Amends the Illinois Procurement Code. Modifies the term "construction agency" to clarify the meaning of State agency as used under that term. Modifies the term "single prime" to mean the design-bid-build procurement delivery method for a building construction project in which the construction agency (currently, the Capital Development Board is the construction agency) procures 2 or more specified subdivisions of work. Extends the repeal of the Section defining "single prime" from January 1, 2020 to January 1, 2030. Modifies a Section concerning design-bid-build construction. Changes references concerning the Capital Development Board to construction agency for purposes of requirements under the Section. Provides that for single prime projects, among other requirements, annual (rather than quarterly) reports shall be submitted to the Procurement Policy Board with information on the general scope, project budget, and established Business Enterprise Program goals for any single prime procurement bid in the previous 12 (currently, 3) months. Provides that use of the single prime procurement delivery method shall not exceed 50% of the total number of projects with total construction cost valued at $5,000,000 or less. Provides that a construction agency shall post notice of its intent to use the single prime method on a project on its online Procurement Bulletin at least 7 (currently, 3) business days following submission of such notice to the Procurement Policy Board. Makes conforming changes.
|
| |
| | A BILL FOR |
|
|
| | SB1950 | | LRB101 10718 RJF 55830 b |
|
|
1 | | AN ACT concerning finance.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Procurement Code is amended by |
5 | | changing Sections 1-15.25, 1-15.93, and 30-30 as follows:
|
6 | | (30 ILCS 500/1-15.25)
|
7 | | Sec. 1-15.25. Construction agency. "Construction agency"
|
8 | | means the Capital
Development Board for construction or |
9 | | remodeling of State-owned
facilities; the Illinois
Department |
10 | | of Transportation for construction or maintenance of
roads, |
11 | | highways, bridges, and
airports; the Illinois Toll Highway |
12 | | Authority for construction or
maintenance of toll highways; the |
13 | | Illinois Power Agency for construction, maintenance, and |
14 | | expansion of Agency-owned facilities, as defined in Section |
15 | | 1-10 of the Illinois Power Agency Act;
and any other State |
16 | | agency , as defined in Sec. 1-15.100, entering into construction |
17 | | contracts as
authorized by law or by
delegation from the chief |
18 | | procurement officer.
|
19 | | (Source: P.A. 95-481, eff. 8-28-07.)
|
20 | | (30 ILCS 500/1-15.93) |
21 | | (Section scheduled to be repealed on January 1, 2020) |
22 | | Sec. 1-15.93. Single prime. "Single prime" means the |
|
| | SB1950 | - 2 - | LRB101 10718 RJF 55830 b |
|
|
1 | | design-bid-build procurement delivery method for a building |
2 | | construction project in which the Capital Development Board is |
3 | | the construction agency procures procuring 2 or more |
4 | | subdivisions of work enumerated in paragraphs (1) through (5) |
5 | | of subsection (a) of Section 30-30 of this Code under a single |
6 | | contract. This Section is repealed on January 1, 2030 2020 .
|
7 | | (Source: P.A. 99-257, eff. 8-4-15.)
|
8 | | (30 ILCS 500/30-30)
|
9 | | Sec. 30-30. Design-bid-build construction. |
10 | | (a) The provisions of this subsection are operative through |
11 | | December 31, 2019. |
12 | | For
building construction contracts in excess of
$250,000, |
13 | | separate specifications may be prepared for all
equipment, |
14 | | labor, and materials in
connection with the following 5 |
15 | | subdivisions of the work to be
performed:
|
16 | | (1) plumbing;
|
17 | | (2) heating, piping, refrigeration, and automatic
|
18 | | temperature control systems,
including the testing and |
19 | | balancing of those systems;
|
20 | | (3) ventilating and distribution systems for
|
21 | | conditioned air, including the testing
and balancing of |
22 | | those systems;
|
23 | | (4) electric wiring; and
|
24 | | (5) general contract work.
|
25 | | The specifications may be so drawn as to permit separate |
|
| | SB1950 | - 3 - | LRB101 10718 RJF 55830 b |
|
|
1 | | and
independent bidding upon
each of the 5 subdivisions of |
2 | | work. All contracts awarded
for any part thereof may
award the |
3 | | 5 subdivisions of work separately to responsible and
reliable |
4 | | persons, firms, or
corporations engaged in these classes of |
5 | | work. The contracts, at
the discretion of the
construction |
6 | | agency, may be assigned to the successful bidder on
the general |
7 | | contract work or
to the successful bidder on the subdivision of |
8 | | work designated by
the construction agency before
the bidding |
9 | | as the prime subdivision of work, provided that all
payments |
10 | | will be made directly
to the contractors for the 5 subdivisions |
11 | | of work upon compliance
with the conditions of the
contract.
|
12 | | Beginning on the effective date of this amendatory Act of |
13 | | the 101st 99th General Assembly and through June 30, 2030 |
14 | | December 31, 2019 , for single prime projects: (i) the bid of |
15 | | the successful low bidder shall identify the name of the |
16 | | subcontractor, if any, and the bid proposal costs for each of |
17 | | the 5 subdivisions of work set forth in this Section; (ii) the |
18 | | contract entered into with the successful bidder shall provide |
19 | | that no identified subcontractor may be terminated without the |
20 | | written consent of the construction agency Capital Development |
21 | | Board ; (iii) the contract shall comply with the disadvantaged |
22 | | business practices of the Business Enterprise for Minorities, |
23 | | Women, and Persons with Disabilities Act and the equal |
24 | | employment practices of Section 2-105 of the Illinois Human |
25 | | Rights Act; (iv) annual reports shall be submitted the Capital |
26 | | Development Board shall submit a quarterly report to the |
|
| | SB1950 | - 4 - | LRB101 10718 RJF 55830 b |
|
|
1 | | Procurement Policy Board with information on the general scope, |
2 | | project budget, and established Business Enterprise Program |
3 | | goals for any single prime procurement bid in the previous 12 3 |
4 | | months with a total construction cost valued at $10,000,000 or |
5 | | less ; and (v) the Construction agency Capital Development Board |
6 | | shall submit an annual report to the General Assembly and |
7 | | Governor on the bidding, award, and performance of all single |
8 | | prime projects. |
9 | | Use of the single prime procurement delivery method shall |
10 | | not exceed 50% of the total number of projects with total |
11 | | construction cost valued at $5,000,000 or less. For building |
12 | | construction projects with a total construction cost valued at |
13 | | $5,000,000 or less, the Capital Development Board shall not use |
14 | | the single prime procurement delivery method for more than 50% |
15 | | of the total number of projects bid for each fiscal year. Any |
16 | | project with a total construction cost valued greater than |
17 | | $5,000,000 may be bid using single prime at the discretion of |
18 | | the Executive Director of the Capital Development Board . |
19 | | Beginning on the effective date of this amendatory Act of |
20 | | the 101st 99th General Assembly and through June 30, 2030 |
21 | | December 31, 2017 , the construction agency Capital Development |
22 | | Board shall, on a weekly basis: review the projects that have |
23 | | been designed, and approved to bid; and, for every fifth |
24 | | determination to use the single prime procurement delivery |
25 | | method for a project under $10,000,000, submit to the |
26 | | Procurement Policy Board a written notice of its intent to use |
|
| | SB1950 | - 5 - | LRB101 10718 RJF 55830 b |
|
|
1 | | the single prime method on the project. The notice shall |
2 | | include the reasons for using the single prime method and an |
3 | | explanation of why the use of that method is in the best |
4 | | interest of the State. The construction agency Capital |
5 | | Development Board shall post the notice on its online |
6 | | procurement webpage and on the online Procurement Bulletin at |
7 | | least 7 3 business days following submission. The Procurement |
8 | | Policy Board shall review and provide its decision on the use |
9 | | of the single prime method for every fifth use of the single |
10 | | prime procurement delivery method for a project under |
11 | | $10,000,000 within 7 business days of receipt of the notice |
12 | | from the Capital Development Board. Approval by the Procurement |
13 | | Policy Board shall not be unreasonably withheld and shall be |
14 | | provided unless the Procurement Policy Board finds that the use |
15 | | of the single prime method is not in the best interest of the |
16 | | State. Any decision by the Procurement Policy Board to |
17 | | disapprove the use of the single prime method shall be made in |
18 | | writing to the Capital Development Board, posted on the online |
19 | | Procurement Bulletin, and shall state the reasons why the |
20 | | single prime method was disapproved and why it is not in the |
21 | | best interest of the State. |
22 | | (b) The provisions of this subsection are operative on and |
23 | | after January 1, 2020.
For building construction contracts in |
24 | | excess of $250,000, separate specifications shall be prepared |
25 | | for all equipment, labor, and materials in connection with the |
26 | | following 5 subdivisions of the work to be performed: |
|
| | SB1950 | - 6 - | LRB101 10718 RJF 55830 b |
|
|
1 | | (1) plumbing; |
2 | | (2) heating, piping, refrigeration, and automatic |
3 | | temperature control systems, including the testing and |
4 | | balancing of those systems; |
5 | | (3) ventilating and distribution systems for |
6 | | conditioned air, including the testing and balancing of |
7 | | those systems; |
8 | | (4) electric wiring; and |
9 | | (5) general contract work. |
10 | | The specifications must be so drawn as to permit separate |
11 | | and independent bidding upon each of the 5 subdivisions of |
12 | | work. All contracts awarded for any part thereof shall award |
13 | | the 5 subdivisions of work separately to responsible and |
14 | | reliable persons, firms, or corporations engaged in these |
15 | | classes of work. The contracts, at the discretion of the |
16 | | construction agency, may be assigned to the successful bidder |
17 | | on the general contract work or to the successful bidder on the |
18 | | subdivision of work designated by the construction agency |
19 | | before the bidding as the prime subdivision of work, provided |
20 | | that all payments will be made directly to the contractors for |
21 | | the 5 subdivisions of work upon compliance with the conditions |
22 | | of the contract. |
23 | | (Source: P.A. 99-257, eff. 8-4-15; 100-391, eff. 8-25-17.)
|