|
Sen. Sue Rezin
Filed: 4/25/2017
| | 10000SB1337sam002 | | LRB100 07731 AWJ 25525 a |
|
|
1 | | AMENDMENT TO SENATE BILL 1337
|
2 | | AMENDMENT NO. ______. Amend Senate Bill 1337, AS AMENDED, |
3 | | by replacing everything after the enacting clause with the |
4 | | following:
|
5 | | "Section 5. The Counties Code is amended by changing |
6 | | Sections 5-1062, 5-1062.2, and 5-1062.3 as follows:
|
7 | | (55 ILCS 5/5-1062) (from Ch. 34, par. 5-1062)
|
8 | | Sec. 5-1062. Stormwater management.
|
9 | | (a) The purpose of this Section is to allow management and |
10 | | mitigation of the
effects of urbanization on stormwater |
11 | | drainage in metropolitan counties located
in the area served by |
12 | | the Chicago Metropolitan Agency for Planning Northeastern |
13 | | Illinois Planning Commission , and
references to "county" in |
14 | | this Section shall apply only to those counties.
This Section |
15 | | shall not apply to any county with a population in excess of
|
16 | | 1,500,000, except as provided in subsection (c). The purpose of |
|
| | 10000SB1337sam002 | - 2 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | this Section
shall be achieved by:
|
2 | | (1) consolidating the existing stormwater management |
3 | | framework into a
united, countywide structure;
|
4 | | (2) setting minimum standards for floodplain and |
5 | | stormwater management with an emphasis on the use of |
6 | | cost-effective solutions to flooding problems ;
and
|
7 | | (3) preparing a countywide plan for the management of |
8 | | stormwater runoff,
including the management of natural and |
9 | | man-made drainageways. The countywide
plan may incorporate |
10 | | watershed plans and shall evaluate and address flooding |
11 | | problems that exist in urbanized areas that are a result of |
12 | | urban flooding .
|
13 | | (b) A stormwater management planning committee shall be |
14 | | established by
county board resolution, with its membership |
15 | | consisting of equal numbers of
county board and municipal |
16 | | representatives from each county board
district, and such other |
17 | | members as may be determined by the county and
municipal |
18 | | members. However, if the county has more than 6 county board
|
19 | | districts, the county board may by ordinance divide the county |
20 | | into not
less than 6 areas of approximately equal population, |
21 | | to be used instead of
county board districts for the purpose of |
22 | | determining representation on the
stormwater management |
23 | | planning committee.
|
24 | | The county board members shall be appointed by the chairman |
25 | | of the county
board. Municipal members from each county board |
26 | | district or other
represented area shall be appointed by a |
|
| | 10000SB1337sam002 | - 3 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | majority vote of the mayors of
those municipalities which have |
2 | | the greatest percentage of their respective
populations |
3 | | residing in such county board district or other represented
|
4 | | area. All municipal and county board representatives shall be |
5 | | entitled
to a vote; the other members shall be nonvoting |
6 | | members, unless authorized
to vote by the unanimous consent of |
7 | | the municipal and county board
representatives. A municipality |
8 | | that is located in more than one county may
choose, at the time |
9 | | of formation of the stormwater management planning
committee |
10 | | and based on watershed boundaries, to participate in the
|
11 | | stormwater management planning program of either or both of the |
12 | | counties.
Subcommittees of the stormwater management planning |
13 | | committee may be
established to serve a portion of the county |
14 | | or a particular drainage basin
that has similar stormwater |
15 | | management needs. The stormwater management
planning committee |
16 | | shall adopt by-laws, by a majority vote of the county and
|
17 | | municipal members, to govern the functions of the committee and |
18 | | its
subcommittees. Officers of the committee shall include a |
19 | | chair and vice chair,
one of whom shall be a county |
20 | | representative and one a municipal
representative.
|
21 | | The principal duties of the committee shall be to develop a |
22 | | stormwater
management plan for presentation to and approval by |
23 | | the county board, and
to direct the plan's implementation and |
24 | | revision. The committee may retain
engineering, legal and |
25 | | financial advisors and inspection personnel. The
committee |
26 | | shall meet at least quarterly and shall hold at least one |
|
| | 10000SB1337sam002 | - 4 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | public
meeting during the preparation of the plan and prior to |
2 | | its submittal to the
county board. The committee may make |
3 | | grants to: (1) units of local government; (2) not-for-profit |
4 | | organizations; and (3) landowners. In order for a municipality |
5 | | located partially or wholly within a mapped floodplain to |
6 | | receive grant moneys, the municipality must be a member in the |
7 | | Federal Emergency Management Agency's National Flood Insurance |
8 | | Program. A municipality receiving grant moneys must have |
9 | | adopted an ordinance requiring actions consistent with the |
10 | | stormwater management plan. Use of the grant moneys must be |
11 | | consistent with the stormwater management plan.
|
12 | | (c) In the preparation of a stormwater management plan, a |
13 | | county
stormwater management planning committee shall |
14 | | coordinate the planning
process with each adjoining county to |
15 | | ensure that recommended stormwater
projects will have no |
16 | | significant impact on the levels or flows of
stormwaters in |
17 | | inter-county watersheds or on the capacity of existing and
|
18 | | planned stormwater retention facilities. An adopted stormwater |
19 | | management
plan shall identify steps taken by the county to |
20 | | coordinate the development
of plan recommendations with |
21 | | adjoining counties.
|
22 | | (d) (Blank).
|
23 | | (e) Prior to recommending the plan to the county board, the |
24 | | stormwater
management planning committee shall hold at least |
25 | | one public hearing thereon
and shall afford interested persons |
26 | | an opportunity to be heard. The hearing
shall be held in the |
|
| | 10000SB1337sam002 | - 5 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | county seat. Notice of the hearing shall be published at
least |
2 | | once no less than 15 days in advance thereof in a newspaper of |
3 | | general
circulation published in the county. The notice shall |
4 | | state the time and place
of the hearing and the place where |
5 | | copies of the proposed plan will be
accessible for examination |
6 | | by interested parties. If an affected municipality
having a |
7 | | stormwater management plan adopted by ordinance wishes to |
8 | | protest the
proposed county plan provisions, it shall appear at |
9 | | the hearing and submit in
writing specific proposals to the |
10 | | stormwater management planning committee.
After consideration |
11 | | of the matters raised at the hearing, the committee may
amend |
12 | | or approve the plan and recommend it to the county board for |
13 | | adoption.
|
14 | | The county board may enact the proposed plan by ordinance. |
15 | | If the
proposals for modification of the plan made by an |
16 | | affected municipality having
a stormwater management plan are |
17 | | not included in the proposed county plan,
and the municipality |
18 | | affected by the plan opposes adoption of the county
plan by |
19 | | resolution of its corporate authorities, approval of
the county |
20 | | plan shall require an affirmative vote of at least two-thirds |
21 | | of the
county board members present and voting. If the county |
22 | | board wishes to
amend the county plan, it shall submit in |
23 | | writing specific proposals to the
stormwater management |
24 | | planning committee. If the proposals are not
approved by the |
25 | | committee, or are opposed by resolution of the corporate
|
26 | | authorities of an affected municipality having a municipal |
|
| | 10000SB1337sam002 | - 6 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | stormwater
management plan, amendment of the plan shall require |
2 | | an affirmative vote of
at least two-thirds of the county board |
3 | | members present and voting.
|
4 | | (f) The county board may prescribe by ordinance reasonable |
5 | | rules and
regulations for floodplain or stormwater management |
6 | | and for governing the location,
width, course and release rate |
7 | | of all stormwater runoff channels, streams
and basins in the |
8 | | county, in accordance with the adopted stormwater
management |
9 | | plan. These rules and regulations shall, at a minimum, meet
the |
10 | | standards for floodplain management established by the Office |
11 | | of Water Resources and
the requirements of the Federal |
12 | | Emergency Management Agency for participation
in the National |
13 | | Flood Insurance Program.
|
14 | | (g) In accordance with, and if recommended in, the adopted |
15 | | stormwater
management plan, the county board may adopt a |
16 | | schedule of fees
as may be necessary to mitigate the effects of |
17 | | increased stormwater runoff
resulting from new development. |
18 | | The fees shall not exceed the cost of
satisfying the onsite |
19 | | stormwater retention or detention requirements of the
adopted |
20 | | stormwater management plan. The fees shall be used to finance
|
21 | | activities undertaken by the county or its included |
22 | | municipalities to
mitigate the effects of urban stormwater |
23 | | runoff by providing regional
stormwater retention or detention |
24 | | facilities, as identified in the county
plan. All such fees |
25 | | collected by the county shall be held in a separate fund,
and |
26 | | shall be expended only in the watershed within which they were |
|
| | 10000SB1337sam002 | - 7 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | collected.
|
2 | | (h) For the purpose of implementing this Section and for |
3 | | the
development, design, planning, construction, operation and |
4 | | maintenance of
stormwater facilities provided for in the |
5 | | stormwater management plan, a
county board that has established |
6 | | a stormwater management planning
committee pursuant to this |
7 | | Section may cause an annual tax of not to exceed
0.20% of the |
8 | | value, as equalized or assessed by the Department of Revenue,
|
9 | | of all taxable property in the county to be levied upon all the |
10 | | taxable
property in the county. The tax shall be in addition to |
11 | | all other taxes
authorized by law to be levied and collected in |
12 | | the county and shall be in
addition to the maximum tax rate |
13 | | authorized by law for general county
purposes. The 0.20% |
14 | | limitation provided in this Section may be increased
or |
15 | | decreased by referendum in accordance with the provisions of |
16 | | Sections
18-120, 18-125, and 18-130 of the Property Tax Code.
|
17 | | Any revenues generated as a result of ownership or |
18 | | operation of facilities
or land acquired with the tax funds |
19 | | collected pursuant to this subsection
(h) shall be held in a |
20 | | separate fund and be used either to abate such
property tax or |
21 | | for implementing this Section.
|
22 | | However, unless at least part of the county has been |
23 | | declared after
July 1, 1986 by presidential proclamation to be |
24 | | a disaster area as a result
of flooding, the tax authorized by |
25 | | this subsection (h) shall not be levied
until the question of |
26 | | its adoption, either for a specified period or
indefinitely, |
|
| | 10000SB1337sam002 | - 8 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | has been submitted to the electors thereof and approved by a
|
2 | | majority of those voting on the question. This question may be |
3 | | submitted
at any election held in the county after the adoption |
4 | | of a resolution by
the county board providing for the |
5 | | submission of the question to the
electors of the county. The |
6 | | county board shall certify the resolution and
proposition to |
7 | | the proper election officials, who shall submit the
proposition |
8 | | at an election in accordance with the general election law. If
|
9 | | a majority of the votes cast on the question is in favor of the |
10 | | levy of
the tax, it may thereafter be levied in the county for |
11 | | the specified
period or indefinitely, as provided in the |
12 | | proposition. The question shall
be put in substantially the |
13 | | following form:
|
14 | | -------------------------------------------------------------
|
15 | | Shall an annual tax be levied
|
16 | | for stormwater management purposes YES
|
17 | | (for a period of not more than
|
18 | | ...... years) at a rate not exceeding ------------------
|
19 | | .....% of the equalized assessed
|
20 | | value of the taxable property of NO
|
21 | | ........ County?
|
22 | | -------------------------------------------------------------
|
23 | | (i) Upon the creation and implementation of a county |
24 | | stormwater management
plan, the county may petition the circuit |
25 | | court to dissolve any or all drainage
districts created |
26 | | pursuant to the Illinois Drainage Code or predecessor Acts
|
|
| | 10000SB1337sam002 | - 9 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | which are located entirely within the area of the county |
2 | | covered by the plan.
|
3 | | However, any active drainage district implementing a plan |
4 | | that is
consistent with and at least as stringent as the county |
5 | | stormwater
management plan may petition the stormwater |
6 | | management planning committee
for exception from dissolution. |
7 | | Upon filing of the petition, the committee
shall set a date for |
8 | | hearing not less than 2 weeks, nor more than 4 weeks,
from the |
9 | | filing thereof, and the committee shall give at least one |
10 | | week's
notice of the hearing in one or more newspapers of |
11 | | general circulation
within the district, and in addition shall |
12 | | cause a copy of the notice to be
personally served upon each of |
13 | | the trustees of the district. At the
hearing, the committee |
14 | | shall hear the district's petition and allow the
district |
15 | | trustees and any interested parties an opportunity to present |
16 | | oral
and written evidence. The committee shall render its |
17 | | decision upon the
petition for exception from dissolution based |
18 | | upon the best interests of
the residents of the district. In |
19 | | the event that the exception is not
allowed, the district may |
20 | | file a petition within 30 days of the decision
with the circuit |
21 | | court. In that case, the notice and hearing requirements
for |
22 | | the court shall be the same as herein provided for the |
23 | | committee.
The court shall likewise render its decision of |
24 | | whether to dissolve the
district based upon the best interests |
25 | | of residents of the district.
|
26 | | The dissolution of any drainage district shall not affect |
|
| | 10000SB1337sam002 | - 10 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | the obligation
of any bonds issued or contracts entered into by |
2 | | the district nor
invalidate the levy, extension or collection |
3 | | of any taxes or special
assessments upon the property in the |
4 | | former drainage district. All property
and obligations of the |
5 | | former drainage district shall be assumed and
managed by the |
6 | | county, and the debts of the former drainage district shall
be |
7 | | discharged as soon as practicable.
|
8 | | If a drainage district lies only partly within a county |
9 | | that adopts a
county stormwater management plan, the county may |
10 | | petition the circuit
court to disconnect from the drainage |
11 | | district that portion of the district
that lies within that |
12 | | county. The property of the drainage district within the
|
13 | | disconnected area shall be assumed and managed by the county. |
14 | | The county shall
also assume a portion of the drainage |
15 | | district's debt at the time of
disconnection, based on the |
16 | | portion of the value of the taxable property of the
drainage |
17 | | district which is located within the area being disconnected.
|
18 | | The operations of any drainage district that continues to |
19 | | exist in a
county that has adopted a stormwater management plan |
20 | | in accordance with
this Section shall be in accordance with the |
21 | | adopted plan.
|
22 | | (j) Any county that has adopted a county stormwater |
23 | | management plan
under this Section may, after 10 days written |
24 | | notice to the owner or
occupant, enter upon any lands or waters |
25 | | within the county for the purpose
of inspecting stormwater |
26 | | facilities or causing the removal of any
obstruction to an |
|
| | 10000SB1337sam002 | - 11 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | affected watercourse. The county shall be responsible
for any |
2 | | damages occasioned thereby.
|
3 | | (k) Upon petition of the municipality, and based on a |
4 | | finding of the
stormwater management planning committee, the |
5 | | county shall not enforce
rules and regulations adopted by the |
6 | | county in any municipality located
wholly or partly within the |
7 | | county that has a municipal stormwater
management ordinance |
8 | | that is consistent with and at least as stringent as
the county |
9 | | plan and ordinance, and is being enforced by the municipal
|
10 | | authorities.
|
11 | | (l) A county may issue general obligation bonds for |
12 | | implementing any
stormwater plan adopted under this Section in |
13 | | the manner prescribed in
Section 5-1012; except that the |
14 | | referendum requirement of Section 5-1012 shall
not apply to |
15 | | bonds issued pursuant to this Section on which the principal |
16 | | and
interest are to be paid entirely out of funds generated by |
17 | | the taxes and fees
authorized by this Section.
|
18 | | (m) The powers authorized by this Section may be |
19 | | implemented by the
county board for a portion of the county |
20 | | subject to similar stormwater
management needs.
|
21 | | (n) The powers and taxes authorized by this Section are in |
22 | | addition to the
powers and taxes authorized by Division 5-15; |
23 | | in exercising its powers
under this Section, a county shall not |
24 | | be subject to the restrictions and
requirements of that |
25 | | Division.
|
26 | | (o) Pursuant to paragraphs (g) and (i) of Section 6 of |
|
| | 10000SB1337sam002 | - 12 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | Article VII of
the Illinois Constitution, this Section |
2 | | specifically denies and limits the
exercise of any power which |
3 | | is inconsistent herewith by home rule units in
any county with |
4 | | a population of less than 1,500,000 in the area served by
the |
5 | | Chicago Metropolitan Agency for Planning Northeastern Illinois |
6 | | Planning Commission . This Section does not
prohibit the |
7 | | concurrent exercise of powers consistent herewith.
|
8 | | (p) As used in this Section: |
9 | | "Urban flooding" means the flooding of public and private |
10 | | land in urban communities that results from stormwater or |
11 | | snowmelt runoff overwhelming the existing drainage |
12 | | infrastructure, unrelated to the overflow of any river or lake, |
13 | | whether or not that land is located in or near a floodplain. |
14 | | "Urbanized areas" means a statistical geographic entity |
15 | | consisting of a densely settled core created from census tracts |
16 | | or blocks and contiguous qualifying territory that together |
17 | | have a minimum population of at least 50,000 persons and has |
18 | | been delineated as an urbanized area by the United States |
19 | | Census Bureau after the most recent decennial census. |
20 | | (Source: P.A. 97-916, eff. 8-9-12.)
|
21 | | (55 ILCS 5/5-1062.2) |
22 | | Sec. 5-1062.2. Stormwater management. |
23 | | (a) The purpose of this Section is to allow management and |
24 | | mitigation of the effects of urbanization on stormwater |
25 | | drainage in the metropolitan counties of Madison, St. Clair, |
|
| | 10000SB1337sam002 | - 13 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and Boone |
2 | | as well as all counties containing all or a part of an |
3 | | urbanized area and references to "county" in this Section apply |
4 | | only to those counties. This Section does not apply to counties |
5 | | in the Chicago Metropolitan Agency for Planning Northeastern |
6 | | Illinois Planning Commission that are granted authorities in |
7 | | Section 5-1062. The purpose of this Section shall be achieved |
8 | | by: |
9 | | (1) Consolidating the existing stormwater management
|
10 | | framework into a united, countywide structure. |
11 | | (2) Setting minimum standards for floodplain and
|
12 | | stormwater management with an emphasis on the use of |
13 | | cost-effective solutions to flooding problems . |
14 | | (3) Preparing a countywide plan for the management
of |
15 | | stormwater runoff, including the management of natural and |
16 | | man-made drainageways. The countywide plan may incorporate |
17 | | watershed plans and shall evaluate and address flooding |
18 | | problems that exist in urbanized areas that are a result of |
19 | | urban flooding . |
20 | | (a-5) This Section also applies to all counties not |
21 | | otherwise covered in Section 5-1062, 5-1062.2, or 5-1062.3 if |
22 | | the question of allowing the county board to establish a |
23 | | stormwater management planning council has been submitted to |
24 | | the electors of the county and approved by a majority of those |
25 | | voting on the question. |
26 | | (b) A stormwater management planning committee may be |
|
| | 10000SB1337sam002 | - 14 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | established by county board resolution, with its membership |
2 | | consisting of equal numbers of county board and municipal |
3 | | representatives from each county board district, one member |
4 | | representing drainage districts, and one member representing |
5 | | soil and water conservation districts and such other members as |
6 | | may be determined by the stormwater management planning |
7 | | committee county and municipal members. If the county has more |
8 | | than 6 county board districts, however, the county board may by |
9 | | ordinance divide the county into not less than 6 areas of |
10 | | approximately equal population, to be used instead of county |
11 | | board districts for the purpose of determining representation |
12 | | on the stormwater management planning committee. |
13 | | The county board members shall be appointed by the chairman |
14 | | of the county board. Municipal members from each county board |
15 | | district or other represented area shall be appointed by a |
16 | | majority vote of the mayors of those municipalities that have |
17 | | the greatest percentage of their respective populations |
18 | | residing in that county board district or other represented |
19 | | area. The member representing drainage districts shall be |
20 | | appointed by the drainage district chairperson or by a majority |
21 | | vote of all drainage district chairpersons in the county if |
22 | | more than one drainage district exists in the county. The |
23 | | member representing soil and water conservation districts |
24 | | shall be appointed by a majority vote of the soil and water |
25 | | conservation district board or by a majority vote of all soil |
26 | | and water conservation district boards in the county if more |
|
| | 10000SB1337sam002 | - 15 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | than one soil and water conservation district board exists in |
2 | | the county. All municipal , and county board , drainage district, |
3 | | and soil and water conservation district representatives shall |
4 | | be entitled to a vote; the other members shall be nonvoting |
5 | | members, unless authorized to vote by the unanimous consent of |
6 | | the voting members of the committee; however, Madison, St. |
7 | | Clair, Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and |
8 | | Boone counties are not required to have a drainage district or |
9 | | a soil and water conservation representative the municipal and |
10 | | county board representatives . A municipality that is located in |
11 | | more than one county may choose, at the time of formation of |
12 | | the stormwater management planning committee and based on |
13 | | watershed boundaries, to participate in the stormwater |
14 | | management planning program of either or both of the counties. |
15 | | Subcommittees of the stormwater management planning committee |
16 | | may be established to serve a portion of the county or a |
17 | | particular drainage basin that has similar stormwater |
18 | | management needs. The stormwater management planning committee |
19 | | shall adopt bylaws, by a majority vote of the county and |
20 | | municipal members, to govern the functions of the committee and |
21 | | its subcommittees. Officers of the committee shall include a |
22 | | chair and vice chair, one of whom shall be a county |
23 | | representative and one a municipal representative. |
24 | | The principal duties of the committee shall be to develop a |
25 | | stormwater management plan for presentation to and approval by |
26 | | the county board, and to direct the plan's implementation and |
|
| | 10000SB1337sam002 | - 16 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | revision. The committee may retain engineering, legal, and |
2 | | financial advisors and inspection personnel. The committee |
3 | | shall meet at least quarterly and shall hold at least one |
4 | | public meeting during the preparation of the plan and prior to |
5 | | its submittal to the county board. The committee may make |
6 | | grants to : (1) units of local government ; (2) not-for-profit |
7 | | organizations; and (3) landowners. In order for a municipality |
8 | | located partially or wholly within a mapped floodplain to |
9 | | receive grant moneys, the municipality must be a member in the |
10 | | Federal Emergency Management Agency's National Flood Insurance |
11 | | Program. A municipality receiving grant moneys must that have |
12 | | adopted an ordinance requiring actions consistent with the |
13 | | stormwater management plan . Use and to landowners for the |
14 | | purposes of stormwater management, including special projects; |
15 | | use of the grant money must be consistent with the stormwater |
16 | | management plan. |
17 | | The committee shall not have or exercise any power of |
18 | | eminent domain.
|
19 | | (c) In the preparation of a stormwater management plan, a |
20 | | county stormwater management planning committee shall |
21 | | coordinate the planning process with each adjoining county to |
22 | | ensure that recommended stormwater projects will have no |
23 | | significant impact on the levels or flows of stormwaters in |
24 | | inter-county watersheds or on the capacity of existing and |
25 | | planned stormwater retention facilities. An adopted stormwater |
26 | | management plan shall identify steps taken by the county to |
|
| | 10000SB1337sam002 | - 17 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | coordinate the development of plan recommendations with |
2 | | adjoining counties. |
3 | | (d) The stormwater management committee may not enforce any |
4 | | rules or regulations that would interfere with (i) any power |
5 | | granted by the Illinois Drainage Code (70 ILCS 605/) to |
6 | | operate, construct, maintain, or improve drainage systems or |
7 | | (ii) the ability to operate, maintain, or improve the drainage |
8 | | systems used on or by land or a facility used for production |
9 | | agriculture purposes, as defined in the Use Tax Act (35 ILCS |
10 | | 105/), except newly constructed buildings and newly installed |
11 | | impervious paved surfaces. Disputes regarding an exception |
12 | | shall be determined by a mutually agreed upon arbitrator paid |
13 | | by the disputing party or parties. |
14 | | (e) Before the stormwater management planning committee |
15 | | recommends to the county board a stormwater management plan for |
16 | | the county or a portion thereof, it shall submit the plan to |
17 | | the Office of Water Resources of the Department of Natural |
18 | | Resources for review and recommendations. The Office, in |
19 | | reviewing the plan, shall consider such factors as impacts on |
20 | | the levels or flows in rivers and streams and the cumulative |
21 | | effects of stormwater discharges on flood levels. The Office of |
22 | | Water Resources shall determine whether the plan or ordinances |
23 | | enacted to implement the plan complies with the requirements of |
24 | | subsection (f). Within a period not to exceed 60 days, the |
25 | | review comments and recommendations shall be submitted to the |
26 | | stormwater management planning committee for consideration. |
|
| | 10000SB1337sam002 | - 18 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | Any amendments to the plan shall be submitted to the Office for |
2 | | review. |
3 | | (f) Prior to recommending the plan to the county board, the |
4 | | stormwater management planning committee shall hold at least |
5 | | one public hearing thereon and shall afford interested persons |
6 | | an opportunity to be heard. The hearing shall be held in the |
7 | | county seat. Notice of the hearing shall be published at least |
8 | | once no less than 15 days in advance of the hearing in a |
9 | | newspaper of general circulation published in the county. The |
10 | | notice shall state the time and place of the hearing and the |
11 | | place where copies of the proposed plan will be accessible for |
12 | | examination by interested parties. If an affected municipality |
13 | | having a stormwater management plan adopted by ordinance wishes |
14 | | to protest the proposed county plan provisions, it shall appear |
15 | | at the hearing and submit in writing specific proposals to the |
16 | | stormwater management planning committee. After consideration |
17 | | of the matters raised at the hearing, the committee may amend |
18 | | or approve the plan and recommend it to the county board for |
19 | | adoption. |
20 | | The county board may enact the proposed plan by ordinance. |
21 | | If the proposals for modification of the plan made by an |
22 | | affected municipality having a stormwater management plan are |
23 | | not included in the proposed county plan, and the municipality |
24 | | affected by the plan opposes adoption of the county plan by |
25 | | resolution of its corporate authorities, approval of the county |
26 | | plan shall require an affirmative vote of at least two-thirds |
|
| | 10000SB1337sam002 | - 19 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | of the county board members present and voting. If the county |
2 | | board wishes to amend the county plan, it shall submit in |
3 | | writing specific proposals to the stormwater management |
4 | | planning committee. If the proposals are not approved by the |
5 | | committee, or are opposed by resolution of the corporate |
6 | | authorities of an affected municipality having a municipal |
7 | | stormwater management plan, amendment of the plan shall require |
8 | | an affirmative vote of at least two-thirds of the county board |
9 | | members present and voting. |
10 | | (g) The county board may prescribe by ordinance reasonable |
11 | | rules and regulations for floodplain or stormwater management |
12 | | and for governing the location, width, course, and release rate |
13 | | of all stormwater runoff channels, streams, and basins in the |
14 | | county, in accordance with the adopted stormwater management |
15 | | plan. Land, facilities, and drainage district facilities used |
16 | | for production agriculture as defined in subsection (d) shall |
17 | | not be subjected to regulation by the county board or |
18 | | stormwater management committee under this Section for |
19 | | floodplain management and for governing location, width, |
20 | | course, maintenance, and release rate of stormwater runoff |
21 | | channels, streams and basins, or water discharged from a |
22 | | drainage district. These rules and regulations shall, at a |
23 | | minimum, meet the standards for floodplain management |
24 | | established by the Office of Water Resources and the |
25 | | requirements of the Federal Emergency Management Agency for |
26 | | participation in the National Flood Insurance Program. The |
|
| | 10000SB1337sam002 | - 20 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | Commission may not impose more stringent regulations regarding |
2 | | water quality on entities discharging in accordance with a |
3 | | valid National Pollution Discharge Elimination System permit |
4 | | issued under the Environmental Protection Act. |
5 | | (h) In accordance with, and if recommended in, the adopted |
6 | | stormwater management plan, the county board may adopt a |
7 | | schedule of fees as may be necessary to mitigate the effects of |
8 | | increased stormwater runoff resulting from new development |
9 | | based on actual costs. The fees shall not exceed the cost of |
10 | | satisfying the onsite stormwater retention or detention |
11 | | requirements of the adopted stormwater management plan. The |
12 | | fees shall be used to finance activities undertaken by the |
13 | | county or its included municipalities to mitigate the effects |
14 | | of urban stormwater runoff by providing regional stormwater |
15 | | retention or detention facilities, as identified in the county |
16 | | plan. The county board shall provide for a credit or reduction |
17 | | in fees for any onsite retention, detention, drainage district |
18 | | assessments, or other similar stormwater facility that the |
19 | | developer is required to construct consistent with the |
20 | | stormwater management ordinance. All these fees collected by |
21 | | the county shall be held in a separate fund, and shall be |
22 | | expended only in the watershed within which they were |
23 | | collected. |
24 | | (i) For the purpose of implementing this Section and for |
25 | | the development, design, planning, construction, operation, |
26 | | and maintenance of stormwater facilities provided for in the |
|
| | 10000SB1337sam002 | - 21 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | stormwater management plan, a county board that has established |
2 | | a stormwater management planning committee pursuant to this |
3 | | Section may cause an annual tax of not to exceed 0.20% of the |
4 | | value, as equalized or assessed by the Department of Revenue, |
5 | | of all taxable property in the county to be levied upon all the |
6 | | taxable property in the county or occupation and use taxes of |
7 | | 1/10 of one cent. The property tax shall be in addition to all |
8 | | other taxes authorized by law to be levied and collected in the |
9 | | county and shall be in addition to the maximum tax rate |
10 | | authorized by law for general county purposes. The 0.20% |
11 | | limitation provided in this Section may be increased or |
12 | | decreased by referendum at a general election in accordance |
13 | | with the provisions of Sections 18-120, 18-125, and 18-130 of |
14 | | the Property Tax Code (35 ILCS 200/). |
15 | | Any revenues generated as a result of ownership or |
16 | | operation of facilities or land acquired with the tax funds |
17 | | collected pursuant to this subsection shall be held in a |
18 | | separate fund and be used either to abate such property tax or |
19 | | for implementing this Section. |
20 | | However, the tax authorized by this subsection shall not be |
21 | | levied until the question of its adoption, either for a |
22 | | specified period or indefinitely, has been submitted to the |
23 | | electors thereof and approved by a majority of those voting on |
24 | | the question. This question may be submitted at any general |
25 | | election held in the county after the adoption of a resolution |
26 | | by the county board providing for the submission of the |
|
| | 10000SB1337sam002 | - 22 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | question to the electors of the county. The county board shall |
2 | | certify the resolution and proposition to the proper election |
3 | | officials, who shall submit the proposition at an election in |
4 | | accordance with the general election law. If a majority of the |
5 | | votes cast on the question is in favor of the levy of the tax, |
6 | | it may thereafter be levied in the county for the specified |
7 | | period or indefinitely, as provided in the proposition. The |
8 | | question shall be put in substantially the following form: |
9 | | Shall an annual tax be levied
for stormwater management |
10 | | purposes (for a period of not more than ..... years) at a |
11 | | rate not exceeding
.....% of the equalized assessed
value |
12 | | of the taxable property of ..... County?
|
13 | | Or this question may be submitted at any general election held |
14 | | in the county after the adoption of a resolution by the county |
15 | | board providing for the submission of the question to the |
16 | | electors of the county to authorize use and occupation taxes of |
17 | | 1/10 of one cent: |
18 | | Shall use and occupation taxes be raised for stormwater |
19 | | management purposes (for a period of not more than ..... |
20 | | years) at a rate of 1/10 of one cent for taxable goods in |
21 | | ..... County? |
22 | | Votes shall be recorded as Yes or No.
|
23 | | (j) For those counties that adopt a property tax in |
24 | | accordance with the provisions in this Section, the stormwater |
25 | | management committee shall offer property tax abatements or |
26 | | incentive payments to property owners who construct, maintain, |
|
| | 10000SB1337sam002 | - 23 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | and use approved stormwater management devices. For those |
2 | | counties that adopt use and occupation taxes in accordance with |
3 | | the provisions of this Section, the stormwater management |
4 | | committee may offer tax rebates or incentive payments to |
5 | | property owners who construct, maintain, and use approved |
6 | | stormwater management devices.
The stormwater management |
7 | | committee is authorized to offer credits to the property tax, |
8 | | if applicable, based on authorized practices consistent with |
9 | | the stormwater management plan and approved by the committee. |
10 | | Expenses of staff of a stormwater management committee that are |
11 | | expended on regulatory project review may be no more than 20% |
12 | | of the annual budget of the committee, including funds raised |
13 | | under subsections (h) and (i). |
14 | | (k) Any county that has adopted a county stormwater |
15 | | management plan under this Section may, after 10 days written |
16 | | notice receiving consent of the owner or occupant, enter upon |
17 | | any lands or waters within the county for the purpose of |
18 | | inspecting stormwater facilities or causing the removal of any |
19 | | obstruction to an affected watercourse. If consent is denied or |
20 | | cannot be reasonably obtained, the county ordinance shall |
21 | | provide a process or procedure for an administrative warrant to |
22 | | be obtained. The county shall be responsible for any damages |
23 | | occasioned thereby. |
24 | | (l) Upon petition of the municipality, and based on a |
25 | | finding of the stormwater management planning committee, the |
26 | | county shall not enforce rules and regulations adopted by the |
|
| | 10000SB1337sam002 | - 24 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | county in any municipality located wholly or partly within the |
2 | | county that has a municipal stormwater management ordinance |
3 | | that is consistent with and at least as stringent as the county |
4 | | plan and ordinance, and is being enforced by the municipal |
5 | | authorities. On issues that the county ordinance is more |
6 | | stringent as deemed by the committee, the county shall only |
7 | | enforce rules and regulations adopted by the county on the more |
8 | | stringent issues and accept municipal permits. The county shall |
9 | | have no more than 60 days to review permits or the permits |
10 | | shall be deemed approved. |
11 | | (m) A county may issue general obligation bonds for |
12 | | implementing any stormwater plan adopted under this Section in |
13 | | the manner prescribed in Section 5-1012; except that the |
14 | | referendum requirement of Section 5-1012 does not apply to |
15 | | bonds issued pursuant to this Section on which the principal |
16 | | and interest are to be paid entirely out of funds generated by |
17 | | the taxes and fees authorized by this Section. |
18 | | (n) The powers authorized by this Section may be |
19 | | implemented by the county board for a portion of the county |
20 | | subject to similar stormwater management needs. |
21 | | (o) The powers and taxes authorized by this Section are in |
22 | | addition to the powers and taxes authorized by Division 5-15; |
23 | | in exercising its powers under this Section, a county shall not |
24 | | be subject to the restrictions and requirements of that |
25 | | Division.
|
26 | | (p) As used in this Section: |
|
| | 10000SB1337sam002 | - 25 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | "Urban flooding" means the flooding of public and private |
2 | | land in urban communities that results from stormwater or |
3 | | snowmelt runoff overwhelming the existing drainage |
4 | | infrastructure, unrelated to the overflow of any river or lake, |
5 | | whether or not that land is located in or near a floodplain. |
6 | | "Urbanized areas" means a statistical geographic entity |
7 | | consisting of a densely settled core created from census tracts |
8 | | or blocks and contiguous qualifying territory that together |
9 | | have a minimum population of at least 50,000 persons and has |
10 | | been delineated as an urbanized area by the United States |
11 | | Census Bureau after the most recent decennial census. |
12 | | (Source: P.A. 94-675, eff. 8-23-05.) |
13 | | (55 ILCS 5/5-1062.3) |
14 | | Sec. 5-1062.3. Stormwater management; DuPage and Peoria |
15 | | Counties. |
16 | | (a) The purpose of this Section is to allow management and |
17 | | mitigation of the effects of urbanization on stormwater |
18 | | drainage in the metropolitan counties of DuPage and Peoria, and |
19 | | references to "county" in this Section apply only to those |
20 | | counties. This Section does not apply to a municipality that |
21 | | only partially lies within one of these counties and, on the |
22 | | effective date of this amendatory Act of the 98th General |
23 | | Assembly, is served by an existing Section in the Counties Code |
24 | | regarding stormwater management. The purpose of this Section |
25 | | shall be achieved by: |
|
| | 10000SB1337sam002 | - 26 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | (1) consolidating the existing stormwater management |
2 | | framework into a
united, countywide structure; |
3 | | (2) setting minimum standards for floodplain and |
4 | | stormwater management with an emphasis on the use of |
5 | | cost-effective solutions to flooding problems ;
and |
6 | | (3) preparing a countywide plan for the management of |
7 | | stormwater runoff,
including the management of natural and |
8 | | man-made drainageways. The countywide
plan may incorporate |
9 | | watershed plans and shall evaluate and address flooding |
10 | | problems that exist in urbanized areas that are a result of |
11 | | urban flooding . |
12 | | (b) A stormwater management planning committee may be |
13 | | established by county board resolution, with its membership |
14 | | consisting of equal numbers of county board and municipal |
15 | | representatives from each county board district, and such other |
16 | | members as may be determined by the county and municipal |
17 | | members. If the county has more than 6 county board districts, |
18 | | however, the county board may by ordinance divide the county |
19 | | into not less than 6 areas of approximately equal population, |
20 | | to be used instead of county board districts for the purpose of |
21 | | determining representation on the stormwater management |
22 | | planning committee. |
23 | | The county board members shall be appointed by the chairman |
24 | | of the county board. Municipal members from each county board |
25 | | district or other represented area shall be appointed by a |
26 | | majority vote of the mayors of those municipalities that have |
|
| | 10000SB1337sam002 | - 27 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | the greatest percentage of their respective populations |
2 | | residing in that county board district or other represented |
3 | | area. All municipal and county board representatives shall be |
4 | | entitled to a vote; the other members shall be nonvoting |
5 | | members, unless authorized to vote by the unanimous consent of |
6 | | the municipal and county board representatives. A municipality |
7 | | that is located in more than one county may choose, at the time |
8 | | of formation of the stormwater management planning committee |
9 | | and based on watershed boundaries, to participate in the |
10 | | stormwater management planning program of either county. |
11 | | Subcommittees of the stormwater management planning committee |
12 | | may be established to serve a portion of the county or a |
13 | | particular drainage basin that has similar stormwater |
14 | | management needs. The stormwater management planning committee |
15 | | shall adopt bylaws, by a majority vote of the county and |
16 | | municipal members, to govern the functions of the committee and |
17 | | its subcommittees. Officers of the committee shall include a |
18 | | chair and vice chair, one of whom shall be a county |
19 | | representative and one a municipal representative. |
20 | | The principal duties of the committee shall be to develop a |
21 | | stormwater management plan for presentation to and approval by |
22 | | the county board, and to direct the plan's implementation and |
23 | | revision. The committee may retain engineering, legal, and |
24 | | financial advisors and inspection personnel. The committee |
25 | | shall meet at least quarterly and shall hold at least one |
26 | | public meeting during the preparation of the plan and prior to |
|
| | 10000SB1337sam002 | - 28 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | its submittal to the county board. The committee may make |
2 | | grants to : (1) units of local government ; (2) not-for-profit |
3 | | organizations; and (3) landowners. In order for a municipality |
4 | | located partially or wholly within a mapped floodplain to |
5 | | receive grant moneys, the municipality must be a member in the |
6 | | Federal Emergency Management Agency's National Flood Insurance |
7 | | Program. A municipality receiving grant moneys must that have |
8 | | adopted an ordinance requiring actions consistent with the |
9 | | stormwater management plan . Use and to landowners for the |
10 | | purposes of stormwater management, including special projects; |
11 | | use of the grant money must be consistent with the stormwater |
12 | | management plan. |
13 | | The committee shall not have or exercise any power of |
14 | | eminent domain. |
15 | | (c) In the preparation of a stormwater management plan, a |
16 | | county stormwater management planning committee shall |
17 | | coordinate the planning process with each adjoining county to |
18 | | ensure that recommended stormwater projects will have no |
19 | | significant impact on the levels or flows of stormwaters in |
20 | | inter-county watersheds or on the capacity of existing and |
21 | | planned stormwater retention facilities. An adopted stormwater |
22 | | management plan shall identify steps taken by the county to |
23 | | coordinate the development of plan recommendations with |
24 | | adjoining counties. |
25 | | (d) The stormwater management committee may not enforce any |
26 | | rules or regulations that would interfere with (i) any power |
|
| | 10000SB1337sam002 | - 29 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | granted by the Illinois Drainage Code (70 ILCS 605/) to |
2 | | operate, construct, maintain, or improve drainage systems or |
3 | | (ii) the ability to operate, maintain, or improve the drainage |
4 | | systems used on or by land or a facility used for production |
5 | | agriculture purposes, as defined in the Use Tax Act (35 ILCS |
6 | | 105/), except newly constructed buildings and newly installed |
7 | | impervious paved surfaces. Disputes regarding an exception |
8 | | shall be determined by a mutually agreed upon arbitrator paid |
9 | | by the disputing party or parties. |
10 | | (e) Before the stormwater management planning committee |
11 | | recommends to the county board a stormwater management plan for |
12 | | the county or a portion thereof, it shall submit the plan to |
13 | | the Office of Water Resources of the Department of Natural |
14 | | Resources for review and recommendations. The Office, in |
15 | | reviewing the plan, shall consider such factors as impacts on |
16 | | the levels or flows in rivers and streams and the cumulative |
17 | | effects of stormwater discharges on flood levels. The Office of |
18 | | Water Resources shall determine whether the plan or ordinances |
19 | | enacted to implement the plan complies with the requirements of |
20 | | subsection (f). Within a period not to exceed 60 days, the |
21 | | review comments and recommendations shall be submitted to the |
22 | | stormwater management planning committee for consideration. |
23 | | Any amendments to the plan shall be submitted to the Office for |
24 | | review. |
25 | | (f) Prior to recommending the plan to the county board, the |
26 | | stormwater management planning committee shall hold at least |
|
| | 10000SB1337sam002 | - 30 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | one public hearing thereon and shall afford interested persons |
2 | | an opportunity to be heard. The hearing shall be held in the |
3 | | county seat. Notice of the hearing shall be published at least |
4 | | once and no less than 15 days in advance of the hearing in a |
5 | | newspaper of general circulation published in the county. The |
6 | | notice shall state the time and place of the hearing and the |
7 | | place where copies of the proposed plan will be accessible for |
8 | | examination by interested parties. If an affected municipality |
9 | | having a stormwater management plan adopted by ordinance wishes |
10 | | to protest the proposed county plan provisions, it shall appear |
11 | | at the hearing and submit in writing specific proposals to the |
12 | | stormwater management planning committee. After consideration |
13 | | of the matters raised at the hearing, the committee may amend |
14 | | or approve the plan and recommend it to the county board for |
15 | | adoption. |
16 | | The county board may enact the proposed plan by ordinance. |
17 | | If the proposals for modification of the plan made by an |
18 | | affected municipality having a stormwater management plan are |
19 | | not included in the proposed county plan, and the municipality |
20 | | affected by the plan opposes adoption of the county plan by |
21 | | resolution of its corporate authorities, approval of the county |
22 | | plan shall require an affirmative vote of at least two-thirds |
23 | | of the county board members present and voting. If the county |
24 | | board wishes to amend the county plan, it shall submit in |
25 | | writing specific proposals to the stormwater management |
26 | | planning committee. If the proposals are not approved by the |
|
| | 10000SB1337sam002 | - 31 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | committee, or are opposed by resolution of the corporate |
2 | | authorities of an affected municipality having a municipal |
3 | | stormwater management plan, amendment of the plan shall require |
4 | | an affirmative vote of at least two-thirds of the county board |
5 | | members present and voting. |
6 | | (g) The county board may prescribe by ordinance reasonable |
7 | | rules and regulations for floodplain or stormwater management |
8 | | and for governing the location, width, course, and release rate |
9 | | of all stormwater runoff channels, streams, and basins in the |
10 | | county, in accordance with the adopted stormwater management |
11 | | plan. Land, facilities, and drainage district facilities used |
12 | | for production agriculture as defined in subsection (d) shall |
13 | | not be subjected to regulation by the county board or |
14 | | stormwater management committee under this Section for |
15 | | floodplain management and for governing location, width, |
16 | | course, maintenance, and release rate of stormwater runoff |
17 | | channels, streams and basins, or water discharged from a |
18 | | drainage district. These rules and regulations shall, at a |
19 | | minimum, meet the standards for floodplain management |
20 | | established by the Office of Water Resources and the |
21 | | requirements of the Federal Emergency Management Agency for |
22 | | participation in the National Flood Insurance Program. With |
23 | | respect to DuPage County only, the Chicago Metropolitan Agency |
24 | | for Planning may not impose more stringent regulations |
25 | | regarding water quality on entities discharging in accordance |
26 | | with a valid National Pollution Discharge Elimination System |
|
| | 10000SB1337sam002 | - 32 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | permit issued under the Environmental Protection Act. |
2 | | (h) For the purpose of implementing this Section and for |
3 | | the development, design, planning, construction, operation, |
4 | | and maintenance of stormwater facilities provided for in the |
5 | | adopted stormwater management plan, a county board that has |
6 | | established a stormwater management planning committee |
7 | | pursuant to this Section or has participated in a stormwater |
8 | | management planning process may adopt a schedule of fees |
9 | | applicable to all real property within the county which |
10 | | benefits from the county's stormwater management facilities |
11 | | and activities, and as may be necessary to mitigate the effects |
12 | | of increased stormwater runoff resulting from development. The |
13 | | total amount of the fees assessed must be specifically and |
14 | | uniquely attributable to the actual costs of the county in the |
15 | | preparation, administration, and implementation of the adopted |
16 | | stormwater management plan, construction and maintenance of |
17 | | stormwater facilities, and other activities related to the |
18 | | management of the runoff from the property. The individual fees |
19 | | must be specifically and uniquely attributable to the portion |
20 | | of the actual cost to the county of managing the runoff from |
21 | | the property. The fees shall be used to finance activities |
22 | | undertaken by the county or its included municipalities to |
23 | | mitigate the effects of urban stormwater runoff by providing |
24 | | and maintaining stormwater collection, retention, detention, |
25 | | and particulate treatment facilities, and improving water |
26 | | bodies impacted by stormwater runoff, as identified in the |
|
| | 10000SB1337sam002 | - 33 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | county plan. In establishing, maintaining, or replacing such |
2 | | facilities, the county shall not duplicate facilities operated |
3 | | by other governmental bodies within its corporate boundaries. |
4 | | The schedule of fees established by the county board shall |
5 | | include a procedure for a full or partial fee waiver for |
6 | | property owners who have taken actions or put in place |
7 | | facilities that reduce or eliminate the cost to the county of |
8 | | providing stormwater management services to their property. |
9 | | The county board may also offer tax or fee rebates or incentive |
10 | | payments to property owners who construct, maintain, and use |
11 | | approved green infrastructure stormwater management devices or |
12 | | any other methods that reduce or eliminate the cost to the |
13 | | county of providing stormwater management services to the |
14 | | property, including but not limited to facilities that reduce |
15 | | the volume, temperature, velocity, and pollutant load of the |
16 | | stormwater managed by the county, such as systems that |
17 | | infiltrate, evapotranspirate, or harvest stormwater for reuse, |
18 | | known as "green infrastructure". In exercising this authority, |
19 | | the county shall provide notice to the municipalities within |
20 | | its jurisdiction of any fees proposed under this Section and |
21 | | seek the input of each municipality with respect to the |
22 | | calculation of the fees. The county shall also give property |
23 | | owners at least 2 years' notice of the fee, during which time |
24 | | the county shall provide education on green infrastructure |
25 | | practices and an opportunity to take action to reduce or |
26 | | eliminate the fee. All these fees collected by the county shall |
|
| | 10000SB1337sam002 | - 34 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | be held in a separate fund, and shall be expended only in the |
2 | | watershed within which they were collected. The county may |
3 | | enter into intergovernmental agreements with other government |
4 | | bodies for the joint administration of stormwater management |
5 | | and the collection of the fees authorized in this Section. |
6 | | A fee schedule authorized by this subsection must have the |
7 | | same limit as the authorized stormwater tax. In Peoria County |
8 | | only, the fee schedule shall not be adopted unless (i) a |
9 | | referendum has been passed approving a stormwater tax as |
10 | | provided in subsection (i) of this Section; or (ii) the |
11 | | question of the adoption of a fee schedule with the same limit |
12 | | as the authorized stormwater tax has been approved in a |
13 | | referendum by a majority of those voting on the question. |
14 | | (i) In the alternative to a fee imposed under subsection |
15 | | (h), the county board may cause an annual tax of not to exceed |
16 | | 0.20% of the value, as equalized or assessed by the Department |
17 | | of Revenue, of all taxable property in the county to be levied |
18 | | upon all the taxable property in the county. The property tax |
19 | | shall be in addition to all other taxes authorized by law to be |
20 | | levied and collected in the county and shall be in addition to |
21 | | the maximum tax rate authorized by law for general county |
22 | | purposes. The 0.20% limitation provided in this Section may be |
23 | | increased or decreased by referendum in accordance with the |
24 | | provisions of Sections 18-120, 18-125, and 18-130 of the |
25 | | Property Tax Code (35 ILCS 200/). |
26 | | Any revenues generated as a result of ownership or |
|
| | 10000SB1337sam002 | - 35 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | operation of facilities or land acquired with the tax funds |
2 | | collected pursuant to this subsection shall be held in a |
3 | | separate fund and be used either to abate such property tax or |
4 | | for implementing this Section. |
5 | | If at least part of the county has been declared by a |
6 | | presidential proclamation after July 1, 1986 and before |
7 | | December 31, 1987, to be a disaster area as a result of |
8 | | flooding, the tax authorized by this subsection does not |
9 | | require approval by referendum. However, in Peoria County, the |
10 | | tax authorized by this subsection shall not be levied until the |
11 | | question of its adoption, either for a specified period or |
12 | | indefinitely, has been submitted to the electors thereof and |
13 | | approved by a majority of those voting on the question. This |
14 | | question may be submitted at any election held in the county |
15 | | after the adoption of a resolution by the county board |
16 | | providing for the submission of the question to the electors of |
17 | | the county. The county board shall certify the resolution and |
18 | | proposition to the proper election officials, who shall submit |
19 | | the proposition at an election in accordance with the general |
20 | | election law. If a majority of the votes cast on the question |
21 | | is in favor of the levy of the tax, it may thereafter be levied |
22 | | in the county for the specified period or indefinitely, as |
23 | | provided in the proposition. The question shall be put in |
24 | | substantially the following form: |
25 | | Shall an annual tax be levied
for stormwater management |
26 | | purposes (for a period of not more than ..... years) at a |
|
| | 10000SB1337sam002 | - 36 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | rate not exceeding
.....% of the equalized assessed
value |
2 | | of the taxable property of ..... County? |
3 | | Votes shall be recorded as Yes or No. |
4 | | The following question may be submitted at any election |
5 | | held in the county after the adoption of a resolution by the |
6 | | county board providing for the submission of the question to |
7 | | the electors of the county to authorize adoption of a schedule |
8 | | of fees applicable to all real property within the county: |
9 | | Shall the county board be authorized to adopt a |
10 | | schedule of fees, at a rate not exceeding that of the |
11 | | stormwater management tax, applicable to all real property |
12 | | for preparation, administration, and implementation of an |
13 | | adopted stormwater management plan, construction and |
14 | | maintenance of related facilities, and management of the |
15 | | runoff from the property? |
16 | | Votes shall be recorded as Yes or No. |
17 | | If these questions have been approved by a majority of |
18 | | those voting prior to the effective date of this amendatory Act |
19 | | of the 98th General Assembly, this subsection does not apply. |
20 | | (j) For those counties that adopt a property tax in |
21 | | accordance with the provisions in this Section, the stormwater |
22 | | management committee shall offer property tax abatements or |
23 | | incentive payments to property owners who construct, maintain, |
24 | | and use approved stormwater management devices. The stormwater |
25 | | management committee is authorized to offer credits to the |
26 | | property tax, if applicable, based on authorized practices |
|
| | 10000SB1337sam002 | - 37 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | consistent with the stormwater management plan and approved by |
2 | | the committee. Expenses of staff of a stormwater management |
3 | | committee that are expended on regulatory project review may be |
4 | | no more than 20% of the annual budget of the committee, |
5 | | including funds raised under subsections (h) and (i). |
6 | | (k) Upon the creation and implementation of a county |
7 | | stormwater management
plan, the county may petition the circuit |
8 | | court to dissolve any or all drainage
districts created |
9 | | pursuant to the Illinois Drainage Code or predecessor Acts
|
10 | | which are located entirely within the area of the county |
11 | | covered by the plan. |
12 | | However, any active drainage district implementing a plan |
13 | | that is
consistent with and at least as stringent as the county |
14 | | stormwater
management plan may petition the stormwater |
15 | | management planning committee
for exception from dissolution. |
16 | | Upon filing of the petition, the committee
shall set a date for |
17 | | hearing not less than 2 weeks, nor more than 4 weeks,
from the |
18 | | filing thereof, and the committee shall give at least one |
19 | | week's
notice of the hearing in one or more newspapers of |
20 | | general circulation
within the district, and in addition shall |
21 | | cause a copy of the notice to be
personally served upon each of |
22 | | the trustees of the district. At the
hearing, the committee |
23 | | shall hear the district's petition and allow the
district |
24 | | trustees and any interested parties an opportunity to present |
25 | | oral
and written evidence. The committee shall render its |
26 | | decision upon the
petition for exception from dissolution based |
|
| | 10000SB1337sam002 | - 38 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | upon the best interests of
the residents of the district. In |
2 | | the event that the exception is not
allowed, the district may |
3 | | file a petition within 30 days of the decision
with the circuit |
4 | | court. In that case, the notice and hearing requirements
for |
5 | | the court shall be the same as herein provided for the |
6 | | committee.
The court shall likewise render its decision of |
7 | | whether to dissolve the
district based upon the best interests |
8 | | of residents of the district. |
9 | | The dissolution of any drainage district shall not affect |
10 | | the obligation
of any bonds issued or contracts entered into by |
11 | | the district nor
invalidate the levy, extension or collection |
12 | | of any taxes or special
assessments upon the property in the |
13 | | former drainage district. All property
and obligations of the |
14 | | former drainage district shall be assumed and
managed by the |
15 | | county, and the debts of the former drainage district shall
be |
16 | | discharged as soon as practicable. |
17 | | If a drainage district lies only partly within a county |
18 | | that adopts a
county stormwater management plan, the county may |
19 | | petition the circuit
court to disconnect from the drainage |
20 | | district that portion of the district
that lies within that |
21 | | county. The property of the drainage district within the
|
22 | | disconnected area shall be assumed and managed by the county. |
23 | | The county shall
also assume a portion of the drainage |
24 | | district's debt at the time of
disconnection, based on the |
25 | | portion of the value of the taxable property of the
drainage |
26 | | district which is located within the area being disconnected. |
|
| | 10000SB1337sam002 | - 39 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | The operations of any drainage district that continues to |
2 | | exist in a
county that has adopted a stormwater management plan |
3 | | in accordance with
this Section shall be in accordance with the |
4 | | adopted plan. |
5 | | (l) Any county that has adopted a county stormwater |
6 | | management plan under this Section may, after 10 days' written |
7 | | notice receiving consent of the owner or occupant, enter upon |
8 | | any lands or waters within the county for the purpose of |
9 | | inspecting stormwater facilities or causing the removal of any |
10 | | obstruction to an affected watercourse. If consent is denied or |
11 | | cannot be reasonably obtained, the county ordinance shall |
12 | | provide a process or procedure for an administrative warrant to |
13 | | be obtained. The county shall be responsible for any damages |
14 | | occasioned thereby. |
15 | | (m) Except as otherwise provided in subsection (a) of this |
16 | | Section, upon petition of the municipality, and based on a |
17 | | finding of the stormwater management planning committee, the |
18 | | county shall not enforce rules and regulations adopted by the |
19 | | county in any municipality located wholly or partly within the |
20 | | county that has a municipal stormwater management ordinance |
21 | | that is consistent with and at least as stringent as the county |
22 | | plan and ordinance, and is being enforced by the municipal |
23 | | authorities. On issues that the county ordinance is more |
24 | | stringent as deemed by the committee, the county shall only |
25 | | enforce rules and regulations adopted by the county on the more |
26 | | stringent issues and accept municipal permits. The county shall |
|
| | 10000SB1337sam002 | - 40 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | have no more than 60 days to review permits or the permits |
2 | | shall be deemed approved. |
3 | | (n) A county may issue general obligation bonds for |
4 | | implementing any stormwater plan adopted under this Section in |
5 | | the manner prescribed in Section 5-1012; except that the |
6 | | referendum requirement of Section 5-1012 does not apply to |
7 | | bonds issued pursuant to this Section on which the principal |
8 | | and interest are to be paid entirely out of funds generated by |
9 | | the taxes and fees authorized by this Section. |
10 | | (o) A county that has adopted a fee schedule pursuant to |
11 | | this Section may not thereafter issue any bond extensions |
12 | | related to implementing a stormwater management plan. |
13 | | (p) The powers authorized by this Section may be |
14 | | implemented by the county board for a portion of the county |
15 | | subject to similar stormwater management needs. |
16 | | (q) The powers and taxes authorized by this Section are in |
17 | | addition to the powers and taxes authorized by Division 5-15; |
18 | | in exercising its powers under this Section, a county shall not |
19 | | be subject to the restrictions and requirements of that |
20 | | Division. |
21 | | (r) Stormwater management projects and actions related to |
22 | | stormwater management in a county that has adopted a fee |
23 | | schedule or tax pursuant to this Section prior to the effective |
24 | | date of this amendatory Act of the 98th General Assembly are |
25 | | not altered by this amendatory Act of the 98th General |
26 | | Assembly.
|
|
| | 10000SB1337sam002 | - 41 - | LRB100 07731 AWJ 25525 a |
|
|
1 | | (s) As used in this Section: |
2 | | "Urban flooding" means the flooding of public and private |
3 | | land in urban communities that results from stormwater or |
4 | | snowmelt runoff overwhelming the existing drainage |
5 | | infrastructure, unrelated to the overflow of any river or lake, |
6 | | whether or not that land is located in or near a floodplain. |
7 | | "Urbanized areas" means a statistical geographic entity |
8 | | consisting of a densely settled core created from census tracts |
9 | | or blocks and contiguous qualifying territory that together |
10 | | have a minimum population of at least 50,000 persons and has |
11 | | been delineated as an urbanized area by the United States |
12 | | Census Bureau after the most recent decennial census. |
13 | | (Source: P.A. 98-335, eff. 8-13-13; 98-756, eff. 7-16-14.)".
|