Section
225.465 Clean Air Set-Aside (CASA) Allowances
a) The CAIR NOx
allowances for the CASA for each control period will be assigned to the
following categories of projects:
|
|
Phase I
|
Phase II
|
(2009-2014)
|
(2015 and thereafter)
|
1)
|
Energy
Efficiency and Conservation/Renewable Energy
|
9149
|
7625
|
2)
|
Air
Pollution Control Equipment Upgrades
|
3811
|
3175
|
3)
|
Clean
Coal Technology
|
4573
|
3810
|
4)
|
Early
Adopters
|
1525
|
1271
|
b) The following formulas
must be used to determine the number of CASA allowances that may be allocated
to a project per control period:
1) For an energy efficiency
and conservation project pursuant to Section 225.460(a)(1) through (a)(4)(A),
the number of allowances must be calculated using the number of megawatt hours
of electricity that was not consumed during a control period and the following
formula:
A
|
=
|
(MWhc)
΄ (1.5 lb/MWh) / 2000 lb
|
Where:
A
|
=
|
The
number of allowances for a particular project.
|
MWhc
|
=
|
The
number of megawatt hours of electricity conserved or generated during a
control period by a project.
|
2) For a zero emission
electric generating project pursuant to Section 225.460(b)(1), the number of
allowances must be calculated using the number of megawatt hours of electricity
generated during a control period and the following formula:
A
|
=
|
(MWhg)
΄ (2.0 lb/MWh) / 2000 lb
|
Where:
A
|
=
|
The number of allowances for a
particular project
|
MWhg
|
=
|
The
number of megawatt hours of electricity generated during a control period by
a project.
|
3) For a renewable energy
emission unit pursuant to Section 225.460(b)(2), the number of allowances must
be calculated using the number of MWhs of electricity generated during a
control period and the following formula:
A
|
=
|
(MWhg)
΄ (0.5 lb/MWh) / 2000 lb
|
Where:
A
|
=
|
The
number of allowances for a particular project.
|
MWhg
|
=
|
The
number of MW hours of electricity generated during a control period by a
project.
|
4) For an air pollution
control equipment upgrade project pursuant to Section 225.460(c)(1), the number
of allowances will be calculated as follows:
A) For NOx or SO2
control projects, by determining the difference in emitted NOx or SO2
per control period using the emission rate before and after replacement or
improvement, and the following formula:
A
|
=
|
(MWhg)
΄ K ΄ (ERB lb/MWh - ERA lb/MWh) / 2000 lb
|
Where:
A
|
=
|
The
number of allowances for a particular project.
|
MWhg
|
=
|
The number
of megawatt hours of electricity generated during a control period by a
project.
|
K
|
=
|
The
pollutant factor: for NOx, K= 0.1; and for SO2, K =
0.05.
|
ERB
|
=
|
Average
NOx or SO2 emission rate based on CEMS data from the
most recent two control periods prior to the replacement or improvement of
the control equipment in lb/MWh, unless subject to a court order or consent
decree. For units subject to a court order or consent decree entered into
before May 30, 2006, ERB is limited to emission rates that are
lower than the emission rate required in the consent decree or court order.
For a court order or consent decree entered into after May 30, 2006, ERB
is limited to the lesser of the emission rate specified in the court order or
consent decree or the actual average emission rate during the control
period. If such limit is not expressed in lb/MWh, the limit must be
converted into lb/MWh using a heat rate of 10 mmBtu/1 MW.
|
ERA
|
=
|
Annual
NOx or SO2 average emission rate for the applicable
control period data based on CEMS data in lb/MWh.
|
B) For a baghouse project:
A
|
=
|
(MWhg)
΄ (Q lb/MWh)
/ 2000 lb
|
Where:
A
|
=
|
The
number of allowances for a particular project.
|
MWhg
|
=
|
The number
of MWh of electricity generated during a control period or the portion of a
control period that the units were controlled by the baghouse.
|
Q
|
=
|
If a baghouse was not
installed pursuant to a consent decree or court order, 0.2.
If a baghouse was installed
pursuant to a consent decree or court order that assigns a Q factor, the
factor established in the consent decree or court order but must not exceed a
factor of 0.2.
If a baghouse was installed
pursuant to a consent decree or court order that does not assign a Q factor, then
Q shall equal:
Q
= 0.25 - (P ΄ ERq)
|
Where:
P
|
=
|
If the
most recent control period's average PM emission rate was based on PM CEMS
data, 1.0; otherwise 1.1.
|
ERq
|
=
|
The
magnitude of the most recent control period's average PM emission rate in
lb/MWh exiting the baghouse, subject to the following limits:
|
|
If P
|
=
|
1.0,
then 1/10 ≤ ERq ≤ 2/10
|
|
|
If P
|
=
|
1.1,
then 1/11 ≤ ERq ≤ 2/11
|
|
If the ERq is less
than the lower limit, the lower limit shall be used.
|
If ERq is greater
than the upper limit, the upper limit shall be used.
|
If ERq is not
expressed in lb/MWh, the number must be converted to lb/MWh using a heat rate
of 10 mmBtu/1 MW.
|
5) For highly efficient
power generation and clean coal technology projects:
A) For projects other than
fluidized coal combustion pursuant to Section 225.460(a)(4)(B), (a)(4)(C), and
(c)(2), the number of allowances must be calculated using the number of MWh of
electricity the project generates during a control period and the following
formula:
A
|
=
|
(MWhg)
΄ (1.0 lb/MWh - ER lb/MWh) / 2000 lb
|
Where:
A
|
=
|
The
number of allowances for a particular project.
|
MWhg
|
=
|
The
number of megawatt hours of electricity generated during a control period by
a project.
|
ER
|
=
|
Annual
average NOx emission rate based on CEMS data in lb/MWh.
|
B) For fluidized bed coal
combustion projects pursuant to Section 225.460(c)(2), the number of allowances
shall be calculated using the number of gross MWh of electricity the project
generates during a control period and the following formula:
A
|
=
|
(MWhg)
΄ (1.4 lb/MWh - ER lb/MWh) / 2000 lb
|
Where:
A
|
=
|
The
number of allowances for a particular project.
|
MWhg
|
=
|
The
number of gross MWh of electricity generated during a control period by a
project.
|
ER
|
=
|
Annual
NOx emission rate for the control period based on CEMS data in lb/MWh.
|
6) For a CASA project that
commences construction before December 31, 2012, in addition to the allowances
allocated pursuant to subsections (b)(1) through (b)(5) of this Section, a
project sponsor may also request additional allowances pursuant to the early
adopter project category pursuant to Section 225.460(e) based on the following
formula:
Where:
A
|
=
|
The
number of allowances for a particular project as determined in subsections
(b)(1) through (b)(5) of this Section.
|
Ai
|
=
|
The
number of allowances as determined in subsection (b)(1), (b)(2), (b)(3), (b)(4)
or (b)(5) of this Section for a given project.
|
(Source:
Added at 31 Ill. Reg. 12864, effective August 31, 2007)