TITLE 83: PUBLIC UTILITIES
CHAPTER I: ILLINOIS COMMERCE COMMISSION SUBCHAPTER c: ELECTRIC UTILITIES PART 466 ELECTRIC INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES FACILITIES SECTION 466.APPENDIX B CERTIFICATE OF COMPLETION
Section 466.APPENDIX B Certificate of Completion
Certificate of Completion (To be completed and returned to the EDC when installation is complete and final electric inspector approval has been obtained[1])
Interconnection Customer Information
Final Electric Inspection and Interconnection Customer Signature
The distributed generation facility is complete and has been approved by the local electric inspector having jurisdiction. A signed copy of the electric inspector's form indicating final approval is attached. The interconnection customer acknowledges that it shall not operate the distributed generation facility until receipt of the final acceptance and approval by the EDC as provided below.
Check if copy of signed electric inspection form is attached Check if copy of as built documents is attached (projects larger than 25 kW only)
The interconnection agreement is approved and the distributed generation facility is approved for interconnected operation upon the signing and return of this Certificate of Completion by EDC:
(Source: Amended at 41 Ill. Reg. 862, effective January 20, 2017) [1] Prior to interconnected operation, the interconnection customer is required to complete this form and return it to the EDC. Use contact information provided on the EDC's web page for generator interconnection to obtain mailing address/fax number/e-mail address.
|