|
| | 100TH GENERAL ASSEMBLY
State of Illinois
2017 and 2018 HB2755 Introduced , by Rep. Marcus C. Evans, Jr. SYNOPSIS AS INTRODUCED: |
| |
Creates the Innovations for Transportation Infrastructure Act. Provides that the Department of Transportation may use design-build project delivery methods, Construction Manager/General Contractor project delivery methods, or Alternative Technical Concepts for design-bid-build project delivery of transportation facilities, provided that the delivery method does not exceed 20% of the Department's multi-year highway improvement program, with no one year exceeding 30%. Provides that the Illinois State Toll Highway Authority may use design-build project delivery methods, Construction Manager/General Contractor project delivery methods, or Alternative Technical Concepts for design-bid-build project delivery of transportation facilities if the facilities delivered do not exceed 20% of the Authority's annual improvement program. Places limits on the number of projects that the Department may use the various methods on. Provides that during the first phase of the two-phase procurement, the Transportation Agency (Department of Transportation or the Illinois State Toll Highway Authority) shall not consider price proposals to make its short-list decision. Provides that at least half of the evaluation committee used to assist in selecting design-build and Construction Manager/General Contractor contracts shall consist of licensed design professionals. Provides the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act does not apply to procurements under the new Act. Contains provisions concerning the procurement process and terms of design-build and construction manager-general contractor contracts. Provides that the Transportation Agency has eminent domain and quick take powers under the Act. Amends the Illinois Procurement Code and the Public Construction Bond Act. Makes conforming changes. Effective immediately.
|
| |
| | | FISCAL NOTE ACT MAY APPLY | |
| | A BILL FOR |
|
|
| | HB2755 | | LRB100 11099 AXK 21360 b |
|
|
1 | | AN ACT concerning transportation.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 1. Short title. This Act may be cited as the |
5 | | Innovations for Transportation Infrastructure Act. |
6 | | Section 5. Legislative policy.
|
7 | | (a) It is the public policy of the State of Illinois to |
8 | | promote the development of infrastructure projects that serve |
9 | | the needs of the public.
|
10 | | (b) The design-build project delivery method and |
11 | | Construction Manager/General Contractor project delivery |
12 | | method and use of Alternative Technical Concepts have the |
13 | | potential to capture private sector innovation and safely |
14 | | deliver infrastructure projects on more predictable schedules |
15 | | and budgets. Earlier completion and lower cost for projects are |
16 | | possible with the ability to shift or share risks with the |
17 | | private sector that are generally retained by the public in the |
18 | | conventional design-bid-build project delivery method.
|
19 | | (c) It is the intent of the General Assembly that the |
20 | | Department of Transportation and the Illinois State Toll |
21 | | Highway Authority may evaluate and use Alternative Technical |
22 | | Concepts proposed by bidders and proposers and to use the |
23 | | design-build project delivery method and Construction |
|
| | HB2755 | - 2 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Manager/General Contractor project delivery method.
|
2 | | (d) It is the intent of this Act to use design |
3 | | professionals, construction companies, and workers from this |
4 | | State to the greatest extent possible.
|
5 | | (e) The powers granted in this Act are in addition to any |
6 | | other powers authorized under applicable law. |
7 | | Section 10. Definitions. As used in this Act:
|
8 | | "Alternative Technical Concepts" means a proposed |
9 | | deviation from the contract technical requirements set forth in |
10 | | the procurement documents for a transportation facility that |
11 | | offers a solution that is equal or better than the requirements |
12 | | in the procurement documents.
|
13 | | "Authority" means the Illinois State Toll Highway |
14 | | Authority. |
15 | | "Best value" means any selection process in which proposals |
16 | | contain both price and qualitative components and award is |
17 | | based upon a combination of price, qualitative concepts, and |
18 | | other factors.
|
19 | | "Chief procurement officer" means the chief procurement |
20 | | officer for the Transportation Agency.
|
21 | | "Construction Manager/General Contractor" means a proposer |
22 | | that has entered into a Construction Manager/General |
23 | | Contractor contract under this Act.
|
24 | | "Construction Manager/General Contractor contract" means |
25 | | the two-phase contract between the Transportation Agency and a |
|
| | HB2755 | - 3 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Construction Manager/General Contractor, which includes a |
2 | | first phase addressing preconstruction services and a second |
3 | | phase addressing the construction of the transportation |
4 | | facility.
|
5 | | "Construction Manager/General Contractor project delivery |
6 | | method" means a method of procurement and contracting that |
7 | | makes a Construction Manager/General Contractor who enters |
8 | | into a contract with the Transportation Agency responsible for |
9 | | certain preconstruction services and then, if the parties reach |
10 | | agreement on key terms, responsible for construction of the |
11 | | transportation facility.
|
12 | | "Department" means the Illinois Department of |
13 | | Transportation.
|
14 | | "Design-bid-build project delivery method" means the |
15 | | traditional method of procuring and contracting for design |
16 | | services and construction services used separately in this |
17 | | State, which incorporates the Architectural, Engineering, and |
18 | | Land Surveying Qualifications Based Selection Act and the |
19 | | principles of competitive bidding under the Illinois |
20 | | Procurement Code.
|
21 | | "Design-build contract" means a contract between the |
22 | | Transportation Agency and a design-builder under which the |
23 | | design-builder agrees to furnish architectural, surveying, |
24 | | engineering, construction, and related services for a |
25 | | transportation facility.
|
26 | | "Design-build project delivery method" means a method of |
|
| | HB2755 | - 4 - | LRB100 11099 AXK 21360 b |
|
|
1 | | procurement and contracting that provides responsibility |
2 | | within a single contract between the Transportation Agency and |
3 | | a design-builder for the furnishing of architectural, |
4 | | surveying, engineering, construction, and related services for |
5 | | a transportation facility.
|
6 | | "Design-builder" means a proposer that has entered into a |
7 | | design-build contract with the Transportation Agency under |
8 | | this Act.
|
9 | | "Evaluation Committee" means the committee assembled to |
10 | | evaluate and score statements of qualifications and proposals.
|
11 | | "Evaluation criteria" means the standards and requirements |
12 | | established by the Transportation Agency against which the |
13 | | qualifications and proposals of a proposer will be assessed |
14 | | during the procurement of a design-build contract or |
15 | | Construction Manager/General Contractor contract, as |
16 | | applicable.
|
17 | | "Executive Director" means the Executive Director of the |
18 | | Illinois State Toll Highway Authority. |
19 | | "Metropolitan planning organization" means a metropolitan |
20 | | planning organization under 23 U.S.C. 134 whose metropolitan |
21 | | planning area boundaries are partially or completely within |
22 | | this State.
|
23 | | "Preconstruction services" means all |
24 | | non-construction-related services that a Construction |
25 | | Manager/General Contractor is required to perform during the |
26 | | first phase of a Construction Manager/General Contractor |
|
| | HB2755 | - 5 - | LRB100 11099 AXK 21360 b |
|
|
1 | | contract, which may include, but is not limited to, giving |
2 | | advice to the Transportation Agency regarding scheduling, work |
3 | | sequencing, cost engineering, constructability, cost |
4 | | estimating, and risk identification.
|
5 | | "Proposal" means a proposer's response to a request for |
6 | | proposals.
|
7 | | "Proposer" means any individual, sole proprietorship, |
8 | | firm, partnership, joint venture, corporation, professional |
9 | | corporation, or other entity legally established to conduct |
10 | | business in this State that proposes to be the design-builder |
11 | | or Construction Manager/General Contractor for any |
12 | | transportation facility under this Act. |
13 | | "Qualifications" means a statement of qualifications |
14 | | submitted by a proposer in response to a request for |
15 | | qualifications.
|
16 | | "Request for proposals" means the document issued by the |
17 | | Transportation Agency to solicit proposals and describe the |
18 | | procurement process for a design-build contract or |
19 | | Construction Manager/General Contractor contract in accordance |
20 | | with the design-build project delivery method or the |
21 | | Construction Manager/General Contractor project delivery |
22 | | method, as applicable.
|
23 | | "Request for qualifications" means the document issued by |
24 | | the Transportation Agency in the first phase of a two-phase |
25 | | procurement to solicit qualifications from proposers in |
26 | | accordance with the design-build project delivery method or the |
|
| | HB2755 | - 6 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Construction Manager/General Contractor project delivery |
2 | | method, as applicable.
|
3 | | "Scope and performance requirements" means the activities, |
4 | | constructed elements, and standards of performance the |
5 | | Transportation Agency requires the design-builder or the |
6 | | Construction Manager/General Contractor to comply with in the |
7 | | development of the transportation facility, which may include, |
8 | | but is not be limited to, the intended usage, capacity, size, |
9 | | scope, quality and performance standards, life-cycle costs, |
10 | | preliminary engineering, design, and other requirements as |
11 | | developed and determined by the Transportation Agency.
|
12 | | "Secretary" means the Secretary of the Illinois Department |
13 | | of Transportation.
|
14 | | "Transportation Agency" means the Illinois Department of |
15 | | Transportation or the Illinois State Toll Highway Authority. |
16 | | "Transportation facility" means any new or existing |
17 | | facility or group of facilities that are the subject of a |
18 | | design-build contract or a Construction Manager/General |
19 | | Contractor contract, and which may include highways, roads, |
20 | | bridges, tunnels, overpasses, bus ways, guideways, ferries, |
21 | | airports or other aviation facilities, public transportation |
22 | | facilities, vehicle parking facilities, port facilities, rail |
23 | | facilities, stations, hubs, terminals, intermodal facilities, |
24 | | transit facilities, or similar facilities used for the |
25 | | transportation of persons or goods, together with any |
26 | | buildings, structures, parking areas, appurtenances, |
|
| | HB2755 | - 7 - | LRB100 11099 AXK 21360 b |
|
|
1 | | intelligent transportation systems, and other property or |
2 | | facilities related to the operation or maintenance of these |
3 | | facilities.
|
4 | | Section 15. Authorization of project delivery methods.
|
5 | | (a) Notwithstanding any other law, and as authority |
6 | | supplemental to its existing powers, the Transportation |
7 | | Agency, in accordance with this Act, may use the design-build |
8 | | project delivery method for transportation facilities, |
9 | | provided that the capital costs for transportation facilities |
10 | | delivered utilizing the design-build project delivery method |
11 | | or Construction Manager/General Contractor project delivery |
12 | | method or Alternative Technical Concepts in a design-bid-build |
13 | | project delivery method do not: (i) for transportation |
14 | | facilities delivered by the Department, exceed 20% of the |
15 | | Department's multi-year highway improvement program for any |
16 | | 5-year period with no one year period exceeding 30%; or (ii) |
17 | | for transportation facilities delivered by the Authority, |
18 | | exceed 20% of the Authority's annual improvement program. The |
19 | | Transportation Agency shall make this calculation prior to |
20 | | commencing the procurement. Notwithstanding any other law, and |
21 | | as authority supplemental to its existing power, the |
22 | | Department, in accordance with this Act, may use the |
23 | | Construction Manager/General Contractor project delivery |
24 | | method for up to 2 transportation facilities. Prior to |
25 | | commencing a procurement under this Act for either a |
|
| | HB2755 | - 8 - | LRB100 11099 AXK 21360 b |
|
|
1 | | design-build contract or a Construction Manager/General |
2 | | Contractor contract, the Transportation Agency shall first |
3 | | undertake an analysis and make a written determination that it |
4 | | is in the best interests of this State to utilize the selected |
5 | | delivery method for that transportation facility. The analysis |
6 | | and determination shall discuss the design-build project |
7 | | delivery method or Construction Manager/General Contractor |
8 | | project delivery method's impact on the anticipated schedule, |
9 | | completion date, and project costs. The best interests of the |
10 | | State analysis shall be made available to the public.
|
11 | | (b) The Transportation Agency shall report to the General |
12 | | Assembly annually for the first 5 years after the effective |
13 | | date of this Act on the progress of procurements and |
14 | | transportation facilities procured under this Act. |
15 | | (c) The Architectural, Engineering, and Land Surveying |
16 | | Qualifications Based Selection Act shall not apply to |
17 | | procurements under this Act. |
18 | | Section 20. Preconditions to commencement of procurement.
|
19 | | If the Transportation Agency determines to use the |
20 | | design-build project delivery method or the Construction |
21 | | Manager/General Contractor project delivery method for a |
22 | | particular transportation facility, the Transportation Agency |
23 | | may not commence a procurement for the transportation facility |
24 | | until the Transportation Agency has satisfied the requirements |
25 | | of both paragraphs (1) and (2) of this Section: |
|
| | HB2755 | - 9 - | LRB100 11099 AXK 21360 b |
|
|
1 | | (1) the Transportation Agency does one of the following: |
2 | | (A) the Transportation Agency includes the |
3 | | transportation facility in the Transportation Agency's |
4 | | respective multi-year highway
improvement program and |
5 | | designates it as a design-build project delivery method |
6 | | project or Construction Manager/General Contractor |
7 | | project; |
8 | | (B) the Transportation Agency has issued a notice of |
9 | | intent to receive qualifications, that includes a |
10 | | description of the proposed procurement and transportation |
11 | | facility, at least 14 days prior to the issuance of the |
12 | | request for qualifications, and for a Department issued |
13 | | notice of intent shall publish the notice in the Illinois |
14 | | Transportation Procurement Bulletin and for an Authority |
15 | | issued notice of intent shall publish the notice in the |
16 | | Illinois Procurement Bulletin; or |
17 | | (C) for a single phase procurement authorized under |
18 | | subsection (a) of Section 25 of this Act, the |
19 | | Transportation Agency has issued a notice of intent to |
20 | | receive proposals, that includes a description of the |
21 | | proposed procurement and transportation facility, at least |
22 | | 14 days prior to the issuance of the request for proposals, |
23 | | for a Department issued notice of intent shall publish the |
24 | | notice in the Illinois Transportation Procurement Bulletin |
25 | | and for an Authority issued notice of intent shall publish |
26 | | the notice in the Illinois Procurement Bulletin; and |
|
| | HB2755 | - 10 - | LRB100 11099 AXK 21360 b |
|
|
1 | | (2) the Transportation Agency shall use its best efforts to |
2 | | ensure that the transportation facility is consistent with the |
3 | | regional plan in existence at the time of any metropolitan |
4 | | planning organization in which the boundaries of the |
5 | | transportation facility is located, or any other |
6 | | publicly-approved plan. |
7 | | Section 25. Procurement process.
|
8 | | (a) The Transportation Agency may solicit a proposer with |
9 | | which to enter into a design-build contract or Construction |
10 | | Manager/General Contractor contract, as applicable, by using, |
11 | | without limitation, one or more requests for qualifications, |
12 | | short-listing of the most highly qualified proposers, requests |
13 | | for proposals, and negotiations. The Transportation Agency |
14 | | shall use a two-phase procurement for a design-build contract |
15 | | to select the successful proposer; provided that the |
16 | | Transportation Agency may use a single phase procurement if the |
17 | | transportation facility is estimated to cost less than |
18 | | $5,000,000 or the Secretary or the Executive Director makes a |
19 | | written determination that the Transportation Agency may use a |
20 | | single phase procurement for a particular transportation |
21 | | facility. In a two-phase procurement, the Transportation |
22 | | Agency shall use the first phase to evaluate and short-list the |
23 | | most highly qualified proposers based on a proposer's |
24 | | qualifications, and then use the second phase to evaluate and |
25 | | select a proposer based on proposals submitted by the |
|
| | HB2755 | - 11 - | LRB100 11099 AXK 21360 b |
|
|
1 | | short-listed proposers. During the first phase of a two-phase |
2 | | procurement, the Transportation Agency shall not consider |
3 | | price proposals to make its short-list decision. In a single |
4 | | phase procurement, the Transportation Agency shall solicit |
5 | | proposers with a request for proposals, and shall evaluate and |
6 | | select a proposer based on those proposals.
|
7 | | (b) The request for qualifications may contain any |
8 | | information deemed appropriate by the Transportation Agency |
9 | | including, without limitation, the following information:
|
10 | | (1) the anticipated scope of work for the |
11 | | transportation facility;
|
12 | | (2) a requirement that the proposer identify certain |
13 | | key personnel, and for design-build contracts certain key |
14 | | firms, the experience of the personnel and firms, and the |
15 | | conditions on which identified personnel and firms can be |
16 | | replaced;
|
17 | | (3) the evaluation criteria for the qualifications and |
18 | | the relative importance of those criteria; these |
19 | | evaluation criteria may address, without limitation, the |
20 | | proposer's technical and financial qualifications, such as |
21 | | specialized experience, technical competence, capability |
22 | | to perform, financial capacity, the proposer's workload, |
23 | | local office presence, past performance, including the |
24 | | proposer's safety record, and any other |
25 | | qualifications-based factors;
|
26 | | (4) the Transportation Agency's prequalification, |
|
| | HB2755 | - 12 - | LRB100 11099 AXK 21360 b |
|
|
1 | | licensing, and registration requirements, including any |
2 | | requirements from the Professional Engineering Practice |
3 | | Act of 1989, the Illinois Architecture Practice Act of |
4 | | 1989, the Structural Engineering Practice Act of 1989, and |
5 | | the Illinois Professional Land Surveyor Act of 1989, |
6 | | provided that nothing contained herein precludes the |
7 | | Transportation Agency's use of additional prequalification |
8 | | criteria or pass/fail evaluation factors addressing |
9 | | minimum levels of technical experience or financial |
10 | | capabilities;
|
11 | | (5) the maximum number of proposers the Transportation |
12 | | Agency will short-list to submit proposals; and
|
13 | | (6) any other relevant information the Transportation |
14 | | Agency deems appropriate.
|
15 | | (c) Upon completion of the qualifications evaluation, the |
16 | | Transportation Agency shall, based on the evaluation criteria |
17 | | set forth in the request for qualifications, create a |
18 | | short-list of the most highly qualified proposers. The |
19 | | Transportation Agency shall short-list no more than 5 and no |
20 | | fewer than 2 of the most highly qualified proposers. |
21 | | Notwithstanding other provisions of this subsection (c), the |
22 | | Transportation Agency may short-list fewer than 2 proposers if |
23 | | the Secretary or the Executive Director make a finding that an |
24 | | emergency situation justifies the limited short-listing and |
25 | | fewer than 2 proposers meet any applicable prequalification or |
26 | | pass/fail requirements set forth in the request for |
|
| | HB2755 | - 13 - | LRB100 11099 AXK 21360 b |
|
|
1 | | qualifications.
|
2 | | (d) The request for proposals may contain any information |
3 | | deemed appropriate by the Transportation Agency including, |
4 | | without limitation, the following information:
|
5 | | (1) the form and amount of required bid security;
|
6 | | (2) the terms of the design-build contract or |
7 | | Construction Manager/General Contractor contract |
8 | | including, but not limited to, scope and performance |
9 | | requirements, schedule or completion date requirements, |
10 | | subcontractor requirements, payment and performance |
11 | | security requirements, and insurance requirements;
|
12 | | (3) the requirements for the technical component of the |
13 | | proposal, including a description of the level of design, |
14 | | scope and type of renderings, drawings, and specifications |
15 | | to be provided in the proposals;
|
16 | | (4) the requirements for the price component of the |
17 | | proposal, which for Construction Manager/General |
18 | | Contractor contracts may include a requirement for the |
19 | | proposer to submit a lump sum price for the direct costs to |
20 | | perform the required preconstruction services and |
21 | | percentage mark-up on those direct costs;
|
22 | | (5) the evaluation criteria for the proposals, |
23 | | including technical criteria, innovation, and schedule, |
24 | | and the relative importance of those criteria, as the |
25 | | Transportation Agency deems appropriate; |
26 | | (6) a process for the Transportation Agency to review |
|
| | HB2755 | - 14 - | LRB100 11099 AXK 21360 b |
|
|
1 | | and accept Alternative Technical Concepts;
|
2 | | (7) requirements regarding the proposer's |
3 | | qualifications; and
|
4 | | (8) any other relevant information the Transportation |
5 | | Agency deems appropriate.
|
6 | | (e) Prior to the proposers' submittal of proposals, the |
7 | | Transportation Agency may conduct confidential meetings and |
8 | | exchange confidential information with proposers to promote |
9 | | understanding of the request for proposals, review Alternative |
10 | | Technical Concepts, or discuss other issues related to the |
11 | | procurement.
|
12 | | (f) The date proposals are due must be at least 28 calendar |
13 | | days after the date the Transportation Agency first issues the |
14 | | request for proposals.
|
15 | | (g) The Transportation Agency may offer to pay a stipend in |
16 | | an amount and on the terms and conditions determined by the |
17 | | Transportation Agency and as set forth in the request for |
18 | | proposals to: (1) all short-listed proposers if the |
19 | | Transportation Agency cancels the procurement before the due |
20 | | date for proposals; or (2) each unsuccessful proposer that |
21 | | submits a responsive proposal. The Transportation Agency may |
22 | | pay a stipend only to those proposers who grant to the |
23 | | Transportation Agency the right to use any work product |
24 | | contained in the unsuccessful proposer's proposal and other |
25 | | proposal-related submissions or, if the Transportation Agency |
26 | | cancels the procurement before the due date for proposals, any |
|
| | HB2755 | - 15 - | LRB100 11099 AXK 21360 b |
|
|
1 | | work product developed prior to cancellation, including |
2 | | technologies, techniques, methods, processes, and information |
3 | | contained in the recipient's design for the transportation |
4 | | facility.
|
5 | | (h) The Transportation Agency shall, as appropriate |
6 | | depending on whether the transportation facility includes |
7 | | building facilities, directly employ or retain a professional |
8 | | engineer or engineers licensed in this State or a licensed |
9 | | architect or architects, or both engineers licensed in this |
10 | | State and licensed architects, to prepare the scope and assist |
11 | | in the evaluation of the proposals' technical submissions under |
12 | | a design-build project delivery method. The professional |
13 | | engineers and licensed architects performing these services |
14 | | are generally precluded from participating in the procurement |
15 | | of the transportation facility at issue as a member of a |
16 | | proposer team.
|
17 | | (i) The Transportation Agency shall have the right to |
18 | | reject any and all qualifications or proposals, including, but |
19 | | not limited to, the right to reject any qualifications or |
20 | | proposals as non-responsive if, in the Transportation Agency's |
21 | | sole discretion, the qualifications or proposals do not meet |
22 | | all material requirements of the request for qualifications or |
23 | | request for proposals, as appropriate. The Transportation |
24 | | Agency shall not consider a proposal that does not include: |
25 | | (1) the proposer's plan to comply with requirements |
26 | | established by the Transportation Agency regarding |
|
| | HB2755 | - 16 - | LRB100 11099 AXK 21360 b |
|
|
1 | | utilization of business enterprises, including |
2 | | disadvantaged business enterprises; or |
3 | | (2) bid security in the form and amount designated in |
4 | | the request for proposals. |
5 | | (j) The Transportation Agency shall consult with the |
6 | | appropriate chief procurement officer on the design-build |
7 | | project delivery method and the Construction Manager/General |
8 | | Contractor project delivery method procurement processes, and |
9 | | the Secretary or the Executive Director, in consultation with |
10 | | the chief procurement officer, shall determine which |
11 | | procedures to adopt and apply to the design-build project |
12 | | delivery method and Construction Manager/General Contractor |
13 | | project delivery method procurement processes in order to |
14 | | ensure an open, transparent, and efficient process that |
15 | | accomplishes the purposes of this Act.
|
16 | | Section 30. Evaluation committee. |
17 | | (a) The Transportation Agency shall establish one or more |
18 | | evaluation committees to assist in selecting a design-builder |
19 | | and a Construction Manager/General Contractor. The |
20 | | Transportation Agency shall, in its sole discretion, determine |
21 | | the appropriate size and composition of the evaluation |
22 | | committee, provided that at least half of the committee must be |
23 | | licensed design professionals.
|
24 | | (b) The Transportation Agency may establish an evaluation |
25 | | committee for a set term or for the procurement of a particular |
|
| | HB2755 | - 17 - | LRB100 11099 AXK 21360 b |
|
|
1 | | transportation facility.
|
2 | | (c) Once the Transportation Agency identifies the |
3 | | proposers for a transportation facility, each member of an |
4 | | evaluation committee must certify that no conflict of interest |
5 | | exists between the member and the proposers. If the |
6 | | Transportation Agency, after consultation with the chief |
7 | | procurement officer, determines that an actual conflict |
8 | | exists, the member shall not participate on the evaluation |
9 | | committee for that procurement and the Transportation Agency |
10 | | shall appoint a replacement member on either a permanent or |
11 | | temporary basis. |
12 | | Section 35. Procedures for selection. The Transportation |
13 | | Agency shall review, evaluate, score, and rank proposals and |
14 | | determine which proposal offers the best value to the public |
15 | | based on the evaluation criteria set forth in the request for |
16 | | proposals. The Transportation Agency shall award the contract |
17 | | based on this determination. Notwithstanding other provisions |
18 | | of this Section, if for any reason the proposer awarded the |
19 | | contract is unable or unwilling to execute the contract, |
20 | | including the failure of the proposer and the Transportation |
21 | | Agency to successfully complete negotiations, if any, of the |
22 | | contract, the Transportation Agency may award the contract to |
23 | | the proposer whose proposal the Transportation Agency |
24 | | determines offers the public the next best value. |
|
| | HB2755 | - 18 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Section 40. Project records; confidentiality; public |
2 | | disclosure.
|
3 | | (a) The Transportation Agency shall maintain all written |
4 | | decisions, qualification and proposal evaluations, scoring |
5 | | documents, selection evaluations, proposals, and procurement |
6 | | documents in a procurement file maintained by the |
7 | | Transportation Agency.
|
8 | | (b) A proposer may identify those portions of a proposal or |
9 | | other submission that the proposer considers to be trade |
10 | | secrets or confidential, commercial, financial, or proprietary |
11 | | information. To consider confidential and proprietary |
12 | | information, including trade secrets, to be exempt from |
13 | | disclosure, the proposer shall do all of the following:
|
14 | | (1) request exclusion from disclosure upon submission |
15 | | of the information or other materials for which protection |
16 | | is sought;
|
17 | | (2) identify the data or other materials for which |
18 | | protection is sought;
|
19 | | (3) state the statutory or regulatory basis for the |
20 | | protection;
|
21 | | (4) fully comply with the federal Freedom of |
22 | | Information Act and any other applicable provisions of |
23 | | State law, including, but not limited to, the Freedom of |
24 | | Information Act, with respect to information the proposer |
25 | | contends should be exempt from disclosure; and
|
26 | | (5) certify if the information is in accordance with |
|
| | HB2755 | - 19 - | LRB100 11099 AXK 21360 b |
|
|
1 | | the protection of the Illinois Trade Secrets Act.
|
2 | | (c) Notwithstanding any other provision of law, in order to |
3 | | properly balance the need to maximize competition under this |
4 | | Act with the need to create a transparent procurement process, |
5 | | the qualifications, proposals, and other information and |
6 | | documents submitted by proposers and the Transportation |
7 | | Agency's evaluation records shall not be subject to release or |
8 | | disclosure by the Transportation Agency until execution of the |
9 | | design-build contract or Construction Manager/General |
10 | | Contractor contract, as applicable. If the Transportation |
11 | | Agency terminates the procurement for a transportation |
12 | | facility, the exemption from release or disclosure under this |
13 | | Section shall remain in place until the Transportation Agency |
14 | | re-procures the transportation facility and has entered into a |
15 | | design-build contract or Construction Manager/General |
16 | | Contractor contract, as applicable. However, this exemption |
17 | | shall lapse if the Transportation Agency does not commence the |
18 | | re-procurement of the transportation facility within 5 years of |
19 | | the termination.
|
20 | | Section 45. Design-build contract.
A design-build contract |
21 | | may include any provisions the Transportation Agency |
22 | | determines are necessary or appropriate, including, but not |
23 | | limited to, provisions regarding the following:
|
24 | | (1) compensation or payments to the design-builder;
|
25 | | (2) grounds for termination of the design-build |
|
| | HB2755 | - 20 - | LRB100 11099 AXK 21360 b |
|
|
1 | | contract, including the Transportation Agency's right to |
2 | | terminate for convenience;
|
3 | | (3) liability for damages and nonperformance;
|
4 | | (4) events of default and the rights and remedies |
5 | | available to the design-builder and the Transportation |
6 | | Agency in the event of a default or delay;
|
7 | | (5) the identification of any technical specifications |
8 | | that the design-builder must comply with when developing |
9 | | plans or performing construction work;
|
10 | | (6) the procedures for review and approval of the |
11 | | design-builder's plans;
|
12 | | (7) required performance and payment security;
|
13 | | (8) the terms and conditions of indemnification and |
14 | | minimum insurance requirements; and
|
15 | | (9) any other terms and conditions the Transportation |
16 | | Agency deems necessary. |
17 | | Section 50. Construction Manager/General Contractor |
18 | | contract.
|
19 | | (a) The Construction Manager/General Contractor contract |
20 | | shall divide the Construction Manager/General Contractor |
21 | | services into 2 phases. The first phase shall address |
22 | | preconstruction services and the procedures the parties shall |
23 | | follow to finalize the contract terms for the second phase. The |
24 | | second phase shall address the Construction Manager/General |
25 | | Contractor's construction of the transportation facility for a |
|
| | HB2755 | - 21 - | LRB100 11099 AXK 21360 b |
|
|
1 | | lump sum or a guaranteed maximum price.
|
2 | | (b) A Construction Manager/General Contractor contract |
3 | | shall include provisions regarding the following:
|
4 | | (1) the Construction Manager/General Contractor's |
5 | | provision of preconstruction services during the first |
6 | | phase of the contract, including the Construction |
7 | | Manager/General Contractor's compensation for those |
8 | | services;
|
9 | | (2) a requirement that, during the first phase of the |
10 | | contract, the Construction Manager/General Contractor |
11 | | shall use a competitive bidding process to procure |
12 | | subcontracts for at least the minimum percentage of |
13 | | construction work specified in the request for proposals, |
14 | | provided that: |
15 | | (A) compliance with this requirement shall be |
16 | | based on an estimated cost for the construction work |
17 | | approved by the Transportation Agency prior to the |
18 | | start of the competitive bidding process; and |
19 | | (B) the Construction Manager/General Contractor |
20 | | may not use subcontracts with its wholly or partially |
21 | | owned subsidiaries, parent companies, or affiliates to |
22 | | satisfy this obligation;
|
23 | | (3) the process the Transportation Agency and the |
24 | | Construction Manager/General Contractor shall use to |
25 | | determine a lump sum or guaranteed maximum price for the |
26 | | construction work, which shall include a requirement that |
|
| | HB2755 | - 22 - | LRB100 11099 AXK 21360 b |
|
|
1 | | the Transportation Agency conduct an independent cost |
2 | | estimate for the construction work; and
|
3 | | (4) grounds for termination of the Construction |
4 | | Manager/General Contractor contract, including the |
5 | | Transportation Agency's right to terminate the contract |
6 | | and not proceed with the construction phase of the project |
7 | | if the Transportation Agency and the Construction |
8 | | Manager/General Contractor are unable to negotiate a lump |
9 | | sum or guaranteed maximum price for the construction work.
|
10 | | (c) In addition to the provisions under subsection (b) of |
11 | | this Section, a Construction Manager/General Contractor |
12 | | contract may include any other provisions the Transportation |
13 | | Agency determines are necessary or appropriate, including, but |
14 | | not limited to, provisions regarding the following:
|
15 | | (1) liability for damages and nonperformance;
|
16 | | (2) events of default and the rights and remedies |
17 | | available to the Construction Manager/General Contractor |
18 | | and the Transportation Agency in the event of a default or |
19 | | delay;
|
20 | | (3) the identification of any technical specifications |
21 | | that the Construction Manager/General Contractor must |
22 | | comply with when aiding the Transportation Agency with |
23 | | developing plans or performing construction work;
|
24 | | (4) required performance and payment security for the |
25 | | construction phase of the contract;
|
26 | | (5) the terms and conditions of indemnification and |
|
| | HB2755 | - 23 - | LRB100 11099 AXK 21360 b |
|
|
1 | | minimum insurance requirements; and
|
2 | | (6) any other terms and conditions the Transportation |
3 | | Agency deems necessary.
|
4 | | (d) If the Construction Manager/General Contractor |
5 | | contract is terminated for any reason, the Transportation |
6 | | Agency may, in its sole discretion, re-advertise the |
7 | | Construction Manager/General Contractor contract under this |
8 | | Act or use any other authorized procurement method to complete |
9 | | the transportation facility or any portion of the |
10 | | transportation facility. Once the contract is terminated, the |
11 | | Transportation Agency may use any work product developed by the |
12 | | Construction Manager/General Contractor to complete the |
13 | | transportation facility.
|
14 | | Section 55. Funding and financing.
|
15 | | (a) The Transportation Agency may utilize any lawful source |
16 | | of funding and financing to compensate a design-builder and |
17 | | Construction Manager/General Contractor for work and services |
18 | | performed under a design-build contract or Construction |
19 | | Manager/General Contractor contract, as applicable, and the |
20 | | Transportation Agency may combine federal, State, local, and |
21 | | private funds to finance a transportation facility.
|
22 | | (b) Subject to appropriation by the General Assembly of the |
23 | | required amounts, the Transportation Agency may obligate and |
24 | | make expenditures of funds as and when needed to satisfy its |
25 | | payment obligations under a design-build contract or |
|
| | HB2755 | - 24 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Construction Manager/General Contractor contract.
|
2 | | Section 56. Utilization requirements. Design-builder and |
3 | | Construction Manager/General Contractor projects shall comply |
4 | | with Section 2-105 of the Illinois Human Rights Act and all |
5 | | applicable laws and rules that establish standards and |
6 | | procedures for the utilization of minority, disadvantaged, and |
7 | | female-owned businesses, including, but not limited to, the |
8 | | Business Enterprise for Minorities, Females, and Persons with |
9 | | Disabilities Act. |
10 | | Section 60. Acquisition of property and related |
11 | | agreements. The Transportation Agency may exercise any and all |
12 | | powers of condemnation or eminent domain, including quick-take |
13 | | powers, to acquire lands or estates or interests in land for a |
14 | | transportation facility under this Act to the extent the |
15 | | Transportation Agency finds that the action serves the public |
16 | | purpose of this Act and deems the action appropriate in the |
17 | | exercise of its powers under this Act. In addition, the |
18 | | Transportation Agency and a design-builder or Construction |
19 | | Manager/General Contractor may enter into leases, licenses, |
20 | | easements, and other grants of property interests that the |
21 | | Transportation Agency determines are necessary to deliver a |
22 | | transportation facility under this Act. |
23 | | Section 65. Federal requirements. In the procurement of |
|
| | HB2755 | - 25 - | LRB100 11099 AXK 21360 b |
|
|
1 | | design-build contracts and Construction Manager/General |
2 | | Contractor contracts, the Transportation Agency shall, to the |
3 | | extent applicable, comply with federal law and regulations and |
4 | | take all necessary steps to adapt its rules, policies, and |
5 | | procedures to remain eligible for federal aid. |
6 | | Section 70. Powers. The powers granted to the |
7 | | Transportation Agency under this Act, including the power to |
8 | | procure and enter into design-build contracts and Construction |
9 | | Manager/General Contractor contracts, shall be liberally |
10 | | construed to accomplish its purpose, are in addition to any |
11 | | existing powers of the Transportation Agency, and shall not |
12 | | affect or impair any other powers authorized under applicable |
13 | | law. |
14 | | Section 75. Rulemaking. |
15 | | (a) The Illinois Administrative Procedure Act applies to |
16 | | all administrative rules and procedures of the Transportation |
17 | | Agency under this Act, except that nothing in this Act shall be |
18 | | construed to render any prequalification or other |
19 | | responsibility criteria as a "license" or "licensing" under |
20 | | that Act. |
21 | | (b) The appropriate chief procurement officer, in |
22 | | consultation with the Transportation Agency, may adopt rules to |
23 | | carry out the provisions of this Act. |
|
| | HB2755 | - 26 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Section 905. The Department of Transportation Law of the
|
2 | | Civil Administrative Code of Illinois is amended by adding |
3 | | Section 2705-233 as follows: |
4 | | (20 ILCS 2705/2705-233 new) |
5 | | Sec. 2705-233. Design-build and Construction |
6 | | Manager/General Contractor for the transportation |
7 | | infrastructure. The Department may exercise all powers granted |
8 | | to it under the Innovations for Transportation Infrastructure |
9 | | Act, including, but not limited to, the power to enter into all |
10 | | contracts or agreements necessary or incidental to the |
11 | | performance of its powers under that Act, and powers related to |
12 | | any transportation facility implemented under that Act. |
13 | | Section 910. The Illinois Finance Authority Act is amended |
14 | | by adding Section 825-108 as follows: |
15 | | (20 ILCS 3501/825-108 new) |
16 | | Sec. 825-108. Transportation project financing. For the |
17 | | purpose of financing a transportation facility undertaken |
18 | | under the Innovations for Transportation Infrastructure Act, |
19 | | the Authority may apply for an allocation of tax-exempt bond |
20 | | financing authorization provided by subsection (m) of Section |
21 | | 142 of the United States Internal Revenue Code, as well as |
22 | | financing available under any other federal law or program. |
|
| | HB2755 | - 27 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Section 915. The Illinois Procurement Code is amended by |
2 | | adding Section 1-10.5 as follows: |
3 | | (30 ILCS 500/1-10.5 new) |
4 | | Sec. 1-10.5. Alternative Technical Concepts. |
5 | | (a) For the purposes of this Section, "Alternative |
6 | | Technical Concepts" and "design-bid-build project delivery |
7 | | method" have the meanings ascribed to those terms in the |
8 | | Innovations for Transportation Infrastructure Act. |
9 | | (b) Notwithstanding subsection (b) of Section 1-10 of this |
10 | | Code, the Department of Transportation may allow bidders and |
11 | | proposers to submit Alternative Technical Concepts in their |
12 | | bids and proposals, provided the Department determines that the |
13 | | Alternative Technical Concepts provide an equal or better |
14 | | solution than the underlying technical requirements applicable |
15 | | to the work. Notwithstanding the foregoing, for projects the |
16 | | Department delivers using the design-bid-build project |
17 | | delivery method, the Department shall only use the Alternative |
18 | | Technical Concepts process for no more than 3 projects. If the |
19 | | Department allows bidders or proposers for a particular |
20 | | contract to submit Alternative Technical Concepts, the |
21 | | Department shall describe the process for submission and |
22 | | evaluation of Alternative Technical Concepts in the |
23 | | procurement documents for that contract, including the |
24 | | potential use of confidential meetings and the exchange of |
25 | | confidential information with bidders and proposers to review |
|
| | HB2755 | - 28 - | LRB100 11099 AXK 21360 b |
|
|
1 | | and discuss potential or proposed Alternative Technical |
2 | | Concepts. |
3 | | Section 920. The Public Construction Bond Act is amended by |
4 | | adding Section 1.9 as follows: |
5 | | (30 ILCS 550/1.9 new) |
6 | | Sec. 1.9. Design-build contracts and Construction |
7 | | Manager/General Contractor contracts. This Act applies to any |
8 | | design-build contract or Construction Manager/General |
9 | | Contractor contract entered into under the Innovations for |
10 | | Transportation Infrastructure Act. |
11 | | Section 925. The Employment of Illinois Workers on Public |
12 | | Works Act is amended by adding Section 2.8 as follows: |
13 | | (30 ILCS 570/2.8 new) |
14 | | Sec. 2.8. Design build and Construction Manager/General |
15 | | Contractor contracts. This Act applies to any design build |
16 | | contracts and Construction Manager/General Contractor |
17 | | contracts entered into under the Innovations for |
18 | | Transportation Infrastructure Act. |
19 | | Section 930. The Business Enterprise for Minorities, |
20 | | Females, and Persons with
Disabilities Act is amended by adding |
21 | | Section 2.8 as follows: |
|
| | HB2755 | - 29 - | LRB100 11099 AXK 21360 b |
|
|
1 | | (30 ILCS 575/2.8 new) |
2 | | Sec. 2.8. Design build and Construction Manager/General |
3 | | Contractor contracts. This Act applies to any design-build |
4 | | contracts and Construction Manager/General Contractor |
5 | | contracts entered into under the Innovations for |
6 | | Transportation Infrastructure Act. |
7 | | Section 935. The Toll Highway Act is amended by adding |
8 | | Section 11.2 as follows: |
9 | | (605 ILCS 10/11.2 new) |
10 | | Sec. 11.2. Design-build and Construction Manager/General |
11 | | Contractor contracts. The Authority may exercise all powers |
12 | | granted to it under the Innovations for Transportation |
13 | | Infrastructure Act, including, but not limited to, the power to |
14 | | enter into all contracts or agreements necessary to perform its |
15 | | powers under that Act, and any powers related to a |
16 | | transportation facility implemented under that Act. |
17 | | Section 940. The Eminent Domain Act is amended by adding |
18 | | Section 15-5-48 as follows: |
19 | | (735 ILCS 30/15-5-48 new) |
20 | | Sec. 15-5-48. Eminent domain powers in new Acts. The |
21 | | following provisions of law may include express grants of the |
|
| | HB2755 | - 30 - | LRB100 11099 AXK 21360 b |
|
|
1 | | power to acquire property by condemnation or eminent domain: |
2 | | The Innovations for Transportation Infrastructure Act; for |
3 | | the purposes of constructing a transportation facility under |
4 | | the Act. |
5 | | Section 945. The Prevailing Wage Act is amended by changing |
6 | | Section 2 as follows:
|
7 | | (820 ILCS 130/2) (from Ch. 48, par. 39s-2)
|
8 | | Sec. 2. This Act applies to the wages of laborers, |
9 | | mechanics and
other workers employed in any public works, as |
10 | | hereinafter defined, by
any public body and to anyone under |
11 | | contracts for public works. This includes any maintenance, |
12 | | repair, assembly, or disassembly work performed on equipment |
13 | | whether owned, leased, or rented.
|
14 | | As used in this Act, unless the context indicates |
15 | | otherwise:
|
16 | | "Public works" means all fixed works constructed or |
17 | | demolished by
any public body,
or paid for wholly or in part |
18 | | out of public funds. "Public works" as
defined herein includes |
19 | | all projects financed in whole
or in part with bonds, grants, |
20 | | loans, or other funds made available by or through the State or |
21 | | any of its political subdivisions, including but not limited |
22 | | to: bonds issued under the Industrial Project Revenue Bond
Act |
23 | | (Article 11, Division 74 of the Illinois Municipal Code), the |
24 | | Industrial
Building Revenue Bond Act, the Illinois Finance |
|
| | HB2755 | - 31 - | LRB100 11099 AXK 21360 b |
|
|
1 | | Authority Act,
the Illinois Sports Facilities Authority Act, or |
2 | | the Build Illinois Bond Act; loans or other funds made
|
3 | | available pursuant to the Build Illinois Act; loans or other |
4 | | funds made available pursuant to the Riverfront Development |
5 | | Fund under Section 10-15 of the River Edge Redevelopment Zone |
6 | | Act; or funds from the Fund for
Illinois' Future under Section |
7 | | 6z-47 of the State Finance Act, funds for school
construction |
8 | | under Section 5 of the General Obligation Bond Act, funds
|
9 | | authorized under Section 3 of the School Construction Bond Act, |
10 | | funds for
school infrastructure under Section 6z-45 of the |
11 | | State Finance Act, and funds
for transportation purposes under |
12 | | Section 4 of the General Obligation Bond
Act. "Public works" |
13 | | also includes (i) all projects financed in whole or in part
|
14 | | with funds from the Department of Commerce and Economic |
15 | | Opportunity under the Illinois Renewable Fuels Development |
16 | | Program
Act for which there is no project labor agreement; (ii) |
17 | | all work performed pursuant to a public private agreement under |
18 | | the Public Private Agreements for the Illiana Expressway Act or |
19 | | the Public-Private Agreements for the South Suburban Airport |
20 | | Act; and (iii) all projects undertaken under a public-private |
21 | | agreement under the Public-Private Partnerships for |
22 | | Transportation Act ; and (iv) all transportation facilities |
23 | | undertaken under a design-build contract or a Construction |
24 | | Manager/General Contractor contract under the Innovations for |
25 | | Transportation Infrastructure Act . "Public works" also |
26 | | includes all projects at leased facility property used for |
|
| | HB2755 | - 32 - | LRB100 11099 AXK 21360 b |
|
|
1 | | airport purposes under Section 35 of the Local Government |
2 | | Facility Lease Act. "Public works" also includes the |
3 | | construction of a new wind power facility by a business |
4 | | designated as a High Impact Business under Section 5.5(a)(3)(E) |
5 | | of the Illinois Enterprise Zone Act.
"Public works" does not |
6 | | include work done directly by any public utility company, |
7 | | whether or not done under public supervision or direction, or |
8 | | paid for wholly or in part out of public funds. "Public works" |
9 | | also includes any corrective action performed pursuant to Title |
10 | | XVI of the Environmental Protection Act for which payment from |
11 | | the Underground Storage Tank Fund is requested. "Public works" |
12 | | does not include projects undertaken by the owner at an |
13 | | owner-occupied single-family residence or at an owner-occupied |
14 | | unit of a multi-family residence. "Public works" does not |
15 | | include work performed for soil and water conservation purposes |
16 | | on agricultural lands, whether or not done under public |
17 | | supervision or paid for wholly or in part out of public funds, |
18 | | done directly by an owner or person who has legal control of |
19 | | those lands.
|
20 | | "Construction" means all work on public works involving |
21 | | laborers,
workers or mechanics. This includes any maintenance, |
22 | | repair, assembly, or disassembly work performed on equipment |
23 | | whether owned, leased, or rented.
|
24 | | "Locality" means the county where the physical work upon |
25 | | public works
is performed, except (1) that if there is not |
26 | | available in the county a
sufficient number of competent |
|
| | HB2755 | - 33 - | LRB100 11099 AXK 21360 b |
|
|
1 | | skilled laborers, workers and mechanics
to construct the public |
2 | | works efficiently and properly, "locality"
includes any other |
3 | | county nearest the one in which the work or
construction is to |
4 | | be performed and from which such persons may be
obtained in |
5 | | sufficient numbers to perform the work and (2) that, with
|
6 | | respect to contracts for highway work with the Department of
|
7 | | Transportation of this State, "locality" may at the discretion |
8 | | of the
Secretary of the Department of Transportation be |
9 | | construed to include
two or more adjacent counties from which |
10 | | workers may be accessible for
work on such construction.
|
11 | | "Public body" means the State or any officer, board or |
12 | | commission of
the State or any political subdivision or |
13 | | department thereof, or any
institution supported in whole or in |
14 | | part by public funds,
and includes every county, city, town,
|
15 | | village, township, school district, irrigation, utility, |
16 | | reclamation
improvement or other district and every other |
17 | | political subdivision,
district or municipality of the state |
18 | | whether such political
subdivision, municipality or district |
19 | | operates under a special charter
or not.
|
20 | | The terms "general prevailing rate of hourly wages", |
21 | | "general
prevailing rate of wages" or "prevailing rate of |
22 | | wages" when used in
this Act mean the hourly cash wages plus |
23 | | annualized fringe benefits for training and
apprenticeship |
24 | | programs approved by the U.S. Department of Labor, Bureau of
|
25 | | Apprenticeship and Training, health and welfare, insurance, |
26 | | vacations and
pensions paid generally, in the
locality in which |
|
| | HB2755 | - 34 - | LRB100 11099 AXK 21360 b |
|
|
1 | | the work is being performed, to employees engaged in
work of a |
2 | | similar character on public works.
|
3 | | (Source: P.A. 97-502, eff. 8-23-11; 98-109, eff. 7-25-13; |
4 | | 98-482, eff. 1-1-14; 98-740, eff. 7-16-14; 98-756, eff. |
5 | | 7-16-14.)
|
6 | | Section 997. Severability. The provisions of this Act are |
7 | | severable under Section 1.31 of the Statute on Statutes.
|
8 | | Section 999. Effective date. This Act takes effect upon |
9 | | becoming law.
|
| | | HB2755 | - 35 - | LRB100 11099 AXK 21360 b |
|
| 1 | |
INDEX
| 2 | |
Statutes amended in order of appearance
| | 3 | | New Act | | | 4 | | 20 ILCS 2705/2705-233 new | | | 5 | | 20 ILCS 3501/825-108 new | | | 6 | | 30 ILCS 500/1-10.5 new | | | 7 | | 30 ILCS 550/1.9 new | | | 8 | | 30 ILCS 570/2.8 new | | | 9 | | 30 ILCS 575/2.8 new | | | 10 | | 605 ILCS 10/11.2 new | | | 11 | | 735 ILCS 30/15-5-48 new | | | 12 | | 820 ILCS 130/2 | from Ch. 48, par. 39s-2 |
|
|