TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE C: WATER POLLUTION
CHAPTER II: ENVIRONMENTAL PROTECTION AGENCY
PART 371 REQUIREMENTS FOR PLANS OF OPERATION AND OPERATION AND MAINTENANCE MANUALS
SECTION 371.200 INTRODUCTION


 

Section 371.200  Introduction

 

a)         An O&M Manual provides long term, facility-specific guidance for all persons responsible for facility operation and maintenance.

 

b)         An O&M Manual is required for all Step 3 state and federal construction grant projects.

 

c)         O&M Manuals shall be submitted as follows:

 

1)         One draft copy of the O&M Manual must be submitted to the Agency and approved before 50% of the grant payment of a Step 3 grant can be made.

 

2)         Two final copies of the O&M Manual must be submitted to the Agency and approved before 90% of the grant payment of a Step 3 grant can be made.

 

3)         All O&M Manuals must be sent for review to:

 

Illinois Environmental Protection Agency

Division of Water Pollution Control

Grant Administration Section

2200 Churchill Road

Springfield, Illinois 62706