|
| | 100TH GENERAL ASSEMBLY
State of Illinois
2017 and 2018 HB3657 Introduced , by Rep. Tony McCombie SYNOPSIS AS INTRODUCED: |
| 220 ILCS 5/8-406 | from Ch. 111 2/3, par. 8-406 |
|
Amends the Public Utilities Act. Provides that no public utility shall begin the construction of any nuclear power plant extension, alteration, or addition unless and until it has obtained from the Illinois Commerce Commission a certificate that public convenience and necessity require such construction. Removes a provision that prohibits the issuance of a certificate of public convenience and necessity by the Commission regarding the construction of any new power plant within this State until the Director of the Illinois Environmental Protection Agency finds that the United States Government has identified and approved a demonstrable technology or means for the disposal of high level nuclear waste, or until such construction has been specifically approved by a statute enacted by the General Assembly. Effective immediately.
|
| |
| | A BILL FOR |
|
|
| | HB3657 | | LRB100 06998 RJF 17051 b |
|
|
1 | | AN ACT concerning regulation.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Public Utilities Act is amended by changing |
5 | | Section 8-406 as follows: |
6 | | (220 ILCS 5/8-406) (from Ch. 111 2/3, par. 8-406) |
7 | | Sec. 8-406. Certificate of public convenience and |
8 | | necessity. |
9 | | (a) No public utility not owning any city or village
|
10 | | franchise nor engaged in performing any public service or in |
11 | | furnishing any
product or commodity within this State as of |
12 | | July 1, 1921 and not
possessing a certificate of
public |
13 | | convenience and necessity from the Illinois Commerce |
14 | | Commission,
the State Public Utilities Commission or
the Public |
15 | | Utilities Commission, at the time this amendatory Act of 1985 |
16 | | goes
into effect, shall transact any business in this State |
17 | | until it shall have
obtained a certificate from the Commission |
18 | | that public convenience and
necessity require the transaction |
19 | | of such business. |
20 | | (b) No public utility shall begin the construction of any |
21 | | new plant,
equipment, property or facility which is not in |
22 | | substitution of any
existing plant, equipment, property or |
23 | | facility or any extension or
alteration thereof or in addition |
|
| | HB3657 | - 2 - | LRB100 06998 RJF 17051 b |
|
|
1 | | thereto,
unless and until it shall have obtained from the
|
2 | | Commission a certificate that public convenience and necessity |
3 | | require such
construction. Whenever , after a hearing , the |
4 | | Commission determines that any
new construction or the |
5 | | transaction of any business by a public utility will
promote |
6 | | the public convenience and is necessary thereto, it shall have |
7 | | the
power to issue certificates of public convenience and |
8 | | necessity. The
Commission shall determine that proposed |
9 | | construction will promote the
public convenience and necessity |
10 | | only if the utility demonstrates: (1) that the
proposed |
11 | | construction is necessary to provide adequate, reliable, and
|
12 | | efficient service to its customers and is the
least-cost means |
13 | | of
satisfying the service needs of its customers or that the |
14 | | proposed construction will promote the development of an |
15 | | effectively competitive electricity market that operates |
16 | | efficiently, is equitable to all customers, and is the |
17 | | least-cost least cost means of satisfying those objectives;
(2) |
18 | | that the utility is capable of efficiently managing and
|
19 | | supervising the construction process and has taken sufficient |
20 | | action to
ensure adequate and efficient construction and |
21 | | supervision thereof; and (3)
that the utility is capable of |
22 | | financing the proposed construction without
significant |
23 | | adverse financial consequences for the utility or its
|
24 | | customers. |
25 | | (c) After the effective date of this amendatory Act of |
26 | | 1987, no
construction shall commence on any new nuclear
power |
|
| | HB3657 | - 3 - | LRB100 06998 RJF 17051 b |
|
|
1 | | plant to be located within this State , and no certificate of |
2 | | public
convenience and necessity or other authorization shall |
3 | | be issued therefor
by the Commission, until the Director of the |
4 | | Illinois Environmental
Protection Agency finds that the United |
5 | | States Government, through its
authorized agency, has |
6 | | identified and approved a demonstrable technology or
means for |
7 | | the disposal of high level nuclear waste, or until such
|
8 | | construction has been specifically approved by a statute |
9 | | enacted by the General
Assembly. |
10 | | No public utility shall begin the construction of any |
11 | | nuclear power plant extension, alteration, or addition unless |
12 | | and until it has obtained from the Commission a certificate |
13 | | that public convenience and necessity require such |
14 | | construction. Whenever, after a hearing, the Commission |
15 | | determines that any new construction or the transaction of any |
16 | | business by a public utility will promote the public |
17 | | convenience and is necessary thereto, it shall have the power |
18 | | to issue certificates of public convenience and necessity. The |
19 | | Commission shall determine that proposed construction will |
20 | | promote the public convenience and necessity only if the |
21 | | utility demonstrates: (1) that the proposed construction is |
22 | | necessary to provide adequate, reliable, and efficient service |
23 | | to its customers and is the least-cost means of satisfying the |
24 | | service needs of its customers or that the proposed |
25 | | construction will promote the development of an effectively |
26 | | competitive electricity market that operates efficiently, is |
|
| | HB3657 | - 4 - | LRB100 06998 RJF 17051 b |
|
|
1 | | equitable to all customers, and is the least-cost means of |
2 | | satisfying those objectives; (2) that the utility is capable of |
3 | | efficiently managing and supervising the construction process |
4 | | and has taken sufficient action to ensure adequate and |
5 | | efficient construction and supervision thereof; and (3) that |
6 | | the utility is capable of financing the proposed construction |
7 | | without significant adverse financial consequences for the |
8 | | utility or its customers. |
9 | | As used in this Section, "high level nuclear waste" means |
10 | | those aqueous
wastes resulting from the operation of the first |
11 | | cycle of the solvent
extraction system or equivalent and the |
12 | | concentrated wastes of the
subsequent extraction cycles or |
13 | | equivalent in a facility for reprocessing
irradiated reactor |
14 | | fuel and shall include spent fuel assemblies prior to
fuel |
15 | | reprocessing. |
16 | | (d) In making its determination, the Commission shall |
17 | | attach primary
weight to the cost or cost savings to the |
18 | | customers of the utility. The
Commission may consider any or |
19 | | all factors which will or may affect such
cost or cost savings, |
20 | | including the public utility's engineering judgment regarding |
21 | | the materials used for construction. |
22 | | (e) The Commission may issue a temporary certificate which |
23 | | shall remain
in force not to exceed one year in cases of |
24 | | emergency, to assure maintenance
of adequate service or to |
25 | | serve particular customers, without notice or
hearing, pending |
26 | | the determination of an application for a certificate, and
may |
|
| | HB3657 | - 5 - | LRB100 06998 RJF 17051 b |
|
|
1 | | by regulation exempt from the requirements of this Section |
2 | | temporary
acts or operations for which the issuance of a |
3 | | certificate will not be
required in the public interest. |
4 | | A public utility shall not be required to obtain but may |
5 | | apply for and
obtain a certificate of public convenience and |
6 | | necessity pursuant to this
Section with respect to any matter |
7 | | as to which it has received the
authorization or order of the |
8 | | Commission under the Electric Supplier Act,
and any such |
9 | | authorization or order granted a public utility by the
|
10 | | Commission under that Act shall as between public utilities be |
11 | | deemed to
be, and shall have except as provided in that Act the |
12 | | same force and effect
as, a certificate of public convenience |
13 | | and necessity issued pursuant to this
Section. |
14 | | No electric cooperative shall be made or shall become a |
15 | | party to or shall
be entitled to be heard or to otherwise |
16 | | appear or participate in any
proceeding initiated under this |
17 | | Section for authorization of power plant
construction and as to |
18 | | matters as to which a remedy is available under The
Electric |
19 | | Supplier Act. |
20 | | (f) Such certificates may be altered or modified by the |
21 | | Commission, upon
its own motion or upon application by the |
22 | | person or corporation affected.
Unless exercised within a |
23 | | period of 2 years from the grant thereof
authority conferred by |
24 | | a certificate of convenience and necessity issued by
the |
25 | | Commission shall be null and void. |
26 | | No certificate of public convenience and necessity shall be |
|
| | HB3657 | - 6 - | LRB100 06998 RJF 17051 b |
|
|
1 | | construed as
granting a monopoly or an exclusive privilege, |
2 | | immunity or franchise. |
3 | | (g) A public utility that undertakes any of the actions |
4 | | described in items (1) through (3) of this subsection (g) or |
5 | | that has obtained approval pursuant to Section 8-406.1 of this |
6 | | Act shall not be required to comply with the requirements of |
7 | | this Section to the extent such requirements otherwise would |
8 | | apply. For purposes of this Section and Section 8-406.1 of this |
9 | | Act, "high voltage electric service line" means an electric |
10 | | line having a design voltage of 100,000 or more. For purposes |
11 | | of this subsection (g), a public utility may do any of the |
12 | | following: |
13 | | (1) replace or upgrade any existing high voltage |
14 | | electric service line and related facilities, |
15 | | notwithstanding its length; |
16 | | (2) relocate any existing high voltage electric |
17 | | service line and related facilities, notwithstanding its |
18 | | length, to accommodate construction or expansion of a |
19 | | roadway or other transportation infrastructure; or |
20 | | (3) construct a high voltage electric service line and |
21 | | related facilities that is constructed solely to serve a |
22 | | single customer's premises or to provide a generator |
23 | | interconnection to the public utility's transmission |
24 | | system and that will pass under or over the premises owned |
25 | | by the customer or generator to be served or under or over |
26 | | premises for which the customer or generator has secured |
|
| | HB3657 | - 7 - | LRB100 06998 RJF 17051 b |
|
|
1 | | the necessary right of way. |
2 | | (h) A public utility seeking to construct a high-voltage |
3 | | electric service line and related facilities (Project) must |
4 | | show that the utility has held a minimum of 2 pre-filing public |
5 | | meetings to receive public comment concerning the Project in |
6 | | each county where the Project is to be located, no earlier than |
7 | | 6 months prior to filing an application for a certificate of |
8 | | public convenience and necessity from the Commission. Notice of |
9 | | the public meeting shall be published in a newspaper of general |
10 | | circulation within the affected county once a week for 3 |
11 | | consecutive weeks, beginning no earlier than one month prior to |
12 | | the first public meeting. If the Project traverses 2 contiguous |
13 | | counties and where in one county the transmission line mileage |
14 | | and number of landowners over whose property the proposed route |
15 | | traverses is one-fifth or less of the transmission line mileage |
16 | | and number of such landowners of the other county, then the |
17 | | utility may combine the 2 pre-filing meetings in the county |
18 | | with the greater transmission line mileage and affected |
19 | | landowners. All other requirements regarding pre-filing |
20 | | meetings shall apply in both counties. Notice of the public |
21 | | meeting, including a description of the Project, must be |
22 | | provided in writing to the clerk of each county where the |
23 | | Project is to be located. A representative of the Commission |
24 | | shall be invited to each pre-filing public meeting. |
25 | | (i) For applications filed after the effective date of this |
26 | | amendatory Act of the 99th General Assembly, the Commission |
|
| | HB3657 | - 8 - | LRB100 06998 RJF 17051 b |
|
|
1 | | shall by registered mail notify each owner of record of land, |
2 | | as identified in the records of the relevant county tax |
3 | | assessor, included in the right-of-way over which the utility |
4 | | seeks in its application to construct a high-voltage electric |
5 | | line of the time and place scheduled for the initial hearing on |
6 | | the public utility's application. The utility shall reimburse |
7 | | the Commission for the cost of the postage and supplies |
8 | | incurred for mailing the notice. |
9 | | (Source: P.A. 99-399, eff. 8-18-15.)
|
10 | | Section 99. Effective date. This Act takes effect upon |
11 | | becoming law.
|