| | 10100HB2172ham001 | - 2 - | LRB101 07617 RJF 57668 a |
|
|
1 | | subject to this Section shall be required to annually report to |
2 | | the Commission its existing and newly installed pipeline |
3 | | facilities in order to allow the Commission to monitor and |
4 | | address as necessary natural gas utilities' pipeline |
5 | | replacement programs. |
6 | | (b) Each natural gas public utility serving more than |
7 | | 100,000 customers shall submit to the Commission with its |
8 | | annual Form 21 ILCC filing the following additional information |
9 | | for a pipeline owned and operated by the utility as of December |
10 | | 31 of the preceding calendar year: |
11 | | (1) the length in feet categorized by year of |
12 | | installation; |
13 | | (2) the length in feet categorized by diameter size and |
14 | | material composed of; |
15 | | (3) the length in feet categorized by scheduled |
16 | | replacement year, if any; |
17 | | (4) the length in feet installed during the preceding |
18 | | calendar year for the purpose of replacing existing |
19 | | pipeline and under a tariff authorized by Section 9-220.3 |
20 | | categorized by diameter size and material composed of; |
21 | | (5) the length in feet installed during the preceding |
22 | | calendar year for the purpose of replacing existing |
23 | | pipeline and not under a tariff authorized by Section |
24 | | 9-220.3 categorized by diameter size and material composed |
25 | | of; |
26 | | (6) the length in feet installed during the preceding |
|
| | 10100HB2172ham001 | - 3 - | LRB101 07617 RJF 57668 a |
|
|
1 | | calendar year not for the purpose of replacing existing |
2 | | pipeline categorized by diameter size and material |
3 | | composed of; |
4 | | (7) for each individual project, the cost incurred and |
5 | | associated number of
meters, both existing meters and |
6 | | meters associated with newly connected
customers, for the |
7 | | construction activities described in paragraphs (4), (5), |
8 | | and
(6); and |
9 | | (8) for the construction activities described in |
10 | | paragraphs (4), (5), and (6), a brief description of the |
11 | | reason for the activities and the location in relation
to |
12 | | the nearest incorporated municipality. |
13 | | (c) No later than October 1 of each year, the Commission |
14 | | shall submit to the General Assembly a report containing the |
15 | | information set forth in subsection (b) and evaluating the |
16 | | safety and reliability of the natural gas distribution system |
17 | | in Illinois. The Commission report shall address the |
18 | | sufficiency of utility plans for replacing obsolete pipeline |
19 | | and maintaining the safety and reliability of their respective |
20 | | gas distribution systems. |
21 | | (d) The annual reports submitted to the Commission by the |
22 | | natural gas utilities and the report submitted by the |
23 | | Commission to the General Assembly shall be made available to |
24 | | the public on the Commission's website. The first reports of |
25 | | the additional information required under subsection (b) shall |
26 | | be for 2019 and submitted to the Commission in 2020. |