(225 ILCS 705/19.04) (from Ch. 96 1/2, par. 1904)
Sec. 19.04.
The time allowed for completing such escapement shaft or making
such connections with an adjacent mine, as is required by the terms of this
Act, shall be 3 months for shafts 200 feet or less in depth, and 6 months
for shafts less than 500 feet and more than 200 feet, and 9 months for all
other mines, slopes or drifts, or connections with adjacent mines. The time
to date in all cases from the hoisting of coal from the hoisting shaft.
Provided, that in mines employing 10 men or less, the time for completing
the escapement shaft shall not be more than 6 months from the time of
hoisting coal.
(Source: Laws 1953, p. 701.)
|