TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE J: CLEAN CONSTRUCTION OR DEMOLITION DEBRIS CHAPTER I: POLLUTION CONTROL BOARD PART 1100 CLEAN CONSTRUCTION OR DEMOLITION DEBRIS FILL OPERATIONS AND UNCONTAMINATED SOIL FILL OPERATIONS SECTION 1100.525 PROCEDURES FOR CLOSURE
Section 1100.525 Procedures for Closure
a) Notification of Closure The owner or operator must provide written notification to the Agency within 30 days after the owner or operator begins closure in accordance with the closure plan required by Section 1100.510(h) and the closure requirements of Section 1100.208.
b) Certification of Closure When the closure of the facility is complete, the owner or operator must submit to the Agency:
1) Documentation concerning closure of the facility, including, but not limited to, plans or diagrams of the facility as closed and the date closure was completed.
2) An affidavit by the owner or operator and the seal of a PE or PG that the facility has been closed in accordance with the closure plan required by Section 1100.510(h) and the closure requirements of Section 1100.208.
(Source: Added at 36 Ill. Reg. 13892, effective August 27, 2012) |