TITLE 83: PUBLIC UTILITIES
CHAPTER I: ILLINOIS COMMERCE COMMISSION
SUBCHAPTER c: ELECTRIC UTILITIES
PART 410 STANDARDS OF SERVICE FOR ELECTRIC UTILITIES AND ALTERNATIVE RETAIL ELECTRIC SUPPLIERS
SECTION 410.155 INSTALLATION INSPECTIONS


 

Section 410.155  Installation Inspections

 

Within 90 days after installation or exchange of any meter with associated instrument transformers and/or phase-shifting transformers, a post-installation inspection shall be made under load to determine if the meter is accurately measuring customer energy consumption. At a new or re-wired metering location, where the installation includes potential transformers, the inspection shall be performed by someone other than the original installer.