(415 ILCS 5/25b) (from Ch. 111 1/2, par. 1025b)
Sec. 25b. Any person, corporation or public authority intending to
construct a nuclear steam-generating facility or a nuclear fuel
reprocessing plant shall file with the Illinois Emergency Management Agency an
environmental feasibility report which incorporates the data provided in
the preliminary safety analysis required to be filed with the United States
Nuclear Regulatory Commission. The Board may by rule prescribe the form of
such report. The Board shall have the power to adopt standards to protect
the health, safety and welfare of the citizens of Illinois from the hazards
of radiation to the extent that such powers are not preempted under the
federal constitution.
(Source: P.A. 95-777, eff. 8-4-08.)
|