(220 ILCS 5/9-217) (from Ch. 111 2/3, par. 9-217)
Sec. 9-217.
In each case or proceeding to determine the reasonableness
of rates for any electric utility which involves the proposed inclusion of
a significant new generation or production facility in rate base, the
Commission may consider the adoption of a rate moderation plan which is
designed to diminish the immediate rate impact of such proposed inclusion.
(Source: P.A. 84-617.)
|