TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL CHAPTER I: POLLUTION CONTROL BOARD SUBCHAPTER f: RISK BASED CLEANUP OBJECTIVES PART 742 TIERED APPROACH TO CORRECTIVE ACTION OBJECTIVES SECTION 742.315 SOIL INGESTION EXPOSURE ROUTE
Section 742.315 Soil Ingestion Exposure Route
The soil ingestion exposure route may be excluded from consideration if:
a) The requirements of Sections 742.300 and 742.305 are met;
b) An approved engineered barrier is in place that meets the requirements of Subpart K;
c) Safety precautions for the construction worker are taken if the Tier 1 construction worker remediation objectives are exceeded; and
d) An institutional control, in accordance with Subpart J, will be placed on the property.
(Source: Amended at 25 Ill. Reg. 10374, effective August 15, 2001) |