4 | | "Section 5. The Public Utilities Act is amended by adding |
5 | | Section 4-701 as follows: |
6 | | (220 ILCS 5/4-701 new) |
7 | | Sec. 4-701. Generation availability and cost during peak |
8 | | electricity demand periods. The Illinois Commerce Commission |
9 | | shall conduct at least one workshop and issue a report on the |
10 | | performance of all power generation in the State during the |
11 | | summer peak demand periods of 2018 and the winter peak demand |
12 | | period of 2018-2019, and identify which resources ensure the |
13 | | lowest cost and most reliable generation for Illinois |
14 | | consumers. The report under this Section shall be submitted to |
15 | | the Governor and the General Assembly, as well as posted on the |