State of Illinois
Introduced , by Rep. Jay Hoffman
SYNOPSIS AS INTRODUCED:
Appropriates the Department of Transportation's Capital expenses for the fiscal year beginning July 1, 2017. Effective July 1, 2017.
FISCAL NOTE ACT MAY APPLY |
|
|
AN ACT concerning appropriations.
Be it enacted by the People of the State of Illinois, represented in the General Assembly:
ARTICLE 1
DEPARTMENT OF TRANSPORTATION
Section 5. The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Working Capital Revolving Loan Fund to the Department of Transportation for the purpose of making loans to disadvantaged business enterprises certified by IDOT for participation on IDOT-procured construction and construction-related projects under the provisions of the Disadvantaged Business Revolving Loan Program pursuant to Section 610 of the Department of Transportation Law.
Section 10. The sum of $37,500,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Transportation Enhancement, Congestion Mitigation, Air Quality, High Priority and Scenic By-way Projects not eligible for inclusion in the Highway Improvement Program Appropriation provided expenditures do not exceed funds made available by the federal government. Expenditures for this purpose may be made by the Department of Transportation without regard to the fiscal year in which the service was rendered or cost incurred.
PERMANENT IMPROVEMENTS
Section 15. The sum of $16,660,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
OTHER LUMP SUMS
Office of Highway Project Implementation
Section 20. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named. Expenditures for these purposes may be made by the Department of Transportation without regard to the fiscal year in which the service was rendered or cost incurred:
For costs associated with the identification,
corrective action, and disposal of hazardous
materials at storage facilities............... 6,600,000
For Maintenance, Traffic and Physical
Research Purposes (A)........................ 79,600,000
For repair of damages by motorists to
highway guardrails, fencing, lighting
units, bridges, underpasses, signs, traffic
signals, crash attenuators, landscaping,
roadside shelters, rest areas, fringe
parking facilities, sanitary facilities,
maintenance facilities including salt
storage buildings, vehicle weight enforcement
facilities including scale houses, and
other highway appurtenances, provided such
amount shall not exceed funds to be made
available from collections from claims
filed by the Department to recover the
costs of such damages........................ 16,500,000
For Maintenance, Traffic and Physical
Research Purposes (B)........................ 14,000,000
Total $116,700,000
GRANTS AND AWARDS
Section 25. The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:
For apportionment to counties for
construction of township bridges 20
feet or more in length as provided in
Section 6-901 through 6-906 of the
"Illinois Highway Code"...................... 15,000,000
For apportionment to needy Townships
and Road Districts, as determined by
the Department in consultation with
the County Superintendents of Highways,
Township Highway Commissioners, or Road
District Highway Commissioners............... 10,014,300
For apportionment to high-growth cities
over 5,000 in population, as determined
by the Department in consultation
with the Illinois Municipal League............ 4,000,000
For apportionment to counties under
1,000,000 in population, $8,000,000 of
the total apportioned in equal amounts to
each eligible county, and $13,800,000
apportioned to each eligible county in
proportion to the amount of motor vehicle
license fees received from the residents
of eligible counties......................... 21,800,000
Total $50,814,300
CONSTRUCTION AND LAND ACQUISITION
Section 30. The sum of $1,081,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:
District 1, Schaumburg........................ 247,828,800
District 2, Dixon............................. 121,381,000
District 3, Ottawa............................. 41,474,400
District 4, Peoria............................. 69,332,300
District 5, Paris.............................. 18,690,900
District 6, Springfield........................ 35,118,900
District 7, Effingham.......................... 34,683,100
District 8, Collinsville....................... 56,829,900
District 9, Carbondale......................... 23,628,700
Statewide (including refunds)................. 260,955,000
Engineering................................... 171,077,000
Total $1,081,000,000
Section 35. The sum of $606,185,700, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program as approximated below:
District 1, Schaumburg........................ 362,880,000
District 2, Dixon.............................. 27,103,000
District 3, Ottawa............................. 20,956,000
District 4, Peoria............................. 21,080,000
District 5, Paris.............................. 12,783,000
District 6, Springfield........................ 19,768,000
District 7, Effingham.......................... 16,454,000
District 8, Collinsville....................... 23,223,000
District 9, Carbondale......................... 11,446,000
Statewide (including refunds).................. 90,492,700
Total $606,185,700
Section 40. The sum of $462,000,000, or so much thereof as may be necessary, is appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas fringe parking facilities and sanitary facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the Road Improvement Program as approximated below:
District 1, Schaumburg........................ 176,429,200
District 2, Dixon.............................. 86,411,000
District 3, Ottawa............................. 29,525,600
District 4, Peoria............................. 49,357,700
District 5, Paris.............................. 13,306,100
District 6, Springfield........................ 25,001,100
District 7, Effingham.......................... 24,690,900
District 8, Collinsville....................... 40,457,100
District 9, Carbondale......................... 16,821,300
Total $462,000,000
Section 45. The sum of $18,000,000, or so much thereof as may be necessary, is appropriated from Road Fund to the Department of Transportation for any costs associated with the procurement of public private partnership agreements.
Section 50. The sum of $10,000,000, or so much thereof as may be necessary, is appropriated from Road Fund to the Department of Transportation for all costs associated with the procurement of agreements that enable managed lanes to be developed, financed, constructed, managed, or operated in an entrepreneurial and business-like manner.
GRADE CROSSING PROTECTION
Section 55. The sum of $39,000,000 or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.
AERONAUTICS
Section 60. The sum of $4,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for such purposes as are described in Sections 31 and 34 of the Illinois Aeronautics Act, as amended and to leverage federal funds for the airport improvement program.
Section 65. The sum of $100,000,000 or so much thereof as may be necessary, is appropriated from the Federal/State/Local Airport Fund to the Department of Transportation for funding airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws.
Section 70. The sum of $1,000,000, or so much thereof as may be necessary, is appropriated from the South Suburban Airport Improvement Fund to the Department of Transportation for costs associated with the development, financing, and operation of the South Suburban Airport as authorized under the Public-Private Agreements for the South Suburban Airport Act.
INTERMODAL PROJECT IMPLEMENTATION
Section 75. The sum of $30,000,000, or so much thereof as may be necessary, is appropriated from the Downstate Transit Improvement Fund to the Department of Transportation for making competitive capital grants pursuant to Section 2-15 of the Downstate Public Transportation Act (30 ILCS 740/2-15).
Section 80. The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
Section 85. The sum of $1,700,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.
Section 90. The sum of $250,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.
Section 95. The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for high speed rail track maintenance.
Section 100. The sum of $500,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series A Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, and fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program.
Section 105. The sum of $300,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(a) of the Build Illinois Bond Act. The appropriated amounts shall be distributed as follows:
Regional Transportation
Authority................................... 270,000,000
Downstate Mass Transit........................ 30,000,000
Total $300,000,000
Section 110. No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in
Section 15 Permanent Improvements
Section 85 State Rail Freight Loan Repayment
Section 90 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
ARTICLE 2
DEPARTMENT OF TRANSPORTATION
PERMANENT IMPROVEMENTS
Section 5. The sum of $42,531,260, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation and reappropriation heretofore made in Article 165, Section 10 and Article 166, Section 5 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
Section 10. The sum of $12,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 172, Section 5 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.
CONSULTANT AND PRELIMINARY ENGINEERING
Section 15. The sum of $4,216,065, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 10 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for Highways Engineering and Consultant Contracts only.
Section 20. The sum of $4,225,933, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 15 of Public Act 99-0524, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for Highway Engineering and Consultant Contracts only.
OTHER LUMP SUMS
Section 25. The sum of $16,165,341, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, less $13,665,341 to be lapsed, from the appropriation and reappropriation heretofore made in Article 165, Section 5 and Article 166, Section 20 of Public Act 99-0524, as amended, is reappropriated from the Working Capital Revolving Loan Fund to the Department of Transportation for the purpose of making loans to disadvantaged business enterprises certified by IDOT for participation on IDOT-procured construction and construction-related projects under the provisions of the Disadvantaged Business Revolving Loan Program pursuant to Section 610 of the Department of Transportation Law.
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
AWARDS AND GRANTS
Section 30. The sum of $37,048,726, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation and reappropriation heretofore made in Article 165, Section 20 and Article 166, Section 40 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for apportionment to counties for construction of township bridges 20 feet or more in length as provided in Section 6-901 through 6-906 of the "Illinois Highway Code".
Section 35. The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 45 of Public Act 99-0524, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY04 federal earmarks provided in Conference Report 108-401 which accompanies Public Law 108-199. Expenditures shall not exceed funds to be made available by the federal government.
Bridge Discretionary
US 51, Christian/Shelby Counties................... 116,412
Section 40. The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2017, from the reappropriations heretofore made in Article 166, Section 50 of Public Act 99-0524, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY05 federal earmarks provided in Conference Report 108-792 which accompanies Public Law 108-447. Expenditures shall not exceed funds to be made available by the federal government.
Bridge Discretionary
Cicero Avenue lighting in University Park.......... 104,146
I-290 Cap, Oak Park................................ 938,426
U.S. 41/I-176 Interchange improvements
Phase I study.................................... 262,206
Total $1,304,778
Section 45. The sum of $35,969,006, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 55 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.
Section 50. The sum of $77,543,619, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 65 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for High Priority Projects (HPP) and Transportation Improvement Projects (TI) pertaining to local governments as designated in Public Law 109-59, Title I, Subtitle G, Section 1702 and Subtitle I, Section 1934 of the federal reauthorization act entitled SAFETEA-LU; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations. Specific project approximations appear in Article 101, Section 25 of Public Act 94-0798.
Section 55. The sum of $6,464,296, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 70 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriation Act, 2008, Division K, Public Law 110-161; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 35, Section 20 of Public Act 95-0734.
Section 60. The sum of $9,613,060, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 75 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, Federal Lands Highway Discretionary, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Omnibus Appropriations Act, 2009, Public Law 111-8; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 2, Section 20 of Public Act 96-0039.
Section 65. The sum of $4,225,093, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 80 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation, for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance, and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriations Act, 2010, Public Law 111-11 117; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.
Section 70. The sum of $7,541,934, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 85 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for Federal Discretionary Program Awards provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations. Specific project approximations appear in Article 20, Section 25 of Public Act 97-0725.
Section 75. The sum of $6,007,780, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 95 of Public Act 99-0524, as amended is reappropriated from the Road Fund to the Department of Transportation for Federal Discretionary Projects identified in Article 20, Section 26 of Public Act 97-0725 provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations obligations limitations or any other federal limitations (These amounts are in additional to amounts appropriated elsewhere.)
Section 80. The sum of $84,611,284, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2017, from the appropriation and reappropriation heretofore made in Article 164, Section 5, and Article 166, Section 100 of Public Act 99-0524, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, and fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program.
Section 85. The sum of $554,581,454, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2017, from the appropriation and reappropriation heretofore made in Article 164, Section 10 and Article 166, Section 105 of Public Act 99-0524, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, and fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program.
Section 90. The sum of $407,240,277, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 110 of Public Act 99-0524, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series D Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, and fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program.
Section 95. The sum of $200,258, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 115 of Public Act 99-0524, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for all expenses related to Phase II of the I-57/294 interchange in the County of Cook.
Section 100. The sum of $71,756,822, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriations heretofore made in Article 166, Section 120 and Section 125 of Public Act 99-0524, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 105. The sum of $25,723,150, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 130 of Public Act 99-0524, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 110. The sum of $163,852,398, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 135 of Public Act 99-0524, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 115. The sum of $566,925,295, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 140 of Public Act 99-0524, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 120. The sum of $466,152,874, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 35 of Public Act 99-0524, as amended, is reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.
Section 125. The sum of $18,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 40 of Public Act 99-0524, as amended, is reappropriated from Road Fund to the Department of Transportation for all costs associated with the procurement of agreements that enable managed lanes to be developed, financed, constructed, managed, or operated in an entrepreneurial and business-like manner.
Section 130. The sum of $22,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 45 of Public Act 99-0524, as amended, is reappropriated from Road Fund to the Department of Transportation for the purpose of funding various street rehabilitation projects on core transit corridors in Champaign County pursuant to a grant from the Transportation Investment Generating Economic Recovery VI (TIGER VI) Program awards as provided in Title VIII of Division F of the Consolidated and Further Continuing Appropriations Act, 2013 (Public Law 113-6). Such expenditures shall not exceed the amounts made available to the Department from a combination of federal and local reimbursements.
Section 135. The sum of $18,760,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 50 of Public Act 99-0524, as amended, is reappropriated from Road Fund to the Department of Transportation for the purpose of funding the construction of the 41st Street pedestrian bridge (Bronzeville Bridge) that will connect Lake Park Crescent to the City of Chicago’s Lakefront pursuant to a grant from the Transportation Investment Generating Economic Recovery VI(TIGER VI) Program awards as provided in Title VIII of Division F of the Consolidated and Further Continuing Appropriations Act, 2013 (Public Law 113-6). Such expenditures shall not exceed the amounts made available to the Department from the federal reimbursements.
HIGHWAY CONSTRUCTION AND LAND ACQUISITION
LUMP SUMS
Section 140. The sum of $2,647,810, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 145 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for all costs associated with the procurement of public private agreements.
Section 145. The sum of $30,404,465, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 150 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the High Priority Projects (HPP) and Transportation Improvement Projects (TI) specifically identified in Article 101, Section 25 of Public Act 94-0798, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 150. The sum of $763,397, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 155 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 35, Section 20a of Public Act 95-0734, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 155. The sum of $25,011,641, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 160 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations. (Emergency Repair Program)
Section 160. The sum of $1,829,109, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 165 of Public Act 99-0524, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 2, Section 20 of Public Act 96-0039, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 165. The sum of $391,060, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 170 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation, for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 50, Section 16 of Public Act 96-0035, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.
Section 170. The sum of $901,717, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 175 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for Transportation Investment Generating Economic Recovery II (TIGER II) awards designated in Division A of the Consolidated Appropriations Ace, 2010, Public Law 111-117 as identified and approximated in Article 10, Section 20 of Public Act 97-0076; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.
Section 175. The sum of $717,232, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 180 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation Investment Generating Economic Recovery II (TIGER II) awards specifically identified in Article 10, Section 20 of Public Act 97-0076, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.
Section 180. The sum of $491,722, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 185 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Federal Discretionary Program Awards provided for in the “Department of Defense and Full-Year Continuing Appropriations Act, 2011” – Public Law 112-10 (H.R. 1473) earmarks specifically identified in Article 20 Section 25 of Public Act 97-0725, provided such amounts do not exceed funds made available and paid in to the Road Fund by local governments.
Section 185. The sum of $689,442, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 190 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Federal Discretionary Projects (specifically identified in Article 20 Section 26 of Public Act 97-0725), provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments. (These amounts are in addition to amounts appropriated elsewhere.)
Section 190. The sum of $28,658,055, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 195 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for land acquisition, construction engineering and construction of the Milburn Bypass (US 45 from north of Milburn Road to north of Grass lake Road) provided that such amounts do not exceed amounts reimbursed by the local agency using Lake County Challenge bonds.
Section 195. The sum of $294,924,799, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriations heretofore made in Article 166, Section 200 and Section 205 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 200. The sum of $96,124,297, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 210 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 205. The sum of $86,594,751, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 215 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 210. The sum of $58,033,365, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 220 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.
Section 215. The sum of $840,188,270, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 25 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the State and local portions of the Road Improvement Program, including refunds.
Section 220. The sum of $198,806,964, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriations heretofore made in Article 166, Section 225 and Section 230 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 225. The sum of $66,593,110, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 235 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 230. The sum of $171,617,204, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 240 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 235. The sum of $311,322,054, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 245 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.
Section 240. The sum of $573,510,396, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 30 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program including refunds.
GRADE CROSSING PROTECTION
Section 245. The sum of $92,486,970, or so much thereof as may be necessary and remains unexpended, at the close of business on June 30, 2017, less $10,000,000 to be lapsed, from the appropriation and reappropriation heretofore made in Article 165, Section 60 and Article 166, Section 250 of Public Act 99-0524, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.
AERONAUTICS
AWARDS AND GRANTS
Section 250. The sum of $5,464,029, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2017, from the appropriations heretofore made in Article 165, Section 65 and Article 172, Section 20 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for such purposes as are described in Sections 31 and 34 of the Illinois Aeronautics Act, as amended and to leverage federal funds for the airport improvement program.
Section 255. The sum of $747,752,460, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, less $591,247,397 to be lapsed, from the appropriation and reappropriation heretofore made in Article 165, Section 70 and Article 166, Section 255 of Public Act 99-0524, as amended, is reappropriated from the Federal/State/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.
Section 260. The sum of $11,714,283, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 260 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for such purposes as are described Section 34 of the Illinois Aeronautics Act, as amended, and Section 72 of the Illinois Aeronautics Act, as amended, for airport improvements.
Section 265. The sum of $11,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 164, Section 15 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the State’s share of costs related to facility improvements associated with Airports as defined in Section 6 of the Illinois Aeronautics Act, as amended, or Air Navigation Facilities as described in Section 9 of the Illinois Aeronautics Act, as amended.
CONSTRUCTION
Section 270. The sum of $29,734,131, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 265 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for expenses associated with land acquisition for the South Suburban Airport.
PUBLIC AND INTERMODAL TRANSPORTATION
AWARDS AND GRANTS
Section 275. The sum of $368,962, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 270 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers, and the Intercity Rail Program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the counties of Cook, DuPage, Kane, Lake, McHenry and Will, pursuant to Section 4(b)(2) of the General Obligation Bond Act, as amended.
Section 280. The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriations heretofore made in Article 166, Section 275 of Public Act 99-0524, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers, and the Intercity Rail Program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, as follows:
Pursuant to Section 4(b)(1) of the
General Obligation Bond Act,
as amended.................................. 13,134,608
For the counties of the State outside
the counties of Cook, DuPage, Kane, McHenry,
and Will, pursuant to Section 4(b)(1)of
the General Obligation Bond
Act, as amended................................. 600,327
For the Department of Transportation's
Operation Greenlight Program pursuant to
Section 4(b)(1) of the General
Obligation Bond Act, as amended.............. 5,521,013
Total $19,255,948
Section 285. The sum of $11,104,725, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 285 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.
Section 290. The sum of $713,385,621, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 290 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.
Section 295. The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 295 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.
Section 300. The sum of $476,579,477, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 300 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority.
Section 303. The sum of $20,000,000 or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for a grant to the Regional Transportation Authority for costs associated with construction of a Metra Station located at the intersection of 79th Street and Lowe Avenue in Chicago.
Section 305. The sum of $152,236,040, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 305 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, for the purpose of downstate public transit systems.
Section 310. The sum of $96,000,540, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 164, Section 20 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for purposes authorized under Section 4(b)(1)of the General obligation Bond Act, as amended (30 ILCS 330/4(b)(1)).
Section 315. The sum of 103,002,309, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, less $64,440,501 to be lapsed, from the appropriation and reappropriation heretofore made in Article 165, Section 80 and Article 166, Section 310 of Public Act 99-0524, as amended, is reappropriated from the Downstate Transit Improvement Fund to the Department of Transportation for making competitive capital grants pursuant to Section 2-15 of the Downstate Public Transportation Act. (30 ILCS 740/2-15)
Section 320. The sum of $68,485,209, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation and reappropriation heretofore made in Article 165, Section 85 and Article 166, Section 315 of Public Act 99-0524, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.
LUMP SUMS
Section 325. The sum of $4,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 90 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program.
Section 330. The sum of $9,731,124, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 320 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.
Section 335. The sum of, $5,922,681, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 325 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE)program, as awarded from the Transportation Investment Generating Economic Recovery (TIGER) IV, as provided for in the “:consolidated and Further Continuing Appropriations Act of 2012” – P.L. 112-055, provided such amounts do not exceed funds made available by the Federal government.
Section 340. The sum of $189,864,091, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 330 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program.
RAIL PASSENGER AND RAIL FREIGHT
Section 345. The sum of $10,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 335 of Public Act 99-0524 as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, construction, and all other costs relating to rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 350. The sum of $5,000,000, or so much thereof as may be necessary and remains unexpended, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 172, Section 25 of Public Act 99-0524 as amended, is reappropriated from the Road Fund to the Department of Transportation for construction and all other costs relating to projects associated with high speed rail projects, provided such amounts not exceed funds made available by entities other than the federal government for this purpose.
Section 355. The sum of $21,665,463, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2017, from the appropriation and reappropriation heretofore made in Article 165, Section 95 and Article 166, Section 340 of Public Act 99-0524, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.
Section 360. The sum of $964,880,567, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 345 of Public Act 99-0524, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 365. The sum of $10,139,357, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 350 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation, pursuant to Section 4(b)(1) of the General Obligation Bond Act, for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.
Section 370. The sum of $99,938,552, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 355 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.
Section 375. The sum of $176,376,596, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 360 of Public Act 99-0524, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation to leverage federal funding in accordance with the Department of Transportation’s Federal Railroad Administration’s Capital Assistance for High Speed Rail Corridors and Intercity Passenger Rail Service Program and any other federal grant programs made available for capital and operating improvements for intercity passenger rail.
Section 380. The sum of $5,262,749, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2017, from the appropriation and reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 165, Section 100 and Article 166, Section 365 of Public Act 99-0524, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.
Section 385. The sum of $1,300,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 370 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for costs associated with the relocation of locally-owned utilities along federally-designated High Speed Rail Corridors in Illinois, provided that such amounts do not exceed funds to be made available and paid into the Road Fund pursuant to agreements executed between the Department of Transportation and the affected local governments.
Section 390. The sum of $10,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the appropriation heretofore made in Article 165, Section 105 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for high speed rail track maintenance.
STIMULUS
RAIL
Section 395. The sum of $19,859,629, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 375 of Public Act 99-0524, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.
Section 400. The sum of $423,736,360, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2017, from the reappropriation heretofore made in Article 166, Section 380 of Public Act 99-0524, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects in compliance with the American Recovery and Reinvestment Act of 2009, provided such amounts not exceed funds made available by the federal government for this purpose.
Section 405. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:
Section 5 Permanent Improvements
Section 80 Series A - Road Program
Section 85 Series D - Road Program
Section 90 Series D - Road Program
Section 260 Series B - Aeronautics
Section 265 Series B - Aeronautics
Section 270 Series B - Land Acquisition 3rd Airport
Section 275 Series B - Transit
Section 280 Series B - Transit
Section 285 Series B - Transit
Section 290 Series B - Transit
Section 295 Series B - Transit
Section 300 Series B - Transit
Section 305 Series B - Transit
Section 310 Series B - Transit
Section 340 Series B - Transit
Section 355 State Rail Freight Loan Repayment
Section 365 Series B - Rail
Section 370 Series B - Rail
Section 375 Series B - Rail
Section 380 Federal Rail Freight Loan Repayment
of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.
ARTICLE 999
Section 999. Effective Date. This Act takes effect July 1, 2017.