Section 2120.APPENDIX A Operational and Maintenance Log
Section 2120.EXHIBIT B Steam Heating Boilers
|
|
OFFICE OF THE STATE FIRE MARSHAL
DIVISION OF BOILER & PRESSURE VESSEL SAFETY
1035 STEVENSON DRIVE
SPRINGFIELD, IL 62703-4259
(217)782-2696
FAX: (217)782-1062
|
|
Operational and
Maintenance Log
|
Building:
|
Month:
|
Year:
|
|
Steam Heating Boilers
|
Address:
|
Fuel Type:
|
Person(s) to be Notified
in Emergency (Name and Telephone No.)
|
Illinois No.:
|
CHECKS (Enter Date)
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
31
|
(1) Observe Water Level
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) Record Pressure.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(3) Record Flue Gas Temp.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHECKS (Enter Date)
|
(1) Test Low Water Cutoff
|
WEEK 1
|
WEEK 2
|
WEEK 3
|
WEEK 4
|
(2) Test Gage Glass
|
|
|
|
|
(3) Observe Flame
Condition
|
|
|
|
|
CHECKS (Enter Date)
|
(1) Manual Lift Safety
Valve
|
|
(A) Linkages
|
|
(F) Floor Drains
|
|
|
(B) Damper Controls
|
|
(G) Flame Detection Device
|
|
(2) Review Condition of
|
(C) Stop Valves
|
|
(H) Limit Controls
|
|
|
or Test Each Item
|
(D) Refractory
|
|
(I) Operating Controls
|
|
|
(E) Flue-Chimney Breeching
|
|
|
|
(3) Inspect Fuel Piping
|
|
|
|
(4) Combustion Air Adequate/Unobstructed
|
|
|
|
General Comments:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Source: Added at 23 Ill. Reg. 162, effective January 1, 1999)