SECTION 742.315 SOIL INGESTION EXPOSURE ROUTE


 

Section 742.315  Soil Ingestion Exposure Route

 

The soil ingestion exposure route may be excluded from consideration if:

 

a)         The requirements of Sections 742.300 and 742.305 are met;

 

b)         An approved engineered barrier is in place that meets the requirements of Subpart K;

 

c)         Safety precautions for the construction worker are taken if the Tier 1 construction worker remediation objectives are exceeded; and

 

d)         An institutional control, in accordance with Subpart J, will be placed on the property.

 

(Source:  Amended at 25 Ill. Reg. 10374, effective August 15, 2001)