| | 101ST GENERAL ASSEMBLY
State of Illinois
2019 and 2020 SB1529 Introduced 2/15/2019, by Sen. Don Harmon SYNOPSIS AS INTRODUCED: |
| |
Amends the Illinois Power Agency Act. In provisions requiring the Illinois Power Agency to solicit 15-year contracts for delivery of renewable energy credits from new utility-scale wind projects, new utility-scale solar projects, and brownfield site photovoltaic projects to begin delivery on June 1, 2019, if available, but not later than June 1, 2021, specifies that, if the project has delays in the establishment of an operating interconnection with the applicable transmission or distribution system as a result of the actions or inactions of the transmission or distribution provider, or other causes for force majeure as outlined in the procurement contract, delivery shall begin not later than June 1, 2022.
|
| |
| | A BILL FOR |
|
|
| | SB1529 | | LRB101 08496 JRG 53573 b |
|
|
1 | | AN ACT concerning State government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Illinois Power Agency Act is amended by |
5 | | changing Section 1-75 as follows: |
6 | | (20 ILCS 3855/1-75) |
7 | | Sec. 1-75. Planning and Procurement Bureau. The Planning |
8 | | and Procurement Bureau has the following duties and |
9 | | responsibilities: |
10 | | (a) The Planning and Procurement Bureau shall each year, |
11 | | beginning in 2008, develop procurement plans and conduct |
12 | | competitive procurement processes in accordance with the |
13 | | requirements of Section 16-111.5 of the Public Utilities Act |
14 | | for the eligible retail customers of electric utilities that on |
15 | | December 31, 2005 provided electric service to at least 100,000 |
16 | | customers in Illinois. Beginning with the delivery year |
17 | | commencing on June 1, 2017, the Planning and Procurement Bureau |
18 | | shall develop plans and processes for the procurement of zero |
19 | | emission credits from zero emission facilities in accordance |
20 | | with the requirements of subsection (d-5) of this Section. The |
21 | | Planning and Procurement Bureau shall also develop procurement |
22 | | plans and conduct competitive procurement processes in |
23 | | accordance with the requirements of Section 16-111.5 of the |
|
| | SB1529 | - 2 - | LRB101 08496 JRG 53573 b |
|
|
1 | | Public Utilities Act for the eligible retail customers of small |
2 | | multi-jurisdictional electric utilities that (i) on December |
3 | | 31, 2005 served less than 100,000 customers in Illinois and |
4 | | (ii) request a procurement plan for their Illinois |
5 | | jurisdictional load. This Section shall not apply to a small |
6 | | multi-jurisdictional utility until such time as a small |
7 | | multi-jurisdictional utility requests the Agency to prepare a |
8 | | procurement plan for their Illinois jurisdictional load. For |
9 | | the purposes of this Section, the term "eligible retail |
10 | | customers" has the same definition as found in Section |
11 | | 16-111.5(a) of the Public Utilities Act. |
12 | | Beginning with the plan or plans to be implemented in the |
13 | | 2017 delivery year, the Agency shall no longer include the |
14 | | procurement of renewable energy resources in the annual |
15 | | procurement plans required by this subsection (a), except as |
16 | | provided in subsection (q) of Section 16-111.5 of the Public |
17 | | Utilities Act, and shall instead develop a long-term renewable |
18 | | resources procurement plan in accordance with subsection (c) of |
19 | | this Section and Section 16-111.5 of the Public Utilities Act. |
20 | | (1) The Agency shall each year, beginning in 2008, as |
21 | | needed, issue a request for qualifications for experts or |
22 | | expert consulting firms to develop the procurement plans in |
23 | | accordance with Section 16-111.5 of the Public Utilities |
24 | | Act. In order to qualify an expert or expert consulting |
25 | | firm must have: |
26 | | (A) direct previous experience assembling |
|
| | SB1529 | - 3 - | LRB101 08496 JRG 53573 b |
|
|
1 | | large-scale power supply plans or portfolios for |
2 | | end-use customers; |
3 | | (B) an advanced degree in economics, mathematics, |
4 | | engineering, risk management, or a related area of |
5 | | study; |
6 | | (C) 10 years of experience in the electricity |
7 | | sector, including managing supply risk; |
8 | | (D) expertise in wholesale electricity market |
9 | | rules, including those established by the Federal |
10 | | Energy Regulatory Commission and regional transmission |
11 | | organizations; |
12 | | (E) expertise in credit protocols and familiarity |
13 | | with contract protocols; |
14 | | (F) adequate resources to perform and fulfill the |
15 | | required functions and responsibilities; and |
16 | | (G) the absence of a conflict of interest and |
17 | | inappropriate bias for or against potential bidders or |
18 | | the affected electric utilities. |
19 | | (2) The Agency shall each year, as needed, issue a |
20 | | request for qualifications for a procurement administrator |
21 | | to conduct the competitive procurement processes in |
22 | | accordance with Section 16-111.5 of the Public Utilities |
23 | | Act. In order to qualify an expert or expert consulting |
24 | | firm must have: |
25 | | (A) direct previous experience administering a |
26 | | large-scale competitive procurement process; |
|
| | SB1529 | - 4 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (B) an advanced degree in economics, mathematics, |
2 | | engineering, or a related area of study; |
3 | | (C) 10 years of experience in the electricity |
4 | | sector, including risk management experience; |
5 | | (D) expertise in wholesale electricity market |
6 | | rules, including those established by the Federal |
7 | | Energy Regulatory Commission and regional transmission |
8 | | organizations; |
9 | | (E) expertise in credit and contract protocols; |
10 | | (F) adequate resources to perform and fulfill the |
11 | | required functions and responsibilities; and |
12 | | (G) the absence of a conflict of interest and |
13 | | inappropriate bias for or against potential bidders or |
14 | | the affected electric utilities. |
15 | | (3) The Agency shall provide affected utilities and |
16 | | other interested parties with the lists of qualified |
17 | | experts or expert consulting firms identified through the |
18 | | request for qualifications processes that are under |
19 | | consideration to develop the procurement plans and to serve |
20 | | as the procurement administrator. The Agency shall also |
21 | | provide each qualified expert's or expert consulting |
22 | | firm's response to the request for qualifications. All |
23 | | information provided under this subparagraph shall also be |
24 | | provided to the Commission. The Agency may provide by rule |
25 | | for fees associated with supplying the information to |
26 | | utilities and other interested parties. These parties |
|
| | SB1529 | - 5 - | LRB101 08496 JRG 53573 b |
|
|
1 | | shall, within 5 business days, notify the Agency in writing |
2 | | if they object to any experts or expert consulting firms on |
3 | | the lists. Objections shall be based on: |
4 | | (A) failure to satisfy qualification criteria; |
5 | | (B) identification of a conflict of interest; or |
6 | | (C) evidence of inappropriate bias for or against |
7 | | potential bidders or the affected utilities. |
8 | | The Agency shall remove experts or expert consulting |
9 | | firms from the lists within 10 days if there is a |
10 | | reasonable basis for an objection and provide the updated |
11 | | lists to the affected utilities and other interested |
12 | | parties. If the Agency fails to remove an expert or expert |
13 | | consulting firm from a list, an objecting party may seek |
14 | | review by the Commission within 5 days thereafter by filing |
15 | | a petition, and the Commission shall render a ruling on the |
16 | | petition within 10 days. There is no right of appeal of the |
17 | | Commission's ruling. |
18 | | (4) The Agency shall issue requests for proposals to |
19 | | the qualified experts or expert consulting firms to develop |
20 | | a procurement plan for the affected utilities and to serve |
21 | | as procurement administrator. |
22 | | (5) The Agency shall select an expert or expert |
23 | | consulting firm to develop procurement plans based on the |
24 | | proposals submitted and shall award contracts of up to 5 |
25 | | years to those selected. |
26 | | (6) The Agency shall select an expert or expert |
|
| | SB1529 | - 6 - | LRB101 08496 JRG 53573 b |
|
|
1 | | consulting firm, with approval of the Commission, to serve |
2 | | as procurement administrator based on the proposals |
3 | | submitted. If the Commission rejects, within 5 days, the |
4 | | Agency's selection, the Agency shall submit another |
5 | | recommendation within 3 days based on the proposals |
6 | | submitted. The Agency shall award a 5-year contract to the |
7 | | expert or expert consulting firm so selected with |
8 | | Commission approval. |
9 | | (b) The experts or expert consulting firms retained by the |
10 | | Agency shall, as appropriate, prepare procurement plans, and |
11 | | conduct a competitive procurement process as prescribed in |
12 | | Section 16-111.5 of the Public Utilities Act, to ensure |
13 | | adequate, reliable, affordable, efficient, and environmentally |
14 | | sustainable electric service at the lowest total cost over |
15 | | time, taking into account any benefits of price stability, for |
16 | | eligible retail customers of electric utilities that on |
17 | | December 31, 2005 provided electric service to at least 100,000 |
18 | | customers in the State of Illinois, and for eligible Illinois |
19 | | retail customers of small multi-jurisdictional electric |
20 | | utilities that (i) on December 31, 2005 served less than |
21 | | 100,000 customers in Illinois and (ii) request a procurement |
22 | | plan for their Illinois jurisdictional load. |
23 | | (c) Renewable portfolio standard. |
24 | | (1)(A) The Agency shall develop a long-term renewable |
25 | | resources procurement plan that shall include procurement |
26 | | programs and competitive procurement events necessary to |
|
| | SB1529 | - 7 - | LRB101 08496 JRG 53573 b |
|
|
1 | | meet the goals set forth in this subsection (c). The |
2 | | initial long-term renewable resources procurement plan |
3 | | shall be released for comment no later than 160 days after |
4 | | June 1, 2017 (the effective date of Public Act 99-906). The |
5 | | Agency shall review, and may revise on an expedited basis, |
6 | | the long-term renewable resources procurement plan at |
7 | | least every 2 years, which shall be conducted in |
8 | | conjunction with the procurement plan under Section |
9 | | 16-111.5 of the Public Utilities Act to the extent |
10 | | practicable to minimize administrative expense. The |
11 | | long-term renewable resources procurement plans shall be |
12 | | subject to review and approval by the Commission under |
13 | | Section 16-111.5 of the Public Utilities Act. |
14 | | (B) Subject to subparagraph (F) of this paragraph (1), |
15 | | the long-term renewable resources procurement plan shall |
16 | | include the goals for procurement of renewable energy |
17 | | credits to meet at least the following overall percentages: |
18 | | 13% by the 2017 delivery year; increasing by at least 1.5% |
19 | | each delivery year thereafter to at least 25% by the 2025 |
20 | | delivery year; and continuing at no less than 25% for each |
21 | | delivery year thereafter. In the event of a conflict |
22 | | between these goals and the new wind and new photovoltaic |
23 | | procurement requirements described in items (i) through |
24 | | (iii) of subparagraph (C) of this paragraph (1), the |
25 | | long-term plan shall prioritize compliance with the new |
26 | | wind and new photovoltaic procurement requirements |
|
| | SB1529 | - 8 - | LRB101 08496 JRG 53573 b |
|
|
1 | | described in items (i) through (iii) of subparagraph (C) of |
2 | | this paragraph (1) over the annual percentage targets |
3 | | described in this subparagraph (B). |
4 | | For the delivery year beginning June 1, 2017, the |
5 | | procurement plan shall include cost-effective renewable |
6 | | energy resources equal to at least 13% of each utility's |
7 | | load for eligible retail customers and 13% of the |
8 | | applicable portion of each utility's load for retail |
9 | | customers who are not eligible retail customers, which |
10 | | applicable portion shall equal 50% of the utility's load |
11 | | for retail customers who are not eligible retail customers |
12 | | on February 28, 2017. |
13 | | For the delivery year beginning June 1, 2018, the |
14 | | procurement plan shall include cost-effective renewable |
15 | | energy resources equal to at least 14.5% of each utility's |
16 | | load for eligible retail customers and 14.5% of the |
17 | | applicable portion of each utility's load for retail |
18 | | customers who are not eligible retail customers, which |
19 | | applicable portion shall equal 75% of the utility's load |
20 | | for retail customers who are not eligible retail customers |
21 | | on February 28, 2017. |
22 | | For the delivery year beginning June 1, 2019, and for |
23 | | each year thereafter, the procurement plans shall include |
24 | | cost-effective renewable energy resources equal to a |
25 | | minimum percentage of each utility's load for all retail |
26 | | customers as follows: 16% by June 1, 2019; increasing by |
|
| | SB1529 | - 9 - | LRB101 08496 JRG 53573 b |
|
|
1 | | 1.5% each year thereafter to 25% by June 1, 2025; and 25% |
2 | | by June 1, 2026 and each year thereafter. |
3 | | For each delivery year, the Agency shall first |
4 | | recognize each utility's obligations for that delivery |
5 | | year under existing contracts. Any renewable energy |
6 | | credits under existing contracts, including renewable |
7 | | energy credits as part of renewable energy resources, shall |
8 | | be used to meet the goals set forth in this subsection (c) |
9 | | for the delivery year. |
10 | | (C) Of the renewable energy credits procured under this |
11 | | subsection (c), at least 75% shall come from wind and |
12 | | photovoltaic projects. The long-term renewable resources |
13 | | procurement plan described in subparagraph (A) of this |
14 | | paragraph (1) shall include the procurement of renewable |
15 | | energy credits in amounts equal to at least the following: |
16 | | (i) By the end of the 2020 delivery year: |
17 | | At least 2,000,000 renewable energy credits |
18 | | for each delivery year shall come from new wind |
19 | | projects; and |
20 | | At least 2,000,000 renewable energy credits |
21 | | for each delivery year shall come from new |
22 | | photovoltaic projects; of that amount, to the |
23 | | extent possible, the Agency shall procure: at |
24 | | least 50% from solar photovoltaic projects using |
25 | | the program outlined in subparagraph (K) of this |
26 | | paragraph (1) from distributed renewable energy |
|
| | SB1529 | - 10 - | LRB101 08496 JRG 53573 b |
|
|
1 | | generation devices or community renewable |
2 | | generation projects; at least 40% from |
3 | | utility-scale solar projects; at least 2% from |
4 | | brownfield site photovoltaic projects that are not |
5 | | community renewable generation projects; and the |
6 | | remainder shall be determined through the |
7 | | long-term planning process described in |
8 | | subparagraph (A) of this paragraph (1). |
9 | | (ii) By the end of the 2025 delivery year: |
10 | | At least 3,000,000 renewable energy credits |
11 | | for each delivery year shall come from new wind |
12 | | projects; and |
13 | | At least 3,000,000 renewable energy credits |
14 | | for each delivery year shall come from new |
15 | | photovoltaic projects; of that amount, to the |
16 | | extent possible, the Agency shall procure: at |
17 | | least 50% from solar photovoltaic projects using |
18 | | the program outlined in subparagraph (K) of this |
19 | | paragraph (1) from distributed renewable energy |
20 | | devices or community renewable generation |
21 | | projects; at least 40% from utility-scale solar |
22 | | projects; at least 2% from brownfield site |
23 | | photovoltaic projects that are not community |
24 | | renewable generation projects; and the remainder |
25 | | shall be determined through the long-term planning |
26 | | process described in subparagraph (A) of this |
|
| | SB1529 | - 11 - | LRB101 08496 JRG 53573 b |
|
|
1 | | paragraph (1). |
2 | | (iii) By the end of the 2030 delivery year: |
3 | | At least 4,000,000 renewable energy credits |
4 | | for each delivery year shall come from new wind |
5 | | projects; and |
6 | | At least 4,000,000 renewable energy credits |
7 | | for each delivery year shall come from new |
8 | | photovoltaic projects; of that amount, to the |
9 | | extent possible, the Agency shall procure: at |
10 | | least 50% from solar photovoltaic projects using |
11 | | the program outlined in subparagraph (K) of this |
12 | | paragraph (1) from distributed renewable energy |
13 | | devices or community renewable generation |
14 | | projects; at least 40% from utility-scale solar |
15 | | projects; at least 2% from brownfield site |
16 | | photovoltaic projects that are not community |
17 | | renewable generation projects; and the remainder |
18 | | shall be determined through the long-term planning |
19 | | process described in subparagraph (A) of this |
20 | | paragraph (1). |
21 | | For purposes of this Section: |
22 | | "New wind projects" means wind renewable |
23 | | energy facilities that are energized after June 1, |
24 | | 2017 for the delivery year commencing June 1, 2017 |
25 | | or within 3 years after the date the Commission |
26 | | approves contracts for subsequent delivery years. |
|
| | SB1529 | - 12 - | LRB101 08496 JRG 53573 b |
|
|
1 | | "New photovoltaic projects" means photovoltaic |
2 | | renewable energy facilities that are energized |
3 | | after June 1, 2017. Photovoltaic projects |
4 | | developed under Section 1-56 of this Act shall not |
5 | | apply towards the new photovoltaic project |
6 | | requirements in this subparagraph (C). |
7 | | (D) Renewable energy credits shall be cost effective. |
8 | | For purposes of this subsection (c), "cost effective" means |
9 | | that the costs of procuring renewable energy resources do |
10 | | not cause the limit stated in subparagraph (E) of this |
11 | | paragraph (1) to be exceeded and, for renewable energy |
12 | | credits procured through a competitive procurement event, |
13 | | do not exceed benchmarks based on market prices for like |
14 | | products in the region. For purposes of this subsection |
15 | | (c), "like products" means contracts for renewable energy |
16 | | credits from the same or substantially similar technology, |
17 | | same or substantially similar vintage (new or existing), |
18 | | the same or substantially similar quantity, and the same or |
19 | | substantially similar contract length and structure. |
20 | | Benchmarks shall be developed by the procurement |
21 | | administrator, in consultation with the Commission staff, |
22 | | Agency staff, and the procurement monitor and shall be |
23 | | subject to Commission review and approval. If price |
24 | | benchmarks for like products in the region are not |
25 | | available, the procurement administrator shall establish |
26 | | price benchmarks based on publicly available data on |
|
| | SB1529 | - 13 - | LRB101 08496 JRG 53573 b |
|
|
1 | | regional technology costs and expected current and future |
2 | | regional energy prices. The benchmarks in this Section |
3 | | shall not be used to curtail or otherwise reduce |
4 | | contractual obligations entered into by or through the |
5 | | Agency prior to June 1, 2017 (the effective date of Public |
6 | | Act 99-906). |
7 | | (E) For purposes of this subsection (c), the required |
8 | | procurement of cost-effective renewable energy resources |
9 | | for a particular year commencing prior to June 1, 2017 |
10 | | shall be measured as a percentage of the actual amount of |
11 | | electricity (megawatt-hours) supplied by the electric |
12 | | utility to eligible retail customers in the delivery year |
13 | | ending immediately prior to the procurement, and, for |
14 | | delivery years commencing on and after June 1, 2017, the |
15 | | required procurement of cost-effective renewable energy |
16 | | resources for a particular year shall be measured as a |
17 | | percentage of the actual amount of electricity |
18 | | (megawatt-hours) delivered by the electric utility in the |
19 | | delivery year ending immediately prior to the procurement, |
20 | | to all retail customers in its service territory. For |
21 | | purposes of this subsection (c), the amount paid per |
22 | | kilowatthour means the total amount paid for electric |
23 | | service expressed on a per kilowatthour basis. For purposes |
24 | | of this subsection (c), the total amount paid for electric |
25 | | service includes without limitation amounts paid for |
26 | | supply, transmission, distribution, surcharges, and add-on |
|
| | SB1529 | - 14 - | LRB101 08496 JRG 53573 b |
|
|
1 | | taxes. |
2 | | Notwithstanding the requirements of this subsection |
3 | | (c), the total of renewable energy resources procured under |
4 | | the procurement plan for any single year shall be subject |
5 | | to the limitations of this subparagraph (E). Such |
6 | | procurement shall be reduced for all retail customers based |
7 | | on the amount necessary to limit the annual estimated |
8 | | average net increase due to the costs of these resources |
9 | | included in the amounts paid by eligible retail customers |
10 | | in connection with electric service to no more than the |
11 | | greater of 2.015% of the amount paid per kilowatthour by |
12 | | those customers during the year ending May 31, 2007 or the |
13 | | incremental amount per kilowatthour paid for these |
14 | | resources in 2011. To arrive at a maximum dollar amount of |
15 | | renewable energy resources to be procured for the |
16 | | particular delivery year, the resulting per kilowatthour |
17 | | amount shall be applied to the actual amount of |
18 | | kilowatthours of electricity delivered, or applicable |
19 | | portion of such amount as specified in paragraph (1) of |
20 | | this subsection (c), as applicable, by the electric utility |
21 | | in the delivery year immediately prior to the procurement |
22 | | to all retail customers in its service territory. The |
23 | | calculations required by this subparagraph (E) shall be |
24 | | made only once for each delivery year at the time that the |
25 | | renewable energy resources are procured. Once the |
26 | | determination as to the amount of renewable energy |
|
| | SB1529 | - 15 - | LRB101 08496 JRG 53573 b |
|
|
1 | | resources to procure is made based on the calculations set |
2 | | forth in this subparagraph (E) and the contracts procuring |
3 | | those amounts are executed, no subsequent rate impact |
4 | | determinations shall be made and no adjustments to those |
5 | | contract amounts shall be allowed. All costs incurred under |
6 | | such contracts shall be fully recoverable by the electric |
7 | | utility as provided in this Section. |
8 | | (F) If the limitation on the amount of renewable energy |
9 | | resources procured in subparagraph (E) of this paragraph |
10 | | (1) prevents the Agency from meeting all of the goals in |
11 | | this subsection (c), the Agency's long-term plan shall |
12 | | prioritize compliance with the requirements of this |
13 | | subsection (c) regarding renewable energy credits in the |
14 | | following order: |
15 | | (i) renewable energy credits under existing |
16 | | contractual obligations; |
17 | | (i-5) funding for the Illinois Solar for All |
18 | | Program, as described in subparagraph (O) of this |
19 | | paragraph (1); |
20 | | (ii) renewable energy credits necessary to comply |
21 | | with the new wind and new photovoltaic procurement |
22 | | requirements described in items (i) through (iii) of |
23 | | subparagraph (C) of this paragraph (1); and |
24 | | (iii) renewable energy credits necessary to meet |
25 | | the remaining requirements of this subsection (c). |
26 | | (G) The following provisions shall apply to the |
|
| | SB1529 | - 16 - | LRB101 08496 JRG 53573 b |
|
|
1 | | Agency's procurement of renewable energy credits under |
2 | | this subsection (c): |
3 | | (i) Notwithstanding whether a long-term renewable |
4 | | resources procurement plan has been approved, the |
5 | | Agency shall conduct an initial forward procurement |
6 | | for renewable energy credits from new utility-scale |
7 | | wind projects within 160 days after June 1, 2017 (the |
8 | | effective date of Public Act 99-906). For the purposes |
9 | | of this initial forward procurement, the Agency shall |
10 | | solicit 15-year contracts for delivery of 1,000,000 |
11 | | renewable energy credits delivered annually from new |
12 | | utility-scale wind projects to begin delivery on June |
13 | | 1, 2019, if available, but not later than June 1, 2021 , |
14 | | unless the project has delays in the establishment of |
15 | | an operating interconnection with the applicable |
16 | | transmission or distribution system as a result of the |
17 | | actions or inactions of the transmission or |
18 | | distribution provider, or other causes for force |
19 | | majeure as outlined in the procurement contract, in |
20 | | which case, not later than June 1, 2022 . Payments to |
21 | | suppliers of renewable energy credits shall commence |
22 | | upon delivery. Renewable energy credits procured under |
23 | | this initial procurement shall be included in the |
24 | | Agency's long-term plan and shall apply to all |
25 | | renewable energy goals in this subsection (c). |
26 | | (ii) Notwithstanding whether a long-term renewable |
|
| | SB1529 | - 17 - | LRB101 08496 JRG 53573 b |
|
|
1 | | resources procurement plan has been approved, the |
2 | | Agency shall conduct an initial forward procurement |
3 | | for renewable energy credits from new utility-scale |
4 | | solar projects and brownfield site photovoltaic |
5 | | projects within one year after June 1, 2017 (the |
6 | | effective date of Public Act 99-906). For the purposes |
7 | | of this initial forward procurement, the Agency shall |
8 | | solicit 15-year contracts for delivery of 1,000,000 |
9 | | renewable energy credits delivered annually from new |
10 | | utility-scale solar projects and brownfield site |
11 | | photovoltaic projects to begin delivery on June 1, |
12 | | 2019, if available, but not later than June 1, 2021 , |
13 | | unless the project has delays in the establishment of |
14 | | an operating interconnection with the applicable |
15 | | transmission or distribution system as a result of the |
16 | | actions or inactions of the transmission or |
17 | | distribution provider, or other causes for force |
18 | | majeure as outlined in the procurement contract, in |
19 | | which case, not later than June 1, 2022 . The Agency may |
20 | | structure this initial procurement in one or more |
21 | | discrete procurement events. Payments to suppliers of |
22 | | renewable energy credits shall commence upon delivery. |
23 | | Renewable energy credits procured under this initial |
24 | | procurement shall be included in the Agency's |
25 | | long-term plan and shall apply to all renewable energy |
26 | | goals in this subsection (c). |
|
| | SB1529 | - 18 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (iii) Subsequent forward procurements for |
2 | | utility-scale wind projects shall solicit at least |
3 | | 1,000,000 renewable energy credits delivered annually |
4 | | per procurement event and shall be planned, scheduled, |
5 | | and designed such that the cumulative amount of |
6 | | renewable energy credits delivered from all new wind |
7 | | projects in each delivery year shall not exceed the |
8 | | Agency's projection of the cumulative amount of |
9 | | renewable energy credits that will be delivered from |
10 | | all new photovoltaic projects, including utility-scale |
11 | | and distributed photovoltaic devices, in the same |
12 | | delivery year at the time scheduled for wind contract |
13 | | delivery. |
14 | | (iv) If, at any time after the time set for |
15 | | delivery of renewable energy credits pursuant to the |
16 | | initial procurements in items (i) and (ii) of this |
17 | | subparagraph (G), the cumulative amount of renewable |
18 | | energy credits projected to be delivered from all new |
19 | | wind projects in a given delivery year exceeds the |
20 | | cumulative amount of renewable energy credits |
21 | | projected to be delivered from all new photovoltaic |
22 | | projects in that delivery year by 200,000 or more |
23 | | renewable energy credits, then the Agency shall within |
24 | | 60 days adjust the procurement programs in the |
25 | | long-term renewable resources procurement plan to |
26 | | ensure that the projected cumulative amount of |
|
| | SB1529 | - 19 - | LRB101 08496 JRG 53573 b |
|
|
1 | | renewable energy credits to be delivered from all new |
2 | | wind projects does not exceed the projected cumulative |
3 | | amount of renewable energy credits to be delivered from |
4 | | all new photovoltaic projects by 200,000 or more |
5 | | renewable energy credits, provided that nothing in |
6 | | this Section shall preclude the projected cumulative |
7 | | amount of renewable energy credits to be delivered from |
8 | | all new photovoltaic projects from exceeding the |
9 | | projected cumulative amount of renewable energy |
10 | | credits to be delivered from all new wind projects in |
11 | | each delivery year and provided further that nothing in |
12 | | this item (iv) shall require the curtailment of an |
13 | | executed contract. The Agency shall update, on a |
14 | | quarterly basis, its projection of the renewable |
15 | | energy credits to be delivered from all projects in |
16 | | each delivery year. Notwithstanding anything to the |
17 | | contrary, the Agency may adjust the timing of |
18 | | procurement events conducted under this subparagraph |
19 | | (G). The long-term renewable resources procurement |
20 | | plan shall set forth the process by which the |
21 | | adjustments may be made. |
22 | | (v) All procurements under this subparagraph (G) |
23 | | shall comply with the geographic requirements in |
24 | | subparagraph (I) of this paragraph (1) and shall follow |
25 | | the procurement processes and procedures described in |
26 | | this Section and Section 16-111.5 of the Public |
|
| | SB1529 | - 20 - | LRB101 08496 JRG 53573 b |
|
|
1 | | Utilities Act to the extent practicable, and these |
2 | | processes and procedures may be expedited to |
3 | | accommodate the schedule established by this |
4 | | subparagraph (G). |
5 | | (H) The procurement of renewable energy resources for a |
6 | | given delivery year shall be reduced as described in this |
7 | | subparagraph (H) if an alternative retail electric |
8 | | supplier meets the requirements described in this |
9 | | subparagraph (H). |
10 | | (i) Within 45 days after June 1, 2017 (the |
11 | | effective date of Public Act 99-906), an alternative |
12 | | retail electric supplier or its successor shall submit |
13 | | an informational filing to the Illinois Commerce |
14 | | Commission certifying that, as of December 31, 2015, |
15 | | the alternative retail electric supplier owned one or |
16 | | more electric generating facilities that generates |
17 | | renewable energy resources as defined in Section 1-10 |
18 | | of this Act, provided that such facilities are not |
19 | | powered by wind or photovoltaics, and the facilities |
20 | | generate one renewable energy credit for each |
21 | | megawatthour of energy produced from the facility. |
22 | | The informational filing shall identify each |
23 | | facility that was eligible to satisfy the alternative |
24 | | retail electric supplier's obligations under Section |
25 | | 16-115D of the Public Utilities Act as described in |
26 | | this item (i). |
|
| | SB1529 | - 21 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (ii) For a given delivery year, the alternative |
2 | | retail electric supplier may elect to supply its retail |
3 | | customers with renewable energy credits from the |
4 | | facility or facilities described in item (i) of this |
5 | | subparagraph (H) that continue to be owned by the |
6 | | alternative retail electric supplier. |
7 | | (iii) The alternative retail electric supplier |
8 | | shall notify the Agency and the applicable utility, no |
9 | | later than February 28 of the year preceding the |
10 | | applicable delivery year or 15 days after June 1, 2017 |
11 | | (the effective date of Public Act 99-906), whichever is |
12 | | later, of its election under item (ii) of this |
13 | | subparagraph (H) to supply renewable energy credits to |
14 | | retail customers of the utility. Such election shall |
15 | | identify the amount of renewable energy credits to be |
16 | | supplied by the alternative retail electric supplier |
17 | | to the utility's retail customers and the source of the |
18 | | renewable energy credits identified in the |
19 | | informational filing as described in item (i) of this |
20 | | subparagraph (H), subject to the following |
21 | | limitations: |
22 | | For the delivery year beginning June 1, 2018, |
23 | | the maximum amount of renewable energy credits to |
24 | | be supplied by an alternative retail electric |
25 | | supplier under this subparagraph (H) shall be 68% |
26 | | multiplied by 25% multiplied by 14.5% multiplied |
|
| | SB1529 | - 22 - | LRB101 08496 JRG 53573 b |
|
|
1 | | by the amount of metered electricity |
2 | | (megawatt-hours) delivered by the alternative |
3 | | retail electric supplier to Illinois retail |
4 | | customers during the delivery year ending May 31, |
5 | | 2016. |
6 | | For delivery years beginning June 1, 2019 and |
7 | | each year thereafter, the maximum amount of |
8 | | renewable energy credits to be supplied by an |
9 | | alternative retail electric supplier under this |
10 | | subparagraph (H) shall be 68% multiplied by 50% |
11 | | multiplied by 16% multiplied by the amount of |
12 | | metered electricity (megawatt-hours) delivered by |
13 | | the alternative retail electric supplier to |
14 | | Illinois retail customers during the delivery year |
15 | | ending May 31, 2016, provided that the 16% value |
16 | | shall increase by 1.5% each delivery year |
17 | | thereafter to 25% by the delivery year beginning |
18 | | June 1, 2025, and thereafter the 25% value shall |
19 | | apply to each delivery year. |
20 | | For each delivery year, the total amount of |
21 | | renewable energy credits supplied by all alternative |
22 | | retail electric suppliers under this subparagraph (H) |
23 | | shall not exceed 9% of the Illinois target renewable |
24 | | energy credit quantity. The Illinois target renewable |
25 | | energy credit quantity for the delivery year beginning |
26 | | June 1, 2018 is 14.5% multiplied by the total amount of |
|
| | SB1529 | - 23 - | LRB101 08496 JRG 53573 b |
|
|
1 | | metered electricity (megawatt-hours) delivered in the |
2 | | delivery year immediately preceding that delivery |
3 | | year, provided that the 14.5% shall increase by 1.5% |
4 | | each delivery year thereafter to 25% by the delivery |
5 | | year beginning June 1, 2025, and thereafter the 25% |
6 | | value shall apply to each delivery year. |
7 | | If the requirements set forth in items (i) through |
8 | | (iii) of this subparagraph (H) are met, the charges |
9 | | that would otherwise be applicable to the retail |
10 | | customers of the alternative retail electric supplier |
11 | | under paragraph (6) of this subsection (c) for the |
12 | | applicable delivery year shall be reduced by the ratio |
13 | | of the quantity of renewable energy credits supplied by |
14 | | the alternative retail electric supplier compared to |
15 | | that supplier's target renewable energy credit |
16 | | quantity. The supplier's target renewable energy |
17 | | credit quantity for the delivery year beginning June 1, |
18 | | 2018 is 14.5% multiplied by the total amount of metered |
19 | | electricity (megawatt-hours) delivered by the |
20 | | alternative retail supplier in that delivery year, |
21 | | provided that the 14.5% shall increase by 1.5% each |
22 | | delivery year thereafter to 25% by the delivery year |
23 | | beginning June 1, 2025, and thereafter the 25% value |
24 | | shall apply to each delivery year. |
25 | | On or before April 1 of each year, the Agency shall |
26 | | annually publish a report on its website that |
|
| | SB1529 | - 24 - | LRB101 08496 JRG 53573 b |
|
|
1 | | identifies the aggregate amount of renewable energy |
2 | | credits supplied by alternative retail electric |
3 | | suppliers under this subparagraph (H). |
4 | | (I) The Agency shall design its long-term renewable |
5 | | energy procurement plan to maximize the State's interest in |
6 | | the health, safety, and welfare of its residents, including |
7 | | but not limited to minimizing sulfur dioxide, nitrogen |
8 | | oxide, particulate matter and other pollution that |
9 | | adversely affects public health in this State, increasing |
10 | | fuel and resource diversity in this State, enhancing the |
11 | | reliability and resiliency of the electricity distribution |
12 | | system in this State, meeting goals to limit carbon dioxide |
13 | | emissions under federal or State law, and contributing to a |
14 | | cleaner and healthier environment for the citizens of this |
15 | | State. In order to further these legislative purposes, |
16 | | renewable energy credits shall be eligible to be counted |
17 | | toward the renewable energy requirements of this |
18 | | subsection (c) if they are generated from facilities |
19 | | located in this State. The Agency may qualify renewable |
20 | | energy credits from facilities located in states adjacent |
21 | | to Illinois if the generator demonstrates and the Agency |
22 | | determines that the operation of such facility or |
23 | | facilities will help promote the State's interest in the |
24 | | health, safety, and welfare of its residents based on the |
25 | | public interest criteria described above. To ensure that |
26 | | the public interest criteria are applied to the procurement |
|
| | SB1529 | - 25 - | LRB101 08496 JRG 53573 b |
|
|
1 | | and given full effect, the Agency's long-term procurement |
2 | | plan shall describe in detail how each public interest |
3 | | factor shall be considered and weighted for facilities |
4 | | located in states adjacent to Illinois. |
5 | | (J) In order to promote the competitive development of |
6 | | renewable energy resources in furtherance of the State's |
7 | | interest in the health, safety, and welfare of its |
8 | | residents, renewable energy credits shall not be eligible |
9 | | to be counted toward the renewable energy requirements of |
10 | | this subsection (c) if they are sourced from a generating |
11 | | unit whose costs were being recovered through rates |
12 | | regulated by this State or any other state or states on or |
13 | | after January 1, 2017. Each contract executed to purchase |
14 | | renewable energy credits under this subsection (c) shall |
15 | | provide for the contract's termination if the costs of the |
16 | | generating unit supplying the renewable energy credits |
17 | | subsequently begin to be recovered through rates regulated |
18 | | by this State or any other state or states; and each |
19 | | contract shall further provide that, in that event, the |
20 | | supplier of the credits must return 110% of all payments |
21 | | received under the contract. Amounts returned under the |
22 | | requirements of this subparagraph (J) shall be retained by |
23 | | the utility and all of these amounts shall be used for the |
24 | | procurement of additional renewable energy credits from |
25 | | new wind or new photovoltaic resources as defined in this |
26 | | subsection (c). The long-term plan shall provide that these |
|
| | SB1529 | - 26 - | LRB101 08496 JRG 53573 b |
|
|
1 | | renewable energy credits shall be procured in the next |
2 | | procurement event. |
3 | | Notwithstanding the limitations of this subparagraph |
4 | | (J), renewable energy credits sourced from generating |
5 | | units that are constructed, purchased, owned, or leased by |
6 | | an electric utility as part of an approved project, |
7 | | program, or pilot under Section 1-56 of this Act shall be |
8 | | eligible to be counted toward the renewable energy |
9 | | requirements of this subsection (c), regardless of how the |
10 | | costs of these units are recovered. |
11 | | (K) The long-term renewable resources procurement plan |
12 | | developed by the Agency in accordance with subparagraph (A) |
13 | | of this paragraph (1) shall include an Adjustable Block |
14 | | program for the procurement of renewable energy credits |
15 | | from new photovoltaic projects that are distributed |
16 | | renewable energy generation devices or new photovoltaic |
17 | | community renewable generation projects. The Adjustable |
18 | | Block program shall be designed to provide a transparent |
19 | | schedule of prices and quantities to enable the |
20 | | photovoltaic market to scale up and for renewable energy |
21 | | credit prices to adjust at a predictable rate over time. |
22 | | The prices set by the Adjustable Block program can be |
23 | | reflected as a set value or as the product of a formula. |
24 | | The Adjustable Block program shall include for each |
25 | | category of eligible projects: a schedule of standard block |
26 | | purchase prices to be offered; a series of steps, with |
|
| | SB1529 | - 27 - | LRB101 08496 JRG 53573 b |
|
|
1 | | associated nameplate capacity and purchase prices that |
2 | | adjust from step to step; and automatic opening of the next |
3 | | step as soon as the nameplate capacity and available |
4 | | purchase prices for an open step are fully committed or |
5 | | reserved. Only projects energized on or after June 1, 2017 |
6 | | shall be eligible for the Adjustable Block program. For |
7 | | each block group the Agency shall determine the number of |
8 | | blocks, the amount of generation capacity in each block, |
9 | | and the purchase price for each block, provided that the |
10 | | purchase price provided and the total amount of generation |
11 | | in all blocks for all block groups shall be sufficient to |
12 | | meet the goals in this subsection (c). The Agency may |
13 | | periodically review its prior decisions establishing the |
14 | | number of blocks, the amount of generation capacity in each |
15 | | block, and the purchase price for each block, and may |
16 | | propose, on an expedited basis, changes to these previously |
17 | | set values, including but not limited to redistributing |
18 | | these amounts and the available funds as necessary and |
19 | | appropriate, subject to Commission approval as part of the |
20 | | periodic plan revision process described in Section |
21 | | 16-111.5 of the Public Utilities Act. The Agency may define |
22 | | different block sizes, purchase prices, or other distinct |
23 | | terms and conditions for projects located in different |
24 | | utility service territories if the Agency deems it |
25 | | necessary to meet the goals in this subsection (c). |
26 | | The Adjustable Block program shall include at least the |
|
| | SB1529 | - 28 - | LRB101 08496 JRG 53573 b |
|
|
1 | | following block groups in at least the following amounts, |
2 | | which may be adjusted upon review by the Agency and |
3 | | approval by the Commission as described in this |
4 | | subparagraph (K): |
5 | | (i) At least 25% from distributed renewable energy |
6 | | generation devices with a nameplate capacity of no more |
7 | | than 10 kilowatts. |
8 | | (ii) At least 25% from distributed renewable |
9 | | energy generation devices with a nameplate capacity of |
10 | | more than 10 kilowatts and no more than 2,000 |
11 | | kilowatts. The Agency may create sub-categories within |
12 | | this category to account for the differences between |
13 | | projects for small commercial customers, large |
14 | | commercial customers, and public or non-profit |
15 | | customers. |
16 | | (iii) At least 25% from photovoltaic community |
17 | | renewable generation projects. |
18 | | (iv) The remaining 25% shall be allocated as |
19 | | specified by the Agency in the long-term renewable |
20 | | resources procurement plan. |
21 | | The Adjustable Block program shall be designed to |
22 | | ensure that renewable energy credits are procured from |
23 | | photovoltaic distributed renewable energy generation |
24 | | devices and new photovoltaic community renewable energy |
25 | | generation projects in diverse locations and are not |
26 | | concentrated in a few geographic areas. |
|
| | SB1529 | - 29 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (L) The procurement of photovoltaic renewable energy |
2 | | credits under items (i) through (iv) of subparagraph (K) of |
3 | | this paragraph (1) shall be subject to the following |
4 | | contract and payment terms: |
5 | | (i) The Agency shall procure contracts of at least |
6 | | 15 years in length. |
7 | | (ii) For those renewable energy credits that |
8 | | qualify and are procured under item (i) of subparagraph |
9 | | (K) of this paragraph (1), the renewable energy credit |
10 | | purchase price shall be paid in full by the contracting |
11 | | utilities at the time that the facility producing the |
12 | | renewable energy credits is interconnected at the |
13 | | distribution system level of the utility and |
14 | | energized. The electric utility shall receive and |
15 | | retire all renewable energy credits generated by the |
16 | | project for the first 15 years of operation. |
17 | | (iii) For those renewable energy credits that |
18 | | qualify and are procured under item (ii) and (iii) of |
19 | | subparagraph (K) of this paragraph (1) and any |
20 | | additional categories of distributed generation |
21 | | included in the long-term renewable resources |
22 | | procurement plan and approved by the Commission, 20 |
23 | | percent of the renewable energy credit purchase price |
24 | | shall be paid by the contracting utilities at the time |
25 | | that the facility producing the renewable energy |
26 | | credits is interconnected at the distribution system |
|
| | SB1529 | - 30 - | LRB101 08496 JRG 53573 b |
|
|
1 | | level of the utility and energized. The remaining |
2 | | portion shall be paid ratably over the subsequent |
3 | | 4-year period. The electric utility shall receive and |
4 | | retire all renewable energy credits generated by the |
5 | | project for the first 15 years of operation. |
6 | | (iv) Each contract shall include provisions to |
7 | | ensure the delivery of the renewable energy credits for |
8 | | the full term of the contract. |
9 | | (v) The utility shall be the counterparty to the |
10 | | contracts executed under this subparagraph (L) that |
11 | | are approved by the Commission under the process |
12 | | described in Section 16-111.5 of the Public Utilities |
13 | | Act. No contract shall be executed for an amount that |
14 | | is less than one renewable energy credit per year. |
15 | | (vi) If, at any time, approved applications for the |
16 | | Adjustable Block program exceed funds collected by the |
17 | | electric utility or would cause the Agency to exceed |
18 | | the limitation described in subparagraph (E) of this |
19 | | paragraph (1) on the amount of renewable energy |
20 | | resources that may be procured, then the Agency shall |
21 | | consider future uncommitted funds to be reserved for |
22 | | these contracts on a first-come, first-served basis, |
23 | | with the delivery of renewable energy credits required |
24 | | beginning at the time that the reserved funds become |
25 | | available. |
26 | | (vii) Nothing in this Section shall require the |
|
| | SB1529 | - 31 - | LRB101 08496 JRG 53573 b |
|
|
1 | | utility to advance any payment or pay any amounts that |
2 | | exceed the actual amount of revenues collected by the |
3 | | utility under paragraph (6) of this subsection (c) and |
4 | | subsection (k) of Section 16-108 of the Public |
5 | | Utilities Act, and contracts executed under this |
6 | | Section shall expressly incorporate this limitation. |
7 | | (M) The Agency shall be authorized to retain one or |
8 | | more experts or expert consulting firms to develop, |
9 | | administer, implement, operate, and evaluate the |
10 | | Adjustable Block program described in subparagraph (K) of |
11 | | this paragraph (1), and the Agency shall retain the |
12 | | consultant or consultants in the same manner, to the extent |
13 | | practicable, as the Agency retains others to administer |
14 | | provisions of this Act, including, but not limited to, the |
15 | | procurement administrator. The selection of experts and |
16 | | expert consulting firms and the procurement process |
17 | | described in this subparagraph (M) are exempt from the |
18 | | requirements of Section 20-10 of the Illinois Procurement |
19 | | Code, under Section 20-10 of that Code. The Agency shall |
20 | | strive to minimize administrative expenses in the |
21 | | implementation of the Adjustable Block program. |
22 | | The Agency and its consultant or consultants shall |
23 | | monitor block activity, share program activity with |
24 | | stakeholders and conduct regularly scheduled meetings to |
25 | | discuss program activity and market conditions. If |
26 | | necessary, the Agency may make prospective administrative |
|
| | SB1529 | - 32 - | LRB101 08496 JRG 53573 b |
|
|
1 | | adjustments to the Adjustable Block program design, such as |
2 | | redistributing available funds or making adjustments to |
3 | | purchase prices as necessary to achieve the goals of this |
4 | | subsection (c). Program modifications to any price, |
5 | | capacity block, or other program element that do not |
6 | | deviate from the Commission's approved value by more than |
7 | | 25% shall take effect immediately and are not subject to |
8 | | Commission review and approval. Program modifications to |
9 | | any price, capacity block, or other program element that |
10 | | deviate more than 25% from the Commission's approved value |
11 | | must be approved by the Commission as a long-term plan |
12 | | amendment under Section 16-111.5 of the Public Utilities |
13 | | Act. The Agency shall consider stakeholder feedback when |
14 | | making adjustments to the Adjustable Block design and shall |
15 | | notify stakeholders in advance of any planned changes. |
16 | | (N) The long-term renewable resources procurement plan |
17 | | required by this subsection (c) shall include a community |
18 | | renewable generation program. The Agency shall establish |
19 | | the terms, conditions, and program requirements for |
20 | | community renewable generation projects with a goal to |
21 | | expand renewable energy generating facility access to a |
22 | | broader group of energy consumers, to ensure robust |
23 | | participation opportunities for residential and small |
24 | | commercial customers and those who cannot install |
25 | | renewable energy on their own properties. Any plan approved |
26 | | by the Commission shall allow subscriptions to community |
|
| | SB1529 | - 33 - | LRB101 08496 JRG 53573 b |
|
|
1 | | renewable generation projects to be portable and |
2 | | transferable. For purposes of this subparagraph (N), |
3 | | "portable" means that subscriptions may be retained by the |
4 | | subscriber even if the subscriber relocates or changes its |
5 | | address within the same utility service territory; and |
6 | | "transferable" means that a subscriber may assign or sell |
7 | | subscriptions to another person within the same utility |
8 | | service territory. |
9 | | Electric utilities shall provide a monetary credit to a |
10 | | subscriber's subsequent bill for service for the |
11 | | proportional output of a community renewable generation |
12 | | project attributable to that subscriber as specified in |
13 | | Section 16-107.5 of the Public Utilities Act. |
14 | | The Agency shall purchase renewable energy credits |
15 | | from subscribed shares of photovoltaic community renewable |
16 | | generation projects through the Adjustable Block program |
17 | | described in subparagraph (K) of this paragraph (1) or |
18 | | through the Illinois Solar for All Program described in |
19 | | Section 1-56 of this Act. The electric utility shall |
20 | | purchase any unsubscribed energy from community renewable |
21 | | generation projects that are Qualifying Facilities ("QF") |
22 | | under the electric utility's tariff for purchasing the |
23 | | output from QFs under Public Utilities Regulatory Policies |
24 | | Act of 1978. |
25 | | The owners of and any subscribers to a community |
26 | | renewable generation project shall not be considered |
|
| | SB1529 | - 34 - | LRB101 08496 JRG 53573 b |
|
|
1 | | public utilities or alternative retail electricity |
2 | | suppliers under the Public Utilities Act solely as a result |
3 | | of their interest in or subscription to a community |
4 | | renewable generation project and shall not be required to |
5 | | become an alternative retail electric supplier by |
6 | | participating in a community renewable generation project |
7 | | with a public utility. |
8 | | (O) For the delivery year beginning June 1, 2018, the |
9 | | long-term renewable resources procurement plan required by |
10 | | this subsection (c) shall provide for the Agency to procure |
11 | | contracts to continue offering the Illinois Solar for All |
12 | | Program described in subsection (b) of Section 1-56 of this |
13 | | Act, and the contracts approved by the Commission shall be |
14 | | executed by the utilities that are subject to this |
15 | | subsection (c). The long-term renewable resources |
16 | | procurement plan shall allocate 5% of the funds available |
17 | | under the plan for the applicable delivery year, or |
18 | | $10,000,000 per delivery year, whichever is greater, to |
19 | | fund the programs, and the plan shall determine the amount |
20 | | of funding to be apportioned to the programs identified in |
21 | | subsection (b) of Section 1-56 of this Act; provided that |
22 | | for the delivery years beginning June 1, 2017, June 1, |
23 | | 2021, and June 1, 2025, the long-term renewable resources |
24 | | procurement plan shall allocate 10% of the funds available |
25 | | under the plan for the applicable delivery year, or |
26 | | $20,000,000 per delivery year, whichever is greater, and |
|
| | SB1529 | - 35 - | LRB101 08496 JRG 53573 b |
|
|
1 | | $10,000,000 of such funds in such year shall be used by an |
2 | | electric utility that serves more than 3,000,000 retail |
3 | | customers in the State to implement a Commission-approved |
4 | | plan under Section 16-108.12 of the Public Utilities Act. |
5 | | In making the determinations required under this |
6 | | subparagraph (O), the Commission shall consider the |
7 | | experience and performance under the programs and any |
8 | | evaluation reports. The Commission shall also provide for |
9 | | an independent evaluation of those programs on a periodic |
10 | | basis that are funded under this subparagraph (O). |
11 | | (2) (Blank). |
12 | | (3) (Blank). |
13 | | (4) The electric utility shall retire all renewable |
14 | | energy credits used to comply with the standard. |
15 | | (5) Beginning with the 2010 delivery year and ending |
16 | | June 1, 2017, an electric utility subject to this |
17 | | subsection (c) shall apply the lesser of the maximum |
18 | | alternative compliance payment rate or the most recent |
19 | | estimated alternative compliance payment rate for its |
20 | | service territory for the corresponding compliance period, |
21 | | established pursuant to subsection (d) of Section 16-115D |
22 | | of the Public Utilities Act to its retail customers that |
23 | | take service pursuant to the electric utility's hourly |
24 | | pricing tariff or tariffs. The electric utility shall |
25 | | retain all amounts collected as a result of the application |
26 | | of the alternative compliance payment rate or rates to such |
|
| | SB1529 | - 36 - | LRB101 08496 JRG 53573 b |
|
|
1 | | customers, and, beginning in 2011, the utility shall |
2 | | include in the information provided under item (1) of |
3 | | subsection (d) of Section 16-111.5 of the Public Utilities |
4 | | Act the amounts collected under the alternative compliance |
5 | | payment rate or rates for the prior year ending May 31. |
6 | | Notwithstanding any limitation on the procurement of |
7 | | renewable energy resources imposed by item (2) of this |
8 | | subsection (c), the Agency shall increase its spending on |
9 | | the purchase of renewable energy resources to be procured |
10 | | by the electric utility for the next plan year by an amount |
11 | | equal to the amounts collected by the utility under the |
12 | | alternative compliance payment rate or rates in the prior |
13 | | year ending May 31. |
14 | | (6) The electric utility shall be entitled to recover |
15 | | all of its costs associated with the procurement of |
16 | | renewable energy credits under plans approved under this |
17 | | Section and Section 16-111.5 of the Public Utilities Act. |
18 | | These costs shall include associated reasonable expenses |
19 | | for implementing the procurement programs, including, but |
20 | | not limited to, the costs of administering and evaluating |
21 | | the Adjustable Block program, through an automatic |
22 | | adjustment clause tariff in accordance with subsection (k) |
23 | | of Section 16-108 of the Public Utilities Act. |
24 | | (7) Renewable energy credits procured from new |
25 | | photovoltaic projects or new distributed renewable energy |
26 | | generation devices under this Section after June 1, 2017 |
|
| | SB1529 | - 37 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (the effective date of Public Act 99-906) must be procured |
2 | | from devices installed by a qualified person in compliance |
3 | | with the requirements of Section 16-128A of the Public |
4 | | Utilities Act and any rules or regulations adopted |
5 | | thereunder. |
6 | | In meeting the renewable energy requirements of this |
7 | | subsection (c), to the extent feasible and consistent with |
8 | | State and federal law, the renewable energy credit |
9 | | procurements, Adjustable Block solar program, and |
10 | | community renewable generation program shall provide |
11 | | employment opportunities for all segments of the |
12 | | population and workforce, including minority-owned and |
13 | | female-owned business enterprises, and shall not, |
14 | | consistent with State and federal law, discriminate based |
15 | | on race or socioeconomic status. |
16 | | (d) Clean coal portfolio standard. |
17 | | (1) The procurement plans shall include electricity |
18 | | generated using clean coal. Each utility shall enter into |
19 | | one or more sourcing agreements with the initial clean coal |
20 | | facility, as provided in paragraph (3) of this subsection |
21 | | (d), covering electricity generated by the initial clean |
22 | | coal facility representing at least 5% of each utility's |
23 | | total supply to serve the load of eligible retail customers |
24 | | in 2015 and each year thereafter, as described in paragraph |
25 | | (3) of this subsection (d), subject to the limits specified |
26 | | in paragraph (2) of this subsection (d). It is the goal of |
|
| | SB1529 | - 38 - | LRB101 08496 JRG 53573 b |
|
|
1 | | the State that by January 1, 2025, 25% of the electricity |
2 | | used in the State shall be generated by cost-effective |
3 | | clean coal facilities. For purposes of this subsection (d), |
4 | | "cost-effective" means that the expenditures pursuant to |
5 | | such sourcing agreements do not cause the limit stated in |
6 | | paragraph (2) of this subsection (d) to be exceeded and do |
7 | | not exceed cost-based benchmarks, which shall be developed |
8 | | to assess all expenditures pursuant to such sourcing |
9 | | agreements covering electricity generated by clean coal |
10 | | facilities, other than the initial clean coal facility, by |
11 | | the procurement administrator, in consultation with the |
12 | | Commission staff, Agency staff, and the procurement |
13 | | monitor and shall be subject to Commission review and |
14 | | approval. |
15 | | A utility party to a sourcing agreement shall |
16 | | immediately retire any emission credits that it receives in |
17 | | connection with the electricity covered by such agreement. |
18 | | Utilities shall maintain adequate records documenting |
19 | | the purchases under the sourcing agreement to comply with |
20 | | this subsection (d) and shall file an accounting with the |
21 | | load forecast that must be filed with the Agency by July 15 |
22 | | of each year, in accordance with subsection (d) of Section |
23 | | 16-111.5 of the Public Utilities Act. |
24 | | A utility shall be deemed to have complied with the |
25 | | clean coal portfolio standard specified in this subsection |
26 | | (d) if the utility enters into a sourcing agreement as |
|
| | SB1529 | - 39 - | LRB101 08496 JRG 53573 b |
|
|
1 | | required by this subsection (d). |
2 | | (2) For purposes of this subsection (d), the required |
3 | | execution of sourcing agreements with the initial clean |
4 | | coal facility for a particular year shall be measured as a |
5 | | percentage of the actual amount of electricity |
6 | | (megawatt-hours) supplied by the electric utility to |
7 | | eligible retail customers in the planning year ending |
8 | | immediately prior to the agreement's execution. For |
9 | | purposes of this subsection (d), the amount paid per |
10 | | kilowatthour means the total amount paid for electric |
11 | | service expressed on a per kilowatthour basis. For purposes |
12 | | of this subsection (d), the total amount paid for electric |
13 | | service includes without limitation amounts paid for |
14 | | supply, transmission, distribution, surcharges and add-on |
15 | | taxes. |
16 | | Notwithstanding the requirements of this subsection |
17 | | (d), the total amount paid under sourcing agreements with |
18 | | clean coal facilities pursuant to the procurement plan for |
19 | | any given year shall be reduced by an amount necessary to |
20 | | limit the annual estimated average net increase due to the |
21 | | costs of these resources included in the amounts paid by |
22 | | eligible retail customers in connection with electric |
23 | | service to: |
24 | | (A) in 2010, no more than 0.5% of the amount paid |
25 | | per kilowatthour by those customers during the year |
26 | | ending May 31, 2009; |
|
| | SB1529 | - 40 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (B) in 2011, the greater of an additional 0.5% of |
2 | | the amount paid per kilowatthour by those customers |
3 | | during the year ending May 31, 2010 or 1% of the amount |
4 | | paid per kilowatthour by those customers during the |
5 | | year ending May 31, 2009; |
6 | | (C) in 2012, the greater of an additional 0.5% of |
7 | | the amount paid per kilowatthour by those customers |
8 | | during the year ending May 31, 2011 or 1.5% of the |
9 | | amount paid per kilowatthour by those customers during |
10 | | the year ending May 31, 2009; |
11 | | (D) in 2013, the greater of an additional 0.5% of |
12 | | the amount paid per kilowatthour by those customers |
13 | | during the year ending May 31, 2012 or 2% of the amount |
14 | | paid per kilowatthour by those customers during the |
15 | | year ending May 31, 2009; and |
16 | | (E) thereafter, the total amount paid under |
17 | | sourcing agreements with clean coal facilities |
18 | | pursuant to the procurement plan for any single year |
19 | | shall be reduced by an amount necessary to limit the |
20 | | estimated average net increase due to the cost of these |
21 | | resources included in the amounts paid by eligible |
22 | | retail customers in connection with electric service |
23 | | to no more than the greater of (i) 2.015% of the amount |
24 | | paid per kilowatthour by those customers during the |
25 | | year ending May 31, 2009 or (ii) the incremental amount |
26 | | per kilowatthour paid for these resources in 2013. |
|
| | SB1529 | - 41 - | LRB101 08496 JRG 53573 b |
|
|
1 | | These requirements may be altered only as provided by |
2 | | statute. |
3 | | No later than June 30, 2015, the Commission shall |
4 | | review the limitation on the total amount paid under |
5 | | sourcing agreements, if any, with clean coal facilities |
6 | | pursuant to this subsection (d) and report to the General |
7 | | Assembly its findings as to whether that limitation unduly |
8 | | constrains the amount of electricity generated by |
9 | | cost-effective clean coal facilities that is covered by |
10 | | sourcing agreements. |
11 | | (3) Initial clean coal facility. In order to promote |
12 | | development of clean coal facilities in Illinois, each |
13 | | electric utility subject to this Section shall execute a |
14 | | sourcing agreement to source electricity from a proposed |
15 | | clean coal facility in Illinois (the "initial clean coal |
16 | | facility") that will have a nameplate capacity of at least |
17 | | 500 MW when commercial operation commences, that has a |
18 | | final Clean Air Act permit on June 1, 2009 (the effective |
19 | | date of Public Act 95-1027), and that will meet the |
20 | | definition of clean coal facility in Section 1-10 of this |
21 | | Act when commercial operation commences. The sourcing |
22 | | agreements with this initial clean coal facility shall be |
23 | | subject to both approval of the initial clean coal facility |
24 | | by the General Assembly and satisfaction of the |
25 | | requirements of paragraph (4) of this subsection (d) and |
26 | | shall be executed within 90 days after any such approval by |
|
| | SB1529 | - 42 - | LRB101 08496 JRG 53573 b |
|
|
1 | | the General Assembly. The Agency and the Commission shall |
2 | | have authority to inspect all books and records associated |
3 | | with the initial clean coal facility during the term of |
4 | | such a sourcing agreement. A utility's sourcing agreement |
5 | | for electricity produced by the initial clean coal facility |
6 | | shall include: |
7 | | (A) a formula contractual price (the "contract |
8 | | price") approved pursuant to paragraph (4) of this |
9 | | subsection (d), which shall: |
10 | | (i) be determined using a cost of service |
11 | | methodology employing either a level or deferred |
12 | | capital recovery component, based on a capital |
13 | | structure consisting of 45% equity and 55% debt, |
14 | | and a return on equity as may be approved by the |
15 | | Federal Energy Regulatory Commission, which in any |
16 | | case may not exceed the lower of 11.5% or the rate |
17 | | of return approved by the General Assembly |
18 | | pursuant to paragraph (4) of this subsection (d); |
19 | | and |
20 | | (ii) provide that all miscellaneous net |
21 | | revenue, including but not limited to net revenue |
22 | | from the sale of emission allowances, if any, |
23 | | substitute natural gas, if any, grants or other |
24 | | support provided by the State of Illinois or the |
25 | | United States Government, firm transmission |
26 | | rights, if any, by-products produced by the |
|
| | SB1529 | - 43 - | LRB101 08496 JRG 53573 b |
|
|
1 | | facility, energy or capacity derived from the |
2 | | facility and not covered by a sourcing agreement |
3 | | pursuant to paragraph (3) of this subsection (d) or |
4 | | item (5) of subsection (d) of Section 16-115 of the |
5 | | Public Utilities Act, whether generated from the |
6 | | synthesis gas derived from coal, from SNG, or from |
7 | | natural gas, shall be credited against the revenue |
8 | | requirement for this initial clean coal facility; |
9 | | (B) power purchase provisions, which shall: |
10 | | (i) provide that the utility party to such |
11 | | sourcing agreement shall pay the contract price |
12 | | for electricity delivered under such sourcing |
13 | | agreement; |
14 | | (ii) require delivery of electricity to the |
15 | | regional transmission organization market of the |
16 | | utility that is party to such sourcing agreement; |
17 | | (iii) require the utility party to such |
18 | | sourcing agreement to buy from the initial clean |
19 | | coal facility in each hour an amount of energy |
20 | | equal to all clean coal energy made available from |
21 | | the initial clean coal facility during such hour |
22 | | times a fraction, the numerator of which is such |
23 | | utility's retail market sales of electricity |
24 | | (expressed in kilowatthours sold) in the State |
25 | | during the prior calendar month and the |
26 | | denominator of which is the total retail market |
|
| | SB1529 | - 44 - | LRB101 08496 JRG 53573 b |
|
|
1 | | sales of electricity (expressed in kilowatthours |
2 | | sold) in the State by utilities during such prior |
3 | | month and the sales of electricity (expressed in |
4 | | kilowatthours sold) in the State by alternative |
5 | | retail electric suppliers during such prior month |
6 | | that are subject to the requirements of this |
7 | | subsection (d) and paragraph (5) of subsection (d) |
8 | | of Section 16-115 of the Public Utilities Act, |
9 | | provided that the amount purchased by the utility |
10 | | in any year will be limited by paragraph (2) of |
11 | | this subsection (d); and |
12 | | (iv) be considered pre-existing contracts in |
13 | | such utility's procurement plans for eligible |
14 | | retail customers; |
15 | | (C) contract for differences provisions, which |
16 | | shall: |
17 | | (i) require the utility party to such sourcing |
18 | | agreement to contract with the initial clean coal |
19 | | facility in each hour with respect to an amount of |
20 | | energy equal to all clean coal energy made |
21 | | available from the initial clean coal facility |
22 | | during such hour times a fraction, the numerator of |
23 | | which is such utility's retail market sales of |
24 | | electricity (expressed in kilowatthours sold) in |
25 | | the utility's service territory in the State |
26 | | during the prior calendar month and the |
|
| | SB1529 | - 45 - | LRB101 08496 JRG 53573 b |
|
|
1 | | denominator of which is the total retail market |
2 | | sales of electricity (expressed in kilowatthours |
3 | | sold) in the State by utilities during such prior |
4 | | month and the sales of electricity (expressed in |
5 | | kilowatthours sold) in the State by alternative |
6 | | retail electric suppliers during such prior month |
7 | | that are subject to the requirements of this |
8 | | subsection (d) and paragraph (5) of subsection (d) |
9 | | of Section 16-115 of the Public Utilities Act, |
10 | | provided that the amount paid by the utility in any |
11 | | year will be limited by paragraph (2) of this |
12 | | subsection (d); |
13 | | (ii) provide that the utility's payment |
14 | | obligation in respect of the quantity of |
15 | | electricity determined pursuant to the preceding |
16 | | clause (i) shall be limited to an amount equal to |
17 | | (1) the difference between the contract price |
18 | | determined pursuant to subparagraph (A) of |
19 | | paragraph (3) of this subsection (d) and the |
20 | | day-ahead price for electricity delivered to the |
21 | | regional transmission organization market of the |
22 | | utility that is party to such sourcing agreement |
23 | | (or any successor delivery point at which such |
24 | | utility's supply obligations are financially |
25 | | settled on an hourly basis) (the "reference |
26 | | price") on the day preceding the day on which the |
|
| | SB1529 | - 46 - | LRB101 08496 JRG 53573 b |
|
|
1 | | electricity is delivered to the initial clean coal |
2 | | facility busbar, multiplied by (2) the quantity of |
3 | | electricity determined pursuant to the preceding |
4 | | clause (i); and |
5 | | (iii) not require the utility to take physical |
6 | | delivery of the electricity produced by the |
7 | | facility; |
8 | | (D) general provisions, which shall: |
9 | | (i) specify a term of no more than 30 years, |
10 | | commencing on the commercial operation date of the |
11 | | facility; |
12 | | (ii) provide that utilities shall maintain |
13 | | adequate records documenting purchases under the |
14 | | sourcing agreements entered into to comply with |
15 | | this subsection (d) and shall file an accounting |
16 | | with the load forecast that must be filed with the |
17 | | Agency by July 15 of each year, in accordance with |
18 | | subsection (d) of Section 16-111.5 of the Public |
19 | | Utilities Act; |
20 | | (iii) provide that all costs associated with |
21 | | the initial clean coal facility will be |
22 | | periodically reported to the Federal Energy |
23 | | Regulatory Commission and to purchasers in |
24 | | accordance with applicable laws governing |
25 | | cost-based wholesale power contracts; |
26 | | (iv) permit the Illinois Power Agency to |
|
| | SB1529 | - 47 - | LRB101 08496 JRG 53573 b |
|
|
1 | | assume ownership of the initial clean coal |
2 | | facility, without monetary consideration and |
3 | | otherwise on reasonable terms acceptable to the |
4 | | Agency, if the Agency so requests no less than 3 |
5 | | years prior to the end of the stated contract term; |
6 | | (v) require the owner of the initial clean coal |
7 | | facility to provide documentation to the |
8 | | Commission each year, starting in the facility's |
9 | | first year of commercial operation, accurately |
10 | | reporting the quantity of carbon emissions from |
11 | | the facility that have been captured and |
12 | | sequestered and report any quantities of carbon |
13 | | released from the site or sites at which carbon |
14 | | emissions were sequestered in prior years, based |
15 | | on continuous monitoring of such sites. If, in any |
16 | | year after the first year of commercial operation, |
17 | | the owner of the facility fails to demonstrate that |
18 | | the initial clean coal facility captured and |
19 | | sequestered at least 50% of the total carbon |
20 | | emissions that the facility would otherwise emit |
21 | | or that sequestration of emissions from prior |
22 | | years has failed, resulting in the release of |
23 | | carbon dioxide into the atmosphere, the owner of |
24 | | the facility must offset excess emissions. Any |
25 | | such carbon offsets must be permanent, additional, |
26 | | verifiable, real, located within the State of |
|
| | SB1529 | - 48 - | LRB101 08496 JRG 53573 b |
|
|
1 | | Illinois, and legally and practicably enforceable. |
2 | | The cost of such offsets for the facility that are |
3 | | not recoverable shall not exceed $15 million in any |
4 | | given year. No costs of any such purchases of |
5 | | carbon offsets may be recovered from a utility or |
6 | | its customers. All carbon offsets purchased for |
7 | | this purpose and any carbon emission credits |
8 | | associated with sequestration of carbon from the |
9 | | facility must be permanently retired. The initial |
10 | | clean coal facility shall not forfeit its |
11 | | designation as a clean coal facility if the |
12 | | facility fails to fully comply with the applicable |
13 | | carbon sequestration requirements in any given |
14 | | year, provided the requisite offsets are |
15 | | purchased. However, the Attorney General, on |
16 | | behalf of the People of the State of Illinois, may |
17 | | specifically enforce the facility's sequestration |
18 | | requirement and the other terms of this contract |
19 | | provision. Compliance with the sequestration |
20 | | requirements and offset purchase requirements |
21 | | specified in paragraph (3) of this subsection (d) |
22 | | shall be reviewed annually by an independent |
23 | | expert retained by the owner of the initial clean |
24 | | coal facility, with the advance written approval |
25 | | of the Attorney General. The Commission may, in the |
26 | | course of the review specified in item (vii), |
|
| | SB1529 | - 49 - | LRB101 08496 JRG 53573 b |
|
|
1 | | reduce the allowable return on equity for the |
2 | | facility if the facility willfully fails to comply |
3 | | with the carbon capture and sequestration |
4 | | requirements set forth in this item (v); |
5 | | (vi) include limits on, and accordingly |
6 | | provide for modification of, the amount the |
7 | | utility is required to source under the sourcing |
8 | | agreement consistent with paragraph (2) of this |
9 | | subsection (d); |
10 | | (vii) require Commission review: (1) to |
11 | | determine the justness, reasonableness, and |
12 | | prudence of the inputs to the formula referenced in |
13 | | subparagraphs (A)(i) through (A)(iii) of paragraph |
14 | | (3) of this subsection (d), prior to an adjustment |
15 | | in those inputs including, without limitation, the |
16 | | capital structure and return on equity, fuel |
17 | | costs, and other operations and maintenance costs |
18 | | and (2) to approve the costs to be passed through |
19 | | to customers under the sourcing agreement by which |
20 | | the utility satisfies its statutory obligations. |
21 | | Commission review shall occur no less than every 3 |
22 | | years, regardless of whether any adjustments have |
23 | | been proposed, and shall be completed within 9 |
24 | | months; |
25 | | (viii) limit the utility's obligation to such |
26 | | amount as the utility is allowed to recover through |
|
| | SB1529 | - 50 - | LRB101 08496 JRG 53573 b |
|
|
1 | | tariffs filed with the Commission, provided that |
2 | | neither the clean coal facility nor the utility |
3 | | waives any right to assert federal pre-emption or |
4 | | any other argument in response to a purported |
5 | | disallowance of recovery costs; |
6 | | (ix) limit the utility's or alternative retail |
7 | | electric supplier's obligation to incur any |
8 | | liability until such time as the facility is in |
9 | | commercial operation and generating power and |
10 | | energy and such power and energy is being delivered |
11 | | to the facility busbar; |
12 | | (x) provide that the owner or owners of the |
13 | | initial clean coal facility, which is the |
14 | | counterparty to such sourcing agreement, shall |
15 | | have the right from time to time to elect whether |
16 | | the obligations of the utility party thereto shall |
17 | | be governed by the power purchase provisions or the |
18 | | contract for differences provisions; |
19 | | (xi) append documentation showing that the |
20 | | formula rate and contract, insofar as they relate |
21 | | to the power purchase provisions, have been |
22 | | approved by the Federal Energy Regulatory |
23 | | Commission pursuant to Section 205 of the Federal |
24 | | Power Act; |
25 | | (xii) provide that any changes to the terms of |
26 | | the contract, insofar as such changes relate to the |
|
| | SB1529 | - 51 - | LRB101 08496 JRG 53573 b |
|
|
1 | | power purchase provisions, are subject to review |
2 | | under the public interest standard applied by the |
3 | | Federal Energy Regulatory Commission pursuant to |
4 | | Sections 205 and 206 of the Federal Power Act; and |
5 | | (xiii) conform with customary lender |
6 | | requirements in power purchase agreements used as |
7 | | the basis for financing non-utility generators. |
8 | | (4) Effective date of sourcing agreements with the |
9 | | initial clean coal facility. Any proposed sourcing |
10 | | agreement with the initial clean coal facility shall not |
11 | | become effective unless the following reports are prepared |
12 | | and submitted and authorizations and approvals obtained: |
13 | | (i) Facility cost report. The owner of the initial |
14 | | clean coal facility shall submit to the Commission, the |
15 | | Agency, and the General Assembly a front-end |
16 | | engineering and design study, a facility cost report, |
17 | | method of financing (including but not limited to |
18 | | structure and associated costs), and an operating and |
19 | | maintenance cost quote for the facility (collectively |
20 | | "facility cost report"), which shall be prepared in |
21 | | accordance with the requirements of this paragraph (4) |
22 | | of subsection (d) of this Section, and shall provide |
23 | | the Commission and the Agency access to the work |
24 | | papers, relied upon documents, and any other backup |
25 | | documentation related to the facility cost report. |
26 | | (ii) Commission report. Within 6 months following |
|
| | SB1529 | - 52 - | LRB101 08496 JRG 53573 b |
|
|
1 | | receipt of the facility cost report, the Commission, in |
2 | | consultation with the Agency, shall submit a report to |
3 | | the General Assembly setting forth its analysis of the |
4 | | facility cost report. Such report shall include, but |
5 | | not be limited to, a comparison of the costs associated |
6 | | with electricity generated by the initial clean coal |
7 | | facility to the costs associated with electricity |
8 | | generated by other types of generation facilities, an |
9 | | analysis of the rate impacts on residential and small |
10 | | business customers over the life of the sourcing |
11 | | agreements, and an analysis of the likelihood that the |
12 | | initial clean coal facility will commence commercial |
13 | | operation by and be delivering power to the facility's |
14 | | busbar by 2016. To assist in the preparation of its |
15 | | report, the Commission, in consultation with the |
16 | | Agency, may hire one or more experts or consultants, |
17 | | the costs of which shall be paid for by the owner of |
18 | | the initial clean coal facility. The Commission and |
19 | | Agency may begin the process of selecting such experts |
20 | | or consultants prior to receipt of the facility cost |
21 | | report. |
22 | | (iii) General Assembly approval. The proposed |
23 | | sourcing agreements shall not take effect unless, |
24 | | based on the facility cost report and the Commission's |
25 | | report, the General Assembly enacts authorizing |
26 | | legislation approving (A) the projected price, stated |
|
| | SB1529 | - 53 - | LRB101 08496 JRG 53573 b |
|
|
1 | | in cents per kilowatthour, to be charged for |
2 | | electricity generated by the initial clean coal |
3 | | facility, (B) the projected impact on residential and |
4 | | small business customers' bills over the life of the |
5 | | sourcing agreements, and (C) the maximum allowable |
6 | | return on equity for the project; and |
7 | | (iv) Commission review. If the General Assembly |
8 | | enacts authorizing legislation pursuant to |
9 | | subparagraph (iii) approving a sourcing agreement, the |
10 | | Commission shall, within 90 days of such enactment, |
11 | | complete a review of such sourcing agreement. During |
12 | | such time period, the Commission shall implement any |
13 | | directive of the General Assembly, resolve any |
14 | | disputes between the parties to the sourcing agreement |
15 | | concerning the terms of such agreement, approve the |
16 | | form of such agreement, and issue an order finding that |
17 | | the sourcing agreement is prudent and reasonable. |
18 | | The facility cost report shall be prepared as follows: |
19 | | (A) The facility cost report shall be prepared by |
20 | | duly licensed engineering and construction firms |
21 | | detailing the estimated capital costs payable to one or |
22 | | more contractors or suppliers for the engineering, |
23 | | procurement and construction of the components |
24 | | comprising the initial clean coal facility and the |
25 | | estimated costs of operation and maintenance of the |
26 | | facility. The facility cost report shall include: |
|
| | SB1529 | - 54 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (i) an estimate of the capital cost of the core |
2 | | plant based on one or more front end engineering |
3 | | and design studies for the gasification island and |
4 | | related facilities. The core plant shall include |
5 | | all civil, structural, mechanical, electrical, |
6 | | control, and safety systems. |
7 | | (ii) an estimate of the capital cost of the |
8 | | balance of the plant, including any capital costs |
9 | | associated with sequestration of carbon dioxide |
10 | | emissions and all interconnects and interfaces |
11 | | required to operate the facility, such as |
12 | | transmission of electricity, construction or |
13 | | backfeed power supply, pipelines to transport |
14 | | substitute natural gas or carbon dioxide, potable |
15 | | water supply, natural gas supply, water supply, |
16 | | water discharge, landfill, access roads, and coal |
17 | | delivery. |
18 | | The quoted construction costs shall be expressed |
19 | | in nominal dollars as of the date that the quote is |
20 | | prepared and shall include capitalized financing costs |
21 | | during construction,
taxes, insurance, and other |
22 | | owner's costs, and an assumed escalation in materials |
23 | | and labor beyond the date as of which the construction |
24 | | cost quote is expressed. |
25 | | (B) The front end engineering and design study for |
26 | | the gasification island and the cost study for the |
|
| | SB1529 | - 55 - | LRB101 08496 JRG 53573 b |
|
|
1 | | balance of plant shall include sufficient design work |
2 | | to permit quantification of major categories of |
3 | | materials, commodities and labor hours, and receipt of |
4 | | quotes from vendors of major equipment required to |
5 | | construct and operate the clean coal facility. |
6 | | (C) The facility cost report shall also include an |
7 | | operating and maintenance cost quote that will provide |
8 | | the estimated cost of delivered fuel, personnel, |
9 | | maintenance contracts, chemicals, catalysts, |
10 | | consumables, spares, and other fixed and variable |
11 | | operations and maintenance costs. The delivered fuel |
12 | | cost estimate will be provided by a recognized third |
13 | | party expert or experts in the fuel and transportation |
14 | | industries. The balance of the operating and |
15 | | maintenance cost quote, excluding delivered fuel |
16 | | costs, will be developed based on the inputs provided |
17 | | by duly licensed engineering and construction firms |
18 | | performing the construction cost quote, potential |
19 | | vendors under long-term service agreements and plant |
20 | | operating agreements, or recognized third party plant |
21 | | operator or operators. |
22 | | The operating and maintenance cost quote |
23 | | (including the cost of the front end engineering and |
24 | | design study) shall be expressed in nominal dollars as |
25 | | of the date that the quote is prepared and shall |
26 | | include taxes, insurance, and other owner's costs, and |
|
| | SB1529 | - 56 - | LRB101 08496 JRG 53573 b |
|
|
1 | | an assumed escalation in materials and labor beyond the |
2 | | date as of which the operating and maintenance cost |
3 | | quote is expressed. |
4 | | (D) The facility cost report shall also include an |
5 | | analysis of the initial clean coal facility's ability |
6 | | to deliver power and energy into the applicable |
7 | | regional transmission organization markets and an |
8 | | analysis of the expected capacity factor for the |
9 | | initial clean coal facility. |
10 | | (E) Amounts paid to third parties unrelated to the |
11 | | owner or owners of the initial clean coal facility to |
12 | | prepare the core plant construction cost quote, |
13 | | including the front end engineering and design study, |
14 | | and the operating and maintenance cost quote will be |
15 | | reimbursed through Coal Development Bonds. |
16 | | (5) Re-powering and retrofitting coal-fired power |
17 | | plants previously owned by Illinois utilities to qualify as |
18 | | clean coal facilities. During the 2009 procurement |
19 | | planning process and thereafter, the Agency and the |
20 | | Commission shall consider sourcing agreements covering |
21 | | electricity generated by power plants that were previously |
22 | | owned by Illinois utilities and that have been or will be |
23 | | converted into clean coal facilities, as defined by Section |
24 | | 1-10 of this Act. Pursuant to such procurement planning |
25 | | process, the owners of such facilities may propose to the |
26 | | Agency sourcing agreements with utilities and alternative |
|
| | SB1529 | - 57 - | LRB101 08496 JRG 53573 b |
|
|
1 | | retail electric suppliers required to comply with |
2 | | subsection (d) of this Section and item (5) of subsection |
3 | | (d) of Section 16-115 of the Public Utilities Act, covering |
4 | | electricity generated by such facilities. In the case of |
5 | | sourcing agreements that are power purchase agreements, |
6 | | the contract price for electricity sales shall be |
7 | | established on a cost of service basis. In the case of |
8 | | sourcing agreements that are contracts for differences, |
9 | | the contract price from which the reference price is |
10 | | subtracted shall be established on a cost of service basis. |
11 | | The Agency and the Commission may approve any such utility |
12 | | sourcing agreements that do not exceed cost-based |
13 | | benchmarks developed by the procurement administrator, in |
14 | | consultation with the Commission staff, Agency staff and |
15 | | the procurement monitor, subject to Commission review and |
16 | | approval. The Commission shall have authority to inspect |
17 | | all books and records associated with these clean coal |
18 | | facilities during the term of any such contract. |
19 | | (6) Costs incurred under this subsection (d) or |
20 | | pursuant to a contract entered into under this subsection |
21 | | (d) shall be deemed prudently incurred and reasonable in |
22 | | amount and the electric utility shall be entitled to full |
23 | | cost recovery pursuant to the tariffs filed with the |
24 | | Commission. |
25 | | (d-5) Zero emission standard. |
26 | | (1) Beginning with the delivery year commencing on June |
|
| | SB1529 | - 58 - | LRB101 08496 JRG 53573 b |
|
|
1 | | 1, 2017, the Agency shall, for electric utilities that |
2 | | serve at least 100,000 retail customers in this State, |
3 | | procure contracts with zero emission facilities that are |
4 | | reasonably capable of generating cost-effective zero |
5 | | emission credits in an amount approximately equal to 16% of |
6 | | the actual amount of electricity delivered by each electric |
7 | | utility to retail customers in the State during calendar |
8 | | year 2014. For an electric utility serving fewer than |
9 | | 100,000 retail customers in this State that requested, |
10 | | under Section 16-111.5 of the Public Utilities Act, that |
11 | | the Agency procure power and energy for all or a portion of |
12 | | the utility's Illinois load for the delivery year |
13 | | commencing June 1, 2016, the Agency shall procure contracts |
14 | | with zero emission facilities that are reasonably capable |
15 | | of generating cost-effective zero emission credits in an |
16 | | amount approximately equal to 16% of the portion of power |
17 | | and energy to be procured by the Agency for the utility. |
18 | | The duration of the contracts procured under this |
19 | | subsection (d-5) shall be for a term of 10 years ending May |
20 | | 31, 2027. The quantity of zero emission credits to be |
21 | | procured under the contracts shall be all of the zero |
22 | | emission credits generated by the zero emission facility in |
23 | | each delivery year; however, if the zero emission facility |
24 | | is owned by more than one entity, then the quantity of zero |
25 | | emission credits to be procured under the contracts shall |
26 | | be the amount of zero emission credits that are generated |
|
| | SB1529 | - 59 - | LRB101 08496 JRG 53573 b |
|
|
1 | | from the portion of the zero emission facility that is |
2 | | owned by the winning supplier. |
3 | | The 16% value identified in this paragraph (1) is the |
4 | | average of the percentage targets in subparagraph (B) of |
5 | | paragraph (1) of subsection (c) of this Section 1-75 of |
6 | | this Act for the 5 delivery years beginning June 1, 2017. |
7 | | The procurement process shall be subject to the |
8 | | following provisions: |
9 | | (A) Those zero emission facilities that intend to |
10 | | participate in the procurement shall submit to the |
11 | | Agency the following eligibility information for each |
12 | | zero emission facility on or before the date |
13 | | established by the Agency: |
14 | | (i) the in-service date and remaining useful |
15 | | life of the zero emission facility; |
16 | | (ii) the amount of power generated annually |
17 | | for each of the years 2005 through 2015, and the |
18 | | projected zero emission credits to be generated |
19 | | over the remaining useful life of the zero emission |
20 | | facility, which shall be used to determine the |
21 | | capability of each facility; |
22 | | (iii) the annual zero emission facility cost |
23 | | projections, expressed on a per megawatthour |
24 | | basis, over the next 6 delivery years, which shall |
25 | | include the following: operation and maintenance |
26 | | expenses; fully allocated overhead costs, which |
|
| | SB1529 | - 60 - | LRB101 08496 JRG 53573 b |
|
|
1 | | shall be allocated using the methodology developed |
2 | | by the Institute for Nuclear Power Operations; |
3 | | fuel expenditures; non-fuel capital expenditures; |
4 | | spent fuel expenditures; a return on working |
5 | | capital; the cost of operational and market risks |
6 | | that could be avoided by ceasing operation; and any |
7 | | other costs necessary for continued operations, |
8 | | provided that "necessary" means, for purposes of |
9 | | this item (iii), that the costs could reasonably be |
10 | | avoided only by ceasing operations of the zero |
11 | | emission facility; and |
12 | | (iv) a commitment to continue operating, for |
13 | | the duration of the contract or contracts executed |
14 | | under the procurement held under this subsection |
15 | | (d-5), the zero emission facility that produces |
16 | | the zero emission credits to be procured in the |
17 | | procurement. |
18 | | The information described in item (iii) of this |
19 | | subparagraph (A) may be submitted on a confidential |
20 | | basis and shall be treated and maintained by the |
21 | | Agency, the procurement administrator, and the |
22 | | Commission as confidential and proprietary and exempt |
23 | | from disclosure under subparagraphs (a) and (g) of |
24 | | paragraph (1) of Section 7 of the Freedom of |
25 | | Information Act. The Office of Attorney General shall |
26 | | have access to, and maintain the confidentiality of, |
|
| | SB1529 | - 61 - | LRB101 08496 JRG 53573 b |
|
|
1 | | such information pursuant to Section 6.5 of the |
2 | | Attorney General Act. |
3 | | (B) The price for each zero emission credit |
4 | | procured under this subsection (d-5) for each delivery |
5 | | year shall be in an amount that equals the Social Cost |
6 | | of Carbon, expressed on a price per megawatthour basis. |
7 | | However, to ensure that the procurement remains |
8 | | affordable to retail customers in this State if |
9 | | electricity prices increase, the price in an |
10 | | applicable delivery year shall be reduced below the |
11 | | Social Cost of Carbon by the amount ("Price |
12 | | Adjustment") by which the market price index for the |
13 | | applicable delivery year exceeds the baseline market |
14 | | price index for the consecutive 12-month period ending |
15 | | May 31, 2016. If the Price Adjustment is greater than |
16 | | or equal to the Social Cost of Carbon in an applicable |
17 | | delivery year, then no payments shall be due in that |
18 | | delivery year. The components of this calculation are |
19 | | defined as follows: |
20 | | (i) Social Cost of Carbon: The Social Cost of |
21 | | Carbon is $16.50 per megawatthour, which is based |
22 | | on the U.S. Interagency Working Group on Social |
23 | | Cost of Carbon's price in the August 2016 Technical |
24 | | Update using a 3% discount rate, adjusted for |
25 | | inflation for each year of the program. Beginning |
26 | | with the delivery year commencing June 1, 2023, the |
|
| | SB1529 | - 62 - | LRB101 08496 JRG 53573 b |
|
|
1 | | price per megawatthour shall increase by $1 per |
2 | | megawatthour, and continue to increase by an |
3 | | additional $1 per megawatthour each delivery year |
4 | | thereafter. |
5 | | (ii) Baseline market price index: The baseline |
6 | | market price index for the consecutive 12-month |
7 | | period ending May 31, 2016 is $31.40 per |
8 | | megawatthour, which is based on the sum of (aa) the |
9 | | average day-ahead energy price across all hours of |
10 | | such 12-month period at the PJM Interconnection |
11 | | LLC Northern Illinois Hub, (bb) 50% multiplied by |
12 | | the Base Residual Auction, or its successor, |
13 | | capacity price for the rest of the RTO zone group |
14 | | determined by PJM Interconnection LLC, divided by |
15 | | 24 hours per day, and (cc) 50% multiplied by the |
16 | | Planning Resource Auction, or its successor, |
17 | | capacity price for Zone 4 determined by the |
18 | | Midcontinent Independent System Operator, Inc., |
19 | | divided by 24 hours per day. |
20 | | (iii) Market price index: The market price |
21 | | index for a delivery year shall be the sum of |
22 | | projected energy prices and projected capacity |
23 | | prices determined as follows: |
24 | | (aa) Projected energy prices: the |
25 | | projected energy prices for the applicable |
26 | | delivery year shall be calculated once for the |
|
| | SB1529 | - 63 - | LRB101 08496 JRG 53573 b |
|
|
1 | | year using the forward market price for the PJM |
2 | | Interconnection, LLC Northern Illinois Hub. |
3 | | The forward market price shall be calculated as |
4 | | follows: the energy forward prices for each |
5 | | month of the applicable delivery year averaged |
6 | | for each trade date during the calendar year |
7 | | immediately preceding that delivery year to |
8 | | produce a single energy forward price for the |
9 | | delivery year. The forward market price |
10 | | calculation shall use data published by the |
11 | | Intercontinental Exchange, or its successor. |
12 | | (bb) Projected capacity prices: |
13 | | (I) For the delivery years commencing |
14 | | June 1, 2017, June 1, 2018, and June 1, |
15 | | 2019, the projected capacity price shall |
16 | | be equal to the sum of (1) 50% multiplied |
17 | | by the Base Residual Auction, or its |
18 | | successor, price for the rest of the RTO |
19 | | zone group as determined by PJM |
20 | | Interconnection LLC, divided by 24 hours |
21 | | per day and, (2) 50% multiplied by the |
22 | | resource auction price determined in the |
23 | | resource auction administered by the |
24 | | Midcontinent Independent System Operator, |
25 | | Inc., in which the largest percentage of |
26 | | load cleared for Local Resource Zone 4, |
|
| | SB1529 | - 64 - | LRB101 08496 JRG 53573 b |
|
|
1 | | divided by 24 hours per day, and where such |
2 | | price is determined by the Midcontinent |
3 | | Independent System Operator, Inc. |
4 | | (II) For the delivery year commencing |
5 | | June 1, 2020, and each year thereafter, the |
6 | | projected capacity price shall be equal to |
7 | | the sum of (1) 50% multiplied by the Base |
8 | | Residual Auction, or its successor, price |
9 | | for the ComEd zone as determined by PJM |
10 | | Interconnection LLC, divided by 24 hours |
11 | | per day, and (2) 50% multiplied by the |
12 | | resource auction price determined in the |
13 | | resource auction administered by the |
14 | | Midcontinent Independent System Operator, |
15 | | Inc., in which the largest percentage of |
16 | | load cleared for Local Resource Zone 4, |
17 | | divided by 24 hours per day, and where such |
18 | | price is determined by the Midcontinent |
19 | | Independent System Operator, Inc. |
20 | | For purposes of this subsection (d-5): |
21 | | "Rest of the RTO" and "ComEd Zone" shall have |
22 | | the meaning ascribed to them by PJM |
23 | | Interconnection, LLC. |
24 | | "RTO" means regional transmission |
25 | | organization. |
26 | | (C) No later than 45 days after June 1, 2017 (the |
|
| | SB1529 | - 65 - | LRB101 08496 JRG 53573 b |
|
|
1 | | effective date of Public Act 99-906), the Agency shall |
2 | | publish its proposed zero emission standard |
3 | | procurement plan. The plan shall be consistent with the |
4 | | provisions of this paragraph (1) and shall provide that |
5 | | winning bids shall be selected based on public interest |
6 | | criteria that include, but are not limited to, |
7 | | minimizing carbon dioxide emissions that result from |
8 | | electricity consumed in Illinois and minimizing sulfur |
9 | | dioxide, nitrogen oxide, and particulate matter |
10 | | emissions that adversely affect the citizens of this |
11 | | State. In particular, the selection of winning bids |
12 | | shall take into account the incremental environmental |
13 | | benefits resulting from the procurement, such as any |
14 | | existing environmental benefits that are preserved by |
15 | | the procurements held under Public Act 99-906 and would |
16 | | cease to exist if the procurements were not held, |
17 | | including the preservation of zero emission |
18 | | facilities. The plan shall also describe in detail how |
19 | | each public interest factor shall be considered and |
20 | | weighted in the bid selection process to ensure that |
21 | | the public interest criteria are applied to the |
22 | | procurement and given full effect. |
23 | | For purposes of developing the plan, the Agency |
24 | | shall consider any reports issued by a State agency, |
25 | | board, or commission under House Resolution 1146 of the |
26 | | 98th General Assembly and paragraph (4) of subsection |
|
| | SB1529 | - 66 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (d) of this Section 1-75 of this Act , as well as |
2 | | publicly available analyses and studies performed by |
3 | | or for regional transmission organizations that serve |
4 | | the State and their independent market monitors. |
5 | | Upon publishing of the zero emission standard |
6 | | procurement plan, copies of the plan shall be posted |
7 | | and made publicly available on the Agency's website. |
8 | | All interested parties shall have 10 days following the |
9 | | date of posting to provide comment to the Agency on the |
10 | | plan. All comments shall be posted to the Agency's |
11 | | website. Following the end of the comment period, but |
12 | | no more than 60 days later than June 1, 2017 (the |
13 | | effective date of Public Act 99-906), the Agency shall |
14 | | revise the plan as necessary based on the comments |
15 | | received and file its zero emission standard |
16 | | procurement plan with the Commission. |
17 | | If the Commission determines that the plan will |
18 | | result in the procurement of cost-effective zero |
19 | | emission credits, then the Commission shall, after |
20 | | notice and hearing, but no later than 45 days after the |
21 | | Agency filed the plan, approve the plan or approve with |
22 | | modification. For purposes of this subsection (d-5), |
23 | | "cost effective" means the projected costs of |
24 | | procuring zero emission credits from zero emission |
25 | | facilities do not cause the limit stated in paragraph |
26 | | (2) of this subsection to be exceeded. |
|
| | SB1529 | - 67 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (C-5) As part of the Commission's review and |
2 | | acceptance or rejection of the procurement results, |
3 | | the Commission shall, in its public notice of |
4 | | successful bidders: |
5 | | (i) identify how the winning bids satisfy the |
6 | | public interest criteria described in subparagraph |
7 | | (C) of this paragraph (1) of minimizing carbon |
8 | | dioxide emissions that result from electricity |
9 | | consumed in Illinois and minimizing sulfur |
10 | | dioxide, nitrogen oxide, and particulate matter |
11 | | emissions that adversely affect the citizens of |
12 | | this State; |
13 | | (ii) specifically address how the selection of |
14 | | winning bids takes into account the incremental |
15 | | environmental benefits resulting from the |
16 | | procurement, including any existing environmental |
17 | | benefits that are preserved by the procurements |
18 | | held under Public Act 99-906 and would have ceased |
19 | | to exist if the procurements had not been held, |
20 | | such as the preservation of zero emission |
21 | | facilities; |
22 | | (iii) quantify the environmental benefit of |
23 | | preserving the resources identified in item (ii) |
24 | | of this subparagraph (C-5), including the |
25 | | following: |
26 | | (aa) the value of avoided greenhouse gas |
|
| | SB1529 | - 68 - | LRB101 08496 JRG 53573 b |
|
|
1 | | emissions measured as the product of the zero |
2 | | emission facilities' output over the contract |
3 | | term multiplied by the U.S. Environmental |
4 | | Protection Agency eGrid subregion carbon |
5 | | dioxide emission rate and the U.S. Interagency |
6 | | Working Group on Social Cost of Carbon's price |
7 | | in the August 2016 Technical Update using a 3% |
8 | | discount rate, adjusted for inflation for each |
9 | | delivery year; and |
10 | | (bb) the costs of replacement with other |
11 | | zero carbon dioxide resources, including wind |
12 | | and photovoltaic, based upon the simple |
13 | | average of the following: |
14 | | (I) the price, or if there is more than |
15 | | one price, the average of the prices, paid |
16 | | for renewable energy credits from new |
17 | | utility-scale wind projects in the |
18 | | procurement events specified in item (i) |
19 | | of subparagraph (G) of paragraph (1) of |
20 | | subsection (c) of this Section 1-75 of this |
21 | | Act ; and |
22 | | (II) the price, or if there is more |
23 | | than one price, the average of the prices, |
24 | | paid for renewable energy credits from new |
25 | | utility-scale solar projects and |
26 | | brownfield site photovoltaic projects in |
|
| | SB1529 | - 69 - | LRB101 08496 JRG 53573 b |
|
|
1 | | the procurement events specified in item |
2 | | (ii) of subparagraph (G) of paragraph (1) |
3 | | of subsection (c) of this Section 1-75 of |
4 | | this Act and, after January 1, 2015, |
5 | | renewable energy credits from photovoltaic |
6 | | distributed generation projects in |
7 | | procurement events held under subsection |
8 | | (c) of this Section 1-75 of this Act . |
9 | | Each utility shall enter into binding contractual |
10 | | arrangements with the winning suppliers. |
11 | | The procurement described in this subsection |
12 | | (d-5), including, but not limited to, the execution of |
13 | | all contracts procured, shall be completed no later |
14 | | than May 10, 2017. Based on the effective date of |
15 | | Public Act 99-906, the Agency and Commission may, as |
16 | | appropriate, modify the various dates and timelines |
17 | | under this subparagraph and subparagraphs (C) and (D) |
18 | | of this paragraph (1). The procurement and plan |
19 | | approval processes required by this subsection (d-5) |
20 | | shall be conducted in conjunction with the procurement |
21 | | and plan approval processes required by subsection (c) |
22 | | of this Section and Section 16-111.5 of the Public |
23 | | Utilities Act, to the extent practicable. |
24 | | Notwithstanding whether a procurement event is |
25 | | conducted under Section 16-111.5 of the Public |
26 | | Utilities Act, the Agency shall immediately initiate a |
|
| | SB1529 | - 70 - | LRB101 08496 JRG 53573 b |
|
|
1 | | procurement process on June 1, 2017 (the effective date |
2 | | of Public Act 99-906). |
3 | | (D) Following the procurement event described in |
4 | | this paragraph (1) and consistent with subparagraph |
5 | | (B) of this paragraph (1), the Agency shall calculate |
6 | | the payments to be made under each contract for the |
7 | | next delivery year based on the market price index for |
8 | | that delivery year. The Agency shall publish the |
9 | | payment calculations no later than May 25, 2017 and |
10 | | every May 25 thereafter. |
11 | | (E) Notwithstanding the requirements of this |
12 | | subsection (d-5), the contracts executed under this |
13 | | subsection (d-5) shall provide that the zero emission |
14 | | facility may, as applicable, suspend or terminate |
15 | | performance under the contracts in the following |
16 | | instances: |
17 | | (i) A zero emission facility shall be excused |
18 | | from its performance under the contract for any |
19 | | cause beyond the control of the resource, |
20 | | including, but not restricted to, acts of God, |
21 | | flood, drought, earthquake, storm, fire, |
22 | | lightning, epidemic, war, riot, civil disturbance |
23 | | or disobedience, labor dispute, labor or material |
24 | | shortage, sabotage, acts of public enemy, |
25 | | explosions, orders, regulations or restrictions |
26 | | imposed by governmental, military, or lawfully |
|
| | SB1529 | - 71 - | LRB101 08496 JRG 53573 b |
|
|
1 | | established civilian authorities, which, in any of |
2 | | the foregoing cases, by exercise of commercially |
3 | | reasonable efforts the zero emission facility |
4 | | could not reasonably have been expected to avoid, |
5 | | and which, by the exercise of commercially |
6 | | reasonable efforts, it has been unable to |
7 | | overcome. In such event, the zero emission |
8 | | facility shall be excused from performance for the |
9 | | duration of the event, including, but not limited |
10 | | to, delivery of zero emission credits, and no |
11 | | payment shall be due to the zero emission facility |
12 | | during the duration of the event. |
13 | | (ii) A zero emission facility shall be |
14 | | permitted to terminate the contract if legislation |
15 | | is enacted into law by the General Assembly that |
16 | | imposes or authorizes a new tax, special |
17 | | assessment, or fee on the generation of |
18 | | electricity, the ownership or leasehold of a |
19 | | generating unit, or the privilege or occupation of |
20 | | such generation, ownership, or leasehold of |
21 | | generation units by a zero emission facility. |
22 | | However, the provisions of this item (ii) do not |
23 | | apply to any generally applicable tax, special |
24 | | assessment or fee, or requirements imposed by |
25 | | federal law. |
26 | | (iii) A zero emission facility shall be |
|
| | SB1529 | - 72 - | LRB101 08496 JRG 53573 b |
|
|
1 | | permitted to terminate the contract in the event |
2 | | that the resource requires capital expenditures in |
3 | | excess of $40,000,000 that were neither known nor |
4 | | reasonably foreseeable at the time it executed the |
5 | | contract and that a prudent owner or operator of |
6 | | such resource would not undertake. |
7 | | (iv) A zero emission facility shall be |
8 | | permitted to terminate the contract in the event |
9 | | the Nuclear Regulatory Commission terminates the |
10 | | resource's license. |
11 | | (F) If the zero emission facility elects to |
12 | | terminate a contract under this subparagraph (E ) , of |
13 | | this paragraph (1), then the Commission shall reopen |
14 | | the docket in which the Commission approved the zero |
15 | | emission standard procurement plan under subparagraph |
16 | | (C) of this paragraph (1) and, after notice and |
17 | | hearing, enter an order acknowledging the contract |
18 | | termination election if such termination is consistent |
19 | | with the provisions of this subsection (d-5). |
20 | | (2) For purposes of this subsection (d-5), the amount |
21 | | paid per kilowatthour means the total amount paid for |
22 | | electric service expressed on a per kilowatthour basis. For |
23 | | purposes of this subsection (d-5), the total amount paid |
24 | | for electric service includes, without limitation, amounts |
25 | | paid for supply, transmission, distribution, surcharges, |
26 | | and add-on taxes. |
|
| | SB1529 | - 73 - | LRB101 08496 JRG 53573 b |
|
|
1 | | Notwithstanding the requirements of this subsection |
2 | | (d-5), the contracts executed under this subsection (d-5) |
3 | | shall provide that the total of zero emission credits |
4 | | procured under a procurement plan shall be subject to the |
5 | | limitations of this paragraph (2). For each delivery year, |
6 | | the contractual volume receiving payments in such year |
7 | | shall be reduced for all retail customers based on the |
8 | | amount necessary to limit the net increase that delivery |
9 | | year to the costs of those credits included in the amounts |
10 | | paid by eligible retail customers in connection with |
11 | | electric service to no more than 1.65% of the amount paid |
12 | | per kilowatthour by eligible retail customers during the |
13 | | year ending May 31, 2009. The result of this computation |
14 | | shall apply to and reduce the procurement for all retail |
15 | | customers, and all those customers shall pay the same |
16 | | single, uniform cents per kilowatthour charge under |
17 | | subsection (k) of Section 16-108 of the Public Utilities |
18 | | Act. To arrive at a maximum dollar amount of zero emission |
19 | | credits to be paid for the particular delivery year, the |
20 | | resulting per kilowatthour amount shall be applied to the |
21 | | actual amount of kilowatthours of electricity delivered by |
22 | | the electric utility in the delivery year immediately prior |
23 | | to the procurement, to all retail customers in its service |
24 | | territory. Unpaid contractual volume for any delivery year |
25 | | shall be paid in any subsequent delivery year in which such |
26 | | payments can be made without exceeding the amount specified |
|
| | SB1529 | - 74 - | LRB101 08496 JRG 53573 b |
|
|
1 | | in this paragraph (2). The calculations required by this |
2 | | paragraph (2) shall be made only once for each procurement |
3 | | plan year. Once the determination as to the amount of zero |
4 | | emission credits to be paid is made based on the |
5 | | calculations set forth in this paragraph (2), no subsequent |
6 | | rate impact determinations shall be made and no adjustments |
7 | | to those contract amounts shall be allowed. All costs |
8 | | incurred under those contracts and in implementing this |
9 | | subsection (d-5) shall be recovered by the electric utility |
10 | | as provided in this Section. |
11 | | No later than June 30, 2019, the Commission shall |
12 | | review the limitation on the amount of zero emission |
13 | | credits procured under this subsection (d-5) and report to |
14 | | the General Assembly its findings as to whether that |
15 | | limitation unduly constrains the procurement of |
16 | | cost-effective zero emission credits. |
17 | | (3) Six years after the execution of a contract under |
18 | | this subsection (d-5), the Agency shall determine whether |
19 | | the actual zero emission credit payments received by the |
20 | | supplier over the 6-year period exceed the Average ZEC |
21 | | Payment. In addition, at the end of the term of a contract |
22 | | executed under this subsection (d-5), or at the time, if |
23 | | any, a zero emission facility's contract is terminated |
24 | | under subparagraph (E) of paragraph (1) of this subsection |
25 | | (d-5), then the Agency shall determine whether the actual |
26 | | zero emission credit payments received by the supplier over |
|
| | SB1529 | - 75 - | LRB101 08496 JRG 53573 b |
|
|
1 | | the term of the contract exceed the Average ZEC Payment, |
2 | | after taking into account any amounts previously credited |
3 | | back to the utility under this paragraph (3). If the Agency |
4 | | determines that the actual zero emission credit payments |
5 | | received by the supplier over the relevant period exceed |
6 | | the Average ZEC Payment, then the supplier shall credit the |
7 | | difference back to the utility. The amount of the credit |
8 | | shall be remitted to the applicable electric utility no |
9 | | later than 120 days after the Agency's determination, which |
10 | | the utility shall reflect as a credit on its retail |
11 | | customer bills as soon as practicable; however, the credit |
12 | | remitted to the utility shall not exceed the total amount |
13 | | of payments received by the facility under its contract. |
14 | | For purposes of this Section, the Average ZEC Payment |
15 | | shall be calculated by multiplying the quantity of zero |
16 | | emission credits delivered under the contract times the |
17 | | average contract price. The average contract price shall be |
18 | | determined by subtracting the amount calculated under |
19 | | subparagraph (B) of this paragraph (3) from the amount |
20 | | calculated under subparagraph (A) of this paragraph (3), as |
21 | | follows: |
22 | | (A) The average of the Social Cost of Carbon, as |
23 | | defined in subparagraph (B) of paragraph (1) of this |
24 | | subsection (d-5), during the term of the contract. |
25 | | (B) The average of the market price indices, as |
26 | | defined in subparagraph (B) of paragraph (1) of this |
|
| | SB1529 | - 76 - | LRB101 08496 JRG 53573 b |
|
|
1 | | subsection (d-5), during the term of the contract, |
2 | | minus the baseline market price index, as defined in |
3 | | subparagraph (B) of paragraph (1) of this subsection |
4 | | (d-5). |
5 | | If the subtraction yields a negative number, then the |
6 | | Average ZEC Payment shall be zero. |
7 | | (4) Cost-effective zero emission credits procured from |
8 | | zero emission facilities shall satisfy the applicable |
9 | | definitions set forth in Section 1-10 of this Act. |
10 | | (5) The electric utility shall retire all zero emission |
11 | | credits used to comply with the requirements of this |
12 | | subsection (d-5). |
13 | | (6) Electric utilities shall be entitled to recover all |
14 | | of the costs associated with the procurement of zero |
15 | | emission credits through an automatic adjustment clause |
16 | | tariff in accordance with subsection (k) and (m) of Section |
17 | | 16-108 of the Public Utilities Act, and the contracts |
18 | | executed under this subsection (d-5) shall provide that the |
19 | | utilities' payment obligations under such contracts shall |
20 | | be reduced if an adjustment is required under subsection |
21 | | (m) of Section 16-108 of the Public Utilities Act. |
22 | | (7) This subsection (d-5) shall become inoperative on |
23 | | January 1, 2028. |
24 | | (e) The draft procurement plans are subject to public |
25 | | comment, as required by Section 16-111.5 of the Public |
26 | | Utilities Act. |
|
| | SB1529 | - 77 - | LRB101 08496 JRG 53573 b |
|
|
1 | | (f) The Agency shall submit the final procurement plan to |
2 | | the Commission. The Agency shall revise a procurement plan if |
3 | | the Commission determines that it does not meet the standards |
4 | | set forth in Section 16-111.5 of the Public Utilities Act. |
5 | | (g) The Agency shall assess fees to each affected utility |
6 | | to recover the costs incurred in preparation of the annual |
7 | | procurement plan for the utility. |
8 | | (h) The Agency shall assess fees to each bidder to recover |
9 | | the costs incurred in connection with a competitive procurement |
10 | | process.
|
11 | | (i) A renewable energy credit, carbon emission credit, or |
12 | | zero emission credit can only be used once to comply with a |
13 | | single portfolio or other standard as set forth in subsection |
14 | | (c), subsection (d), or subsection (d-5) of this Section, |
15 | | respectively. A renewable energy credit, carbon emission |
16 | | credit, or zero emission credit cannot be used to satisfy the |
17 | | requirements of more than one standard. If more than one type |
18 | | of credit is issued for the same megawatt hour of energy, only |
19 | | one credit can be used to satisfy the requirements of a single |
20 | | standard. After such use, the credit must be retired together |
21 | | with any other credits issued for the same megawatt hour of |
22 | | energy. |
23 | | (Source: P.A. 99-536, eff. 7-8-16; 99-906, eff. 6-1-17; |
24 | | 100-863, eff. 8-14-18; revised 10-18-18.)
|