1 | AN ACT concerning animals.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Livestock Management Facilities Act is | |||||||||||||||||||
5 | amended by changing Section 12 as follows:
| |||||||||||||||||||
6 | (510 ILCS 77/12)
| |||||||||||||||||||
7 | Sec. 12. Public informational meeting; lagoons and | |||||||||||||||||||
8 | non-lagoon structures.
| |||||||||||||||||||
9 | (a) Beginning on the effective date of this amendatory Act | |||||||||||||||||||
10 | of 1999, within 7
days after
receiving a form giving notice of | |||||||||||||||||||
11 | intent to construct (i) a new livestock
management facility or
| |||||||||||||||||||
12 | livestock waste handling facility serving 1,000 or more animal | |||||||||||||||||||
13 | units that does
not propose to
utilize a lagoon , or (ii) a | |||||||||||||||||||
14 | livestock waste management facility or livestock
waste | |||||||||||||||||||
15 | handling facility
that does propose to utilize a lagoon, or | |||||||||||||||||||
16 | (iii) any livestock management facility or livestock waste | |||||||||||||||||||
17 | handling facility that proposes to increase its animal unit | |||||||||||||||||||
18 | capacity or waste handling facility capacity to serve | |||||||||||||||||||
19 | additional animal units, the Department shall send a copy of | |||||||||||||||||||
20 | the
notice form to the
county board of the county in which the | |||||||||||||||||||
21 | facility is to be located and any municipalities located within | |||||||||||||||||||
22 | 1.5 miles of the facility and shall
publish a public notice in
| |||||||||||||||||||
23 | a newspaper of general circulation within the county. After |
| |||||||
| |||||||
1 | receiving a copy
of the notice form
from the Department, the | ||||||
2 | county board or a municipality located within 1.5 miles of the | ||||||
3 | facility may, at its discretion and within 30 days
after | ||||||
4 | receipt of
the notice, request that the Department conduct an | ||||||
5 | informational meeting
concerning the
proposed construction | ||||||
6 | that is subject to this Section. In addition, during the
| ||||||
7 | county's or municipality's 30-day
review period, county or | ||||||
8 | municipal residents may petition the county board of the county
| ||||||
9 | where the proposed
new facility will be located or the | ||||||
10 | municipality located within 1.5 miles of where the proposed | ||||||
11 | facility will be located to request that the Department conduct | ||||||
12 | an
informational meeting.
When petitioned by 75 or more of the | ||||||
13 | county's or municipality's residents who are registered
| ||||||
14 | voters, the county
board or municipality shall request that the | ||||||
15 | Department conduct an informational meeting. If
the county | ||||||
16 | board
or municipality requests that the Department conduct the | ||||||
17 | informational meeting, the Department
shall conduct
the | ||||||
18 | informational meeting within 15 days of the county board's or | ||||||
19 | municipality's request. If the
Department
conducts such a | ||||||
20 | meeting, it shall cause notice of the meeting to be published
| ||||||
21 | in a newspaper of
general circulation in the county and any | ||||||
22 | municipality located within 1.5 miles of where the proposed | ||||||
23 | facility will be located and in the State newspaper and shall | ||||||
24 | send a
copy of the notice to the County Board and any | ||||||
25 | municipality located within 1.5 miles of the proposed facility . | ||||||
26 | Upon receipt of the notice, the County
Board or municipality |
| |||||||
| |||||||
1 | shall post the notice
on the public
informational board at the | ||||||
2 | county courthouse at least 10 days before the
meeting. The | ||||||
3 | owner or
operator who submitted the notice of intent to | ||||||
4 | construct to the Department
shall appear at the
meeting. At the | ||||||
5 | meeting, the Department shall afford members of the public an
| ||||||
6 | opportunity to ask
questions and present oral or written | ||||||
7 | comments concerning the proposed
construction. If a county and | ||||||
8 | municipality both request informational meetings, one meeting | ||||||
9 | shall be held at the county. If a county does not request a | ||||||
10 | meeting, but multiple municipal entities do, the location of | ||||||
11 | the meeting shall be determined by the Department to be | ||||||
12 | conducive to all interested entities.
| ||||||
13 | (b) The county board shall submit at the informational | ||||||
14 | meeting or within 30
days following
the meeting an advisory, | ||||||
15 | non-binding recommendation to the Department about the
| ||||||
16 | proposed
new facility's construction in accordance with the | ||||||
17 | applicable requirements of
this Act. The
advisory, non-binding | ||||||
18 | recommendation shall contain at a minimum:
| ||||||
19 | (1) a statement of whether the proposed facility | ||||||
20 | achieves or fails to
achieve each
of the 8 siting criteria | ||||||
21 | as outlined in subsection (d); and
| ||||||
22 | (2) a statement of the information and criteria used by | ||||||
23 | the county board
in
determining that the proposed facility | ||||||
24 | met or failed to meet any of the
criteria
described in | ||||||
25 | subsection (d).
| ||||||
26 | (c) When the county board requests an informational |
| |||||||
| |||||||
1 | meeting, construction
shall not
begin until after the | ||||||
2 | informational meeting has been held, the Department has
| ||||||
3 | reviewed the
county board's recommendation and replied to the | ||||||
4 | recommendation indicating if
the proposed
new livestock | ||||||
5 | management facility or the new livestock waste handling | ||||||
6 | facility
is or will be in
compliance with the requirements of | ||||||
7 | the Act, and the owner, operator, or
certified manager and
| ||||||
8 | operator has received the Department's notice that the setbacks | ||||||
9 | and all
applicable requirements
of this Act have been met.
| ||||||
10 | (d) At the informational meeting for the proposed facility, | ||||||
11 | the Department
of
Agriculture
shall receive evidence by | ||||||
12 | testimony or otherwise on the following subjects:
| ||||||
13 | (1) Whether registration and livestock waste | ||||||
14 | management plan certification
requirements, if required, | ||||||
15 | are met by the notice of intent to construct.
| ||||||
16 | (2) Whether the design, location, or proposed | ||||||
17 | operation will protect the
environment
by being consistent | ||||||
18 | with this Act.
| ||||||
19 | (3) Whether the location minimizes any incompatibility | ||||||
20 | with the
surrounding area's
character by being located in | ||||||
21 | any area zoned for agriculture where the county
has zoning | ||||||
22 | or where the county is not zoned, the setback requirements
| ||||||
23 | established by this Act are complied with.
| ||||||
24 | (4) Whether the facility is located within a 100-year | ||||||
25 | floodplain or an
otherwise
environmentally sensitive area | ||||||
26 | (defined as an area of karst area or with
aquifer
material |
| |||||||
| |||||||
1 | within 5 feet of the bottom of the livestock waste handling | ||||||
2 | facility)
and
whether construction standards set forth in | ||||||
3 | the notice of intent to construct
are
consistent with the | ||||||
4 | goal of protecting the safety of the area.
| ||||||
5 | (5) Whether the owner or operator has submitted plans | ||||||
6 | for operation that
minimize
the likelihood of any | ||||||
7 | environmental damage to the surrounding area from spills,
| ||||||
8 | runoff, and leaching.
| ||||||
9 | (6) Whether odor control plans are reasonable and | ||||||
10 | incorporate reasonable
or
innovative odor reduction | ||||||
11 | technologies given the current state of such
technologies.
| ||||||
12 | (7) Whether traffic patterns minimize the effect on | ||||||
13 | existing traffic
flows.
| ||||||
14 | (8) Whether construction or modification of a new | ||||||
15 | facility is consistent
with existing
community growth, | ||||||
16 | tourism, recreation, or economic development or with | ||||||
17 | specific
projects involving community growth, tourism, | ||||||
18 | recreation, or economic
development that have been | ||||||
19 | identified by government action for development or
| ||||||
20 | operation within one year through compliance with | ||||||
21 | applicable zoning and setback
requirements for populated | ||||||
22 | areas as established by this Act.
| ||||||
23 | (Source: P.A. 91-110, eff. 7-13-99.)
|