TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE C: WATER POLLUTION CHAPTER II: ENVIRONMENTAL PROTECTION AGENCY PART 371 REQUIREMENTS FOR PLANS OF OPERATION AND OPERATION AND MAINTENANCE MANUALS SECTION 371.200 INTRODUCTION
Section 371.200 Introduction
a) An O&M Manual provides long term, facility-specific guidance for all persons responsible for facility operation and maintenance.
b) An O&M Manual is required for all Step 3 state and federal construction grant projects.
c) O&M Manuals shall be submitted as follows:
1) One draft copy of the O&M Manual must be submitted to the Agency and approved before 50% of the grant payment of a Step 3 grant can be made.
2) Two final copies of the O&M Manual must be submitted to the Agency and approved before 90% of the grant payment of a Step 3 grant can be made.
3) All O&M Manuals must be sent for review to:
Illinois Environmental Protection Agency Division of Water Pollution Control Grant Administration Section 2200 Churchill Road Springfield, Illinois 62706 |