TITLE 35: ENVIRONMENTAL PROTECTION
SUBPART A: PERMITS
SUBPART B: DESIGN CRITERIA |
AUTHORITY: Authorized by and implementing Section 13(a)(3) of the Environmental Protection Act [415 ILCS 5/13(a)(3)].
SOURCE: Filed with the Secretary of State December 20, 1977, effective December 20, 1977; codified at 6 Ill. Reg. 13019, effective October 12, 1982; amended at 21 Ill. Reg. 12439, effective August 28, 1997.
SUBPART A: PERMITS
Section 374.101 Introduction
These design criteria are to be used by the Illinois Environmental Protection Agency in reviewing 35 Ill. Adm. Code 309, Subpart B permit applications for pressure sewer systems including grinder pump systems and septic tank effluent pumping (STEP) systems.
(Source: Amended at 21 Ill. Reg. 12439, effective August 28, 1997)
Section 374.102 Conventional System Preference
If possible, the development proposed shall be served by a conventional sewer system. A conventional sewer system is defined as gravity sewers or a conventionally designed pumping station.
(Source: Amended at 21 Ill. Reg. 12439, effective August 28, 1997)