 |
TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL CHAPTER I: POLLUTION CONTROL BOARD SUBCHAPTER i: SOLID WASTE AND SPECIAL WASTE HAULING
PART 813
PROCEDURAL REQUIREMENTS FOR PERMITTED LANDFILLS
The General Assembly's Illinois Administrative Code database includes only those rulemakings that have been permanently adopted. This menu will point out the Sections on which an emergency rule (valid for a maximum of 150 days, usually until replaced by a permanent rulemaking) exists. The emergency rulemaking is linked through the notation that follows the Section heading in the menu. View Entire Part
SUBPART A: GENERAL PROCEDURES
SUBPART B: ADDITIONAL PROCEDURES FOR MODIFICATION AND SIGNIFICANT MODIFICATION OF PERMITS
SUBPART C: ADDITIONAL PROCEDURES FOR THE RENEWAL OF PERMITS
SUBPART D: ADDITIONAL PROCEDURES FOR INITIATION AND TERMINATION OF TEMPORARY AND PERMANENT CLOSURE AND POSTCLOSURE CARE
SUBPART E: CERTIFICATION AND REPORTS
|
AUTHORITY: Implementing Sections 7.2, 21, 21.1, 22, 22.17, and 22.40, and authorized by Section 27 of the Environmental Protection Act [415 ILCS 5/7.2, 21, 21.1, 22, 22.17, 22.40, and 27].
SOURCE: Adopted in R88-7 at 14 Ill. Reg. 15814, effective September 18, 1990; amended in R92-19 at 17 Ill. Reg. 12409, effective July 19, 1993; expedited correction at 18 Ill. Reg. 7501, effective July 19, 1993; amended in R90-26 at 18 Ill. Reg. 12388, effective August 1, 1994; amended in R98-9 at 22 Ill. Reg. 11483, effective June 23, 1998; amended in R05-1 at 29 Ill. Reg. 5066, effective March 22, 2005; amended in R06-16/R06-17/R06-18 at 31 Ill. Reg. 1466, effective December 20, 2006; amended in R17-5 at 41 Ill. Reg. 1201, effective January 23, 2017.