|
| | SB0450 Engrossed | - 2 - | LRB101 04211 AXK 49219 b |
|
|
1 | | (13) Insulation/Spray Foam. |
2 | | (14) Siding Installation. |
3 | | (15) Roofing. |
4 | | (16) Lathing. |
5 | | (17) Pile Driving. |
6 | | (18) Concrete Forming. |
7 | | (19) Scaffolding. |
8 | | (20) Residential Electrical Construction. |
9 | | (21) Commercial Electrical Construction. |
10 | | (22) Industrial Electrical Construction. |
11 | | (23) Renewable Energy Technology. |
12 | | (24) Energy Efficiency Concepts. |
13 | | (25) Electrical Manufacturing Sector. |
14 | | (26) Communications Systems. |
15 | | (27) Life Safety Systems. |
16 | | (28) Security Systems. |
17 | | (29) Sound Alarms. |
18 | | (30) Electrical Work Safety Practices. |
19 | | (31) Electrical Maintenance. |
20 | | (32) Fire Alarms. |
21 | | (33) Motor Controls. |
22 | | (34) Transformers. |
23 | | (35) Variable Speed Drive Systems. |
24 | | (36) Rigging. |
25 | | The program must, at a minimum, be a 9-month program and use a |
26 | | credit-hour system.
|
|
| | SB0450 Engrossed | - 3 - | LRB101 04211 AXK 49219 b |
|
|
1 | | (b) The public community college district may accept the |
2 | | credits as direct equivalent credits or prior learning credits, |
3 | | as determined by the district and consistent with the |
4 | | accrediting standards and institutional and residency |
5 | | requirements of the Board, the Higher Learning Commission, |
6 | | other State and national accreditors, and State licensing |
7 | | bodies, as appropriate. |
8 | | (c) Any designation given by the Board of credit hour value |
9 | | for items (1) through (6) under subsection (a) shall be applied |
10 | | by the community college district as direct or elective credit |
11 | | toward an associate degree of applied science or its equivalent |
12 | | as determined by the community college district. |
13 | | (Source: P.A. 99-468, eff. 1-1-16; 100-569, eff. 12-15-17.)
|
14 | | Section 99. Effective date. This Act takes effect upon |
15 | | becoming law.
|