Bill Status of SB 565   102nd General Assembly


Short Description:  EPA-GROUNDWATER MONITORING

Senate Sponsors
Sen. Laura Ellman-John Connor

Last Action  View All Actions

DateChamber Action
  1/10/2023SenateSession Sine Die

Statutes Amended In Order of Appearance
415 ILCS 5/22.51
415 ILCS 5/22.51a

Synopsis As Introduced
Amends the Environmental Protection Act. Provides that within 180 days after the effective date of the amendatory Act, the Pollution Control Board shall adopt amendments to the rules adopted under specified provisions to require groundwater monitoring at all clean construction or demolition debris fill operations and all uncontaminated soil fill operations. Provides that the groundwater monitoring requirements adopted under specified provisions shall be designed to detect and prevent any exceedance of the Board's Class I groundwater quality standards and meet specified requirements. Provides that groundwater monitoring shall be required for all clean construction or demolition debris fill operations and all uncontaminated soil fill operations unless, before the effective date of the amendatory Act, the owner or operator has completed post-closure maintenance and, for clean construction or demolition debris fill operations, received specified notice from the Environmental Protection Agency, or, for uncontaminated soil fill operations, submitted specified information to the Agency. Effective immediately.

Actions 
DateChamber Action
  2/23/2021SenateFiled with Secretary by Sen. Laura Ellman
  2/23/2021SenateFirst Reading
  2/23/2021SenateReferred to Assignments
  3/3/2021SenateAssigned to Executive
  3/5/2021SenateAdded as Chief Co-Sponsor Sen. John Connor
  3/17/2021SenateTo Executive- Special Issues
  4/16/2021SenateRule 3-9(a) / Re-referred to Assignments
  1/10/2023SenateSession Sine Die

Back To Top