by or for |
3 | | regional transmission organizations that serve the |
4 | | State and their independent market monitors. |
5 | | Upon publishing of the zero emission standard |
6 | | procurement plan, copies of the plan shall be posted |
7 | | and made publicly available on the Agency's website. |
8 | | All interested parties shall have 10 days following |
9 | | the date of posting to provide comment to the Agency on |
10 | | the plan. All comments shall be posted to the Agency's |
11 | | website. Following the end of the comment period, but |
12 | | no more than 60 days later than June 1, 2017 (the |
13 | | effective date of Public Act 99-906), the Agency shall |
14 | | revise the plan as necessary based on the comments |
15 | | received and file its zero emission standard |
16 | | procurement plan with the Commission. |
17 | | If the Commission determines that the plan will |
18 | | result in the procurement of cost-effective zero |
19 | | emission credits, then the Commission shall, after |
20 | | notice and hearing, but no later than 45 days after the |
21 | | Agency filed the plan, approve the plan or approve |
22 | | with modification. For purposes of this subsection |
23 | | (d-5), "cost effective" means the projected costs of |
24 | | procuring zero emission credits from zero emission |
25 | | facilities do not cause the limit stated in paragraph |
26 | | (2) of this subsection to be exceeded. |
|
| | HB2659 | - 149 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (C-5) As part of the Commission's review and |
2 | | acceptance or rejection of the procurement results, |
3 | | the Commission shall, in its public notice of |
4 | | successful bidders: |
5 | | (i) identify how the winning bids satisfy the |
6 | | public interest criteria described in subparagraph |
7 | | (C) of this paragraph (1) of minimizing carbon |
8 | | dioxide emissions that result from electricity |
9 | | consumed in Illinois and minimizing sulfur |
10 | | dioxide, nitrogen oxide, and particulate matter |
11 | | emissions that adversely affect the residents |
12 | | citizens of this State; |
13 | | (ii) specifically address how the selection of |
14 | | winning bids takes into account the incremental |
15 | | environmental benefits resulting from the |
16 | | procurement, including any existing environmental |
17 | | benefits that are preserved by the procurements |
18 | | held under Public Act 99-906 and would have ceased |
19 | | to exist if the procurements had not been held, |
20 | | such as the preservation of zero emission |
21 | | facilities; |
22 | | (iii) quantify the environmental benefit of |
23 | | preserving the resources identified in item (ii) |
24 | | of this subparagraph (C-5), including the |
25 | | following: |
26 | | (aa) the value of avoided greenhouse gas |
|
| | HB2659 | - 150 - | LRB102 15746 SPS 21112 b |
|
|
1 | | emissions measured as the product of the zero |
2 | | emission facilities' output over the contract |
3 | | term multiplied by the U.S. Environmental |
4 | | Protection Agency eGrid subregion carbon |
5 | | dioxide emission rate and the U.S. Interagency |
6 | | Working Group on Social Cost of Carbon's price |
7 | | in the August 2016 Technical Update using a 3% |
8 | | discount rate, adjusted for inflation for each |
9 | | delivery year; and |
10 | | (bb) the costs of replacement with other |
11 | | zero carbon dioxide resources, including wind |
12 | | and photovoltaic, based upon the simple |
13 | | average of the following: |
14 | | (I) the price, or if there is more |
15 | | than one price, the average of the prices, |
16 | | paid for renewable energy credits from new |
17 | | utility-scale wind projects in the |
18 | | procurement events specified in item (i) |
19 | | of subparagraph (G) of paragraph (1) of |
20 | | subsection (c) of this Section; and |
21 | | (II) the price, or if there is more |
22 | | than one price, the average of the prices, |
23 | | paid for renewable energy credits from new |
24 | | utility-scale solar projects and |
25 | | brownfield site photovoltaic projects in |
26 | | the procurement events specified in item |
|
| | HB2659 | - 151 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (ii) of subparagraph (G) of paragraph (1) |
2 | | of subsection (c) of this Section and, |
3 | | after January 1, 2015, renewable energy |
4 | | credits from photovoltaic distributed |
5 | | generation projects in procurement events |
6 | | held under subsection (c) of this Section. |
7 | | Each utility shall enter into binding contractual |
8 | | arrangements with the winning suppliers. |
9 | | The procurement described in this subsection |
10 | | (d-5), including, but not limited to, the execution of |
11 | | all contracts procured, shall be completed no later |
12 | | than May 10, 2017. Based on the effective date of |
13 | | Public Act 99-906, the Agency and Commission may, as |
14 | | appropriate, modify the various dates and timelines |
15 | | under this subparagraph and subparagraphs (C) and (D) |
16 | | of this paragraph (1). The procurement and plan |
17 | | approval processes required by this subsection (d-5) |
18 | | shall be conducted in conjunction with the procurement |
19 | | and plan approval processes required by subsection (c) |
20 | | of this Section and Section 16-111.5 of the Public |
21 | | Utilities Act, to the extent practicable. |
22 | | Notwithstanding whether a procurement event is |
23 | | conducted under Section 16-111.5 of the Public |
24 | | Utilities Act, the Agency shall immediately initiate a |
25 | | procurement process on June 1, 2017 (the effective |
26 | | date of Public Act 99-906). |
|
| | HB2659 | - 152 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (D) Following the procurement event described in |
2 | | this paragraph (1) and consistent with subparagraph |
3 | | (B) of this paragraph (1), the Agency shall calculate |
4 | | the payments to be made under each contract for the |
5 | | next delivery year based on the market price index for |
6 | | that delivery year. The Agency shall publish the |
7 | | payment calculations no later than May 25, 2017 and |
8 | | every May 25 thereafter. |
9 | | (E) Notwithstanding the requirements of this |
10 | | subsection (d-5), the contracts executed under this |
11 | | subsection (d-5) shall provide that the zero emission |
12 | | facility may, as applicable, suspend or terminate |
13 | | performance under the contracts in the following |
14 | | instances: |
15 | | (i) A zero emission facility shall be excused |
16 | | from its performance under the contract for any |
17 | | cause beyond the control of the resource, |
18 | | including, but not restricted to, acts of God, |
19 | | flood, drought, earthquake, storm, fire, |
20 | | lightning, epidemic, war, riot, civil disturbance |
21 | | or disobedience, labor dispute, labor or material |
22 | | shortage, sabotage, acts of public enemy, |
23 | | explosions, orders, regulations or restrictions |
24 | | imposed by governmental, military, or lawfully |
25 | | established civilian authorities, which, in any of |
26 | | the foregoing cases, by exercise of commercially |
|
| | HB2659 | - 153 - | LRB102 15746 SPS 21112 b |
|
|
1 | | reasonable efforts the zero emission facility |
2 | | could not reasonably have been expected to avoid, |
3 | | and which, by the exercise of commercially |
4 | | reasonable efforts, it has been unable to |
5 | | overcome. In such event, the zero emission |
6 | | facility shall be excused from performance for the |
7 | | duration of the event, including, but not limited |
8 | | to, delivery of zero emission credits, and no |
9 | | payment shall be due to the zero emission facility |
10 | | during the duration of the event. |
11 | | (ii) A zero emission facility shall be |
12 | | permitted to terminate the contract if legislation |
13 | | is enacted into law by the General Assembly that |
14 | | imposes or authorizes a new tax, special |
15 | | assessment, or fee on the generation of |
16 | | electricity, the ownership or leasehold of a |
17 | | generating unit, or the privilege or occupation of |
18 | | such generation, ownership, or leasehold of |
19 | | generation units by a zero emission facility. |
20 | | However, the provisions of this item (ii) do not |
21 | | apply to any generally applicable tax, special |
22 | | assessment or fee, or requirements imposed by |
23 | | federal law. |
24 | | (iii) A zero emission facility shall be |
25 | | permitted to terminate the contract in the event |
26 | | that the resource requires capital expenditures in |
|
| | HB2659 | - 154 - | LRB102 15746 SPS 21112 b |
|
|
1 | | excess of $40,000,000 that were neither known nor |
2 | | reasonably foreseeable at the time it executed the |
3 | | contract and that a prudent owner or operator of |
4 | | such resource would not undertake. |
5 | | (iv) A zero emission facility shall be |
6 | | permitted to terminate the contract in the event |
7 | | the Nuclear Regulatory Commission terminates the |
8 | | resource's license. |
9 | | (F) If the zero emission facility elects to |
10 | | terminate a contract under subparagraph (E) of this |
11 | | paragraph (1), then the Commission shall reopen the |
12 | | docket in which the Commission approved the zero |
13 | | emission standard procurement plan under subparagraph |
14 | | (C) of this paragraph (1) and, after notice and |
15 | | hearing, enter an order acknowledging the contract |
16 | | termination election if such termination is consistent |
17 | | with the provisions of this subsection (d-5). |
18 | | (2) For purposes of this subsection (d-5), the amount |
19 | | paid per kilowatthour means the total amount paid for |
20 | | electric service expressed on a per kilowatthour basis. |
21 | | For purposes of this subsection (d-5), the total amount |
22 | | paid for electric service includes, without limitation, |
23 | | amounts paid for supply, transmission, distribution, |
24 | | surcharges, and add-on taxes. |
25 | | Notwithstanding the requirements of this subsection |
26 | | (d-5), the contracts executed under this subsection (d-5) |
|
| | HB2659 | - 155 - | LRB102 15746 SPS 21112 b |
|
|
1 | | shall provide that the total of zero emission credits |
2 | | procured under a procurement plan shall be subject to the |
3 | | limitations of this paragraph (2). For each delivery year, |
4 | | the contractual volume receiving payments in such year |
5 | | shall be reduced for all retail customers based on the |
6 | | amount necessary to limit the net increase that delivery |
7 | | year to the costs of those credits included in the amounts |
8 | | paid by eligible retail customers in connection with |
9 | | electric service to no more than 1.65% of the amount paid |
10 | | per kilowatthour by eligible retail customers during the |
11 | | year ending May 31, 2009. The result of this computation |
12 | | shall apply to and reduce the procurement for all retail |
13 | | customers, and all those customers shall pay the same |
14 | | single, uniform cents per kilowatthour charge under |
15 | | subsection (k) of Section 16-108 of the Public Utilities |
16 | | Act. To arrive at a maximum dollar amount of zero emission |
17 | | credits to be paid for the particular delivery year, the |
18 | | resulting per kilowatthour amount shall be applied to the |
19 | | actual amount of kilowatthours of electricity delivered by |
20 | | the electric utility in the delivery year immediately |
21 | | prior to the procurement, to all retail customers in its |
22 | | service territory. Unpaid contractual volume for any |
23 | | delivery year shall be paid in any subsequent delivery |
24 | | year in which such payments can be made without exceeding |
25 | | the amount specified in this paragraph (2). The |
26 | | calculations required by this paragraph (2) shall be made |
|
| | HB2659 | - 156 - | LRB102 15746 SPS 21112 b |
|
|
1 | | only once for each procurement plan year. Once the |
2 | | determination as to the amount of zero emission credits to |
3 | | be paid is made based on the calculations set forth in this |
4 | | paragraph (2), no subsequent rate impact determinations |
5 | | shall be made and no adjustments to those contract amounts |
6 | | shall be allowed. All costs incurred under those contracts |
7 | | and in implementing this subsection (d-5) shall be |
8 | | recovered by the electric utility as provided in this |
9 | | Section. |
10 | | No later than June 30, 2019, the Commission shall |
11 | | review the limitation on the amount of zero emission |
12 | | credits procured under this subsection (d-5) and report to |
13 | | the General Assembly its findings as to whether that |
14 | | limitation unduly constrains the procurement of |
15 | | cost-effective zero emission credits. |
16 | | (3) Six years after the execution of a contract under |
17 | | this subsection (d-5), the Agency shall determine whether |
18 | | the actual zero emission credit payments received by the |
19 | | supplier over the 6-year period exceed the Average ZEC |
20 | | Payment. In addition, at the end of the term of a contract |
21 | | executed under this subsection (d-5), or at the time, if |
22 | | any, a zero emission facility's contract is terminated |
23 | | under subparagraph (E) of paragraph (1) of this subsection |
24 | | (d-5), then the Agency shall determine whether the actual |
25 | | zero emission credit payments received by the supplier |
26 | | over the term of the contract exceed the Average ZEC |
|
| | HB2659 | - 157 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Payment, after taking into account any amounts previously |
2 | | credited back to the utility under this paragraph (3). If |
3 | | the Agency determines that the actual zero emission credit |
4 | | payments received by the supplier over the relevant period |
5 | | exceed the Average ZEC Payment, then the supplier shall |
6 | | credit the difference back to the utility. The amount of |
7 | | the credit shall be remitted to the applicable electric |
8 | | utility no later than 120 days after the Agency's |
9 | | determination, which the utility shall reflect as a credit |
10 | | on its retail customer bills as soon as practicable; |
11 | | however, the credit remitted to the utility shall not |
12 | | exceed the total amount of payments received by the |
13 | | facility under its contract. |
14 | | For purposes of this Section, the Average ZEC Payment |
15 | | shall be calculated by multiplying the quantity of zero |
16 | | emission credits delivered under the contract times the |
17 | | average contract price. The average contract price shall |
18 | | be determined by subtracting the amount calculated under |
19 | | subparagraph (B) of this paragraph (3) from the amount |
20 | | calculated under subparagraph (A) of this paragraph (3), |
21 | | as follows: |
22 | | (A) The average of the Social Cost of Carbon, as |
23 | | defined in subparagraph (B) of paragraph (1) of this |
24 | | subsection (d-5), during the term of the contract. |
25 | | (B) The average of the market price indices, as |
26 | | defined in subparagraph (B) of paragraph (1) of this |
|
| | HB2659 | - 158 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subsection (d-5), during the term of the contract, |
2 | | minus the baseline market price index, as defined in |
3 | | subparagraph (B) of paragraph (1) of this subsection |
4 | | (d-5). |
5 | | If the subtraction yields a negative number, then the |
6 | | Average ZEC Payment shall be zero. |
7 | | (4) Cost-effective zero emission credits procured from |
8 | | zero emission facilities shall satisfy the applicable |
9 | | definitions set forth in Section 1-10 of this Act. |
10 | | (5) The electric utility shall retire all zero |
11 | | emission credits used to comply with the requirements of |
12 | | this subsection (d-5). |
13 | | (6) Electric utilities shall be entitled to recover |
14 | | all of the costs associated with the procurement of zero |
15 | | emission credits through an automatic adjustment clause |
16 | | tariff in accordance with subsection (k) and (m) of |
17 | | Section 16-108 of the Public Utilities Act, and the |
18 | | contracts executed under this subsection (d-5) shall |
19 | | provide that the utilities' payment obligations under such |
20 | | contracts shall be reduced if an adjustment is required |
21 | | under subsection (m) of Section 16-108 of the Public |
22 | | Utilities Act. |
23 | | (7) This subsection (d-5) shall become inoperative on |
24 | | January 1, 2028. |
25 | | (e) The draft procurement plans are subject to public |
26 | | comment, as required by Section 16-111.5 of the Public |
|
| | HB2659 | - 159 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Utilities Act. |
2 | | (f) The Agency shall submit the final procurement plan to |
3 | | the Commission. The Agency shall revise a procurement plan if |
4 | | the Commission determines that it does not meet the standards |
5 | | set forth in Section 16-111.5 of the Public Utilities Act. |
6 | | (g) The Agency shall assess fees to each affected utility |
7 | | to recover the costs incurred in preparation of the annual |
8 | | procurement plan for the utility. |
9 | | (h) The Agency shall assess fees to each bidder to recover |
10 | | the costs incurred in connection with a competitive |
11 | | procurement process.
|
12 | | (i) A renewable energy credit, carbon emission credit, or |
13 | | zero emission credit can only be used once to comply with a |
14 | | single portfolio or other standard as set forth in subsection |
15 | | (c), subsection (d), or subsection (d-5) of this Section, |
16 | | respectively. A renewable energy credit, carbon emission |
17 | | credit, or zero emission credit cannot be used to satisfy the |
18 | | requirements of more than one standard. If more than one type |
19 | | of credit is issued for the same megawatt hour of energy, only |
20 | | one credit can be used to satisfy the requirements of a single |
21 | | standard. After such use, the credit must be retired together |
22 | | with any other credits issued for the same megawatt hour of |
23 | | energy. |
24 | | (j) Renewable energy supply. |
25 | | (1) Beginning with the energy to be delivered in the |
26 | | delivery year commencing on June 1, 2023, the Agency shall |
|
| | HB2659 | - 160 - | LRB102 15746 SPS 21112 b |
|
|
1 | | assess the feasibility of procuring cost-effective, |
2 | | long-term contracts for energy supply from renewable |
3 | | energy projects, in accordance with the requirements of |
4 | | Section 16-111.5 of the Public Utilities Act for the |
5 | | eligible retail customers of electric utilities that on |
6 | | December 31, 2005 provided electric service to at least |
7 | | 100,000 customers in Illinois. |
8 | | (2) Long-term contracts as described in this |
9 | | subsection (j) shall refer to contracts that are |
10 | | preferably no less than a 15-year period, but in no case |
11 | | less than a 5-year period. |
12 | | (3) The Agency shall evaluate energy supply |
13 | | procurements that enable greater achievement, or more |
14 | | cost-effective achievement, of the renewable energy goals |
15 | | in this Section, including through coordination or |
16 | | bundling with procurements of renewable energy credits, or |
17 | | capacity from renewable energy resources, as provided |
18 | | under subparagraph (P) of subsection (c) of this Section, |
19 | | or capacity from renewable energy resources, as provided |
20 | | under subsection (k) of this Section. |
21 | | (4) The Agency shall include in its annual procurement |
22 | | plan the results of this assessment and any recommended |
23 | | procurements. The Agency shall, at a minimum, reevaluate |
24 | | its assessment every 3 years, incorporating new |
25 | | information from updated data, including, but not limited |
26 | | to, the results of its procurements, competitive market |
|
| | HB2659 | - 161 - | LRB102 15746 SPS 21112 b |
|
|
1 | | trends, and energy procurements in other states. |
2 | | (k) Capacity procurement. |
3 | | (1) This Section grants the Illinois Power Agency the |
4 | | sole authority to conduct auctions for the purpose of |
5 | | procuring capacity if a public utility in the State elects |
6 | | to use the Fixed Resource Requirement Alternative as |
7 | | provided for in the Open Access Transmission Tariff, |
8 | | Reliability Assurance Agreement, and manuals of PJM |
9 | | Interconnection, LLC or its successors, and that election |
10 | | is approved by the Illinois Commerce Commission. Where the |
11 | | election is approved by the Illinois Commerce Commission, |
12 | | the Illinois Power Agency shall develop a procurement plan |
13 | | for the procurement of capacity in amounts necessary to |
14 | | ensure the public utility's resource adequacy pursuant to |
15 | | PJM's federally-mandated requirements. The Agency is |
16 | | authorized to conduct Capacity Procurement auctions as |
17 | | necessary to meet the public utility's resource |
18 | | obligations while achieving the objectives set forth in |
19 | | this Section for the duration of the public utility's |
20 | | election of the Fixed Resource Requirement Alternative. |
21 | | (2) The draft procurement plan is subject to public |
22 | | comment, as required by Section 16-111.5 of the Public |
23 | | Utilities Act. |
24 | | (3) The Agency shall design the Capacity Procurement |
25 | | Plan to achieve the following objectives: |
26 | | (i) Through one or more auctions which procure |
|
| | HB2659 | - 162 - | LRB102 15746 SPS 21112 b |
|
|
1 | | capacity for one or more years, meets the public |
2 | | utility's resource obligation under the Fixed Resource |
3 | | Requirement Alternative while maximizing benefits that |
4 | | meet the State's public interest in the health, safety |
5 | | and welfare of its residents, including, but not |
6 | | limited to: significantly reduced emissions in the |
7 | | State from power generation sources; consumer savings; |
8 | | and those interests described in subparagraph (I) of |
9 | | paragraph (1) of subsection (c) of Section 1-75 of the |
10 | | Illinois Power Agency Act. |
11 | | (ii) Implements a limiter on auction payments to |
12 | | all resources that are not renewable energy resources, |
13 | | demand response, or energy efficiency resources. The |
14 | | limiter shall be imposed on all other resources such |
15 | | that total payments under the auction ensure consumer |
16 | | savings at an amount no less than 5% below a baseline |
17 | | of previous years' payments. |
18 | | (iii) Implements a limiter on participating |
19 | | carbon-emitting resources such that emissions decrease |
20 | | below a baseline of previous years' emissions. |
21 | | (4) As part of its Capacity Procurement plans, the |
22 | | Agency may implement an auction for an optional bundled |
23 | | product which includes payments to resources that provide |
24 | | both capacity and renewable energy credits. Renewable |
25 | | energy resources that are not eligible to participate in |
26 | | auctions pursuant to subparagraph (J) of paragraph (1) of |
|
| | HB2659 | - 163 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subsection (c) of Section 1-75 of the Illinois Power |
2 | | Agency Act are not eligible to participate in auctions |
3 | | conducted to implement Capacity Procurement plans. |
4 | | (Source: P.A. 100-863, eff. 8-14-18; 101-81, eff. 7-12-19; |
5 | | 101-113, eff. 1-1-20 .) |
6 | | Section 15. The Public Utilities Act is amended by |
7 | | changing Sections 16-107.5, 16-107.6, 16-108, and 16-111.5 and |
8 | | by adding Sections 8-512 and 16-131 as follows: |
9 | | (220 ILCS 5/8-512 new) |
10 | | Sec. 8-512. Renewable energy access plan. |
11 | | (a) It is the policy of this State to promote |
12 | | cost-effective transmission system development that ensures |
13 | | reliability of the electric transmission system, lowers carbon |
14 | | emissions, minimizes long-term costs for consumers, and |
15 | | supports the electric policy goals of this State. |
16 | | The General Assembly finds that: |
17 | | (1) Transmission planning, primarily for reliability |
18 | | purposes, but also for economic and public policy reasons |
19 | | is conducted by regional transmission organizations in |
20 | | which transmission-owning Illinois utilities and other |
21 | | stakeholders are members. |
22 | | (2) Order No. 1000 of the Federal Energy Regulatory |
23 | | Commission requires regional transmission organizations to |
24 | | plan for transmission system needs in light of state |
|
| | HB2659 | - 164 - | LRB102 15746 SPS 21112 b |
|
|
1 | | public policies, and to accept input from states during |
2 | | the transmission system planning processes. |
3 | | (3) The State of Illinois does not currently have a |
4 | | comprehensive power and environmental policy planning |
5 | | process to identify transmission infrastructure needs that |
6 | | can serve as a vital input into the regional and |
7 | | inter-regional transmission organization planning |
8 | | processes conducted under Order No. 1000 and other laws. |
9 | | (4) This State is an electricity generation and power |
10 | | transmission hub, and can leverage that position to invest |
11 | | in infrastructure that enables new and existing Illinois |
12 | | generators to meet the public policy goals of the State of |
13 | | Illinois and of interconnected states while |
14 | | cost-effectively supporting tens of thousands of jobs in |
15 | | the renewable energy sector in this State. |
16 | | (5) The nation cannot readily access this State's |
17 | | low-cost, clean electric power, and this State is hindered |
18 | | in its ability to develop and support its low-carbon |
19 | | economy and keep electricity prices low in Illinois and |
20 | | interconnected states. |
21 | | (6) Existing transmission infrastructure may constrain |
22 | | the State's achievement of 100% renewable energy by 2050, |
23 | | a carbon-free power sector by 2030, and an expanded use of |
24 | | electric vehicles in a just and equitable way. |
25 | | (7) Transmission system congestion within this State |
26 | | and the regional transmission organizations serving this |
|
| | HB2659 | - 165 - | LRB102 15746 SPS 21112 b |
|
|
1 | | State limits the ability of this State's existing and new |
2 | | electric generation facilities that do not emit carbon |
3 | | dioxide, including renewable energy resources and zero |
4 | | emission facilities, to serve the public policy goals of |
5 | | this State and other states, which constrains investment |
6 | | in this State. |
7 | | (8) Investment in infrastructure to support existing |
8 | | and new electric generation facilities that do not emit |
9 | | carbon dioxide, including renewable energy resources and |
10 | | zero emission facilities, stimulates significant economic |
11 | | development and job growth in this State, as well as |
12 | | creates environmental and public health benefits in this |
13 | | State. |
14 | | (9) Creating a forward-looking plan for this State's |
15 | | electric transmission infrastructure, as opposed to |
16 | | relying on case-by-case development and repeated marginal |
17 | | upgrades, will achieve a lower-cost system for Illinois' |
18 | | electricity customers. A forward-looking plan can also |
19 | | help integrate and achieve a comprehensive set of |
20 | | objectives and multiple state, regional, and national |
21 | | policy goals. |
22 | | (10) Alternatives to overhead electric transmission |
23 | | lines can achieve cost-effective resolution of system |
24 | | impacts, and warrant investigation of the circumstances |
25 | | those alternatives should be considered and approved. The |
26 | | alternatives are likely to be beneficial as investment in |
|
| | HB2659 | - 166 - | LRB102 15746 SPS 21112 b |
|
|
1 | | electric transmission infrastructure moves forward. |
2 | | (b) Consistent with the findings identified in subsection |
3 | | (a), the Commission shall open an investigation to deliberate, |
4 | | develop, and adopt a renewable energy access plan no later |
5 | | than December 31, 2022. To assist and support the Commission |
6 | | in the development of the plan, the Commission shall retain |
7 | | the services of technical and policy experts with relevant |
8 | | fields of expertise, solicit technical and policy analysis |
9 | | from the public, and provide for a 120-day open public comment |
10 | | period after publication of a draft report, which shall be |
11 | | published no later than 90 days after the comment period ends. |
12 | | The plan shall, at a minimum, do the following: |
13 | | (1) designate renewable energy access plan zones |
14 | | throughout this State in areas in which renewable energy |
15 | | resources and suitable land areas are sufficient to |
16 | | develop generating capacity from renewable energy |
17 | | technologies; |
18 | | (2) develop a plan to achieve transmission capacity |
19 | | necessary to deliver to electric customers in Illinois and |
20 | | other states, in a manner that is most beneficial and |
21 | | cost-effective to the customers, the electric output from |
22 | | renewable energy technologies in the renewable energy |
23 | | access plan zones; |
24 | | (3) use this State's position as an electricity |
25 | | generation and power transmission hub to create new |
26 | | investment in this State's renewable energy resources; |
|
| | HB2659 | - 167 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (4) introduce and consider programs, policies, and |
2 | | electric transmission projects that can be adopted within |
3 | | this State and advocated for at regional transmission |
4 | | organizations, that promote the cost-effective delivery of |
5 | | power from renewable energy resources interconnected to |
6 | | the bulk electric system to meet the renewable portfolio |
7 | | standard targets under subsection (c) of Section 1-75 of |
8 | | the Illinois Power Agency Act, and to meet current and |
9 | | future public policy goals of other states, the region, or |
10 | | the nation; |
11 | | (5) introduce and consider proposals to improve |
12 | | regional transmission organizations' regional and |
13 | | interregional system planning processes and an analysis of |
14 | | how those proposals would improve reliability and |
15 | | cost-effective delivery of electricity in Illinois and the |
16 | | region; |
17 | | (6) the Commission's specific findings, based on |
18 | | technical and policy analysis, regarding locations of |
19 | | renewable energy access plan zones, the transmission |
20 | | system developments needed to cost-effectively achieve the |
21 | | public policy goals identified herein, any recommended |
22 | | policies to initiate within this State, or recommended |
23 | | advocacy at regional transmission organizations; and |
24 | | (7) the Commission's conclusions and proposed |
25 | | recommendations based on its analysis. |
26 | | (c) No later than December 31, 2025, and in each |
|
| | HB2659 | - 168 - | LRB102 15746 SPS 21112 b |
|
|
1 | | odd-numbered year thereafter, the Commission shall open an |
2 | | investigation to deliberate, develop, and adopt an updated |
3 | | renewable energy access plan that, at a minimum, evaluates the |
4 | | implementation and effectiveness of the renewable energy |
5 | | access plan, recommends improvements to the renewable energy |
6 | | access plan, and provides changes to transmission capacity |
7 | | necessary to deliver electric output from the renewable energy |
8 | | access plan zones. |
9 | | (220 ILCS 5/16-107.5)
|
10 | | Sec. 16-107.5. Net electricity metering. |
11 | | (a) The General Assembly Legislature finds and declares |
12 | | that a program to provide net electricity
metering, as defined |
13 | | in this Section,
for eligible customers can encourage private |
14 | | investment in renewable energy
resources, stimulate
economic |
15 | | growth, enhance the continued diversification of Illinois' |
16 | | energy
resource mix, and protect
the Illinois environment. The |
17 | | General Assembly further finds and declares that ensuring a |
18 | | smooth, predictable transition from full net metering of the |
19 | | retail electricity rate to the distributed generation rebate |
20 | | described in Section 16-107.6 of this Act is important to |
21 | | achieve these legislative goals. In implementing the |
22 | | investigation discussed in subsection (e) of Section 16-107.6 |
23 | | of this Act and the transition discussed in subsection (n) of |
24 | | this Section 16-107.5, the Commission shall ensure that |
25 | | distributed generation customers are fairly compensated for |
|
| | HB2659 | - 169 - | LRB102 15746 SPS 21112 b |
|
|
1 | | the benefits and services that customer-sited distributed |
2 | | generation provides and that the distributed generation market |
3 | | in Illinois continues to experience stable growth for both |
4 | | small and large customers.
|
5 | | (b) As used in this Section : , |
6 | | (i) " Community community renewable generation project" has |
7 | | shall have the meaning set forth in Section 1-10 of the |
8 | | Illinois Power Agency Act . ; |
9 | | "Delivery service provider" means a public utility as |
10 | | defined in subsection (a) of Section 3-105 of this Act. |
11 | | "Electricity provider" means an electric utility or |
12 | | alternative retail electric supplier providing energy supply. |
13 | | (ii) " Eligible eligible customer" means a retail
customer |
14 | | or retail customers with that owns or operates a
solar, wind, |
15 | | or other eligible renewable electrical generating facility |
16 | | with a rated capacity of not more than
2,000 kilowatts that is
|
17 | | located on the customer's or customers' side of the billing |
18 | | meter premises and is intended primarily to offset the |
19 | | customer's or customers'
own current or future electrical |
20 | | requirements when accounting for shading, orientation, and |
21 | | other siting factors that can reasonably be expected to alter |
22 | | an eligible renewable electrical generating facility's |
23 | | generation output. An eligible customer does not need to own |
24 | | the solar, wind, or other eligible renewable electrical |
25 | | generating facility. Subscribers to community renewable |
26 | | generation projects shall also be considered eligible |
|
| | HB2659 | - 170 - | LRB102 15746 SPS 21112 b |
|
|
1 | | customers for the purpose of this Section, including |
2 | | subscribers to community renewable generation projects that |
3 | | are larger than 2,000 kilowatts. ; (iii) "electricity provider" |
4 | | means an electric utility or alternative retail electric |
5 | | supplier; |
6 | | (iv) " Eligible eligible renewable electrical generating |
7 | | facility" means a generator , which may include the co-location |
8 | | of an energy storage system, that is interconnected under |
9 | | rules adopted by the Commission and is powered by solar |
10 | | electric energy, wind, dedicated crops grown for electricity |
11 | | generation, agricultural residues, untreated and unadulterated |
12 | | wood waste, landscape trimmings, livestock manure, anaerobic |
13 | | digestion of livestock or food processing waste, fuel cells or |
14 | | microturbines powered by renewable fuels, or hydroelectric |
15 | | energy . ; |
16 | | "Energy storage system" means commercially available |
17 | | technology that is capable of absorbing energy and storing it |
18 | | for a period of time for use at a later time, including, but |
19 | | not limited to, electrochemical, thermal, and |
20 | | electromechanical technologies, and may be interconnected on |
21 | | the customer's side of the billing meter or interconnected via |
22 | | its own meter. |
23 | | "Future electrical requirements" means the reasonable |
24 | | anticipation of load growth, such as from the addition of an |
25 | | electric vehicle, the addition of electric space heating or |
26 | | water heating, modeled electrical requirements upon occupation |
|
| | HB2659 | - 171 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of a new or vacant property, as well as other reasonable |
2 | | expectations of future electrical use. |
3 | | (v) " Net net electricity metering" (or "net metering") |
4 | | means the
measurement, during the
billing period applicable to |
5 | | an eligible customer, of the net amount of
electricity |
6 | | supplied by an
electricity provider to the customer customer's |
7 | | premises or provided to the electricity provider by the |
8 | | customer or subscriber . ; |
9 | | "Statewide net metering penetration" means the sum of |
10 | | nameplate capacity of all net metering facilities in the |
11 | | State, excluding community renewable generation projects, |
12 | | divided by the sum of peak demand of electricity delivered by |
13 | | each delivery service provider (with the peak identified |
14 | | independently for each provider) in the State during the |
15 | | previous year. |
16 | | (vi) " Subscriber subscriber " has shall have the meaning as |
17 | | set forth in Section 1-10 of the Illinois Power Agency Act . ; |
18 | | and |
19 | | (vii) " Subscription subscription " has shall have the |
20 | | meaning set forth in Section 1-10 of the Illinois Power Agency |
21 | | Act.
|
22 | | (c) A net metering facility shall be equipped with |
23 | | metering equipment that can measure the flow of electricity in |
24 | | both directions at the same rate. |
25 | | (1) For eligible customers whose electric service has |
26 | | not been declared competitive pursuant to Section 16-113 |
|
| | HB2659 | - 172 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of this Act as of July 1, 2011 and whose electric delivery |
2 | | service is provided and measured on a kilowatt-hour basis |
3 | | and electric supply service is not provided based on |
4 | | hourly pricing, this shall typically be accomplished |
5 | | through use of a single, bi-directional meter. If the |
6 | | eligible customer's existing electric revenue meter does |
7 | | not meet this requirement, the electricity provider shall |
8 | | arrange for the local electric utility or a meter service |
9 | | provider to install and maintain a new revenue meter at |
10 | | the electricity provider's expense, which may be the smart |
11 | | meter described by subsection (b) of Section 16-108.5 of |
12 | | this Act. |
13 | | (2) For eligible customers whose electric service has |
14 | | not been declared competitive pursuant to Section 16-113 |
15 | | of this Act as of July 1, 2011 and whose electric delivery |
16 | | service is provided and measured on a kilowatt demand |
17 | | basis and electric supply service is not provided based on |
18 | | hourly pricing, this shall typically be accomplished |
19 | | through use of a dual channel meter capable of measuring |
20 | | the flow of electricity both into and out of the |
21 | | customer's facility at the same rate and ratio. If such |
22 | | customer's existing electric revenue meter does not meet |
23 | | this requirement, then the electricity provider shall |
24 | | arrange for the local electric utility or a meter service |
25 | | provider to install and maintain a new revenue meter at |
26 | | the electricity provider's expense, which may be the smart |
|
| | HB2659 | - 173 - | LRB102 15746 SPS 21112 b |
|
|
1 | | meter described by subsection (b) of Section 16-108.5 of |
2 | | this Act. |
3 | | (3) For all other eligible customers, until such time |
4 | | as the local electric utility installs a smart meter, as |
5 | | described by subsection (b) of Section 16-108.5 of this |
6 | | Act, the electricity provider may arrange for the local |
7 | | electric utility or a meter service provider to install |
8 | | and maintain metering equipment capable of measuring the |
9 | | flow of electricity both into and out of the customer's |
10 | | facility at the same rate and ratio, typically through the |
11 | | use of a dual channel meter. If the eligible customer's |
12 | | existing electric revenue meter does not meet this |
13 | | requirement, then the costs of installing such equipment |
14 | | shall be paid for by the customer.
|
15 | | (d) An electricity provider shall
measure and charge or |
16 | | credit for the net
electricity supplied to eligible customers |
17 | | or provided by eligible customers whose electric service has |
18 | | not been declared competitive pursuant to Section 16-113 of |
19 | | this Act as of July 1, 2011 and whose electric delivery service |
20 | | is provided and measured on a kilowatt-hour basis and electric |
21 | | supply service is not provided based on hourly pricing in
the |
22 | | following manner:
|
23 | | (1) If the amount of electricity used by the customer |
24 | | during the billing
period exceeds the
amount of |
25 | | electricity produced by the customer, the electricity |
26 | | provider shall charge the customer for the net electricity |
|
| | HB2659 | - 174 - | LRB102 15746 SPS 21112 b |
|
|
1 | | supplied to and used
by the customer as provided in |
2 | | subsection (e-5) of this Section.
|
3 | | (2) If the amount of electricity produced by a |
4 | | customer during the billing period exceeds the amount of |
5 | | electricity used by the customer during that billing |
6 | | period, the electricity provider supplying that customer |
7 | | shall apply a 1:1 kilowatt-hour credit to a subsequent |
8 | | bill for service to the customer for the net electricity |
9 | | supplied to the electricity provider. The electricity |
10 | | provider shall continue to carry over any excess |
11 | | kilowatt-hour credits earned and apply those credits to |
12 | | subsequent billing periods to offset any |
13 | | customer-generator consumption in those billing periods |
14 | | until all credits are used or until the end of the |
15 | | annualized period.
|
16 | | (3) At the end of the year or annualized over the |
17 | | period that service is supplied by means of net metering, |
18 | | or in the event that the retail customer terminates |
19 | | service with the electricity provider prior to the end of |
20 | | the year or the annualized period, any remaining credits |
21 | | in the customer's account shall expire.
|
22 | | (d-5) An electricity provider shall measure and charge or |
23 | | credit for the net electricity
supplied to eligible customers |
24 | | or provided by eligible customers whose electric service has |
25 | | not
been declared competitive pursuant to Section 16-113 of |
26 | | this Act as of July 1, 2011 and whose electric delivery
service |
|
| | HB2659 | - 175 - | LRB102 15746 SPS 21112 b |
|
|
1 | | is provided and measured on a kilowatt-hour basis and electric |
2 | | supply service is provided
based on hourly pricing or |
3 | | time-of-use rates in the following manner: |
4 | | (1) If the amount of electricity used by the customer |
5 | | during any hourly or time-of-use period exceeds the amount |
6 | | of electricity produced by the customer, the electricity |
7 | | provider shall charge the customer for the net electricity |
8 | | supplied to and used by the customer according to the |
9 | | terms of the contract or tariff to which the same customer |
10 | | would be assigned to or be eligible for if the customer was |
11 | | not a net metering customer. |
12 | | (2) If the amount of electricity produced by a |
13 | | customer during any hourly period or time-of-use period |
14 | | exceeds the amount of electricity used by the customer |
15 | | during that hourly period or time-of-use period , the |
16 | | energy provider shall apply a credit for the net |
17 | | kilowatt-hours produced in such period. The credit shall |
18 | | consist of an energy credit and a delivery service credit. |
19 | | The energy
credit shall be valued at the same price per |
20 | | kilowatt-hour as the electric service provider
would |
21 | | charge for kilowatt-hour energy sales during that same |
22 | | hourly or time-of-use period. The delivery credit shall be |
23 | | equal to the net kilowatt-hours produced in such hourly or |
24 | | time-of-use period times a credit that reflects all |
25 | | kilowatt-hour based charges in the customer's electric |
26 | | service rate, excluding energy charges. |
|
| | HB2659 | - 176 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (e) An electricity provider shall measure and charge or |
2 | | credit for the net electricity supplied to eligible customers |
3 | | whose electric service has not been declared competitive |
4 | | pursuant to Section 16-113 of this Act as of July 1, 2011 and |
5 | | whose electric delivery service is provided and measured on a |
6 | | kilowatt demand basis and electric supply service is not |
7 | | provided based on hourly pricing in the following manner: |
8 | | (1) If the amount of electricity used by the customer |
9 | | during the billing period exceeds the amount of |
10 | | electricity produced by the customer, then the electricity |
11 | | provider shall charge the customer for the net electricity |
12 | | supplied to and used by the customer as provided in |
13 | | subsection (e-5) of this Section. The customer shall |
14 | | remain responsible for all taxes, fees, and utility |
15 | | delivery charges that would otherwise be applicable to the |
16 | | net amount of electricity used by the customer. |
17 | | (2) If the amount of electricity produced by a |
18 | | customer during the billing period exceeds the amount of |
19 | | electricity used by the customer during that billing |
20 | | period, then the electricity provider supplying that |
21 | | customer shall apply a 1:1 kilowatt-hour credit that |
22 | | reflects the kilowatt-hour based charges in the customer's |
23 | | electric service rate to a subsequent bill for service to |
24 | | the customer for the net electricity supplied to the |
25 | | electricity provider. The electricity provider shall |
26 | | continue to carry over any excess kilowatt-hour credits |
|
| | HB2659 | - 177 - | LRB102 15746 SPS 21112 b |
|
|
1 | | earned and apply those credits to subsequent billing |
2 | | periods to offset any customer-generator consumption in |
3 | | those billing periods until all credits are used or until |
4 | | the end of the annualized period. |
5 | | (3) At the end of the year or annualized over the |
6 | | period that service is supplied by means of net metering, |
7 | | or in the event that the retail customer terminates |
8 | | service with the electricity provider prior to the end of |
9 | | the year or the annualized period, any remaining credits |
10 | | in the customer's account shall expire. |
11 | | (e-5) An electricity provider shall provide electric |
12 | | service to eligible customers who utilize net metering at |
13 | | non-discriminatory rates that are identical, with respect to |
14 | | rate structure, retail rate components, and any monthly |
15 | | charges, to the rates that the customer would be charged if not |
16 | | a net metering customer. An electricity provider shall not |
17 | | charge net metering customers any fee or charge or require |
18 | | additional equipment, insurance, or any other requirements not |
19 | | specifically authorized by interconnection standards |
20 | | authorized by the Commission, unless the fee, charge, or other |
21 | | requirement would apply to other similarly situated customers |
22 | | who are not net metering customers. The customer will remain |
23 | | responsible for all taxes, fees, and utility delivery charges |
24 | | that would otherwise be applicable to the net amount of |
25 | | electricity used by the customer. Subsections (c) through (e) |
26 | | of this Section shall not be construed to prevent an |
|
| | HB2659 | - 178 - | LRB102 15746 SPS 21112 b |
|
|
1 | | arms-length agreement between an electricity provider and an |
2 | | eligible customer that sets forth different prices, terms, and |
3 | | conditions for the provision of net metering service, |
4 | | including, but not limited to, the provision of the |
5 | | appropriate metering equipment for non-residential customers.
|
6 | | (f) Notwithstanding the requirements of subsections (c) |
7 | | through (e-5) of this Section, an electricity provider must |
8 | | require dual-channel metering for customers operating eligible |
9 | | renewable electrical generating facilities with a nameplate |
10 | | rating up to 2,000 kilowatts and to whom the provisions of |
11 | | neither subsection (d), (d-5), nor (e) of this Section apply. |
12 | | In such cases, electricity charges and credits shall be |
13 | | determined as follows:
|
14 | | (1) The electricity provider shall assess and the |
15 | | customer remains responsible for all taxes, fees, and |
16 | | utility delivery charges that would otherwise be |
17 | | applicable to the gross amount of kilowatt-hours supplied |
18 | | to the eligible customer by the electricity provider. |
19 | | (2) Each month that service is supplied by means of |
20 | | dual-channel metering, the electricity provider shall |
21 | | compensate the eligible customer for any excess |
22 | | kilowatt-hour credits at the electricity provider's |
23 | | avoided cost of electricity supply over the monthly period |
24 | | or as otherwise specified by the terms of a power-purchase |
25 | | agreement negotiated between the customer and electricity |
26 | | provider. |
|
| | HB2659 | - 179 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (3) For all eligible net metering customers taking |
2 | | service from an electricity provider under contracts or |
3 | | tariffs employing hourly or time of use rates, any monthly |
4 | | consumption of electricity shall be calculated according |
5 | | to the terms of the contract or tariff to which the same |
6 | | customer would be assigned to or be eligible for if the |
7 | | customer was not a net metering customer. When those same |
8 | | customer-generators are net generators during any discrete |
9 | | hourly or time of use period, the net kilowatt-hours |
10 | | produced shall be valued at the same price per |
11 | | kilowatt-hour as the electric service provider would |
12 | | charge for retail kilowatt-hour sales during that same |
13 | | time of use period.
|
14 | | (g) For purposes of federal and State laws providing |
15 | | renewable energy credits or greenhouse gas credits, the |
16 | | eligible customer shall be treated as owning and having title |
17 | | to the renewable energy attributes, renewable energy credits, |
18 | | and greenhouse gas emission credits related to any electricity |
19 | | produced by the qualified generating unit. The electricity |
20 | | provider may not condition participation in a net metering |
21 | | program on the signing over of a customer's renewable energy |
22 | | credits; provided, however, this subsection (g) shall not be |
23 | | construed to prevent an arms-length agreement between an |
24 | | electricity provider and an eligible customer that sets forth |
25 | | the ownership or title of the credits.
|
26 | | (h) Within 120 days after the effective date of this
|
|
| | HB2659 | - 180 - | LRB102 15746 SPS 21112 b |
|
|
1 | | amendatory Act of the 95th General Assembly, the Commission |
2 | | shall establish standards for net metering and, if the |
3 | | Commission has not already acted on its own initiative, |
4 | | standards for the interconnection of eligible renewable |
5 | | generating equipment to the utility system. The |
6 | | interconnection standards shall address any procedural |
7 | | barriers, delays, and administrative costs associated with the |
8 | | interconnection of customer-generation while ensuring the |
9 | | safety and reliability of the units and the electric utility |
10 | | system. The Commission shall consider the Institute of |
11 | | Electrical and Electronics Engineers (IEEE) Standard 1547 and |
12 | | the issues of (i) reasonable and fair fees and costs, (ii) |
13 | | clear timelines for major milestones in the interconnection |
14 | | process, (iii) nondiscriminatory terms of agreement, and (iv) |
15 | | any best practices for interconnection of distributed |
16 | | generation.
|
17 | | (h-3) On and after the effective date of this amendatory |
18 | | Act of the 102nd General Assembly, it is the policy of the |
19 | | State that: |
20 | | (1) Electric utilities must provide interconnection |
21 | | customers with a detailed accounting of the components of |
22 | | the utility's cost to study and perform system upgrades, |
23 | | with itemized lists of equipment costs, labor costs, |
24 | | engineering costs, and administrative costs associated |
25 | | with the study or system upgrade. |
26 | | (2) An electric utility that has failed to meet an |
|
| | HB2659 | - 181 - | LRB102 15746 SPS 21112 b |
|
|
1 | | interconnection timeline by more than 20 days is subject |
2 | | to a penalty of $1,000 for each day over 20 days past the |
3 | | applicable date upon which the utility action was due. |
4 | | (3) The Illinois Commerce Commission shall, within 60 |
5 | | days after the effective date of this amendatory Act of |
6 | | the 102nd General Assembly, hire or contract with an |
7 | | independent grid engineer to address delays and disputes |
8 | | between the utility and the interconnection customer. |
9 | | Specifically, this independent engineer shall: |
10 | | (A) review utility cost estimates at the request |
11 | | of interconnection customers; |
12 | | (B) resolve technical disputes between utilities |
13 | | and interconnection customers regarding necessary |
14 | | upgrades and costs thereof; |
15 | | (C) authorize customers to self-supply |
16 | | interconnection studies when the electric utility is |
17 | | unable to provide such studies at a reasonable cost |
18 | | and schedule; and |
19 | | (D) authorize customers to self-build system |
20 | | upgrades consistent with electric utility standards |
21 | | when the electric utility cannot provide such upgrades |
22 | | and interconnection facilities at a reasonable cost |
23 | | and schedule. |
24 | | The process to hire or contract with an independent |
25 | | grid engineer described in this paragraph (3) is exempt |
26 | | from the requirements of the Illinois Procurement Code, |
|
| | HB2659 | - 182 - | LRB102 15746 SPS 21112 b |
|
|
1 | | pursuant to Section 20-10 of that Code. |
2 | | (h-5) Within 90 days after the effective date of this |
3 | | amendatory Act of the 102nd General Assembly, the Commission |
4 | | shall open a proceeding to update the interconnection |
5 | | standards and applicable utility tariffs. For the public |
6 | | interest, safety, and welfare of Illinois residents, the |
7 | | Commission may adopt emergency rules under Section 5-45 of the |
8 | | Illinois Administrative Procedure Act to implement the |
9 | | requirements of subsection (h-3) and this subsection (h-5). In |
10 | | addition to the requirements of subsection (h-3), the |
11 | | Commission shall also revise the standards to address critical |
12 | | standards for interconnection and the following issues: |
13 | | (1) transparency and accuracy of costs, both direct |
14 | | and indirect, while maintaining system security through |
15 | | the effective management of confidentiality agreements; |
16 | | (2) standardization of typical costs associated with |
17 | | interconnection; |
18 | | (3) transparency of the interconnection queue or |
19 | | queues and hosting capacity; |
20 | | (4) development of hosting capacity maps that enable |
21 | | greater visibility to customers about the locations with |
22 | | the greatest need or availability for distributed |
23 | | generation; |
24 | | (5) predictability of the queue management process and |
25 | | enforcement of timelines; |
26 | | (6) ability to undertake group interconnection studies |
|
| | HB2659 | - 183 - | LRB102 15746 SPS 21112 b |
|
|
1 | | and share interconnection costs among multiple applicants; |
2 | | (7) minimum requirements for application to the |
3 | | interconnection process and throughout the interconnection |
4 | | process to avoid queue clogging behavior; |
5 | | (8) requirements that the electric utility performing |
6 | | the interconnection study justify its interconnection |
7 | | study cost and the estimates of costs for identified |
8 | | upgrades, and to cap payments required by the |
9 | | interconnection customer for the electric utility |
10 | | installed facilities to the lesser of +50% of the |
11 | | Feasibility Study estimate, +25% of the System Impact |
12 | | Study estimate, or +10% of the Facilities Study estimate; |
13 | | (9) facilitation of the deployment of energy storage |
14 | | systems while ensuring the continued grid safety and |
15 | | reliability of the system, including addressing the |
16 | | following: |
17 | | (A) treatment of energy storage systems as |
18 | | generation for purposes of the interconnection, |
19 | | ownership, and operation; |
20 | | (B) fair study assumptions that reflect the |
21 | | operational profile of the energy storage device; |
22 | | (C) streamlined notification-only interconnection |
23 | | requirements for nonexporting systems that meet |
24 | | utility criteria for safety and reliability, as is |
25 | | determined through a robust stakeholder process; and |
26 | | (D) enabling exports from customer-sited energy |
|
| | HB2659 | - 184 - | LRB102 15746 SPS 21112 b |
|
|
1 | | storage systems for participation either in utility |
2 | | programs or wholesale markets; |
3 | | (10) establishment of a dispute resolution process |
4 | | designed to address instances of unreasonable impediments |
5 | | by the electric utility to the critical standards for |
6 | | interconnection enumerated in paragraphs (1) through (9) |
7 | | of this subsection (h-5). The Commission shall make |
8 | | available adequate Commission staff for this dispute |
9 | | resolution process to ensure that matters are decided on |
10 | | an expedited basis; and |
11 | | (11) other policies, processes, tariffs, and standards |
12 | | associated with interconnection, including the creation of |
13 | | standards and processes that support the achievement of |
14 | | the objectives in subparagraph (K) of paragraph (1) of |
15 | | subsection (c) of Section 1-75 of the Illinois Power |
16 | | Agency Act |
17 | | As part of this proceeding initiated under this subsection |
18 | | (h-5), the Commission shall establish an interconnection |
19 | | working group. The working group shall include representatives |
20 | | from electric utilities, developers of renewable electric |
21 | | generating facilities, representatives of interconnection |
22 | | customers, Commission staff, and other stakeholders. The |
23 | | working group shall be facilitated by Commission staff. The |
24 | | working group shall examine and make recommendations regarding |
25 | | best practices for interconnection process and customer |
26 | | service for interconnecting customer adopting distributed |
|
| | HB2659 | - 185 - | LRB102 15746 SPS 21112 b |
|
|
1 | | energy resources, including energy storage, interconnection of |
2 | | new technologies, including smart inverters and energy |
3 | | storage, and, without limitation, other technical, policy, and |
4 | | tariff issues related to and affecting interconnection |
5 | | performance and customer service. |
6 | | The working group shall report to the Commission on |
7 | | changes to interconnection rules and tariffs and any other |
8 | | recommendations as determined by the working group within 6 |
9 | | months after its first meeting. The report shall include |
10 | | positions and recommendations of the working group and |
11 | | individual working group members. The report of the working |
12 | | group shall be entered into evidence in the rulemaking process |
13 | | mandated by this subsection (h-5). The working group shall be |
14 | | reconvened one year following the enactment of the rules |
15 | | adopted pursuant to this subsection (h-5) to recommend any |
16 | | additional changes and assess the performance of the rules in |
17 | | meeting the goals as described above. |
18 | | (i) All electricity providers shall begin to offer net |
19 | | metering
no later than April 1,
2008.
|
20 | | (j) An electricity provider shall provide net metering to |
21 | | eligible
customers until both of the following occur: (i) the |
22 | | statewide net metering penetration equals 5% and (ii) the |
23 | | Commission approves the utility tariffs prescribed by |
24 | | subsection (e) of Section 16-107.6 of this Act that make |
25 | | distributed generation rebates available to all eligible |
26 | | customers, including residential customers, and those tariffs |
|
| | HB2659 | - 186 - | LRB102 15746 SPS 21112 b |
|
|
1 | | go into effect. After that time the load of its net metering |
2 | | customers equals 5% of
the total peak demand supplied by
that |
3 | | electricity provider during the
previous year. After such time |
4 | | as the load of the electricity provider's net metering |
5 | | customers equals 5% of the total peak demand supplied by that |
6 | | electricity provider during the previous year , eligible |
7 | | customers that begin taking net metering shall no longer be |
8 | | eligible for netting of delivery service credits as described |
9 | | in subsection (n) of this Section only be eligible for netting |
10 | | of energy .
|
11 | | (k) Each electricity provider shall maintain records and |
12 | | report annually to the Commission the total number of net |
13 | | metering customers served by the provider, as well as the |
14 | | type, capacity, and energy sources of the generating systems |
15 | | used by the net metering customers. Nothing in this Section |
16 | | shall limit the ability of an electricity provider to request |
17 | | the redaction of information deemed by the Commission to be |
18 | | confidential business information. |
19 | | (l)(1) Notwithstanding the definition of "eligible |
20 | | customer" in item (ii) of subsection (b) of this Section, each |
21 | | electricity provider shall allow net metering as set forth in |
22 | | this subsection (l) and for the following projects:
|
23 | | (A) properties owned or leased by multiple customers |
24 | | that contribute to the operation of an eligible renewable |
25 | | electrical generating facility through an ownership or |
26 | | leasehold interest of at least 200 watts in such facility, |
|
| | HB2659 | - 187 - | LRB102 15746 SPS 21112 b |
|
|
1 | | such as a community-owned wind project, a community-owned |
2 | | biomass project, a community-owned solar project, or a |
3 | | community methane digester processing livestock waste from |
4 | | multiple sources, provided that the facility is also |
5 | | located within the utility's service territory;
|
6 | | (B) individual units, apartments, or properties |
7 | | located in a single building that are owned or leased by |
8 | | multiple customers and collectively served by a common |
9 | | eligible renewable electrical generating facility, such as |
10 | | an office or apartment building, a shopping center or |
11 | | strip mall served by photovoltaic panels on the roof; and
|
12 | | (C) subscriptions to community renewable generation |
13 | | projects , including community renewable generation |
14 | | projects on the customer's side of the billing meter of a |
15 | | host facility and partially used for the customer's own |
16 | | load . |
17 | | In addition, the nameplate capacity of the eligible |
18 | | renewable electric generating facility that serves the demand |
19 | | of the properties, units, or apartments identified in |
20 | | paragraphs (1) and (2) of this subsection (l) shall not exceed |
21 | | 2,000 kilowatts in nameplate capacity in total.
Any eligible |
22 | | renewable electrical generating facility or community |
23 | | renewable generation project that is powered by photovoltaic |
24 | | electric energy and installed after the effective date of this |
25 | | amendatory Act of the 99th General Assembly must be installed |
26 | | by a qualified person in compliance with the requirements of |
|
| | HB2659 | - 188 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Section 16-128A of the Public Utilities Act and any rules or |
2 | | regulations adopted thereunder. |
3 | | (2) Notwithstanding anything to the contrary, an |
4 | | electricity provider shall provide credits for the electricity |
5 | | produced by the projects described in paragraph (1) of this |
6 | | subsection (l). The electricity provider shall provide credits |
7 | | that include at least energy supply, capacity, transmission, |
8 | | and the purchased electricity adjustment, as applicable, at |
9 | | the subscriber's energy supply rate on the subscriber's |
10 | | monthly bill equal to the subscriber's share of the production |
11 | | of electricity from the project, as determined by paragraph |
12 | | (3) of this subsection (l). |
13 | | (3) For the purposes of facilitating net metering, the |
14 | | owner or operator of the eligible renewable electrical |
15 | | generating facility or community renewable generation project |
16 | | shall be responsible for determining the amount of the credit |
17 | | that each customer or subscriber participating in a project |
18 | | under this subsection (l) is to receive in the following |
19 | | manner:
|
20 | | (A) The owner or operator shall, on a monthly basis, |
21 | | provide to the electric utility the kilowatthours of |
22 | | generation attributable to each of the utility's retail |
23 | | customers and subscribers participating in projects under |
24 | | this subsection (l) in accordance with the customer's or |
25 | | subscriber's share of the eligible renewable electric |
26 | | generating facility's or community renewable generation |
|
| | HB2659 | - 189 - | LRB102 15746 SPS 21112 b |
|
|
1 | | project's output of power and energy for such month. The |
2 | | owner or operator shall electronically transmit such |
3 | | calculations and associated documentation to the electric |
4 | | utility, in a format or method set forth in the applicable |
5 | | tariff, on a monthly basis so that the electric utility |
6 | | can reflect the monetary credits on customers' and |
7 | | subscribers' electric utility bills. The electric utility |
8 | | shall be permitted to revise its tariffs to implement the |
9 | | provisions of this amendatory Act of the 102nd General |
10 | | Assembly this amendatory Act of the 99th General Assembly . |
11 | | The owner or operator shall separately provide the |
12 | | electric utility with the documentation detailing the |
13 | | calculations supporting the credit in the manner set forth |
14 | | in the applicable tariff. |
15 | | (B) For those participating customers and subscribers |
16 | | who receive their energy supply from an alternative retail |
17 | | electric supplier, the electric utility shall remit to the |
18 | | applicable alternative retail electric supplier the |
19 | | information provided under subparagraph (A) of this |
20 | | paragraph (3) for such customers and subscribers in a |
21 | | manner set forth in such alternative retail electric |
22 | | supplier's net metering program, or as otherwise agreed |
23 | | between the utility and the alternative retail electric |
24 | | supplier. The alternative retail electric supplier shall |
25 | | then submit to the utility the amount of the charges for |
26 | | power and energy to be applied to such customers and |
|
| | HB2659 | - 190 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subscribers, including the amount of the credit associated |
2 | | with net metering. |
3 | | (C) A participating customer or subscriber may provide |
4 | | authorization as required by applicable law that directs |
5 | | the electric utility to submit information to the owner or |
6 | | operator of the eligible renewable electrical generating |
7 | | facility or community renewable generation project to |
8 | | which the customer or subscriber has an ownership or |
9 | | leasehold interest or a subscription. Such information |
10 | | shall be limited to the components of the net metering |
11 | | credit calculated under this subsection (l), including the |
12 | | bill credit rate, total kilowatthours, and total monetary |
13 | | credit value applied to the customer's or subscriber's |
14 | | bill for the monthly billing period. |
15 | | For community renewable generation projects located behind |
16 | | the meter of a host facility, the determination of the |
17 | | quantity of energy eligible for crediting to participating |
18 | | customers or subscribers of the community renewable generation |
19 | | project shall be based on any energy production of the project |
20 | | that exceeds the host's instantaneous on-site consumption |
21 | | during the applicable billing period. |
22 | | (l-5) Within 90 days after the effective date of this |
23 | | amendatory Act of the 102nd General Assembly this amendatory |
24 | | Act of the 99th General Assembly , each electric utility |
25 | | subject to this Section shall file a tariff to implement the |
26 | | provisions of subsection (l) of this Section, which shall, |
|
| | HB2659 | - 191 - | LRB102 15746 SPS 21112 b |
|
|
1 | | consistent with the provisions of subsection (l), describe the |
2 | | terms and conditions under which owners or operators of |
3 | | qualifying properties, units, or apartments may participate in |
4 | | net metering. The Commission shall approve, or approve with |
5 | | modification, the tariff within 120 days after the effective |
6 | | date of this amendatory Act of the 102nd General Assembly this |
7 | | amendatory Act of the 99th General Assembly . |
8 | | (m) Nothing in this Section shall affect the right of an |
9 | | electricity provider to continue to provide, or the right of a |
10 | | retail customer to continue to receive service pursuant to a |
11 | | contract for electric service between the electricity provider |
12 | | and the retail customer in accordance with the prices, terms, |
13 | | and conditions provided for in that contract. Either the |
14 | | electricity provider or the customer may require compliance |
15 | | with the prices, terms, and conditions of the contract.
|
16 | | (n) At such time, if any, that statewide net metering |
17 | | penetration equals 5% the load of the electricity provider's |
18 | | net metering customers equals 5% of the total peak demand |
19 | | supplied by that electricity provider during the previous |
20 | | year , as specified in subsection (j) of this Section, and the |
21 | | distributed generation rebate tariff for the electricity |
22 | | utility prescribed by subsection (e) of Section 16-107.6 of |
23 | | this Act has gone into effect and the rebate is approved and |
24 | | available to eligible customers, the net metering services |
25 | | described in subsections (d), (d-5), (e), (e-5), and (f) of |
26 | | this Section shall no longer be offered, except as to those |
|
| | HB2659 | - 192 - | LRB102 15746 SPS 21112 b |
|
|
1 | | eligible renewable generating facilities for which retail |
2 | | customers that are receiving net metering service under these |
3 | | subsections at the time the net metering services under those |
4 | | subsections are no longer offered ; those systems shall |
5 | | continue to receive net metering services described in |
6 | | subsections (d), (d-5), (e), (e-5), and (f) of this Section |
7 | | for the lifetime of the system, regardless of whether those |
8 | | retail customers change electricity providers or whether the |
9 | | retail customer benefiting from the system changes . Those |
10 | | retail customers that begin taking net metering service after |
11 | | the date that net metering services are no longer offered |
12 | | under such subsections shall be subject to the provisions set |
13 | | forth in the following paragraphs (1) through (3) of this |
14 | | subsection (n): |
15 | | (1) An electricity provider shall charge or credit for |
16 | | the net electricity supplied to eligible customers or |
17 | | provided by eligible customers whose electric supply |
18 | | service is not provided based on hourly pricing in the |
19 | | following manner: |
20 | | (A) If the amount of electricity used by the |
21 | | customer during the billing period exceeds the amount |
22 | | of electricity produced by the customer, then the |
23 | | electricity provider shall charge the customer for the |
24 | | net kilowatt-hour based electricity charges reflected |
25 | | in the customer's electric service rate supplied to |
26 | | and used by the customer as provided in paragraph (3) |
|
| | HB2659 | - 193 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of this subsection (n). |
2 | | (B) If the amount of electricity produced by a |
3 | | customer during the billing period exceeds the amount |
4 | | of electricity used by the customer during that |
5 | | billing period, then the electricity provider |
6 | | supplying that customer shall apply a 1:1 |
7 | | kilowatt-hour energy credit that reflects the |
8 | | kilowatt-hour based energy charges in the customer's |
9 | | electric service rate to a subsequent bill for service |
10 | | to the customer for the net electricity supplied to |
11 | | the electricity provider. The electricity provider |
12 | | shall continue to carry over any excess kilowatt-hour |
13 | | energy credits earned and apply those credits to |
14 | | subsequent billing periods to offset any |
15 | | customer-generator consumption in those billing |
16 | | periods until all credits are used or until the end of |
17 | | the annualized period. |
18 | | (C) At the end of the year or annualized over the |
19 | | period that service is supplied by means of net |
20 | | metering, or in the event that the retail customer |
21 | | terminates service with the electricity provider prior |
22 | | to the end of the year or the annualized period, any |
23 | | remaining credits in the customer's account shall |
24 | | expire. |
25 | | (2) An electricity provider shall charge or credit for |
26 | | the net electricity supplied to eligible customers or |
|
| | HB2659 | - 194 - | LRB102 15746 SPS 21112 b |
|
|
1 | | provided by eligible customers whose electric supply |
2 | | service is provided based on hourly pricing in the |
3 | | following manner: |
4 | | (A) If the amount of electricity used by the |
5 | | customer during any hourly period exceeds the amount |
6 | | of electricity produced by the customer, then the |
7 | | electricity provider shall charge the customer for the |
8 | | net electricity supplied to and used by the customer |
9 | | as provided in paragraph (3) of this subsection (n). |
10 | | (B) If the amount of electricity produced by a |
11 | | customer during any hourly period exceeds the amount |
12 | | of electricity used by the customer during that hourly |
13 | | period, the energy provider shall calculate an energy |
14 | | credit for the net kilowatt-hours produced in such |
15 | | period. The value of the energy credit shall be |
16 | | calculated using the same price per kilowatt-hour as |
17 | | the electric service provider would charge for |
18 | | kilowatt-hour energy sales during that same hourly |
19 | | period. |
20 | | (3) An electricity provider shall provide electric |
21 | | service to eligible customers who utilize net metering at |
22 | | non-discriminatory rates that are identical, with respect |
23 | | to rate structure, retail rate components, and any monthly |
24 | | charges, to the rates that the customer would be charged |
25 | | if not a net metering customer. An electricity provider |
26 | | shall charge the customer for the net electricity supplied |
|
| | HB2659 | - 195 - | LRB102 15746 SPS 21112 b |
|
|
1 | | to and used by the customer according to the terms of the |
2 | | contract or tariff to which the same customer would be |
3 | | assigned or be eligible for if the customer was not a net |
4 | | metering customer. An electricity provider shall not |
5 | | charge net metering customers any fee or charge or require |
6 | | additional equipment, insurance, or any other requirements |
7 | | not specifically authorized by interconnection standards |
8 | | authorized by the Commission, unless the fee, charge, or |
9 | | other requirement would apply to other similarly situated |
10 | | customers who are not net metering customers. The charge |
11 | | or credit that the customer receives for net electricity |
12 | | shall be at a rate equal to the customer's energy supply |
13 | | rate. The customer remains responsible for the gross |
14 | | amount of delivery services charges, supply-related |
15 | | charges that are kilowatt based, and all taxes and fees |
16 | | related to such charges. The customer also remains |
17 | | responsible for all taxes and fees that would otherwise be |
18 | | applicable to the net amount of electricity used by the |
19 | | customer. Paragraphs (1) and (2) of this subsection (n) |
20 | | shall not be construed to prevent an arms-length agreement |
21 | | between an electricity provider and an eligible customer |
22 | | that sets forth different prices, terms, and conditions |
23 | | for the provision of net metering service, including, but |
24 | | not limited to, the provision of the appropriate metering |
25 | | equipment for non-residential customers. Nothing in this |
26 | | paragraph (3) shall be interpreted to mandate that a |
|
| | HB2659 | - 196 - | LRB102 15746 SPS 21112 b |
|
|
1 | | utility that is only required to provide delivery services |
2 | | to a given customer must also sell electricity to such |
3 | | customer.
|
4 | | (o) Within 90 days after the effective date of this |
5 | | amendatory Act of the 102nd General Assembly, each electric |
6 | | utility subject to this Section shall file a tariff that |
7 | | shall, consistent with the provisions of this Section, propose |
8 | | the terms and conditions under which an eligible customer may |
9 | | participate in net metering. The Commission shall approve, or |
10 | | approve with modification based on a stakeholder process, the |
11 | | tariff within 120 days after the effective date of this |
12 | | amendatory Act of the 102nd General Assembly. Each electric |
13 | | utility shall file any changes to terms as a subsequent tariff |
14 | | for approval or approval with modifications from the |
15 | | Commission. |
16 | | (Source: P.A. 99-906, eff. 6-1-17 .) |
17 | | (220 ILCS 5/16-107.6) |
18 | | Sec. 16-107.6. Distributed generation rebate. |
19 | | (a) In this Section: |
20 | | "Distributed energy resource" means a wide range of |
21 | | technologies that are located on the customer side of the |
22 | | customer's electric meter and can provide value to the |
23 | | distribution system, including, but not limited to, |
24 | | distributed generation, energy storage, electric vehicles, and |
25 | | demand response technologies. |
|
| | HB2659 | - 197 - | LRB102 15746 SPS 21112 b |
|
|
1 | | "Smart inverter" means a device that converts direct |
2 | | current
into alternating current and meets the IEEE 1547-2018 |
3 | | equipment standards. Until devices that meet the IEEE |
4 | | 1547-2018 standard are available, devices that meet the UL |
5 | | 1741 SA standard are acceptable can autonomously contribute to |
6 | | grid support during excursions from normal operating voltage |
7 | | and frequency conditions by providing each of the following: |
8 | | dynamic reactive and real power support, voltage and frequency |
9 | | ride-through, ramp rate controls, communication systems with |
10 | | ability to accept external commands, and other functions from |
11 | | the electric utility . |
12 | | "Subscriber" has the meaning set forth in Section 1-10 of |
13 | | the Illinois Power Agency Act. |
14 | | "Subscription" has the meaning set forth in Section 1-10 |
15 | | of the Illinois Power Agency Act. |
16 | | "Threshold date" means the date on which statewide net |
17 | | metering penetration equals 5% the load of an electricity |
18 | | provider's net metering customers equals 5% of the total peak |
19 | | demand supplied by that electricity provider during the |
20 | | previous year , as specified under subsection (j) of Section |
21 | | 16-107.5 of this Act. |
22 | | (b) An electric utility that serves more than 200,000 |
23 | | customers in the State shall file a petition with the |
24 | | Commission requesting approval of the utility's tariff to |
25 | | provide a rebate to a retail customer who owns or operates |
26 | | distributed generation that meets the following criteria: |
|
| | HB2659 | - 198 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (1) has a nameplate generating capacity no greater |
2 | | than 2,000 kilowatts and is primarily used to offset that |
3 | | customer's electricity load; |
4 | | (2) is located on the customer's side of the billing |
5 | | meter premises , for the customer's own use, and not for |
6 | | commercial use or sales, including, but not limited to, |
7 | | wholesale sales of electric power and energy; |
8 | | (3) is located in the electric utility's service |
9 | | territory; and |
10 | | (4) is interconnected under rules adopted by the |
11 | | Commission by means of the inverter or smart inverter |
12 | | required by this Section, as applicable. |
13 | | For purposes of this Section, "distributed generation" |
14 | | shall satisfy the definition of distributed renewable energy |
15 | | generation device set forth in Section 1-10 of the Illinois |
16 | | Power Agency Act to the extent such definition is consistent |
17 | | with the requirements of this Section. |
18 | | In addition, any new photovoltaic distributed generation |
19 | | that is installed after the effective date of this amendatory |
20 | | Act of the 99th General Assembly must be installed by a |
21 | | qualified person, as defined by subsection (i) of Section 1-56 |
22 | | of the Illinois Power Agency Act. |
23 | | The tariff shall provide that the smart inverter |
24 | | associated with the distributed generation shall provide |
25 | | autonomous responses to grid conditions through its default |
26 | | settings as approved by the Commission utility shall be |
|
| | HB2659 | - 199 - | LRB102 15746 SPS 21112 b |
|
|
1 | | permitted to operate and control the smart inverter associated |
2 | | with the distributed generation that is the subject of the |
3 | | rebate for the purpose of preserving reliability during |
4 | | distribution system reliability events and shall address the |
5 | | terms and conditions of the operation and the compensation |
6 | | associated with the operation . Nothing in this Section shall |
7 | | negate or supersede Institute of Electrical and Electronics |
8 | | Engineers equipment interconnection requirements or standards |
9 | | or other similar standards or requirements. The tariff shall |
10 | | not limit the ability of the smart inverter or other |
11 | | distributed energy resource to provide wholesale market |
12 | | products such as regulation, demand response, or other |
13 | | services, or limit the ability of the owner of the smart |
14 | | inverter or the other distributed energy resource to receive |
15 | | compensation for providing those wholesale market products or |
16 | | services. The tariff shall also provide for additional uses of |
17 | | the smart inverter that shall be separately compensated and |
18 | | which may include, but are not limited to, voltage and VAR |
19 | | support, regulation, and other grid services. As part of the |
20 | | proceeding described in subsection (e) of this Section, the |
21 | | Commission shall review and determine whether smart inverters |
22 | | can provide any additional uses or services. If the Commission |
23 | | determines that an additional use or service would be |
24 | | beneficial, the Commission shall determine the terms and |
25 | | conditions of the operation and how the use or service should |
26 | | be separately compensated. |
|
| | HB2659 | - 200 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (c) The proposed tariff authorized by subsection (b) of |
2 | | this Section shall include the following participation terms |
3 | | and formulae to calculate the value of the rebates to be |
4 | | applied under this Section for distributed generation that |
5 | | satisfies the criteria set forth in subsection (b) of this |
6 | | Section: |
7 | | (1) Until the utility's tariff or tariffs setting the |
8 | | new compensation values established under subsection (e) |
9 | | take effect utility files its tariff or tariffs to place |
10 | | into effect the rebate values established by the |
11 | | Commission under subsection (e) of this Section , |
12 | | non-residential customers that are taking service under a |
13 | | net metering program offered by an electricity provider |
14 | | under the terms of Section 16-107.5 of this Act may apply |
15 | | for a rebate as provided for in this Section. The value of |
16 | | the rebate shall be $250 per kilowatt of nameplate |
17 | | generating capacity, measured as nominal DC power output, |
18 | | of a non-residential customer's distributed generation. |
19 | | (2) After the utility's tariff or tariffs setting the |
20 | | new rebate values established under subsection (e) (d) of |
21 | | this Section take effect, retail customers may, as |
22 | | applicable, make the following elections: |
23 | | (A) Residential customers that are taking service |
24 | | under a net metering program offered by an electricity |
25 | | provider under the terms of Section 16-107.5 of this |
26 | | Act on the threshold date may elect to either continue |
|
| | HB2659 | - 201 - | LRB102 15746 SPS 21112 b |
|
|
1 | | to take such service under the terms of such program as |
2 | | in effect on such threshold date for the useful life of |
3 | | the customer's eligible renewable electric generating |
4 | | facility as defined in such Section, or file an |
5 | | application to receive a rebate under the terms of |
6 | | this Section, provided that such application must be |
7 | | submitted within 6 months after the effective date of |
8 | | the tariff approved under subsection (d) of this |
9 | | Section. The value of the rebate shall be the amount |
10 | | established by the Commission and reflected in the |
11 | | utility's tariff approved pursuant to subsection (e) |
12 | | of this Section. |
13 | | (B) Non-residential customers that are taking |
14 | | service under a net metering program offered by an |
15 | | electricity provider under the terms of Section |
16 | | 16-107.5 of this Act on the threshold date may apply |
17 | | for a rebate as provided for in this Section. The value |
18 | | of the rebate shall be the amount established by the |
19 | | Commission and reflected in the utility's tariff |
20 | | pursuant to subsection (e) of this Section. |
21 | | (3) Upon approval of a rebate application submitted |
22 | | under this subsection (c), the retail customer shall no |
23 | | longer be entitled to receive any delivery service credits |
24 | | for the excess electricity generated by its facility and |
25 | | shall be subject to the provisions of subsection (n) of |
26 | | Section 16-107.5 of this Act. |
|
| | HB2659 | - 202 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (4) To be eligible for a rebate described in this |
2 | | subsection (c), customers who begin taking service after |
3 | | the effective date of this amendatory Act of the 99th |
4 | | General Assembly under a net metering program offered by |
5 | | an electricity provider under the terms of Section |
6 | | 16-107.5 of this Act must have a smart inverter associated |
7 | | with the customer's distributed generation. |
8 | | (d) The Commission shall review the proposed tariff |
9 | | submitted under subsections (b) and (c) of this Section and |
10 | | may make changes to the tariff that are consistent with this |
11 | | Section and with the Commission's authority under Article IX |
12 | | of this Act, subject to notice and hearing. Following notice |
13 | | and hearing, the Commission shall issue an order approving, or |
14 | | approving with modification, such tariff no later than 240 |
15 | | days after the utility files its tariff. |
16 | | (e) When statewide the total generating capacity of the |
17 | | electricity provider's net metering penetration, as defined in |
18 | | Section 16-107.5, customers is equal to 3%, the Commission |
19 | | shall open an investigation into a an annual process and |
20 | | formula for calculating the compensation value of rebates for |
21 | | the retail customers described in subsections (b) and (f) of |
22 | | this Section that submit rebate applications after the |
23 | | threshold date for an electric utility that elected to file a |
24 | | tariff pursuant to this Section . The investigation shall |
25 | | include , at minimum, diverse sets of stakeholders, a review of |
26 | | best practices in calculating the value of distributed energy |
|
| | HB2659 | - 203 - | LRB102 15746 SPS 21112 b |
|
|
1 | | resource benefits, and assessments of present and future |
2 | | technological capabilities of distributed energy resources. |
3 | | Compensation shall reflect all known and measurable values of |
4 | | the distributed energy resources over their full expected |
5 | | useful lives. Compensation shall reflect, but shall not be |
6 | | limited to, any geographic, time-based, performance-based, and |
7 | | other benefits of distributed energy resources, as well as |
8 | | technological capabilities and present and future grid needs. |
9 | | The Commission's final order concluding this
investigation |
10 | | shall establish a formula for the compensation of
distributed |
11 | | energy resources, and an initial set of inputs for
that |
12 | | formula. The Commission's final order concluding this |
13 | | proceeding shall also direct the utilities to update the |
14 | | formula, on an annual basis, with inputs derived from their |
15 | | integrated grid plans developed pursuant to Section 16-105.17. |
16 | | The Commission shall also determine, as a part of its |
17 | | investigation under this subsection, whether distributed |
18 | | energy resources can provide any additional beneficial uses or |
19 | | services through utility-controlled responses to grid |
20 | | conditions. If the Commission determines that distributed |
21 | | energy resources can provide additional beneficial uses or |
22 | | services, the Commission shall determine the terms and |
23 | | conditions for the operation and compensation of those uses |
24 | | and services. That compensation shall be above and beyond any |
25 | | rebate that the distributed energy resource receives. diverse |
26 | | sets of stakeholders, calculations for valuing distributed |
|
| | HB2659 | - 204 - | LRB102 15746 SPS 21112 b |
|
|
1 | | energy resource benefits to the grid based on best practices, |
2 | | and assessments of present and future technological |
3 | | capabilities of distributed energy resources. The value of |
4 | | such rebates shall reflect the value of the distributed |
5 | | generation to the distribution system at the location at which |
6 | | it is interconnected, taking into account the geographic, |
7 | | time-based, and performance-based benefits, as well as |
8 | | technological capabilities and present and future grid needs. |
9 | | The Commission shall consider the electric utility's |
10 | | integrated grid plan developed pursuant to Section 16-105.17 |
11 | | of this Act to help identify the value of distributed energy |
12 | | resources for the purpose of calculating the rebates described |
13 | | in this subsection. The Commission shall determine additional |
14 | | compensation for distributed generation that creates savings |
15 | | and value on the distribution system by being co-located or in |
16 | | close proximity to electric vehicle charging infrastructure in |
17 | | use by medium-duty and heavy-duty vehicles, primarily serving |
18 | | environmental justice communities, as outlined in the utility |
19 | | integrated grid planning process under Section 16-105.17 of |
20 | | this Act.
No later than 10 days after the Commission enters its |
21 | | final order under this subsection (e), each the utility shall |
22 | | file its tariff or tariffs in compliance with the order, |
23 | | including new tariffs for the recovery of costs incurred under |
24 | | this subsection (e) that shall provide for volumetric-based |
25 | | cost recovery, and the Commission shall approve, or approve |
26 | | with modification, the tariff or tariffs within 240 45 days |
|
| | HB2659 | - 205 - | LRB102 15746 SPS 21112 b |
|
|
1 | | after the utility's filing. For those rebate applications |
2 | | filed after the threshold date but before the utility's tariff |
3 | | or tariffs filed pursuant to this subsection (e) take effect, |
4 | | the value of the rebate shall remain at the value established |
5 | | in subsection (c) of this Section until the tariff is |
6 | | approved. As part of the process, the Commission shall ensure |
7 | | that the distributed generation rebate results in stable |
8 | | growth of both small and large distributed generation projects |
9 | | in Illinois as provided in subsection (j) of Section 16-107.5 |
10 | | of this Act, with particular attention to impacts to the |
11 | | growth of residential distributed generation customers. The |
12 | | Commission has the authority to establish interim rebate |
13 | | values for part or all of a utility's service territory to |
14 | | ensure transparency and stability of compensation for |
15 | | distributed energy resources in the utility's service |
16 | | territory. |
17 | | (f) Notwithstanding any provision of this Act to the |
18 | | contrary, the owner, developer, or subscriber of a generation |
19 | | facility that is part of a net metering program provided under |
20 | | subsection (l) of Section 16-107.5 shall also be eligible to |
21 | | apply for the rebate described in this Section. A subscriber |
22 | | to the generation facility may apply for a rebate in the amount |
23 | | of the subscriber's subscription only if the owner, developer, |
24 | | or previous subscriber to the same panel or panels has not |
25 | | already submitted an application, and, regardless of whether |
26 | | the subscriber is a residential or non-residential customer, |
|
| | HB2659 | - 206 - | LRB102 15746 SPS 21112 b |
|
|
1 | | may be allowed the amount identified in paragraph (1) of |
2 | | subsection (c) or in subsection (e) of this Section applicable |
3 | | to such customer on the date that the application is |
4 | | submitted. An application for a rebate for a portion of a |
5 | | project described in this subsection (f) may be submitted at |
6 | | or after the time that a related request for net metering is |
7 | | made. |
8 | | (g) No later than 60 days after the utility receives an |
9 | | application for a rebate under its tariff approved under |
10 | | subsection (d) or (e) of this Section, the utility shall issue |
11 | | a rebate to the applicant under the terms of the tariff. In the |
12 | | event the application is incomplete or the utility is |
13 | | otherwise unable to calculate the payment based on the |
14 | | information provided by the owner, the utility shall issue the |
15 | | payment no later than 60 days after the application is |
16 | | complete or all requested information is received. |
17 | | (h) An electric utility shall recover from its retail |
18 | | customers all of the costs of the rebates made under a tariff |
19 | | or tariffs approved under subsection (d) of placed into effect |
20 | | under this Section, including, but not limited to, the value |
21 | | of the rebates and all costs incurred by the utility to comply |
22 | | with and implement subsections (b) and (c) of this Section, |
23 | | but not including costs incurred by the utility to comply with |
24 | | and implement subsection (e) of this Section, consistent with |
25 | | the following provisions: |
26 | | (1) The utility shall defer the full amount of its |
|
| | HB2659 | - 207 - | LRB102 15746 SPS 21112 b |
|
|
1 | | costs incurred under this Section as a regulatory asset. |
2 | | The total costs deferred as a regulatory asset shall be |
3 | | amortized over a 15-year period. The unamortized balance |
4 | | shall be recognized as of December 31 for a given year. The |
5 | | utility shall also earn a return on the total of the |
6 | | unamortized balance of the regulatory assets, less any |
7 | | deferred taxes related to the unamortized balance, at an |
8 | | annual rate equal to the utility's weighted average cost |
9 | | of capital that includes, based on a year-end capital |
10 | | structure, the utility's actual cost of debt for the |
11 | | applicable calendar year and a cost of equity, which shall |
12 | | be calculated as the sum of (i) the average for the |
13 | | applicable calendar year of the monthly average yields of |
14 | | 30-year U.S. Treasury bonds published by the Board of |
15 | | Governors of the Federal Reserve System in its weekly H.15 |
16 | | Statistical Release or successor publication; and (ii) 580 |
17 | | basis points, including a revenue conversion factor |
18 | | calculated to recover or refund all additional income |
19 | | taxes that may be payable or receivable as a result of that |
20 | | return. |
21 | | When an electric utility creates a regulatory asset |
22 | | under the provisions of this Section, the costs are |
23 | | recovered over a period during which customers also |
24 | | receive a benefit, which is in the public interest. |
25 | | Accordingly, it is the intent of the General Assembly that |
26 | | an electric utility that elects to create a regulatory |
|
| | HB2659 | - 208 - | LRB102 15746 SPS 21112 b |
|
|
1 | | asset under the provisions of this Section shall recover |
2 | | all of the associated costs, including, but not limited |
3 | | to, its cost of capital as set forth in this Section. After |
4 | | the Commission has approved the prudence and |
5 | | reasonableness of the costs that comprise the regulatory |
6 | | asset, the electric utility shall be permitted to recover |
7 | | all such costs, and the value and recoverability through |
8 | | rates of the associated regulatory asset shall not be |
9 | | limited, altered, impaired, or reduced. To enable the |
10 | | financing of the incremental capital expenditures, |
11 | | including regulatory assets, for electric utilities that |
12 | | serve less than 3,000,000 retail customers but more than |
13 | | 500,000 retail customers in the State, the utility's |
14 | | actual year-end capital structure that includes a common |
15 | | equity ratio, excluding goodwill, of up to and including |
16 | | 50% of the total capital structure shall be deemed |
17 | | reasonable and used to set rates. |
18 | | (2) The utility, at its election, may recover all of |
19 | | the costs it incurs under this Section as part of a filing |
20 | | for a general increase in rates under Article IX of this |
21 | | Act, as part of an annual filing to update a |
22 | | performance-based formula rate under subsection (d) of |
23 | | Section 16-108.5 of this Act, or through an automatic |
24 | | adjustment clause tariff, provided that nothing in this |
25 | | paragraph (2) permits the double recovery of such costs |
26 | | from customers. If the utility elects to recover the costs |
|
| | HB2659 | - 209 - | LRB102 15746 SPS 21112 b |
|
|
1 | | it incurs under this Section through an automatic |
2 | | adjustment clause tariff, the utility may file its |
3 | | proposed tariff together with the tariff it files under |
4 | | subsection (b) of this Section or at a later time. The |
5 | | proposed tariff shall provide for an annual |
6 | | reconciliation, less any deferred taxes related to the |
7 | | reconciliation, with interest at an annual rate of return |
8 | | equal to the utility's weighted average cost of capital as |
9 | | calculated under paragraph (1) of this subsection (h), |
10 | | including a revenue conversion factor calculated to |
11 | | recover or refund all additional income taxes that may be |
12 | | payable or receivable as a result of that return, of the |
13 | | revenue requirement reflected in rates for each calendar |
14 | | year, beginning with the calendar year in which the |
15 | | utility files its automatic adjustment clause tariff under |
16 | | this subsection (h), with what the revenue requirement |
17 | | would have been had the actual cost information for the |
18 | | applicable calendar year been available at the filing |
19 | | date. The Commission shall review the proposed tariff and |
20 | | may make changes to the tariff that are consistent with |
21 | | this Section and with the Commission's authority under |
22 | | Article IX of this Act, subject to notice and hearing. |
23 | | Following notice and hearing, the Commission shall issue |
24 | | an order approving, or approving with modification, such |
25 | | tariff no later than 240 days after the utility files its |
26 | | tariff. |
|
| | HB2659 | - 210 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (i) An electric utility shall recover from its retail |
2 | | customers, on a volumetric basis, all of the costs of the |
3 | | rebates made under a tariff or tariffs placed into effect |
4 | | under subsection (e) of this Section, including, but not |
5 | | limited to, the value of the rebates and all costs incurred by |
6 | | the utility to comply with and implement subsection (e) of |
7 | | this Section, consistent with the following provisions: |
8 | | (1) The utility may defer a portion of its costs as a |
9 | | regulatory asset. The Commission shall determine the |
10 | | portion that may be appropriately deferred as a regulatory |
11 | | asset. Factors that the Commission shall consider in |
12 | | determining the portion of costs that shall be deferred as |
13 | | a regulatory asset include, but are not limited to: (i) |
14 | | whether and the extent to which a cost effectively |
15 | | deferred or avoided other distribution system costs; (ii) |
16 | | the extent to which a cost provides environmental |
17 | | benefits; (iii) the extent to which a cost improves system |
18 | | reliability or resilience; (iv) the electric utility's |
19 | | distribution system plan developed pursuant to Section |
20 | | 16-108.17 of this Act; and (v) such other factors as the |
21 | | Commission deems appropriate. The remainder of costs shall |
22 | | be deemed an operating expense and shall be recoverable if |
23 | | found prudent and reasonable by the Commission. |
24 | | The total costs deferred as a regulatory asset shall |
25 | | be amortized over a 15-year period. The unamortized |
26 | | balance shall be recognized as of December 31 for a given |
|
| | HB2659 | - 211 - | LRB102 15746 SPS 21112 b |
|
|
1 | | year. The utility shall also earn a return on the total of |
2 | | the unamortized balance of the regulatory assets, less any |
3 | | deferred taxes related to the unamortized balance, at an |
4 | | annual rate equal to the utility's weighted average cost |
5 | | of capital that includes, based on a year-end capital |
6 | | structure, the utility's actual cost of debt for the |
7 | | applicable calendar year and a cost of equity, which shall |
8 | | be calculated as the sum of: (I) the average for the |
9 | | applicable calendar year of the monthly average yields of |
10 | | 30-year U.S. Treasury bonds published by the Board of |
11 | | Governors of the Federal Reserve System in its weekly H.15 |
12 | | Statistical Release or successor publication; and (II) 580 |
13 | | basis points, including a revenue conversion factor |
14 | | calculated to recover or refund all additional income |
15 | | taxes that may be payable or receivable as a result of that |
16 | | return. |
17 | | When an electric utility creates a regulatory asset |
18 | | under the provisions of this subsection (i), the costs are |
19 | | recovered over a period during which customers also |
20 | | receive a benefit, which is in the public interest. |
21 | | Accordingly, it is the intent of the General Assembly that |
22 | | an electric utility that elects to create a regulatory |
23 | | asset under the provisions of this Section shall recover |
24 | | all of the associated costs, including, but not limited |
25 | | to, its cost of capital as set forth in this Section. After |
26 | | the Commission has approved the prudence and |
|
| | HB2659 | - 212 - | LRB102 15746 SPS 21112 b |
|
|
1 | | reasonableness of the costs that comprise the regulatory |
2 | | asset, the electric utility shall be permitted to recover |
3 | | all such costs, and the value and recoverability through |
4 | | rates of the associated regulatory asset shall not be |
5 | | limited, altered, impaired, or reduced. To enable the |
6 | | financing of the incremental capital expenditures, |
7 | | including regulatory assets, for electric utilities that |
8 | | serve less than 3,000,000 retail customers but more than |
9 | | 500,000 retail customers in the State, the utility's |
10 | | actual year-end capital structure that includes a common |
11 | | equity ratio, excluding goodwill, of up to and including |
12 | | 50% of the total capital structure shall be deemed |
13 | | reasonable and used to set rates. |
14 | | (2) The utility may recover all of the costs through |
15 | | an automatic adjustment clause tariff, on a volumetric |
16 | | basis. The utility may file its proposed cost-recovery |
17 | | tariff together with the tariff it files under subsection |
18 | | (e) of this Section or at a later time. The proposed tariff |
19 | | shall provide for an annual reconciliation, less any |
20 | | deferred taxes related to the reconciliation, with |
21 | | interest at an annual rate of return equal to the |
22 | | utility's weighted average cost of capital as calculated |
23 | | under paragraph (1) of this subsection (i), including a |
24 | | revenue conversion factor calculated to recover or refund |
25 | | all additional income taxes that may be payable or |
26 | | receivable as a result of that return, of the revenue |
|
| | HB2659 | - 213 - | LRB102 15746 SPS 21112 b |
|
|
1 | | requirement reflected in rates for each calendar year, |
2 | | beginning with the calendar year in which the utility |
3 | | files its automatic adjustment clause tariff under this |
4 | | subsection (i), with what the revenue requirement would |
5 | | have been had the actual cost information for the |
6 | | applicable calendar year been available at the filing |
7 | | date. The Commission shall review the proposed tariff and |
8 | | may make changes to the tariff that are consistent with |
9 | | this Section and with the Commission's authority under |
10 | | Article IX of this Act, subject to notice and hearing. |
11 | | Following notice and hearing, the Commission shall issue |
12 | | an order approving, or approving with modification, such |
13 | | tariff no later than 240 days after the utility files its |
14 | | tariff. |
15 | | (j) (i) No later than 90 days after the Commission enters |
16 | | an order, or order on rehearing, whichever is later, approving |
17 | | an electric utility's proposed tariff under subsection (d) of |
18 | | this Section, the electric utility shall provide notice of the |
19 | | availability of rebates under this Section. Subsequent to the |
20 | | utility's notice, any entity that offers in the State, for |
21 | | sale or lease, distributed generation and estimates the dollar |
22 | | saving attributable to such distributed generation shall |
23 | | provide estimates based on both delivery service credits , if |
24 | | applicable and if available under Section 16-107.5 of this |
25 | | Act, and the rebates available under this Section.
|
26 | | (Source: P.A. 99-906, eff. 6-1-17 .)
|
|
| | HB2659 | - 214 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (220 ILCS 5/16-108)
|
2 | | Sec. 16-108. Recovery of costs associated with the
|
3 | | provision of delivery and other services. |
4 | | (a) An electric utility shall file a delivery services
|
5 | | tariff with the Commission at least 210 days prior to the date
|
6 | | that it is required to begin offering such services pursuant
|
7 | | to this Act. An electric utility shall provide the components
|
8 | | of delivery services that are subject to the jurisdiction of
|
9 | | the Federal Energy Regulatory Commission at the same prices,
|
10 | | terms and conditions set forth in its applicable tariff as
|
11 | | approved or allowed into effect by that Commission. The
|
12 | | Commission shall otherwise have the authority pursuant to |
13 | | Article IX to review,
approve, and modify the prices, terms |
14 | | and conditions of those
components of delivery services not |
15 | | subject to the
jurisdiction of the Federal Energy Regulatory |
16 | | Commission,
including the authority to determine the extent to |
17 | | which such
delivery services should be offered on an unbundled |
18 | | basis. In making any such
determination the Commission shall |
19 | | consider, at a minimum, the effect of
additional unbundling on |
20 | | (i) the objective of just and reasonable rates, (ii)
electric |
21 | | utility employees, and (iii) the development of competitive |
22 | | markets
for electric energy services in Illinois.
|
23 | | (b) The Commission shall enter an order approving, or
|
24 | | approving as modified, the delivery services tariff no later
|
25 | | than 30 days prior to the date on which the electric utility
|
|
| | HB2659 | - 215 - | LRB102 15746 SPS 21112 b |
|
|
1 | | must commence offering such services. The Commission may
|
2 | | subsequently modify such tariff pursuant to this Act.
|
3 | | (c) The electric utility's
tariffs shall define the |
4 | | classes of its customers for purposes
of delivery services |
5 | | charges. Delivery services shall be priced and made
available |
6 | | to all retail customers electing delivery services in each |
7 | | such class
on a nondiscriminatory basis regardless of whether |
8 | | the retail customer chooses
the electric utility, an affiliate |
9 | | of the electric utility, or another entity
as its supplier of |
10 | | electric power and energy. Charges for delivery services
shall |
11 | | be cost based,
and shall allow the electric utility to recover |
12 | | the costs of
providing delivery services through its charges |
13 | | to its
delivery service customers that use the facilities and
|
14 | | services associated with such costs.
Such costs shall include |
15 | | the
costs of owning, operating and maintaining transmission |
16 | | and
distribution facilities. The Commission shall also be
|
17 | | authorized to consider whether, and if so to what extent, the
|
18 | | following costs are appropriately included in the electric
|
19 | | utility's delivery services rates: (i) the costs of that
|
20 | | portion of generation facilities used for the production and
|
21 | | absorption of reactive power in order that retail customers
|
22 | | located in the electric utility's service area can receive
|
23 | | electric power and energy from suppliers other than the
|
24 | | electric utility, and (ii) the costs associated with the use
|
25 | | and redispatch of generation facilities to mitigate
|
26 | | constraints on the transmission or distribution system in
|
|
| | HB2659 | - 216 - | LRB102 15746 SPS 21112 b |
|
|
1 | | order that retail customers located in the electric utility's
|
2 | | service area can receive electric power and energy from
|
3 | | suppliers other than the electric utility. Nothing in this
|
4 | | subsection shall be construed as directing the Commission to
|
5 | | allocate any of the costs described in (i) or (ii) that are
|
6 | | found to be appropriately included in the electric utility's
|
7 | | delivery services rates to any particular customer group or
|
8 | | geographic area in setting delivery services rates.
|
9 | | (d) The Commission shall establish charges, terms and
|
10 | | conditions for delivery services that are just and reasonable
|
11 | | and shall take into account customer impacts when establishing
|
12 | | such charges. In establishing charges, terms and conditions
|
13 | | for delivery services, the Commission shall take into account
|
14 | | voltage level differences. A retail customer shall have the
|
15 | | option to request to purchase electric service at any delivery
|
16 | | service voltage reasonably and technically feasible from the
|
17 | | electric facilities serving that customer's premises provided
|
18 | | that there are no significant adverse impacts upon system
|
19 | | reliability or system efficiency. A retail customer shall
also |
20 | | have the option to request to purchase electric service
at any |
21 | | point of delivery that is reasonably and technically
feasible |
22 | | provided that there are no significant adverse
impacts on |
23 | | system reliability or efficiency. Such requests
shall not be |
24 | | unreasonably denied.
|
25 | | (e) Electric utilities shall recover the costs of
|
26 | | installing, operating or maintaining facilities for the
|
|
| | HB2659 | - 217 - | LRB102 15746 SPS 21112 b |
|
|
1 | | particular benefit of one or more delivery services customers,
|
2 | | including without limitation any costs incurred in complying
|
3 | | with a customer's request to be served at a different voltage
|
4 | | level, directly from the retail customer or customers for
|
5 | | whose benefit the costs were incurred, to the extent such
|
6 | | costs are not recovered through the charges referred to in
|
7 | | subsections (c) and (d) of this Section.
|
8 | | (f) An electric utility shall be entitled but not
required |
9 | | to implement transition charges in conjunction with
the |
10 | | offering of delivery services pursuant to Section 16-104.
If |
11 | | an electric utility implements transition charges, it shall |
12 | | implement such
charges for all delivery services customers and |
13 | | for all customers described in
subsection (h), but shall not |
14 | | implement transition charges for power and
energy that a |
15 | | retail customer takes from cogeneration or self-generation
|
16 | | facilities located on that retail customer's premises, if such |
17 | | facilities meet
the following criteria:
|
18 | | (i) the cogeneration or self-generation facilities |
19 | | serve a single retail
customer and are located on that |
20 | | retail customer's premises (for purposes of
this |
21 | | subparagraph and subparagraph (ii), an industrial or |
22 | | manufacturing retail
customer and a third party contractor |
23 | | that is served by such industrial or
manufacturing |
24 | | customer through such retail customer's own electrical
|
25 | | distribution facilities under the circumstances described |
26 | | in subsection (vi) of
the definition of "alternative |
|
| | HB2659 | - 218 - | LRB102 15746 SPS 21112 b |
|
|
1 | | retail electric supplier" set forth in Section
16-102, |
2 | | shall be considered a single retail customer);
|
3 | | (ii) the cogeneration or self-generation facilities |
4 | | either (A) are sized
pursuant to generally accepted |
5 | | engineering standards for the retail customer's
electrical |
6 | | load at that premises (taking into account standby or |
7 | | other
reliability considerations related to that retail |
8 | | customer's operations at that
site) or (B) if the facility |
9 | | is a cogeneration facility located on the retail
|
10 | | customer's premises, the retail customer is the thermal |
11 | | host for that facility
and the facility has been designed |
12 | | to meet that retail customer's thermal
energy requirements |
13 | | resulting in electrical output beyond that retail
|
14 | | customer's electrical demand at that premises, comply with |
15 | | the operating and
efficiency standards applicable to |
16 | | "qualifying facilities" specified in title
18 Code of |
17 | | Federal Regulations Section 292.205 as in effect on the |
18 | | effective
date of this amendatory Act of 1999;
|
19 | | (iii) the retail customer on whose premises the |
20 | | facilities are located
either has an exclusive right to |
21 | | receive, and corresponding obligation to pay
for, all of |
22 | | the electrical capacity of the facility, or in the case of |
23 | | a
cogeneration facility that has been designed to meet the |
24 | | retail customer's
thermal energy requirements at that |
25 | | premises, an identified amount of the
electrical capacity |
26 | | of the facility, over a minimum 5-year period; and
|
|
| | HB2659 | - 219 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (iv) if the cogeneration facility is sized for the
|
2 | | retail customer's thermal load at that premises but |
3 | | exceeds the electrical
load, any sales of excess power or |
4 | | energy are made only at wholesale, are
subject to the |
5 | | jurisdiction of the Federal Energy Regulatory Commission, |
6 | | and
are not for the purpose of circumventing the |
7 | | provisions of this subsection (f).
|
8 | | If a generation facility located at a retail customer's |
9 | | premises does not meet
the above criteria, an electric utility |
10 | | implementing
transition charges shall implement a transition |
11 | | charge until December 31, 2006
for any power and energy taken |
12 | | by such retail customer from such facility as if
such power and |
13 | | energy had been delivered by the electric utility. Provided,
|
14 | | however, that an industrial retail customer that is taking |
15 | | power from a
generation facility that does not meet the above |
16 | | criteria but that is located
on such customer's premises will |
17 | | not be subject to a transition charge for the
power and energy |
18 | | taken by such retail customer from such generation facility if
|
19 | | the facility does not serve any other retail customer and |
20 | | either was installed
on behalf of the customer and for its own |
21 | | use prior to January 1, 1997, or is
both predominantly fueled |
22 | | by byproducts of such customer's manufacturing
process at such |
23 | | premises and sells or offers an average of 300 megawatts or
|
24 | | more of electricity produced from such generation facility |
25 | | into the wholesale
market.
Such charges
shall be calculated as |
26 | | provided in Section
16-102, and shall be collected
on each |
|
| | HB2659 | - 220 - | LRB102 15746 SPS 21112 b |
|
|
1 | | kilowatt-hour delivered under a
delivery services tariff to a |
2 | | retail customer from the date
the customer first takes |
3 | | delivery services until December 31,
2006 except as provided |
4 | | in subsection (h) of this Section.
Provided, however, that an |
5 | | electric utility, other than an electric utility
providing |
6 | | service to at least 1,000,000 customers in this State on |
7 | | January 1,
1999,
shall be entitled to petition for
entry of an |
8 | | order by the Commission authorizing the electric utility to
|
9 | | implement transition charges for an additional period ending |
10 | | no later than
December 31, 2008. The electric utility shall |
11 | | file its petition with
supporting evidence no earlier than 16 |
12 | | months, and no later than 12 months,
prior to December 31, |
13 | | 2006. The Commission shall hold a hearing on the
electric |
14 | | utility's petition and shall enter its order no later than 8 |
15 | | months
after the petition is filed. The Commission shall |
16 | | determine whether and to
what extent the electric utility |
17 | | shall be authorized to implement transition
charges for an |
18 | | additional period. The Commission may authorize the electric
|
19 | | utility to implement transition charges for some or all of the |
20 | | additional
period, and shall determine the mitigation factors |
21 | | to be used in implementing
such transition charges; provided, |
22 | | that the Commission shall not authorize
mitigation factors |
23 | | less than 110% of those in effect during the 12 months ended
|
24 | | December 31, 2006. In making its determination, the Commission |
25 | | shall consider
the following factors: the necessity to |
26 | | implement transition charges for an
additional period in order |
|
| | HB2659 | - 221 - | LRB102 15746 SPS 21112 b |
|
|
1 | | to maintain the financial integrity of the electric
utility; |
2 | | the prudence of the electric utility's actions in reducing its |
3 | | costs
since the effective date of this amendatory Act of 1997; |
4 | | the ability of the
electric utility to provide safe, adequate |
5 | | and reliable service to retail
customers in its service area; |
6 | | and the impact on competition of allowing the
electric utility |
7 | | to implement transition charges for the additional period.
|
8 | | (g) The electric utility shall file tariffs that
establish |
9 | | the transition charges to be paid by each class of
customers to |
10 | | the electric utility in conjunction with the
provision of |
11 | | delivery services. The electric utility's tariffs
shall define |
12 | | the classes of its customers for purposes of
calculating |
13 | | transition charges. The electric utility's tariffs
shall |
14 | | provide for the calculation of transition charges on a
|
15 | | customer-specific basis for any retail customer whose average
|
16 | | monthly maximum electrical demand on the electric utility's
|
17 | | system during the 6 months with the customer's highest monthly
|
18 | | maximum electrical demands equals or exceeds 3.0 megawatts for
|
19 | | electric utilities having more than 1,000,000 customers, and
|
20 | | for other electric utilities for any customer that has an
|
21 | | average monthly maximum electrical demand on the electric
|
22 | | utility's system of one megawatt or more, and (A) for which
|
23 | | there exists data on the customer's usage during the 3 years
|
24 | | preceding the date that the customer became eligible to take
|
25 | | delivery services, or (B) for which there does not exist data
|
26 | | on the customer's usage during the 3 years preceding the date
|
|
| | HB2659 | - 222 - | LRB102 15746 SPS 21112 b |
|
|
1 | | that the customer became eligible to take delivery services,
|
2 | | if in the electric utility's reasonable judgment there exists
|
3 | | comparable usage information or a sufficient basis to develop
|
4 | | such information, and further provided that the electric
|
5 | | utility can require customers for which an individual
|
6 | | calculation is made to sign contracts that set forth the
|
7 | | transition charges to be paid by the customer to the electric
|
8 | | utility pursuant to the tariff.
|
9 | | (h) An electric utility shall also be entitled to file
|
10 | | tariffs that allow it to collect transition charges from
|
11 | | retail customers in the electric utility's service area that
|
12 | | do not take delivery services but that take electric power or
|
13 | | energy from an alternative retail electric supplier or from an
|
14 | | electric utility other than the electric utility in whose
|
15 | | service area the customer is located. Such charges shall be
|
16 | | calculated, in accordance with the definition of transition
|
17 | | charges in Section 16-102, for the period of time that the
|
18 | | customer would be obligated to pay transition charges if it
|
19 | | were taking delivery services, except that no deduction for
|
20 | | delivery services revenues shall be made in such calculation,
|
21 | | and usage data from the customer's class shall be used where
|
22 | | historical usage data is not available for the individual
|
23 | | customer. The customer shall be obligated to pay such charges
|
24 | | on a lump sum basis on or before the date on which the
customer |
25 | | commences to take service from the alternative retail
electric |
26 | | supplier or other electric utility, provided, that
the |
|
| | HB2659 | - 223 - | LRB102 15746 SPS 21112 b |
|
|
1 | | electric utility in whose service area the customer is
located |
2 | | shall offer the customer the option of signing a
contract |
3 | | pursuant to which the customer pays such charges
ratably over |
4 | | the period in which the charges would otherwise
have applied.
|
5 | | (i) An electric utility shall be entitled to add to the
|
6 | | bills of delivery services customers charges pursuant to
|
7 | | Sections 9-221, 9-222 (except as provided in Section 9-222.1), |
8 | | and Section
16-114 of this Act, Section 5-5 of the Electricity |
9 | | Infrastructure Maintenance
Fee Law, Section 6-5 of the |
10 | | Renewable Energy, Energy Efficiency, and Coal
Resources |
11 | | Development Law of 1997, and Section 13 of the Energy |
12 | | Assistance Act.
|
13 | | (j) If a retail customer that obtains electric power and
|
14 | | energy from cogeneration or self-generation facilities
|
15 | | installed for its own use on or before January 1, 1997,
|
16 | | subsequently takes service from an alternative retail electric
|
17 | | supplier or an electric utility other than the electric
|
18 | | utility in whose service area the customer is located for any
|
19 | | portion of the customer's electric power and energy
|
20 | | requirements formerly obtained from those facilities |
21 | | (including that amount
purchased from the utility in lieu of |
22 | | such generation and not as standby power
purchases, under a |
23 | | cogeneration displacement tariff in effect as of the
effective |
24 | | date of this amendatory Act of 1997), the
transition charges |
25 | | otherwise applicable pursuant to subsections (f), (g), or
(h) |
26 | | of this Section shall not be applicable
in any year to that |
|
| | HB2659 | - 224 - | LRB102 15746 SPS 21112 b |
|
|
1 | | portion of the customer's electric power
and energy |
2 | | requirements formerly obtained from those
facilities, |
3 | | provided, that for purposes of this subsection
(j), such |
4 | | portion shall not exceed the average number of
kilowatt-hours |
5 | | per year obtained from the cogeneration or
self-generation |
6 | | facilities during the 3 years prior to the
date on which the |
7 | | customer became eligible for delivery
services, except as |
8 | | provided in subsection (f) of Section
16-110.
|
9 | | (k) The electric utility shall be entitled to recover |
10 | | through tariffed charges all of the costs associated with the |
11 | | purchase of zero emission credits from zero emission |
12 | | facilities to meet the requirements of subsection (d-5) of |
13 | | Section 1-75 of the Illinois Power Agency Act. Such costs |
14 | | shall include the costs of procuring the zero emission |
15 | | credits, as well as the reasonable costs that the utility |
16 | | incurs as part of the procurement processes and to implement |
17 | | and comply with plans and processes approved by the Commission |
18 | | under such subsection (d-5). The costs shall be allocated |
19 | | across all retail customers through a single, uniform cents |
20 | | per kilowatt-hour charge applicable to all retail customers, |
21 | | which shall appear as a separate line item on each customer's |
22 | | bill. Beginning June 1, 2017, the electric utility shall be |
23 | | entitled to recover through tariffed charges all of the costs |
24 | | associated with the purchase of renewable energy resources to |
25 | | meet the long-term goals and targets of the renewable energy |
26 | | resource standards of subsection (c) of Section 1-75 of the |
|
| | HB2659 | - 225 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Illinois Power Agency Act, under procurement plans as approved |
2 | | in accordance with that Section and Section 16-111.5 of this |
3 | | Act. Such costs shall include the costs of procuring the |
4 | | renewable energy resources, as well as the reasonable costs |
5 | | that the utility incurs as part of the procurement processes |
6 | | and to implement and comply with plans and processes approved |
7 | | by the Commission under such Sections. The costs associated |
8 | | with the purchase of renewable energy resources shall be |
9 | | allocated across all retail customers in proportion to the |
10 | | amount of renewable energy resources the utility procures for |
11 | | such customers through a single, uniform cents per |
12 | | kilowatt-hour charge applicable to such retail customers, |
13 | | which shall appear as a separate line item on each such |
14 | | customer's bill. |
15 | | Notwithstanding whether the Commission has approved the |
16 | | initial long-term renewable resources procurement plan as of |
17 | | June 1, 2017, an electric utility shall place new tariffed |
18 | | charges into effect beginning with the June 2017 monthly |
19 | | billing period, to the extent practicable, to begin recovering |
20 | | the costs of procuring renewable energy resources, as those |
21 | | charges are calculated under the limitations described in |
22 | | subparagraph (E) of paragraph (1) of subsection (c) of Section |
23 | | 1-75 of the Illinois Power Agency Act. Notwithstanding the |
24 | | date on which the utility places such new tariffed charges |
25 | | into effect, the utility shall be permitted to collect the |
26 | | charges under such tariff as if the tariff had been in effect |
|
| | HB2659 | - 226 - | LRB102 15746 SPS 21112 b |
|
|
1 | | beginning with the first day of the June 2017 monthly billing |
2 | | period. Money collected from customers for the procurement of |
3 | | renewable energy resources in a given delivery may be spent by |
4 | | the utility for the procurement of renewable resources over |
5 | | any of the following 5 delivery years, after which money shall |
6 | | be credited back to retail customers, provided that up to |
7 | | $170,000,000 of funds collected, but not used, in a given |
8 | | delivery year are first made available to the Illinois Solar |
9 | | for All Program established under subsection (b) of Section |
10 | | 1-56 of the Illinois Power Agency Act to cover budget |
11 | | shortfalls due to unexpected fluctuations in the amount of |
12 | | money available to that Program from the Illinois Power Agency |
13 | | Renewable Energy Resources Fund. The electric utility shall |
14 | | spend all money collected in earlier delivery years that has |
15 | | not yet been returned to customers, first, before spending |
16 | | money collected in later delivery years. The For the delivery |
17 | | years commencing June 1, 2017, June 1, 2018, and June 1, 2019, |
18 | | the electric utility shall deposit into a separate interest |
19 | | bearing account of a financial institution the monies |
20 | | collected under the tariffed charges. Any interest earned |
21 | | shall be credited back to retail customers under the |
22 | | reconciliation proceeding provided for in this subsection (k), |
23 | | provided that the electric utility shall first be reimbursed |
24 | | from the interest for the administrative costs that it incurs |
25 | | to administer and manage the account. Any taxes due on the |
26 | | funds in the account, or interest earned on it, will be paid |
|
| | HB2659 | - 227 - | LRB102 15746 SPS 21112 b |
|
|
1 | | from the account or, if insufficient monies are available in |
2 | | the account, from the monies collected under the tariffed |
3 | | charges to recover the costs of procuring renewable energy |
4 | | resources. Monies deposited in the account shall be subject to |
5 | | the review, reconciliation, and true-up process described in |
6 | | this subsection (k) that is applicable to the funds collected |
7 | | and costs incurred for the procurement of renewable energy |
8 | | resources. |
9 | | The electric utility shall be entitled to recover all of |
10 | | the costs identified in this subsection (k) through automatic |
11 | | adjustment clause tariffs applicable to all of the utility's |
12 | | retail customers that allow the electric utility to adjust its |
13 | | tariffed charges consistent with this subsection (k). The |
14 | | determination as to whether any excess funds were collected |
15 | | during a given delivery year for the purchase of renewable |
16 | | energy resources, and the crediting of any excess funds back |
17 | | to retail customers, shall not be made until after the close of |
18 | | the delivery year, which will ensure that the maximum amount |
19 | | of funds is available to implement the approved long-term |
20 | | renewable resources procurement plan during a given delivery |
21 | | year. The electric utility's collections under such automatic |
22 | | adjustment clause tariffs to recover the costs of renewable |
23 | | energy resources and zero emission credits from zero emission |
24 | | facilities shall be subject to separate annual review, |
25 | | reconciliation, and true-up against actual costs by the |
26 | | Commission under a procedure that shall be specified in the |
|
| | HB2659 | - 228 - | LRB102 15746 SPS 21112 b |
|
|
1 | | electric utility's automatic adjustment clause tariffs and |
2 | | that shall be approved by the Commission in connection with |
3 | | its approval of such tariffs. The procedure shall provide that |
4 | | any difference between the electric utility's collections for |
5 | | zero emission credits under the automatic adjustment charges |
6 | | for an annual period and the electric utility's actual costs |
7 | | of renewable energy resources and zero emission credits from |
8 | | zero emission facilities for that same annual period shall be |
9 | | refunded to or collected from, as applicable, the electric |
10 | | utility's retail customers in subsequent periods. |
11 | | Nothing in this subsection (k) is intended to affect, |
12 | | limit, or change the right of the electric utility to recover |
13 | | the costs associated with the procurement of renewable energy |
14 | | resources for periods commencing before, on, or after June 1, |
15 | | 2017, as otherwise provided in the Illinois Power Agency Act. |
16 | | Notwithstanding anything to the contrary, the Commission |
17 | | shall not conduct an annual review, reconciliation, and |
18 | | true-up associated with renewable energy resources' |
19 | | collections and costs for the delivery years commencing June |
20 | | 1, 2017, June 1, 2018, June 1, 2019, and June 1, 2020, and |
21 | | shall instead conduct a single review, reconciliation, and |
22 | | true-up associated with renewable energy resources' |
23 | | collections and costs for the 4-year period beginning June 1, |
24 | | 2017 and ending May 31, 2021, provided that the review, |
25 | | reconciliation, and true-up shall not be initiated until after |
26 | | August 31, 2021. During the 4-year period, the utility shall |
|
| | HB2659 | - 229 - | LRB102 15746 SPS 21112 b |
|
|
1 | | be permitted to collect and retain funds under this subsection |
2 | | (k) and to purchase renewable energy resources under an |
3 | | approved long-term renewable resources procurement plan using |
4 | | those funds regardless of the delivery year in which the funds |
5 | | were collected during the 4-year period. |
6 | | If the amount of funds collected during the delivery year |
7 | | commencing June 1, 2017, exceeds the costs incurred during |
8 | | that delivery year, then up to half of this excess amount, as |
9 | | calculated on June 1, 2018, may be used to fund the programs |
10 | | under subsection (b) of Section 1-56 of the Illinois Power |
11 | | Agency Act in the same proportion the programs are funded |
12 | | under that subsection (b). However, any amount identified |
13 | | under this subsection (k) to fund programs under subsection |
14 | | (b) of Section 1-56 of the Illinois Power Agency Act shall be |
15 | | reduced if it exceeds the funding shortfall. For purposes of |
16 | | this Section, "funding shortfall" means the difference between |
17 | | $200,000,000 and the amount appropriated by the General |
18 | | Assembly to the Illinois Power Agency Renewable Energy |
19 | | Resources Fund during the period that commences on the |
20 | | effective date of this amendatory act of the 99th General |
21 | | Assembly and ends on August 1, 2018. |
22 | | If the amount of funds collected during the delivery year |
23 | | commencing June 1, 2018, exceeds the costs incurred during |
24 | | that delivery year, then up to half of this excess amount, as |
25 | | calculated on June 1, 2019, may be used to fund the programs |
26 | | under subsection (b) of Section 1-56 of the Illinois Power |
|
| | HB2659 | - 230 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Agency Act in the same proportion the programs are funded |
2 | | under that subsection (b). However, any amount identified |
3 | | under this subsection (k) to fund programs under subsection |
4 | | (b) of Section 1-56 of the Illinois Power Agency Act shall be |
5 | | reduced if it exceeds the funding shortfall. |
6 | | If the amount of funds collected during the delivery year |
7 | | commencing June 1, 2019, exceeds the costs incurred during |
8 | | that delivery year, then up to half of this excess amount, as |
9 | | calculated on June 1, 2020, may be used to fund the programs |
10 | | under subsection (b) of Section 1-56 of the Illinois Power |
11 | | Agency Act in the same proportion the programs are funded |
12 | | under that subsection (b). However, any amount identified |
13 | | under this subsection (k) to fund programs under subsection |
14 | | (b) of Section 1-56 of the Illinois Power Agency Act shall be |
15 | | reduced if it exceeds the funding shortfall. |
16 | | The funding available under this subsection (k), if any, |
17 | | for the programs described under subsection (b) of Section |
18 | | 1-56 of the Illinois Power Agency Act shall not reduce the |
19 | | amount of funding for the programs described in subparagraph |
20 | | (O) of paragraph (1) of subsection (c) of Section 1-75 of the |
21 | | Illinois Power Agency Act. If funding is available under this |
22 | | subsection (k) for programs described under subsection (b) of |
23 | | Section 1-56 of the Illinois Power Agency Act, then the |
24 | | long-term renewable resources plan shall provide for the |
25 | | Agency to procure contracts in an amount that does not exceed |
26 | | the funding, and the contracts approved by the Commission |
|
| | HB2659 | - 231 - | LRB102 15746 SPS 21112 b |
|
|
1 | | shall be executed by the applicable utility or utilities. |
2 | | (l) A utility that has terminated any contract executed |
3 | | under subsection (d-5) of Section 1-75 of the Illinois Power |
4 | | Agency Act shall be entitled to recover any remaining balance |
5 | | associated with the purchase of zero emission credits prior to |
6 | | such termination, and such utility shall also apply a credit |
7 | | to its retail customer bills in the event of any |
8 | | over-collection. |
9 | | (m)(1) An electric utility that recovers its costs of |
10 | | procuring zero emission credits from zero emission |
11 | | facilities through a cents-per-kilowatthour charge under |
12 | | to subsection (k) of this Section shall be subject to the |
13 | | requirements of this subsection (m). Notwithstanding |
14 | | anything to the contrary, such electric utility shall, |
15 | | beginning on April 30, 2018, and each April 30 thereafter |
16 | | until April 30, 2026, calculate whether any reduction must |
17 | | be applied to such cents-per-kilowatthour charge that is |
18 | | paid by retail customers of the electric utility that are |
19 | | exempt from subsections (a) through (j) of Section 8-103B |
20 | | of this Act under subsection (l) of Section 8-103B. Such |
21 | | charge shall be reduced for such customers for the next |
22 | | delivery year commencing on June 1 based on the amount |
23 | | necessary, if any, to limit the annual estimated average |
24 | | net increase for the prior calendar year due to the future |
25 | | energy investment costs to no more than 1.3% of 5.98 cents |
26 | | per kilowatt-hour, which is the average amount paid per |
|
| | HB2659 | - 232 - | LRB102 15746 SPS 21112 b |
|
|
1 | | kilowatthour for electric service during the year ending |
2 | | December 31, 2015 by Illinois industrial retail customers, |
3 | | as reported to the Edison Electric Institute. |
4 | | The calculations required by this subsection (m) shall |
5 | | be made only once for each year, and no subsequent rate |
6 | | impact determinations shall be made. |
7 | | (2) For purposes of this Section, "future energy |
8 | | investment costs" shall be calculated by subtracting the |
9 | | cents-per-kilowatthour charge identified in subparagraph |
10 | | (A) of this paragraph (2) from the sum of the |
11 | | cents-per-kilowatthour charges identified in subparagraph |
12 | | (B) of this paragraph (2): |
13 | | (A) The cents-per-kilowatthour charge identified |
14 | | in the electric utility's tariff placed into effect |
15 | | under Section 8-103 of the Public Utilities Act that, |
16 | | on December 1, 2016, was applicable to those retail |
17 | | customers that are exempt from subsections (a) through |
18 | | (j) of Section 8-103B of this Act under subsection (l) |
19 | | of Section 8-103B. |
20 | | (B) The sum of the following |
21 | | cents-per-kilowatthour charges applicable to those |
22 | | retail customers that are exempt from subsections (a) |
23 | | through (j) of Section 8-103B of this Act under |
24 | | subsection (l) of Section 8-103B, provided that if one |
25 | | or more of the following charges has been in effect and |
26 | | applied to such customers for more than one calendar |
|
| | HB2659 | - 233 - | LRB102 15746 SPS 21112 b |
|
|
1 | | year, then each charge shall be equal to the average of |
2 | | the charges applied over a period that commences with |
3 | | the calendar year ending December 31, 2017 and ends |
4 | | with the most recently completed calendar year prior |
5 | | to the calculation required by this subsection (m): |
6 | | (i) the cents-per-kilowatthour charge to |
7 | | recover the costs incurred by the utility under |
8 | | subsection (d-5) of Section 1-75 of the Illinois |
9 | | Power Agency Act, adjusted for any reductions |
10 | | required under this subsection (m); and |
11 | | (ii) the cents-per-kilowatthour charge to |
12 | | recover the costs incurred by the utility under |
13 | | Section 16-107.6 of the Public Utilities Act. |
14 | | If no charge was applied for a given calendar year |
15 | | under item (i) or (ii) of this subparagraph (B), then |
16 | | the value of the charge for that year shall be zero. |
17 | | (3) If a reduction is required by the calculation |
18 | | performed under this subsection (m), then the amount of |
19 | | the reduction shall be multiplied by the number of years |
20 | | reflected in the averages calculated under subparagraph |
21 | | (B) of paragraph (2) of this subsection (m). Such |
22 | | reduction shall be applied to the cents-per-kilowatthour |
23 | | charge that is applicable to those retail customers that |
24 | | are exempt from subsections (a) through (j) of Section |
25 | | 8-103B of this Act under subsection (l) of Section 8-103B |
26 | | beginning with the next delivery year commencing after the |
|
| | HB2659 | - 234 - | LRB102 15746 SPS 21112 b |
|
|
1 | | date of the calculation required by this subsection (m). |
2 | | (4) The electric utility shall file a notice with the |
3 | | Commission on May 1 of 2018 and each May 1 thereafter until |
4 | | May 1, 2026 containing the reduction, if any, which must |
5 | | be applied for the delivery year which begins in the year |
6 | | of the filing. The notice shall contain the calculations |
7 | | made pursuant to this Section. By October 1 of each year |
8 | | beginning in 2018, each electric utility shall notify the |
9 | | Commission if it appears, based on an estimate of the |
10 | | calculation required in this subsection (m), that a |
11 | | reduction will be required in the next year. |
12 | | (Source: P.A. 99-906, eff. 6-1-17 .)
|
13 | | (220 ILCS 5/16-111.5) |
14 | | Sec. 16-111.5. Provisions relating to procurement. |
15 | | (a) An electric utility that on December 31, 2005 served |
16 | | at least 100,000 customers in Illinois shall procure power and |
17 | | energy for its eligible retail customers in accordance with |
18 | | the applicable provisions set forth in Section 1-75 of the |
19 | | Illinois Power Agency Act and this Section. Beginning with the |
20 | | delivery year commencing on June 1, 2017, such electric |
21 | | utility shall also procure zero emission credits from zero |
22 | | emission facilities in accordance with the applicable |
23 | | provisions set forth in Section 1-75 of the Illinois Power |
24 | | Agency Act, and, for years beginning on or after June 1, 2017, |
25 | | the utility shall procure renewable energy resources in |
|
| | HB2659 | - 235 - | LRB102 15746 SPS 21112 b |
|
|
1 | | accordance with the applicable provisions set forth in Section |
2 | | 1-75 of the Illinois Power Agency Act and this Section. |
3 | | Beginning with the delivery year commencing June 1, 2023, an |
4 | | electric utility that, on December 31, 2005, served at least |
5 | | 3,000,000 customers in Illinois shall procure capacity for its |
6 | | retail customers in accordance with the applicable provisions |
7 | | set forth in Section 1-75 of the Illinois Power Agency Act and |
8 | | this Section. A small multi-jurisdictional electric utility |
9 | | that on December 31, 2005 served less than 100,000 customers |
10 | | in Illinois may elect to procure power and energy for all or a |
11 | | portion of its eligible Illinois retail customers in |
12 | | accordance with the applicable provisions set forth in this |
13 | | Section and Section 1-75 of the Illinois Power Agency Act. |
14 | | This Section shall not apply to a small multi-jurisdictional |
15 | | utility until such time as a small multi-jurisdictional |
16 | | utility requests the Illinois Power Agency to prepare a |
17 | | procurement plan for its eligible retail customers. "Eligible |
18 | | retail customers" for the purposes of this Section means those |
19 | | retail customers that purchase power and energy from the |
20 | | electric utility under fixed-price bundled service tariffs, |
21 | | other than those retail customers whose service is declared or |
22 | | deemed competitive under Section 16-113 and those other |
23 | | customer groups specified in this Section, including |
24 | | self-generating customers, customers electing hourly pricing, |
25 | | or those customers who are otherwise ineligible for |
26 | | fixed-price bundled tariff service. For those customers that |
|
| | HB2659 | - 236 - | LRB102 15746 SPS 21112 b |
|
|
1 | | are excluded from the procurement plan's electric supply |
2 | | service requirements, and the utility shall procure any supply |
3 | | requirements, including capacity, ancillary services, and |
4 | | hourly priced energy, in the applicable markets as needed to |
5 | | serve those customers, provided that the utility may include |
6 | | in its procurement plan load requirements for the load that is |
7 | | associated with those retail customers whose service has been |
8 | | declared or deemed competitive pursuant to Section 16-113 of |
9 | | this Act to the extent that those customers are purchasing |
10 | | power and energy during one of the transition periods |
11 | | identified in subsection (b) of Section 16-113 of this Act. |
12 | | (b) A procurement plan shall be prepared for each electric |
13 | | utility consistent with the applicable requirements of the |
14 | | Illinois Power Agency Act and this Section. For purposes of |
15 | | this Section, Illinois electric utilities that are affiliated |
16 | | by virtue of a common parent company are considered to be a |
17 | | single electric utility. Small multi-jurisdictional utilities |
18 | | may request a procurement plan for a portion of or all of its |
19 | | Illinois load. Each procurement plan shall analyze the |
20 | | projected balance of supply and demand for those retail |
21 | | customers to be included in the plan's electric supply service |
22 | | requirements over a 5-year period, with the first planning |
23 | | year beginning on June 1 of the year following the year in |
24 | | which the plan is filed. The plan shall specifically identify |
25 | | the carbon-free capacity to be procured, as described in |
26 | | Section 1-75 of the Illinois Power Agency Act, and the |
|
| | HB2659 | - 237 - | LRB102 15746 SPS 21112 b |
|
|
1 | | wholesale products to be procured following plan approval , and |
2 | | shall follow all the requirements set forth in the Public |
3 | | Utilities Act and all applicable State and federal laws, |
4 | | statutes, rules, or regulations, as well as Commission orders. |
5 | | Nothing in this Section precludes consideration of contracts |
6 | | longer than 5 years and related forecast data. Unless |
7 | | specified otherwise in this Section, in the procurement plan |
8 | | or in the implementing tariff, any procurement occurring in |
9 | | accordance with this plan shall be competitively bid through a |
10 | | request for proposals process. Approval and implementation of |
11 | | the procurement plan shall be subject to review and approval |
12 | | by the Commission according to the provisions set forth in |
13 | | this Section. A procurement plan shall include each of the |
14 | | following components: |
15 | | (1) Hourly load analysis. This analysis shall include: |
16 | | (i) multi-year historical analysis of hourly |
17 | | loads; |
18 | | (ii) switching trends and competitive retail |
19 | | market analysis; |
20 | | (iii) known or projected changes to future loads; |
21 | | and |
22 | | (iv) growth forecasts by customer class. |
23 | | (2) Analysis of the impact of any demand side and |
24 | | renewable energy initiatives. This analysis shall include: |
25 | | (i) the impact of demand response programs and |
26 | | energy efficiency programs, both current and |
|
| | HB2659 | - 238 - | LRB102 15746 SPS 21112 b |
|
|
1 | | projected; for small multi-jurisdictional utilities, |
2 | | the impact of demand response and energy efficiency |
3 | | programs approved pursuant to Section 8-408 of this |
4 | | Act, both current and projected; and |
5 | | (ii) supply side needs that are projected to be |
6 | | offset by purchases of renewable energy resources, if |
7 | | any. |
8 | | (3) A plan for meeting the expected load requirements |
9 | | that will not be met through preexisting contracts. This |
10 | | plan shall include: |
11 | | (i) definitions of the different Illinois retail |
12 | | customer classes for which supply is being purchased; |
13 | | (ii) the proposed mix of demand-response products |
14 | | for which contracts will be executed during the next |
15 | | year. For small multi-jurisdictional electric |
16 | | utilities that on December 31, 2005 served fewer than |
17 | | 100,000 customers in Illinois, these shall be defined |
18 | | as demand-response products offered in an energy |
19 | | efficiency plan approved pursuant to Section 8-408 of |
20 | | this Act. The cost-effective demand-response measures |
21 | | shall be procured whenever the cost is lower than |
22 | | procuring comparable capacity products, provided that |
23 | | such products shall: |
24 | | (A) be procured by a demand-response provider |
25 | | from those retail customers included in the plan's |
26 | | electric supply service requirements; |
|
| | HB2659 | - 239 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (B) at least satisfy the demand-response |
2 | | requirements of the regional transmission |
3 | | organization market in which the utility's service |
4 | | territory is located, including, but not limited |
5 | | to, any applicable capacity or dispatch |
6 | | requirements; |
7 | | (C) provide for customers' participation in |
8 | | the stream of benefits produced by the |
9 | | demand-response products; |
10 | | (D) provide for reimbursement by the |
11 | | demand-response provider of the utility for any |
12 | | costs incurred as a result of the failure of the |
13 | | supplier of such products to perform its |
14 | | obligations thereunder; and |
15 | | (E) meet the same credit requirements as apply |
16 | | to suppliers of capacity, in the applicable |
17 | | regional transmission organization market; |
18 | | (iii) monthly forecasted system supply |
19 | | requirements, including expected minimum, maximum, and |
20 | | average values for the planning period; |
21 | | (iv) the proposed mix and selection of standard |
22 | | wholesale products for which contracts will be |
23 | | executed during the next year, separately or in |
24 | | combination, to meet that portion of its load |
25 | | requirements not met through pre-existing contracts, |
26 | | including , but not limited to , monthly 5 x 16 peak |
|
| | HB2659 | - 240 - | LRB102 15746 SPS 21112 b |
|
|
1 | | period block energy, monthly off-peak wrap energy, |
2 | | monthly 7 x 24 energy, annual 5 x 16 energy, annual |
3 | | off-peak wrap energy, annual 7 x 24 energy, monthly |
4 | | capacity, annual capacity, peak load capacity |
5 | | obligations, capacity purchase plan, and ancillary |
6 | | services; |
7 | | (v) proposed term structures for each wholesale |
8 | | product type included in the proposed procurement plan |
9 | | portfolio of products; and |
10 | | (vi) an assessment of the price risk, load |
11 | | uncertainty, and other factors that are associated |
12 | | with the proposed procurement plan; this assessment, |
13 | | to the extent possible, shall include an analysis of |
14 | | the following factors: contract terms, time frames for |
15 | | securing products or services, fuel costs, weather |
16 | | patterns, transmission costs, market conditions, and |
17 | | the governmental regulatory environment; the proposed |
18 | | procurement plan shall also identify alternatives for |
19 | | those portfolio measures that are identified as having |
20 | | significant price risk ; and . |
21 | | (vii) the amount of capacity procured for each |
22 | | year through the procurements in subsection (k) of |
23 | | Section 1-75 of the Illinois Power Agency Act and this |
24 | | Section, and the amount of capacity to be procured |
25 | | from each procurement during the next year. |
26 | | (4) Proposed procedures for balancing loads. The |
|
| | HB2659 | - 241 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement plan shall include, for load requirements |
2 | | included in the procurement plan, the process for (i) |
3 | | hourly balancing of supply and demand and (ii) the |
4 | | criteria for portfolio re-balancing in the event of |
5 | | significant shifts in load. |
6 | | (5) Long-Term Renewable Resources Procurement Plan. |
7 | | The Agency shall prepare a long-term renewable resources |
8 | | procurement plan for the procurement of renewable energy |
9 | | credits under Sections 1-56 and 1-75 of the Illinois Power |
10 | | Agency Act for delivery beginning in the 2017 delivery |
11 | | year. |
12 | | (i) The initial long-term renewable resources |
13 | | procurement plan and all subsequent revisions shall be |
14 | | subject to review and approval by the Commission. For |
15 | | the purposes of this Section, "delivery year" has the |
16 | | same meaning as in Section 1-10 of the Illinois Power |
17 | | Agency Act. For purposes of this Section, "Agency" |
18 | | shall mean the Illinois Power Agency. |
19 | | (ii) The long-term renewable resources planning |
20 | | process shall be conducted as follows: |
21 | | (A) Electric utilities shall provide a range |
22 | | of load forecasts to the Illinois Power Agency |
23 | | within 45 days of the Agency's request for |
24 | | forecasts, which request shall specify the length |
25 | | and conditions for the forecasts including, but |
26 | | not limited to, the quantity of distributed |
|
| | HB2659 | - 242 - | LRB102 15746 SPS 21112 b |
|
|
1 | | generation expected to be interconnected for each |
2 | | year. |
3 | | (B) The Agency shall publish for comment the |
4 | | initial long-term renewable resources procurement |
5 | | plan no later than 120 days after the effective |
6 | | date of this amendatory Act of the 99th General |
7 | | Assembly and shall review, and may revise, the |
8 | | plan at least every 2 years thereafter. To the |
9 | | extent practicable, the Agency shall review and |
10 | | propose any revisions to the long-term renewable |
11 | | energy resources procurement plan in conjunction |
12 | | with the Agency's other planning and approval |
13 | | processes conducted under this Section. The |
14 | | initial long-term renewable resources procurement |
15 | | plan shall: |
16 | | (aa) Identify the procurement programs and |
17 | | competitive procurement events consistent with |
18 | | the applicable requirements of the Illinois |
19 | | Power Agency Act and shall be designed to |
20 | | achieve the goals set forth in subsection (c) |
21 | | of Section 1-75 of that Act. |
22 | | (bb) Include a schedule for procurements |
23 | | for renewable energy credits from |
24 | | utility-scale wind projects, utility-scale |
25 | | solar projects, and brownfield site |
26 | | photovoltaic projects consistent with |
|
| | HB2659 | - 243 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subparagraph (G) of paragraph (1) of |
2 | | subsection (c) of Section 1-75 of the Illinois |
3 | | Power Agency Act. |
4 | | (cc) Identify the process whereby the |
5 | | Agency will submit to the Commission for |
6 | | review and approval the proposed contracts to |
7 | | implement the programs required by such plan. |
8 | | Copies of the initial long-term renewable |
9 | | resources procurement plan and all subsequent |
10 | | revisions shall be posted and made publicly |
11 | | available on the Agency's and Commission's |
12 | | websites, and copies shall also be provided to |
13 | | each affected electric utility. An affected |
14 | | utility and other interested parties shall have 45 |
15 | | days following the date of posting to provide |
16 | | comment to the Agency on the initial long-term |
17 | | renewable resources procurement plan and all |
18 | | subsequent revisions. All comments submitted to |
19 | | the Agency shall be specific, supported by data or |
20 | | other detailed analyses, and, if objecting to all |
21 | | or a portion of the procurement plan, accompanied |
22 | | by specific alternative wording or proposals. All |
23 | | comments shall be posted on the Agency's and |
24 | | Commission's websites. During this 45-day comment |
25 | | period, the Agency shall hold at least one public |
26 | | hearing within each utility's service area that is |
|
| | HB2659 | - 244 - | LRB102 15746 SPS 21112 b |
|
|
1 | | subject to the requirements of this paragraph (5) |
2 | | for the purpose of receiving public comment. |
3 | | Within 21 days following the end of the 45-day |
4 | | review period, the Agency may revise the long-term |
5 | | renewable resources procurement plan based on the |
6 | | comments received and shall file the plan with the |
7 | | Commission for review and approval. |
8 | | (C) Within 14 days after the filing of the |
9 | | initial long-term renewable resources procurement |
10 | | plan or any subsequent revisions, any person |
11 | | objecting to the plan may file an objection with |
12 | | the Commission. Within 21 days after the filing of |
13 | | the plan, the Commission shall determine whether a |
14 | | hearing is necessary. The Commission shall enter |
15 | | its order confirming or modifying the initial |
16 | | long-term renewable resources procurement plan or |
17 | | any subsequent revisions within 120 days after the |
18 | | filing of the plan by the Illinois Power Agency. |
19 | | (D) The Commission shall approve the initial |
20 | | long-term renewable resources procurement plan and |
21 | | any subsequent revisions, including expressly the |
22 | | forecast used in the plan and taking into account |
23 | | that funding will be limited to the amount of |
24 | | revenues actually collected by the utilities, if |
25 | | the Commission determines that the plan will |
26 | | reasonably and prudently accomplish the |
|
| | HB2659 | - 245 - | LRB102 15746 SPS 21112 b |
|
|
1 | | requirements of Section 1-56 and subsection (c) of |
2 | | Section 1-75 of the Illinois Power Agency Act. The |
3 | | Commission shall also approve the process for the |
4 | | submission, review, and approval of the proposed |
5 | | contracts to procure renewable energy credits or |
6 | | implement the programs authorized by the |
7 | | Commission pursuant to a long-term renewable |
8 | | resources procurement plan approved under this |
9 | | Section. |
10 | | (iii) The Agency or third parties contracted by |
11 | | the Agency shall implement all programs authorized by |
12 | | the Commission in an approved long-term renewable |
13 | | resources procurement plan without further review and |
14 | | approval by the Commission. Third parties shall not |
15 | | begin implementing any programs or receive any payment |
16 | | under this Section until the Commission has approved |
17 | | the contract or contracts under the process authorized |
18 | | by the Commission in item (D) of subparagraph (ii) of |
19 | | paragraph (5) of this subsection (b) and the third |
20 | | party and the Agency or utility, as applicable, have |
21 | | executed the contract. For those renewable energy |
22 | | credits subject to procurement through a competitive |
23 | | bid process under the plan or under the initial |
24 | | forward procurements for wind and solar resources |
25 | | described in subparagraph (G) of paragraph (1) of |
26 | | subsection (c) of Section 1-75 of the Illinois Power |
|
| | HB2659 | - 246 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Agency Act, the Agency shall follow the procurement |
2 | | process specified in the provisions relating to |
3 | | electricity procurement in subsections (e) through (i) |
4 | | of this Section. |
5 | | (iv) An electric utility shall recover its costs |
6 | | associated with the procurement of renewable energy |
7 | | credits under this Section through an automatic |
8 | | adjustment clause tariff under subsection (k) of |
9 | | Section 16-108 of this Act. A utility shall not be |
10 | | required to advance any payment or pay any amounts |
11 | | under this Section that exceed the actual amount of |
12 | | revenues collected by the utility under paragraph (6) |
13 | | of subsection (c) of Section 1-75 of the Illinois |
14 | | Power Agency Act and subsection (k) of Section 16-108 |
15 | | of this Act, and contracts executed under this Section |
16 | | shall expressly incorporate this limitation. |
17 | | (v) For the public interest, safety, and welfare, |
18 | | the Agency and the Commission may adopt rules to carry |
19 | | out the provisions of this Section on an emergency |
20 | | basis immediately following the effective date of this |
21 | | amendatory Act of the 99th General Assembly. |
22 | | (vi) On or before July 1 of each year, the |
23 | | Commission shall hold an informal hearing for the |
24 | | purpose of receiving comments on the prior year's |
25 | | procurement process and any recommendations for |
26 | | change. |
|
| | HB2659 | - 247 - | LRB102 15746 SPS 21112 b |
|
|
1 | | (6) Capacity Procurement Plan. |
2 | | (i) No later than 90 days after notice by a public |
3 | | utility of election of the Fixed Resource Requirement |
4 | | Alternative and Illinois Commerce Commission approval |
5 | | of same, the Illinois Power Agency shall publish for |
6 | | public comment a draft Capacity Procurement Plan |
7 | | pursuant to subsection (k) of Section 1-75 of the |
8 | | Illinois Power Agency Act. The Agency shall conduct at |
9 | | least one public workshop to elicit input regarding |
10 | | development of the Plan. The Agency shall provide 60 |
11 | | days for public comment on the draft Plan, and within |
12 | | 30 days after the deadline for comment shall submit |
13 | | the Plan to the Illinois Commerce Commission. |
14 | | (ii) After providing appropriate opportunities for |
15 | | objection and hearing, the Commission shall enter its |
16 | | order approving or modifying the Plan within 60 days |
17 | | after the filing of the plan by the Illinois Power |
18 | | Agency. The Commission shall approve the Plan if it |
19 | | meets the objectives set forth in subsection (k) of |
20 | | Section 1-75 of the Illinois Power Agency Act. If the |
21 | | Plan does not meet those objectives, the Commission |
22 | | shall modify the Plan or shall provide specific |
23 | | direction to the Agency to modify and resubmit the |
24 | | Plan within 30 days. |
25 | | (c) The procurement process set forth in Section 1-75 of |
26 | | the Illinois Power Agency Act and subsection (e) of this |
|
| | HB2659 | - 248 - | LRB102 15746 SPS 21112 b |
|
|
1 | | Section shall be administered by a procurement administrator |
2 | | and monitored by a procurement monitor. |
3 | | (1) The procurement administrator shall: |
4 | | (i) design the final procurement process in |
5 | | accordance with Section 1-75 of the Illinois Power |
6 | | Agency Act and subsection (e) of this Section |
7 | | following Commission approval of the procurement plan; |
8 | | (ii) develop benchmarks in accordance with |
9 | | subsection (e)(3) to be used to evaluate bids; these |
10 | | benchmarks shall be submitted to the Commission for |
11 | | review and approval on a confidential basis prior to |
12 | | the procurement event; |
13 | | (iii) serve as the interface between the electric |
14 | | utility and suppliers; |
15 | | (iv) manage the bidder pre-qualification and |
16 | | registration process; |
17 | | (v) obtain the electric utilities' agreement to |
18 | | the final form of all supply contracts and credit |
19 | | collateral agreements; |
20 | | (vi) administer the request for proposals process; |
21 | | (vii) have the discretion to negotiate to |
22 | | determine whether bidders are willing to lower the |
23 | | price of bids that meet the benchmarks approved by the |
24 | | Commission; any post-bid negotiations with bidders |
25 | | shall be limited to price only and shall be completed |
26 | | within 24 hours after opening the sealed bids and |
|
| | HB2659 | - 249 - | LRB102 15746 SPS 21112 b |
|
|
1 | | shall be conducted in a fair and unbiased manner; in |
2 | | conducting the negotiations, there shall be no |
3 | | disclosure of any information derived from proposals |
4 | | submitted by competing bidders; if information is |
5 | | disclosed to any bidder, it shall be provided to all |
6 | | competing bidders; |
7 | | (viii) maintain confidentiality of supplier and |
8 | | bidding information in a manner consistent with all |
9 | | applicable laws, rules, regulations, and tariffs; |
10 | | (ix) submit a confidential report to the |
11 | | Commission recommending acceptance or rejection of |
12 | | bids; |
13 | | (x) notify the utility of contract counterparties |
14 | | and contract specifics; and |
15 | | (xi) administer related contingency procurement |
16 | | events. |
17 | | (2) The procurement monitor, who shall be retained by |
18 | | the Commission, shall: |
19 | | (i) monitor interactions among the procurement |
20 | | administrator, suppliers, and utility; |
21 | | (ii) monitor and report to the Commission on the |
22 | | progress of the procurement process; |
23 | | (iii) provide an independent confidential report |
24 | | to the Commission regarding the results of the |
25 | | procurement event; |
26 | | (iv) assess compliance with the procurement plans |
|
| | HB2659 | - 250 - | LRB102 15746 SPS 21112 b |
|
|
1 | | approved by the Commission for each utility that on |
2 | | December 31, 2005 provided electric service to at |
3 | | least 100,000 customers in Illinois and for each small |
4 | | multi-jurisdictional utility that on December 31, 2005 |
5 | | served less than 100,000 customers in Illinois; |
6 | | (v) preserve the confidentiality of supplier and |
7 | | bidding information in a manner consistent with all |
8 | | applicable laws, rules, regulations, and tariffs; |
9 | | (vi) provide expert advice to the Commission and |
10 | | consult with the procurement administrator regarding |
11 | | issues related to procurement process design, rules, |
12 | | protocols, and policy-related matters; and |
13 | | (vii) consult with the procurement administrator |
14 | | regarding the development and use of benchmark |
15 | | criteria, standard form contracts, credit policies, |
16 | | and bid documents. |
17 | | (d) Except as provided in subsection (j), the planning |
18 | | process shall be conducted as follows: |
19 | | (1) Beginning in 2008, each Illinois utility procuring |
20 | | power pursuant to this Section shall annually provide a |
21 | | range of load forecasts to the Illinois Power Agency by |
22 | | July 15 of each year, or such other date as may be required |
23 | | by the Commission or Agency. The load forecasts shall |
24 | | cover the 5-year procurement planning period for the next |
25 | | procurement plan and shall include hourly data |
26 | | representing a high-load, low-load, and expected-load |
|
| | HB2659 | - 251 - | LRB102 15746 SPS 21112 b |
|
|
1 | | scenario for the load of those retail customers included |
2 | | in the plan's electric supply service requirements. The |
3 | | utility shall provide supporting data and assumptions for |
4 | | each of the scenarios.
|
5 | | (2) Beginning in 2008, the Illinois Power Agency shall |
6 | | prepare a procurement plan by August 15th of each year, or |
7 | | such other date as may be required by the Commission. The |
8 | | procurement plan shall identify the portfolio of |
9 | | demand-response and power and energy products to be |
10 | | procured. Cost-effective demand-response measures shall be |
11 | | procured as set forth in item (iii) of subsection (b) of |
12 | | this Section. Copies of the procurement plan shall be |
13 | | posted and made publicly available on the Agency's and |
14 | | Commission's websites, and copies shall also be provided |
15 | | to each affected electric utility. An affected utility |
16 | | shall have 30 days following the date of posting to |
17 | | provide comment to the Agency on the procurement plan. |
18 | | Other interested entities also may comment on the |
19 | | procurement plan. All comments submitted to the Agency |
20 | | shall be specific, supported by data or other detailed |
21 | | analyses, and, if objecting to all or a portion of the |
22 | | procurement plan, accompanied by specific alternative |
23 | | wording or proposals. All comments shall be posted on the |
24 | | Agency's and Commission's websites. During this 30-day |
25 | | comment period, the Agency shall hold at least one public |
26 | | hearing within each utility's service area for the purpose |
|
| | HB2659 | - 252 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of receiving public comment on the procurement plan. |
2 | | Within 14 days following the end of the 30-day review |
3 | | period, the Agency shall revise the procurement plan as |
4 | | necessary based on the comments received and file the |
5 | | procurement plan with the Commission and post the |
6 | | procurement plan on the websites. |
7 | | (3) Within 5 days after the filing of the procurement |
8 | | plan, any person objecting to the procurement plan shall |
9 | | file an objection with the Commission. Within 10 days |
10 | | after the filing, the Commission shall determine whether a |
11 | | hearing is necessary. The Commission shall enter its order |
12 | | confirming or modifying the procurement plan within 90 |
13 | | days after the filing of the procurement plan by the |
14 | | Illinois Power Agency. |
15 | | (4) The Commission shall approve the procurement plan, |
16 | | including expressly the forecast used in the procurement |
17 | | plan, if the Commission determines that it will ensure |
18 | | adequate, reliable, affordable, efficient, and |
19 | | environmentally sustainable electric service at the lowest |
20 | | total cost over time, taking into account any benefits of |
21 | | price stability. |
22 | | (e) The procurement process shall include each of the |
23 | | following components: |
24 | | (1) Solicitation, pre-qualification, and registration |
25 | | of bidders. The procurement administrator shall |
26 | | disseminate information to potential bidders to promote a |
|
| | HB2659 | - 253 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement event, notify potential bidders that the |
2 | | procurement administrator may enter into a post-bid price |
3 | | negotiation with bidders that meet the applicable |
4 | | benchmarks, provide supply requirements, and otherwise |
5 | | explain the competitive procurement process. In addition |
6 | | to such other publication as the procurement administrator |
7 | | determines is appropriate, this information shall be |
8 | | posted on the Illinois Power Agency's and the Commission's |
9 | | websites. The procurement administrator shall also |
10 | | administer the prequalification process, including |
11 | | evaluation of credit worthiness, compliance with |
12 | | procurement rules, and agreement to the standard form |
13 | | contract developed pursuant to paragraph (2) of this |
14 | | subsection (e). The procurement administrator shall then |
15 | | identify and register bidders to participate in the |
16 | | procurement event. |
17 | | (2) Standard contract forms and credit terms and |
18 | | instruments. The procurement administrator, in |
19 | | consultation with the utilities, the Commission, and other |
20 | | interested parties and subject to Commission oversight, |
21 | | shall develop and provide standard contract forms for the |
22 | | supplier contracts that meet generally accepted industry |
23 | | practices. Standard credit terms and instruments that meet |
24 | | generally accepted industry practices shall be similarly |
25 | | developed. The procurement administrator shall make |
26 | | available to the Commission all written comments it |
|
| | HB2659 | - 254 - | LRB102 15746 SPS 21112 b |
|
|
1 | | receives on the contract forms, credit terms, or |
2 | | instruments. If the procurement administrator cannot reach |
3 | | agreement with the applicable electric utility as to the |
4 | | contract terms and conditions, the procurement |
5 | | administrator must notify the Commission of any disputed |
6 | | terms and the Commission shall resolve the dispute. The |
7 | | terms of the contracts shall not be subject to negotiation |
8 | | by winning bidders, and the bidders must agree to the |
9 | | terms of the contract in advance so that winning bids are |
10 | | selected solely on the basis of price. |
11 | | (3) Establishment of a market-based price benchmark. |
12 | | As part of the development of the procurement process, the |
13 | | procurement administrator, in consultation with the |
14 | | Commission staff, Agency staff, and the procurement |
15 | | monitor, shall establish benchmarks for evaluating the |
16 | | final prices in the contracts for each of the products |
17 | | that will be procured through the procurement process. The |
18 | | benchmarks shall be based on price data for similar |
19 | | products for the same delivery period and same delivery |
20 | | hub, or other delivery hubs after adjusting for that |
21 | | difference. The price benchmarks may also be adjusted to |
22 | | take into account differences between the information |
23 | | reflected in the underlying data sources and the specific |
24 | | products and procurement process being used to procure |
25 | | power for the Illinois utilities. The benchmarks shall be |
26 | | confidential but shall be provided to, and will be subject |
|
| | HB2659 | - 255 - | LRB102 15746 SPS 21112 b |
|
|
1 | | to Commission review and approval, prior to a procurement |
2 | | event. |
3 | | (4) Request for proposals competitive procurement |
4 | | process. The procurement administrator shall design and |
5 | | issue a request for proposals to supply electricity in |
6 | | accordance with each utility's procurement plan, as |
7 | | approved by the Commission. The request for proposals |
8 | | shall set forth a procedure for sealed, binding commitment |
9 | | bidding with pay-as-bid settlement, and provision for |
10 | | selection of bids on the basis of price. |
11 | | (5) A plan for implementing contingencies in the event |
12 | | of supplier default or failure of the procurement process |
13 | | to fully meet the expected load requirement due to |
14 | | insufficient supplier participation, Commission rejection |
15 | | of results, or any other cause. |
16 | | (i) Event of supplier default: In the event of |
17 | | supplier default, the utility shall review the |
18 | | contract of the defaulting supplier to determine if |
19 | | the amount of supply is 200 megawatts or greater, and |
20 | | if there are more than 60 days remaining of the |
21 | | contract term. If both of these conditions are met, |
22 | | and the default results in termination of the |
23 | | contract, the utility shall immediately notify the |
24 | | Illinois Power Agency that a request for proposals |
25 | | must be issued to procure replacement power, and the |
26 | | procurement administrator shall run an additional |
|
| | HB2659 | - 256 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement event. If the contracted supply of the |
2 | | defaulting supplier is less than 200 megawatts or |
3 | | there are less than 60 days remaining of the contract |
4 | | term, the utility shall procure power and energy from |
5 | | the applicable regional transmission organization |
6 | | market, including ancillary services, capacity, and |
7 | | day-ahead or real time energy, or both, for the |
8 | | duration of the contract term to replace the |
9 | | contracted supply; provided, however, that if a needed |
10 | | product is not available through the regional |
11 | | transmission organization market it shall be purchased |
12 | | from the wholesale market. |
13 | | (ii) Failure of the procurement process to fully |
14 | | meet the expected load requirement: If the procurement |
15 | | process fails to fully meet the expected load |
16 | | requirement due to insufficient supplier participation |
17 | | or due to a Commission rejection of the procurement |
18 | | results, the procurement administrator, the |
19 | | procurement monitor, and the Commission staff shall |
20 | | meet within 10 days to analyze potential causes of low |
21 | | supplier interest or causes for the Commission |
22 | | decision. If changes are identified that would likely |
23 | | result in increased supplier participation, or that |
24 | | would address concerns causing the Commission to |
25 | | reject the results of the prior procurement event, the |
26 | | procurement administrator may implement those changes |
|
| | HB2659 | - 257 - | LRB102 15746 SPS 21112 b |
|
|
1 | | and rerun the request for proposals process according |
2 | | to a schedule determined by those parties and |
3 | | consistent with Section 1-75 of the Illinois Power |
4 | | Agency Act and this subsection. In any event, a new |
5 | | request for proposals process shall be implemented by |
6 | | the procurement administrator within 90 days after the |
7 | | determination that the procurement process has failed |
8 | | to fully meet the expected load requirement. |
9 | | (iii) In all cases where there is insufficient |
10 | | supply provided under contracts awarded through the |
11 | | procurement process to fully meet the electric |
12 | | utility's load requirement, the utility shall meet the |
13 | | load requirement by procuring power and energy from |
14 | | the applicable regional transmission organization |
15 | | market, including ancillary services, capacity, and |
16 | | day-ahead or real time energy, or both; provided, |
17 | | however, that if a needed product is not available |
18 | | through the regional transmission organization market |
19 | | it shall be purchased from the wholesale market. |
20 | | (6) The procurement process described in this |
21 | | subsection is exempt from the requirements of the Illinois |
22 | | Procurement Code, pursuant to Section 20-10 of that Code. |
23 | | (f) Within 2 business days after opening the sealed bids, |
24 | | the procurement administrator shall submit a confidential |
25 | | report to the Commission. The report shall contain the results |
26 | | of the bidding for each of the products along with the |
|
| | HB2659 | - 258 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement administrator's recommendation for the acceptance |
2 | | and rejection of bids based on the price benchmark criteria |
3 | | and other factors observed in the process. The procurement |
4 | | monitor also shall submit a confidential report to the |
5 | | Commission within 2 business days after opening the sealed |
6 | | bids. The report shall contain the procurement monitor's |
7 | | assessment of bidder behavior in the process as well as an |
8 | | assessment of the procurement administrator's compliance with |
9 | | the procurement process and rules. The Commission shall review |
10 | | the confidential reports submitted by the procurement |
11 | | administrator and procurement monitor, and shall accept or |
12 | | reject the recommendations of the procurement administrator |
13 | | within 2 business days after receipt of the reports. |
14 | | (g) Within 3 business days after the Commission decision |
15 | | approving the results of a procurement event, the utility |
16 | | shall enter into binding contractual arrangements with the |
17 | | winning suppliers using the standard form contracts; except |
18 | | that the utility shall not be required either directly or |
19 | | indirectly to execute the contracts if a tariff that is |
20 | | consistent with subsection (l) of this Section has not been |
21 | | approved and placed into effect for that utility. |
22 | | (h) The names of the successful bidders and the load |
23 | | weighted average of the winning bid prices for each contract |
24 | | type and for each contract term shall be made available to the |
25 | | public at the time of Commission approval of a procurement |
26 | | event. The Commission, the procurement monitor, the |
|
| | HB2659 | - 259 - | LRB102 15746 SPS 21112 b |
|
|
1 | | procurement administrator, the Illinois Power Agency, and all |
2 | | participants in the procurement process shall maintain the |
3 | | confidentiality of all other supplier and bidding information |
4 | | in a manner consistent with all applicable laws, rules, |
5 | | regulations, and tariffs. Confidential information, including |
6 | | the confidential reports submitted by the procurement |
7 | | administrator and procurement monitor pursuant to subsection |
8 | | (f) of this Section, shall not be made publicly available and |
9 | | shall not be discoverable by any party in any proceeding, |
10 | | absent a compelling demonstration of need, nor shall those |
11 | | reports be admissible in any proceeding other than one for law |
12 | | enforcement purposes. |
13 | | (i) Within 2 business days after a Commission decision |
14 | | approving the results of a procurement event or such other |
15 | | date as may be required by the Commission from time to time, |
16 | | the utility shall file for informational purposes with the |
17 | | Commission its actual or estimated retail supply charges, as |
18 | | applicable, by customer supply group reflecting the costs |
19 | | associated with the procurement and computed in accordance |
20 | | with the tariffs filed pursuant to subsection (l) of this |
21 | | Section and approved by the Commission. |
22 | | (j) Within 60 days following August 28, 2007 (the |
23 | | effective date of Public Act 95-481), each electric utility |
24 | | that on December 31, 2005 provided electric service to at |
25 | | least 100,000 customers in Illinois shall prepare and file |
26 | | with the Commission an initial procurement plan, which shall |
|
| | HB2659 | - 260 - | LRB102 15746 SPS 21112 b |
|
|
1 | | conform in all material respects to the requirements of the |
2 | | procurement plan set forth in subsection (b); provided, |
3 | | however, that the Illinois Power Agency Act shall not apply to |
4 | | the initial procurement plan prepared pursuant to this |
5 | | subsection. The initial procurement plan shall identify the |
6 | | portfolio of power and energy products to be procured and |
7 | | delivered for the period June 2008 through May 2009, and shall |
8 | | identify the proposed procurement administrator, who shall |
9 | | have the same experience and expertise as is required of a |
10 | | procurement administrator hired pursuant to Section 1-75 of |
11 | | the Illinois Power Agency Act. Copies of the procurement plan |
12 | | shall be posted and made publicly available on the |
13 | | Commission's website. The initial procurement plan may include |
14 | | contracts for renewable resources that extend beyond May 2009. |
15 | | (i) Within 14 days following filing of the initial |
16 | | procurement plan, any person may file a detailed objection |
17 | | with the Commission contesting the procurement plan |
18 | | submitted by the electric utility. All objections to the |
19 | | electric utility's plan shall be specific, supported by |
20 | | data or other detailed analyses. The electric utility may |
21 | | file a response to any objections to its procurement plan |
22 | | within 7 days after the date objections are due to be |
23 | | filed. Within 7 days after the date the utility's response |
24 | | is due, the Commission shall determine whether a hearing |
25 | | is necessary. If it determines that a hearing is |
26 | | necessary, it shall require the hearing to be completed |
|
| | HB2659 | - 261 - | LRB102 15746 SPS 21112 b |
|
|
1 | | and issue an order on the procurement plan within 60 days |
2 | | after the filing of the procurement plan by the electric |
3 | | utility. |
4 | | (ii) The order shall approve or modify the procurement |
5 | | plan, approve an independent procurement administrator, |
6 | | and approve or modify the electric utility's tariffs that |
7 | | are proposed with the initial procurement plan. The |
8 | | Commission shall approve the procurement plan if the |
9 | | Commission determines that it will ensure adequate, |
10 | | reliable, affordable, efficient, and environmentally |
11 | | sustainable electric service at the lowest total cost over |
12 | | time, taking into account any benefits of price stability. |
13 | | (k) (Blank). |
14 | | (k-5) (Blank). |
15 | | (l) An electric utility shall recover its costs incurred |
16 | | under this Section, including, but not limited to, the costs |
17 | | of procuring power and energy demand-response resources under |
18 | | this Section. The utility shall file with the initial |
19 | | procurement plan its proposed tariffs through which its costs |
20 | | of procuring power that are incurred pursuant to a |
21 | | Commission-approved procurement plan and those other costs |
22 | | identified in this subsection (l), will be recovered. The |
23 | | tariffs shall include a formula rate or charge designed to |
24 | | pass through both the costs incurred by the utility in |
25 | | procuring a supply of electric power and energy for the |
26 | | applicable customer classes with no mark-up or return on the |
|
| | HB2659 | - 262 - | LRB102 15746 SPS 21112 b |
|
|
1 | | price paid by the utility for that supply, plus any just and |
2 | | reasonable costs that the utility incurs in arranging and |
3 | | providing for the supply of electric power and energy. The |
4 | | formula rate or charge shall also contain provisions that |
5 | | ensure that its application does not result in over or under |
6 | | recovery due to changes in customer usage and demand patterns, |
7 | | and that provide for the correction, on at least an annual |
8 | | basis, of any accounting errors that may occur. A utility |
9 | | shall recover through the tariff all reasonable costs incurred |
10 | | to implement or comply with any procurement plan that is |
11 | | developed and put into effect pursuant to Section 1-75 of the |
12 | | Illinois Power Agency Act and this Section, including any fees |
13 | | assessed by the Illinois Power Agency, costs associated with |
14 | | load balancing, and contingency plan costs. The electric |
15 | | utility shall also recover its full costs of procuring |
16 | | electric supply for which it contracted before the effective |
17 | | date of this Section in conjunction with the provision of full |
18 | | requirements service under fixed-price bundled service tariffs |
19 | | subsequent to December 31, 2006. All such costs shall be |
20 | | deemed to have been prudently incurred. The pass-through |
21 | | tariffs that are filed and approved pursuant to this Section |
22 | | shall not be subject to review under, or in any way limited by, |
23 | | Section 16-111(i) of this Act. All of the costs incurred by the |
24 | | electric utility associated with the purchase of zero emission |
25 | | credits in accordance with subsection (d-5) of Section 1-75 of |
26 | | the Illinois Power Agency Act and, beginning June 1, 2017, all |
|
| | HB2659 | - 263 - | LRB102 15746 SPS 21112 b |
|
|
1 | | of the costs incurred by the electric utility associated with |
2 | | the purchase of renewable energy resources in accordance with |
3 | | Sections 1-56 and 1-75 of the Illinois Power Agency Act, shall |
4 | | be recovered through the electric utility's tariffed charges |
5 | | applicable to all of its retail customers, as specified in |
6 | | subsection (k) of Section 16-108 of this Act, and shall not be |
7 | | recovered through the electric utility's tariffed charges for |
8 | | electric power and energy supply to its eligible retail |
9 | | customers. |
10 | | (m) The Commission has the authority to adopt rules to |
11 | | carry out the provisions of this Section. For the public |
12 | | interest, safety, and welfare, the Commission also has |
13 | | authority to adopt rules to carry out the provisions of this |
14 | | Section on an emergency basis immediately following August 28, |
15 | | 2007 (the effective date of Public Act 95-481). |
16 | | (n) Notwithstanding any other provision of this Act, any |
17 | | affiliated electric utilities that submit a single procurement |
18 | | plan covering their combined needs may procure for those |
19 | | combined needs in conjunction with that plan, and may enter |
20 | | jointly into power supply contracts, purchases, and other |
21 | | procurement arrangements, and allocate capacity and energy and |
22 | | cost responsibility therefor among themselves in proportion to |
23 | | their requirements. |
24 | | (o) On or before June 1 of each year, the Commission shall |
25 | | hold an informal hearing for the purpose of receiving comments |
26 | | on the prior year's procurement process and any |
|
| | HB2659 | - 264 - | LRB102 15746 SPS 21112 b |
|
|
1 | | recommendations for change.
|
2 | | (p) An electric utility subject to this Section may |
3 | | propose to invest, lease, own, or operate an electric |
4 | | generation facility as part of its procurement plan, provided |
5 | | the utility demonstrates that such facility is the least-cost |
6 | | option to provide electric service to those retail customers |
7 | | included in the plan's electric supply service requirements. |
8 | | If the facility is shown to be the least-cost option and is |
9 | | included in a procurement plan prepared in accordance with |
10 | | Section 1-75 of the Illinois Power Agency Act and this |
11 | | Section, then the electric utility shall make a filing |
12 | | pursuant to Section 8-406 of this Act, and may request of the |
13 | | Commission any statutory relief required thereunder. If the |
14 | | Commission grants all of the necessary approvals for the |
15 | | proposed facility, such supply shall thereafter be considered |
16 | | as a pre-existing contract under subsection (b) of this |
17 | | Section. The Commission shall in any order approving a |
18 | | proposal under this subsection specify how the utility will |
19 | | recover the prudently incurred costs of investing in, leasing, |
20 | | owning, or operating such generation facility through just and |
21 | | reasonable rates charged to those retail customers included in |
22 | | the plan's electric supply service requirements. Cost recovery |
23 | | for facilities included in the utility's procurement plan |
24 | | pursuant to this subsection shall not be subject to review |
25 | | under or in any way limited by the provisions of Section |
26 | | 16-111(i) of this Act. Nothing in this Section is intended to |
|
| | HB2659 | - 265 - | LRB102 15746 SPS 21112 b |
|
|
1 | | prohibit a utility from filing for a fuel adjustment clause as |
2 | | is otherwise permitted under Section 9-220 of this Act.
|
3 | | (q) If the Illinois Power Agency filed with the |
4 | | Commission, under Section 16-111.5 of this Act, its proposed |
5 | | procurement plan for the period commencing June 1, 2017, and |
6 | | the Commission has not yet entered its final order approving |
7 | | the plan on or before the effective date of this amendatory Act |
8 | | of the 99th General Assembly, then the Illinois Power Agency |
9 | | shall file a notice of withdrawal with the Commission, after |
10 | | the effective date of this amendatory Act of the 99th General |
11 | | Assembly, to withdraw the proposed procurement of renewable |
12 | | energy resources to be approved under the plan, other than the |
13 | | procurement of renewable energy credits from distributed |
14 | | renewable energy generation devices using funds previously |
15 | | collected from electric utilities' retail customers that take |
16 | | service pursuant to electric utilities' hourly pricing tariff |
17 | | or tariffs and, for an electric utility that serves less than |
18 | | 100,000 retail customers in the State, other than the |
19 | | procurement of renewable energy credits from distributed |
20 | | renewable energy generation devices. Upon receipt of the |
21 | | notice, the Commission shall enter an order that approves the |
22 | | withdrawal of the proposed procurement of renewable energy |
23 | | resources from the plan. The initially proposed procurement of |
24 | | renewable energy resources shall not be approved or be the |
25 | | subject of any further hearing, investigation, proceeding, or |
26 | | order of any kind. |
|
| | HB2659 | - 266 - | LRB102 15746 SPS 21112 b |
|
|
1 | | This amendatory Act of the 99th General Assembly preempts |
2 | | and supersedes any order entered by the Commission that |
3 | | approved the Illinois Power Agency's procurement plan for the |
4 | | period commencing June 1, 2017, to the extent it is |
5 | | inconsistent with the provisions of this amendatory Act of the |
6 | | 99th General Assembly. To the extent any previously entered |
7 | | order approved the procurement of renewable energy resources, |
8 | | the portion of that order approving the procurement shall be |
9 | | void, other than the procurement of renewable energy credits |
10 | | from distributed renewable energy generation devices using |
11 | | funds previously collected from electric utilities' retail |
12 | | customers that take service under electric utilities' hourly |
13 | | pricing tariff or tariffs and, for an electric utility that |
14 | | serves less than 100,000 retail customers in the State, other |
15 | | than the procurement of renewable energy credits for |
16 | | distributed renewable energy generation devices. |
17 | | (Source: P.A. 99-906, eff. 6-1-17 .) |
18 | | (220 ILCS 5/16-131 new) |
19 | | Sec. 16-131. Right to self-generate electricity. |
20 | | (a) As used in this Section: |
21 | | "Electric cooperative" has the meaning set forth in |
22 | | Section 3.4 of the Electric Supplier Act. |
23 | | "Municipal utility" means a public utility that is owned |
24 | | and operated by any political subdivision or municipal |
25 | | corporation of this State or owned by such an entity and |
|
| | HB2659 | - 267 - | LRB102 15746 SPS 21112 b |
|
|
1 | | operated by any lessee or any operating agent thereof. |
2 | | "Public utility" has the definition set forth in Section |
3 | | 3-105 of this Act. |
4 | | (b) Customers shall have the right to, and the Commission |
5 | | shall protect the rights of customers to, produce, consume, |
6 | | and store their own energy without discriminatory |
7 | | repercussions from a public utility, electric cooperative, or |
8 | | municipal utility, regardless of whether that energy is |
9 | | produced via a system that is owned outright, leased, or |
10 | | financed through a behind-the-meter solar power-purchase |
11 | | agreement or other means. This includes customers' rights to: |
12 | | (1) generate, consume, and export renewable energy and |
13 | | reduce his or her use of electricity obtained from the |
14 | | grid; |
15 | | (2) use technology to store energy at his or her |
16 | | residence; |
17 | | (3) connect his or her electrical system that |
18 | | generates renewable energy, stores energy, or any |
19 | | combination thereof, with the electricity meter on the |
20 | | customer's premises that is provided by a public utility, |
21 | | electric cooperative, or municipal utility: |
22 | | (A) in a timely manner; |
23 | | (B) in accordance with requirements established by |
24 | | the electric utility to ensure the safety of utility |
25 | | workers; and |
26 | | (C) after providing written notice to the electric |
|
| | HB2659 | - 268 - | LRB102 15746 SPS 21112 b |
|
|
1 | | utility providing service in the service territory, |
2 | | installing a nomenclature plate on the electrical |
3 | | meter panel and meeting all applicable state and local |
4 | | safety and electrical code requirements associated |
5 | | with installing a parallel distributed generation |
6 | | system; and |
7 | | (4) receive fair credit for energy exported to the |
8 | | grid. |
9 | | (c) A public utility, electric cooperative, or municipal |
10 | | utility customer who produces, consumes, and stores his or her |
11 | | own energy shall not face discriminatory rate design, fees, |
12 | | treatment, or excessive compliance requirements as provided by |
13 | | paragraph (3) of subsection (n) of Section 16-107.5. |
14 | | (d) A public utility, electric cooperative, or municipal |
15 | | utility customer shall have a right to appeal any decision |
16 | | related to self-generation and storage that violates these |
17 | | rights to self-generation and non-discrimination pursuant to |
18 | | the provisions of this Section through a complaint process. |
19 | | (e) The Illinois Commerce Commission shall adopt all rules |
20 | | necessary for the administration of this Section. |
21 | | Section 99. Effective date. This Act takes effect upon |
22 | | becoming law.
|
| | | HB2659 | - 269 - | LRB102 15746 SPS 21112 b |
|
| 1 | |
INDEX
| 2 | |
Statutes amended in order of appearance
| | 3 | | 5 ILCS 100/5-45.8 new | | | 4 | | 20 ILCS 3855/1-5 | | | 5 | | 20 ILCS 3855/1-10 | | | 6 | | 20 ILCS 3855/1-20 | | | 7 | | 20 ILCS 3855/1-56 | | | 8 | | 20 ILCS 3855/1-75 | | | 9 | | 220 ILCS 5/8-512 new | | | 10 | | 220 ILCS 5/16-107.5 | | | 11 | | 220 ILCS 5/16-107.6 | | | 12 | | 220 ILCS 5/16-108 | | | 13 | | 220 ILCS 5/16-111.5 | | | 14 | | 220 ILCS 5/16-131 new | |
|
|